CASE STUDY
MOHD. ABDUL MATHEEN (69)
MOHD. SHATEEB (70)
MITHUL SANGHI (68)
SUBHASH KINI (62)
KAUSTUBH SHARMA (51)
MOHITH RAI SRIVASTAV (71)
SRIVATSA KADIYALA (47)
HYDERABAD METRO RAIL PROJECT
Y
RA
ET
I
B IH
O
C
EDUC S
AL
NO I
AT
Transportation in a metro city is a major issue for the Government of Telangana, and Hyderabad is not an exception to this rule. Keeping this
in view, the Hyderabad Metro Rail is being developed as one of the largest modern transport systems in the world based upon the PPP KEY POINTS :
model.
The main idea behind the concept of Metro Rail is to make sure commuters reach on time to work and not delayed on account of lack of
rapid transport. Growing urbanisations has led to innumerable problems for commuters who are delayed on account of traffic jams. Metro
Rail will allow them to bypass these traffic congestion barriers.
Construction Company
INTRODUCTION
REMARKS :
Concessionaire's Engineer
SIGN :
GROUP.NO : SHEET.NO :
01 01
Need of Metro Rail for Hyderabad City Corridor I: Miyapur - LB Nagar : 29 kms; 27 stations.
-Its population stands at 8 million and is projected to touch 13.6 million by 2021.
Y
RA T
U
I
E
B IH
O
C
EDU S
AL
NOI
CAT
addition of 0.20 million vehicles every year. Corridor III: Nagole - Shilparamam : 28 kms; 23 stations. 86, Madhapur, Hitech City Road,
Jubilee Hills,Hyderabad-33
-8 million motorised trips are made every day, of which, only about 3.2 million or
KEY POINTS :
40% are made by the Public Transportation System (PTS) i.e. buses and local trains.
That means the rest of the trips are made by personal vehicles leading to traffic
bottlenecks, high pollution levels and a steep increase in fuel consumption.
-A people-friendly city is that which provides a good quality of life. An efficient, safe,
reliable and comfortable public transportation system is one of the pre-requisites of good living.
-The increasing pressure of the burgeoning population is putting Hyderabad's Transportation
System under constant pressure. The need of the hour is a robust system that is dependable,
comfortable, affordable and sustainable.
The answer lies in Mass Rapid Transit System (MRTS). Accordingly, the development of Metro Rail
HYDERABAD
was approved for 72 km., covering three high density traffic corridors of Hyderabad. The Project METRO
is being developed on DBFOT basis in PPP mode. STATION
GROUP.NO : SHEET.NO :
01 02
Station Concept: Technical Influence: Commuter Facilities:
Y
RA T
U
I
E
B IH
O
C
EDU S
AL
NOI
CAT
are tastefully designed reflecting local culture and track geometry, operational requirements, Vending Machines making ticketing process simpler and faster. Jubilee Hills,Hyderabad-33
flavour, functional aesthetics, user friendly, predicted passenger flows, ROW availability and
Pedestrian facilities from the road to the concourse/car park and/or to the ticket KEY POINTS :
energy efficient and with a station architecture electrical & mechanical requirements.
counters and back shall have been provided to enable unhindered smooth flow
that is site specific and environmentally The station is divided into public & non-public of pedestrians using the Metro and making the commuting experience
compatible. areas (areas where access is restricted). comfortable.
The design identifies significant architectural Architectural planning, also indicates, State of art, Toilets are provided separate for male and female and for disabled and normal
features which should be taken into account. Railway engineering equipment's installations at passengers.
Along with a responsive design stations offer station concourse level for smooth Metro Rail
various facilities for the passengers. Facilities for disabled are provided at all stations for their safe movement from
operations and Passenger Safety.
parking areas to the platforms and back. Lifts and escalators are also provided at
Stations will be covered by an overlapping roofing Station Manager is located at convenient place Stations for the use of passengers including the physically challenged.
system, open at sides, covering the platform, with ease of access, if any passenger desire
staircases & escalators designed based on Facility of vending mineral water, cool drinks, coffee and tea shall be provided at
instant helps.
architectural elements and functional aspects. all Stations.
