Substation 400V Switchboard Test Form Document Number: ECP 11-0216

HYOSUNG CORP
Date:

SUBSTATION LV SWITCHBOARD TEST FORM

Substation Name
Substation Number
Switchboard

General Data

Serial Number
Manufacturer
Manufacturer Type Reference
Service Voltage V
Busbar Current Rating A
Fault rating kA
Short Time Rating s

General Checks

Prove tightness of all fastenings ()


Insulation to earth MΩ
Insulation between phases MΩ
Earthing connections ()
Circuit and switchboard labelling ()
Interlocks ()
Phasing and phase colouring of incoming and outgoing circuits ()
Fuse ratings ()
Correct operation and indication of fuse-switches ()

Wiring Inspection (where circuit-breakers and contactors with automatic


( or n/a)
operation are installed)
Insulation resistance (see test form ECP 11-0301)
Wiring checked to circuit diagram number …………………………
Wiring checked to wiring diagram number …………………………
Correct operation of contactors where supplied
Instruments and metering where supplied (see test form ECP 11-0221)
Protection where supplied (see appropriate test forms in 3.x series)

Operational Tests ( or n/a)


Overall check of automatic scheme (where applicable)
Substation 400V Switchboard Test Form Document Number: ECP 11-0216
HYOSUNG CORP
Date:

Comments

Test Equipment

Purpose Make/Type Serial Number

Certification ()

All tests have been completed satisfactorily

Contractor Commissioning Engineer (if applicable)