Professional Documents
Culture Documents
Mechanism
measures
effective in planned
Objective Process Risk/s Likelihood Consequence Risk Level Intended Preventive Mechanism minimizing the control
required in
level of risk? future?
measures?
Inappropriate level of
To be able to Maintain proper ventilation and a cold
Temperature, Lighting and UNLIKELY MODERATE LOW
keep the temperature.
Preservation and Humidity
collection in
conservation of materials
good
condition. Biological Infestation POSSIBLE MODERATE MEDIUM Maintain clean environment.
Lack of fiction books POSSIBLE MODERATE LOW Acquisition of recent fiction books.
Notes: 1) Always refer to the attached Risk Matrix in filling-up the form.
2) Rate likelihood, consequence and risk level quantitatively and qualitatively.
3) Increase or Insert rows as you add additional process/es.
4) You may ask assistance in the QM staff in the use of the template.
QMO-F-013
& Monitoring
Are further
control
measures
R
required in E
future? M
A
R
K
NO S
ST. PAUL UNIVERSITY SURIGAO QM
Cor. San Nicolas & Rizal Streets, Surigao City
Preventive Mechanism
Have there
Date Completion of
Are the
been any
planned
control changes to Are further
Process Risk/s Likelihood Consequence Risk Level Intended Preventive Mechanism measures the planned control
sufficient and control measures
effective in measures? required in
minimizing the future?
level of risk?
Objective YES NO YES NO YES
HW/SW Component
failure Replace computer component; Requests computer
(3) Possible (2) Minor Medium component; Installation of software.
Misuse of software and Ensure proper installation of security and network
hardware systems; Conduct training or orientation for
(2) Unlikely (2) Minor Low computer users
Unauthorized deletion Installation of computer program or system
or modification (2) Unlikely (2) Minor Low capable of preventing deletion/modification.
To ensure infiltration of Viruses,
good working Preventive Installation of computer anti-virus and ensuring
Trojan horses, or
performance Maintenance of worms that anti virus are updated; conduct regular
of university- University-wide (4) Likely (3) Moderate High monitoring and scanning of computer workstations.
wide
computer computer Fires, floods, or Develop and implement evacuation plan in case of
workstations. workstations earthquakes (3) Possible (3) Moderate High fire, floods, or earthquakes
Computer hardware
& software failure Diagnose computer HW/SW failure and replace if
(4) Likely (2) Minor Medium needed/re-install softwareif needed.
Note : Rate likelihood, consequence and risk level quantitatively and qualitatively.
QMO-F-013
& Monitoring
Are further R
control E
measures M
required in A
future? R
K
NO S
ST. PAUL UNIVERSITY SURIGAO QMO-F-01
Cor. San Nicolas & Rizal Streets, Surigao City
Mechanism
effective in planned control
Process Risk/s Likelihood Consequence Risk Level Intended Preventive Mechanism minimizing the control measures
level of risk? measures? required in
future?
Note : Rate likelihood, consequence and risk level quantitatively and qualitatively.
QMO-F-013
& Monitoring
Are further R
control E
measures M
required in A
future? R
K
NO S