Other retail areas which would enhance the experience of the rider have also
HYDERABAD
been integrated in station planning.
METRO
Public access telephones will be provided at all Stations at convenient locations. STATION
Major facilities at depots are:
CONCEPT
AND
-Automatic train wash plant FACILITIES
-Offices
-Depot control center
REMARKS :
-Covered & open Stabling lines
-Infrastructure maintenance facilities
SIGN :
-Electrical & Mechanical workshops
-Electronic repair shops
ARCHITECTURAL DESIGN
GROUP.NO : SHEET.NO :
01 03
LOCATION
Y
RA
ET
I
B IH
O
C
EDU S
AL
NO I
CAT
Phase I : HYDERABAD
METRO RAIL
Three Corridors of Hyderabad Metro Rail are :
Phase II :
The Government sanctioned second phase of REMARKS :
metro rail extending further 85 km. The proposed
routes are as following:
SIGN :
Miyapur - BHEL - Patancheru 15 km.
Falaknuma - Shamshabad RGI Airport 12 km. ARCHITECTURAL DESIGN
GROUP.NO : SHEET.NO :
01 04
NAGOLE METRO STATION
Y
ET
UR
I
AB O
IH C
EDU S
AL
NO I
CAT
-> The Metro Corridor III : Nagole to Shilparamam , runs 28 km having 23 stations. KEY POINTS :
CORRIDOR III ROUTE -> Nagole Metro Station is the last station of Corridor III.
-> Being the last station, the Hyderabad Metro Rail Uppal Depot is also situated beside the station.
-> Metros slopes down to the depot between 12:00 am to 4:00 am.
-> Proposed Site for the Elevated station is 200 x 60 m i.e., 12000 sqm.
-> No Underground Station is being built due to the hard and tough
rocky terrain of Hyderabad.
NAGOLE
METRO
The Mother Depot cum workshop STATION
and garage, sheds the metro
trains with high class
maintenance and servicing.
INTRODUCTION
Even has the main power
station and train control unit
SCALE :
which carries the technical and
mechanical part. Reasons for the selection of this site :
-> This coincides with the peripheral circle of the city, and been
proposed as the last station or terminal end REMARKS :
Y
RA T
U
I
E
B IH
O
C
EDU S
AL
NO I
CAT
Location :
NAGOLE
Situated on the : METRO
STATION
Inner Ring Rd
Saraswathi Colony, Uppal
Hyderabad, Telangana. SITE LOCATION
&
Pin code - 500039. ANALYSIS
SCALE :
Google Co-ordinates :
REMARKS :
Lattitude - 17°23'25.4"N
Longitude - 78°33'31.8"E
SIGN :
Geographical Features :
Orientation : ARCHITECTURAL DESIGN
B.ARCH 6th SEMESTER
- 100 m away from the station. - 200 m away from the site
01 02
S
Y
STATION TYPE & STRUCTURE :
UR
ET
I
AB O
IH C
EDUC S
AL
NO I
AT
PIER
PIER ARM
PEDESTAL
GAPS ARE FILLED
BY PRESSURE GROUTING
PIER CAP
NAGOLE
METRO
STATION
INTER-LOCKING
VIADUCT SEGMENTS
PIER/COLUMN
STATION TYPE
&
STRUCTURE
CRASH BARRIER SCALE :
ARCHITECTURAL DESIGN
B.ARCH 6th SEMESTER
3rd YEAR (2013-2018)
-> ELEVATED GUIDEWAY STRUCTURE.
S . V . C . A , MADHAPUR.
