The American Institute of Architects (AIA) has published standard form agreements since 1888. AIA
Contract Documents have long been viewed as the industry standard in reflecting current industry
practices and fairly balancing the risks and responsibilities of all project participants. To keep up with
legal and practice developments, this year the AIA released its 2017 documents that included revisions to
its owner-contractor agreements, architect scope documents, and the creation of a sustainability exhibit.

Insurance and Bonds Exhibit

To create a more expansive and flexible set of insurance requirements, the new Insurance and Bonds
Exhibit distinguishes between required coverages and optional coverages. Required coverages for the
contractor include commercial general liability coverage, auto liability coverage, workers’ compensation
and employers’ liability coverage, and other coverages based on the type of project. Optional insurance
coverages include railroad protective liability insurance; asbestos abatement liability insurance; and
insurance for physical damage to property while in storage or transit.

While the substantive terms pertaining to insurance requirements between the owner and contractor are
set forth in the Insurance and Bonds Exhibit, A201–2017 still includes key insurance-related terms that
are applicable to virtually all projects.

Among the revisions to Article 11 of A201, is the removal of the requirement that the contractor provides
certificates of insurance with an obligation on the part of the insurer to notify the owner of a pending
lapse in insurance. Accordingly, A201–2017 now requires that the owner and contractor each provide the
other with notice of an impending or actual cancellation or expiration of insurance coverage.

The new exhibit allows the parties to develop specific insurance requirements for any particular project.
For basic insurance and bond coverage, the parties will insert claims and policy limits for certain basic
coverages, and the penal sum for required bonds. However, the new exhibit also prompts the parties to
consider additional insurance coverages that might be warranted, depending on the nature of the project
and particular risks that might be encountered. The exhibit can be easily transmitted to each party’s
insurance and bond advisor(s) or broker(s) for evaluation and completion. Additionally, all insurance and
bonds obtained for the project are required to be purchased from companies lawfully authorized to issue
insurance or surety bonds in the jurisdiction where the project is located.

AIA Scope Documents

The AIA’s C203-2017 commissioning scope now allows the commissioning agent to be involved in the
early stages of the project, working with the design and construction team throughout. It is also no longer
an “architect only” scope, and commissioning professionals from all backgrounds can use it to perform
these services.

Additional major changes to AIA Scope documents include:

 B203-2017, Site Evaluation and Project Feasibility allow the architect to assist an owner in
selecting a site and determining the feasibility of a project. An owner can use the services
provided by the architect in B203 to decide whether a site, or sites, are suitable for a project, or to
determine the development potential of a site.
 B205-2017, Historic Preservation was reorganized into four categories Historic Assessment,
Existing Buildings Assessment, Preservation Planning, and Specific State and Federal Services.
These categories align with the typical chronology of services an architect might provide on a
project with historically significant buildings or features. B205 also clarifies the architect’s
responsibility regarding hazardous materials on a project with historically significant buildings or
features.
 B207-2017, On Site Project Representation allows the owner and architect to establish the scope
of the on-site project representative’s authority to act on behalf of the architect. B207 also
includes enhanced and clarified responsibilities for the on-site project representative.
 B210-2017, Facility Support was restructured into the following six service categories: (1)
Facility Condition Assessment, (2) Facility Performance Assessment, (3) Operations Assessment,
(4) Space Management, (5) Maintenance Management, and (6) Digital Facility Management
System. B210 was also modified so that it can be used to hire an architect to perform facility
support services on one or multiple facilities.
 C203-2017, Commissioning was updated to reflect changes in the industry. The C203 now
includes: provisions describing the consultant’s role to assist in preparing the owner’s project
requirements, commissioning-related design reviews, consultant’s role in commissioning during
the construction phase of the project and a detailed description of the consultant’s commissioning
plan.

Sustainable Projects Exhibit

The E204–2017, Sustainable Projects Exhibit is not a stand-alone document but is intended to be attached
as an exhibit to an existing agreement on a project that includes a Sustainable Objective. In a single
document, E204-2017 sets forth the roles and responsibilities for each of the project participants. The
exhibit is to be used on a wide variety of sustainable projects, including those in which the Sustainable
Objective includes obtaining a Sustainability Certification, such as LEED® (Leadership in Energy and
Environmental Design), or those in which the Sustainable Objective is based on incorporation of
performance-based sustainable design or construction elements.

Rather than having to pick and choose between of a set of different Sustainable Project documents, any
standard form can be amended with the exhibit to address a specific sustainable objective, certification or
documentation.

Additionally, E204-2017 addresses several issues unique to sustainable design and construction such as:

 Requirements for proposed materials or equipment substitutions


 Requirements for construction waste management
 Project registration with, and submissions to, the certifying authority
 Waiver of consequential damages
 The relationship between achievement of the sustainable objective and substantial and completion

E204-2017 brings the promise of simplified and coordinated sustainability requirements for design and
construction contracts.
Caitlin Sweeney is a Marketing and Education Specialist on the Global Innovations team at The
American Institute of Architects
Contact Our Construction Leadership Team

• CPA with more than 30 year experience.


• Expertise includes audit and review services, agreed-upon procedures, financial services,
operational improvement, and mergers and acquisitions.
• Extensive experience in financial reporting for a wide range of clients in the real estate
and construction, technology, manufacturing, and distribution industries.
• At Large Director for the Construction Industry CPAs/Consultants Association (CICPAC).
• National tax and legislative committee for CFMA.
• Campaign Treasurer for Brady for Congress and Brady Victory Fund.
• Served on the Board of Directors for organizations including The Woodlands Area Economic
Mike Karlins, Construction Lead Development Partnership and, the The Woodlands Area Chamber of Commerce.
mkarlins@calvettiferguson.com • Graduate of the University of Illinois.

• Lori has over 15 years of public accounting experience, specializing in the areas of
corporate and partnership tax, with an emphasis in closely-held businesses.
• She has significant experience with clients in the construction, energy, healthcare, and
manufacturing industries.
• Prior to joining Calvetti Ferguson, Lori worked with a renewable energy start-up company,
assisting them with all aspects of accounting, finance and business development.
• She holds a Bachelor of Science in Accounting from the University of Missouri – St. Louis.
• Lori is a member of the Women’s Energy Network and the Women’s Finance Exchange.
Lori Morales, Tax Partner
lmorales@calvettiferguson.com

• Chin is the Managing Director of the firm’s Corporate Advisory Services, providing advisory
services in the areas of valuation, mergers and acquisitions, fraud and forensic accounting,
commercial and intellectual property damages.
• With over 15 years of experience, Chin blends his years of consulting expertise with real
world corporate experience as CFO, Vice President of Finance, Treasurer and Assistant
Corporate Secretary for a publicly traded oilfield service company and an engineering ser-
vices firm.
• Chin is a Certified Valuation Analyst and a Certified Fraud Examiner with a Bachelor of
Chin Yu, CAS Managing Director Science degree in Political Science and Economics from the University of Houston and a
cyu@calvettiferguson.com Masters of Business Administration from the University of St. Thomas.

You might also like