GROUP.NO : SHEET.NO :
01 03
STREET LEVEL PLAN
Y
RA T
U
I
E
B IH
O
C
EDU S
AL
NO I
CAT
PLAN
SIDE-WALK SIDE-WALK
REMARKS :
SIGN :
ARCHITECTURAL DESIGN
ELEVATOR
B.ARCH 6th SEMESTER
STAIR-CASE, ESCALATOR, RETAIL AREA
ELEVATOR 3rd YEAR (2013-2018)
S . V . C . A , MADHAPUR.
STAFF
-- CORRIDOR ---> STAFF
UNPAID UNPAID
PAID AREA UNPAID AREA AREA
PAID
AREA
STAFF AREA
-- CORRIDOR --->
TOILET
01 04
Furniture on the Walkways :
Y
T
U
I
AB
E
R
O
IH C
EDU S
AL
NO I
CAT
Elevator :
NAGOLE
METRO
STATION
Circulation Standards :
FURNITURE
&
Stair-case : Escalator : STANDARDS
SCALE :
REMARKS :
SIGN :
ARCHITECTURAL DESIGN
B.ARCH 6th SEMESTER
3rd YEAR (2013-2018)
S . V . C . A , MADHAPUR.
GROUP.NO : SHEET.NO :
01 05
CONCOURSE LEVEL PLAN
Y
RA T
U
I
E
B IH
O
C
EDU S
AL
NO I
CAT
2.5 m wide
1.4 m wide
ELEVATOR 2.5 m wide
KEY POINTS :
Skywalk Width
4.15 m wide
Skywalk Width
4.55 m wide
TICKET EMERG.
OFFICE POWER
2.5 x 5.3 m SUPPLY
-- 3m WIDE CORRIDOR ---> EXCESS FARE ROOM
5.6 x 3.5 m
ELECTRICAL
ACCESS HATCH
UNPAID PAID UNPAID ELECTRICAL
SHAFT SHAFT
PHE / FP
AREA AREA AREA PHE / FP
SHAFT STAFF ROOM SHAFT
6.5 x 2.6 m
STATION CONTROL ROOM
3.5m wide 3.2 x 10.5 m -- 3m WIDE CORRIDOR --->
corridor SIGNALLING EQUIPMENT TICKET
1:12 ramp 1:6 ramp ROOM OFFICE
2.5 x 5.3 m
9.7 x 5.6 m
FEMALE TOILET
UPS ROOM
1.6 x 3.5 m
1.75m wide
corridor
6.5 x 4.6 m
TICKET
SPACE FOR 1.5m wide REFUGE
VENDING RETAIL 4
PH TOILET ACCESS LADDER MACHINES
RETAIL 1 RETAIL 2 RETAIL 3 AREA - 2
1.6 x 1.6 m 6.9 x 6.3 m
TELECOM EQUIPMENT 1 x 2.3 m ESCALATOR
ESCALATOR 6.9 x 6.3 m 6.9 x 6.3 m 6.9 x 6.3 m 1.4 x 8.7 m
1.4 m wide
1.4 m wide
ROOM STATION CLEANER'S REFUSE
STAIRCASE
MALE TOILET CLEAN GAS 9.7 x 4.7 m MANAGER STAIRCASE ROOM ROOM
1.0 x 1.5 m 4.8 x 2.3 m BATTERY ROOM ROOM ROOM 2.4 m wide LIFT - 2
1.9 x 2.4 m 1.5 x 2.4 m
2.4 m wide
6.5 x 2.8 m 3.3 x 3 m CASH ROOM 3.6 x 2.4 m 3x2m
CABLE TRAY SPACE
CABLE TRAY SPACE
4 x 1.5 m 0.75 x 1.5 m 0.75 x 1.5 m
Skywalk Width
4.15 m wide
NAGOLE
RETAIL
12.25 x 10.5 m
RETAIL
12.25 x 10.5 m METRO
STAIRCASE
4.88 m wide
ELEVATOR STAIRCASE
4.88 m wide
STATION
SCALE :
REMARKS :
SIGN :
GROUP.NO : SHEET.NO :
Y
ET
U
I
AB
R
O
IH C
EDUC S
AL
NO I
AT
139.2500
KEY POINTS :
ELEVATOR
HOSE
STAIR CASE STAIR CASE
ESCALATOR ESCALATOR
1.4 m wide 1.4 m wide
TRACK - 1
-- 6.5 m WIDE PLATFORM ---> PLATFORM - 1
-- 1.4 m WIDE TRACK --->
TRACK - 2
-- 6.5m WIDE PLATFORM --->
PLATFORM - 2
ESCALATOR ESCALATOR
1.4 m wide 1.4 m wide
STAIR CASE STAIR CASE HOSE
ELEVATOR
NAGOLE
METRO
SIDE RAIL STATION
PLATFORM
TRACK
LANE
VIADUCT PLATFORM
LEVEL PLAN
SCALE :
Section
Track
REMARKS :
SIGN :
ARCHITECTURAL DESIGN
B.ARCH 6th SEMESTER
3rd YEAR (2013-2018)
S . V . C . A , MADHAPUR.
GROUP.NO : SHEET.NO :
01 07
S
Y
RA
ET
U
I
B IH
O
C
EDU S
AL
NO I
CAT
KEY POINTS :
CORRIDORS : 2 CORRIDORS ADDS UP TO 70 km CONSISTING 3 CORRIDORS ADDS UP TO 72 km CONSISTING HYDERABAD METRO RAIL HAS A BETTER
OF 47 STATIONS IN A LINEAR PATH. OF 64 STATIONS IN RADIAL MANNER, WITH PHASING THAN DUBAI.
INTER-CONNECTIONS AT CENTRAL ZONE. -> MORE STATIONS INCREASES THE PROXIMITY.
-> RADIAL PHASING CENTRALIZING THE
COMMUTERS.
ECONOMY : 52,140 CRORES FOR A POPULATION OF 2.5 APPX. 20,000 CRORES FOR A POPULATION OF HMR IS WAY MORE ECONOMICAL.
MILLION. 10 MILLION.
SUSTAINABILITY : AIR-CONDITIONED METRO PROJECT USING HEAT DESIGNED THE PROJECT WITH GREEN CITY HMR IS SUSTAINABLE AND ECO-FRIENDLY.
REFLECTING MATERIALS IN HOTTER CITY AND AS THE MAIN GOAL.
OVER-CONSUMPTION OF MINERALS & OPEN & SPACIOUS DESIGN WITH NATURAL
RESOURCES. VENTILATION AND LIGHTING, NON-AC ,
POLLUTION-FREE , ECO-FRIENDLY.
STANDARDS :
STAIRCASE : REMARKS :
WIDTH : 2.5 to 3.5 m WIDTH : 3 m WIDTH : 2.5 m
TREAD WIDTH : 30-40 mm TREAD WIDTH : 35 mm TREAD WIDTH : 30 mm STANDARD SIZES
RISER HEIGHT : 15-20 mm RISER HEIGHT : 15 mm RISER HEIGHT : 15 mm
HANDRAIL : 900-1000 mm HANDRAIL : 900 mm HANDRAIL : 1200 mm
SIGN :
HEADROOM : 3 m HEADROOM : 3 m HEADROOM : 3 m
ARCHITECTURAL DESIGN
GROUP.NO : SHEET.NO :
01 08
SITE PROPOSAL
TY
U
AB I E
R
O
IH C
EDU S
AL
NOI
CAT
KEY POINTS :
THE PROPOSED SITE IS APT FOR THE DEVELOPMENT AROUND
A TRANSIT HUB. THE FOLLOWING MAKES IT SUITABLE :-
SITE PROPOSAL
SCALE :
REMARKS :
SIGN :
ARCHITECTURAL DESIGN
B.ARCH 6th SEMESTER
3rd YEAR (2013-2018)
S . V . C . A , MADHAPUR.
GROUP.NO : SHEET.NO :
01 01