You are on page 1of 10

Assembly VPD Records

VP Job In VPD Start VPD End Job out Remarks Total No of


Sr.No Job No D
Date Time Date Time Date Time Date Time Running Hours
No
1 Prototype 30001 D 2/7/2014 23:10 2/7/2014 23:20 2/10/2014 8:00 2/10/2014 11:30
2 13B07334,13B07335 C 3/5/2014 15:45 3/5/2014 16:00 3/9/2014 19:30 3/10/2014 8:00
3 13B07333 D 3/6/2014 15:50 3/6/2014 16:00 3/10/2014 18:30 3/11/2014 10:30
4 13B07336 D 3/15/2014 20:00 3/15/2014 20:13 3/19/2014 17:00 3/29/2014 8:00 10 days inside VPD as no tank for job 336
5 12B12339 D 3/31/2014 17:35 3/31/2014 18:30 4/8/2014 7:00 4/8/2014 8:30 Late start as cooling water problem
6 13B07337 D 4/10/2014 15:45 4/10/2014 16:12 4/14/2014 10:00 4/15/2014 9:00
7 13B07300 D 4/23/2014 9:45 4/23/2014 9:50 4/25/2014 8:30 4/25/2014 8:50 Surface drying only
8 13B07301 D 5/1/2014 22:00 5/2/2014 10:45 5/9/2014 7:00 5/9/2014 9:00 Late start as OLTC work was pending
9 13B07301 D 5/9/2014 17:15 5/9/2014 17:20 5/11/2014 7:00 5/26/2014 8:30 Surface drying only. Delay in removal as tank not available
10 13B07338,13B07339 C 5/21/2014 18:00 5/21/2014 19:00 5/25/2014 15:00 5/27/2014 9:00
11 13B07300,13B07302 D 5/26/2014 14:30 5/26/2014 15:00 6/4/2014 4:30 6/4/2014 9:00
12 13B07340,13B07341 C 5/28/2014 16:00 5/29/2014 11:30 6/3/2014 4:30 6/3/2014 14:00 Delay for start due to insulation
13 13B07306,13B07307 C 6/3/2014 16:30 6/4/2014 20:00 6/9/2014 10:30 6/30/2014 10:00 Delay for start due to insulation. Delay in removal as tank not available
14 13B07300,302 D 6/4/2014 19:30 6/4/2014 20:00 6/6/2014 8:30 6/6/2014 9:15 Surface drying only.
15 13B07309,310 D 6/17/2014 17:45 6/17/2014 18:05 6/22/2014 4:00 7/4/2014 7:00 Delay in removal as tank not available
16 13B07308,311 C 7/3/2014 8:30 7/3/2014 9:30 7/7/2014 23:30 7/11/2014 9:30 Delay in removal as tank not available
17 13B07303 D 7/9/2014 15:45 7/9/2014 16:00 7/17/2014 7:30 7/22/2014 10:00 Delay in removal as filter/vacuum m/c not available
18 13B07308,311 C 7/11/2014 18:25 7/11/2014 18:30 7/12/2014 18:30 7/21/2014 9:30 Surface Drying only. 308 out on 16/7/14 at 14:00
19 13B07303 D 7/22/2014 18:20 7/22/2014 18:30 7/23/2014 18:30 7/24/2014 16:30 ICT-Surface Drying
20 13B07312,318 C 7/21/2014 22:30 7/21/2014 23:00 7/26/2014 3:00 7/30/2014 10:00 2 reactors
21 13B07320 D 7/26/2014 13:05 7/26/2014 13:40 7/31/2014 4:00 8/4/2014 10:00 1 reactor. Shift into VPD-C on 31/7 - 5:00 pm
22 13B07312,318 C 7/30/2014 19:00 7/30/2014 19:00 7/31/2014 9:00 7/31/2014 9:30 Surface Drying only
23 13B07304 D 8/1/2014 0:30 8/1/2014 8:00 8/8/2014 15:00 8/9/2014 9:30 1 ICT
24 13B07320 C 8/4/2014 19:45 8/4/2014 19:55 8/5/2014 19:55 8/7/2014 13:30 Surface Drying
25 13B07322,324 C 8/13/2014 0:30 8/13/2014 1:30 8/17/2014 21:00 8/19/2014 6:45 2 reactors
26 13B07325,326 D 8/14/2014 21:00 8/14/2014 21:40 8/19/2014 7:00 8/23/2014 7:00 2 reactors
27 13B07322,324 C 8/19/2014 15:10 8/19/2014 15:15 8/20/2014 15:15 8/22/2014 9:30 Surface Drying only
28 13B07325,326 C 8/23/2014 17:45 8/23/2014 18:00 8/25/2014 18:00 8/28/2014 9:00 Surface Drying only
29 13B07327,329 D 8/26/2014 23:10 8/26/2014 23:30 9/1/2014 9:00 9/2/2014 9/4/2014 2 reactors(327 repacking on 2/9/14)(329 repacking on 4/9/14)

30 13B07327,329 D 9/2/2014 14:00 9/2/2014 14:00 9/3/2014 14:00 9/9/2014 11:00 Two reactors inside 327 & 329 but 327 only removed
31 13B07329 D 9/4/2014 13:30 9/4/2014 13:45 9/5/2014 14:00 9/25/2014 9:30 Delay as tank and hardware not available
32 Prototype 13F015(315 MVA) D 9/30/2014 3:00 9/30/2014 3:30 10/3/2014 21:00 10/4/2014 9:30 short circuit job 3 phase
33 13B07328,330 C 10/4/2014 10:00 10/4/2014 10:00 10/8/2014 19:00 10/9/2014 10:00 2 reactors
Oct-17
274 17B08004/17B06004/17B05035 D 10/4/2017 12:00 10/4/2017 13:00 10/8/2017 15:00 10/9/2017

17B08004/17B06004/17B05035 D 10/9/2017 18:00 10/9/2017 18:30 10/10/2017 5:00 10/10/2017

17B07056 C 10/7/2017 9:30 10/7/2017 10:00 10/13/2017 16:30 10/13/2014

17B07056 C 10/15/2017 5:15 10/15/2017 5:45 10/17/2017 14:30 10/17/2017

17B07056 C 10/13/2017 23:30 10/14/2017 0:00 10/14/2017 21:00 10/19/2017

275 17B03018/17B05036/37 D 10/10/2017 23:30 10/11/2017 0:00 10/17/2017 14:00 10/17/2017

17B03018/17B05036/37 D 10/17/2017 23:30 10/18/2017 0:00 10/18/2017 7:00 10/18/2017

17B03018 D 10/18/2017 22:00 10/18/2017 22:45 10/19/2017 5:00 10/19/2017

276 17B09002/17B07059 C 10/18/2017 2:45 10/18/2017 3:05 10/23/2017 5:15 10/23/2017

17B09002/17B07059 C 10/23/2017 16:00 10/23/2017 16:30 10/24/2017 5:00 10/24/2017

17b07059 C 10/24/2017 12:30 10/24/2017 13:00 10/25/2017 5:00 10/25/2017

277 17B05038/39/17B04023 D 10/25/2017 23:00 10/25/2017 23:30 11/1/2017 5:30 11/1/2017


5:00 CHILKA , S/W 50 MVA / VEMAGIRI 80 MVAR 96.9

9:10 17B08004AND 17B05035 TAKE OUT 10.5

17:30 surface drying 149

16:30 surface drying 56

7:00 surface drying 21

15:00 CHILKA 500 MVA/765 KV & VEMAGIRI 80 MVAR /765 KV 158

9:00 surface drying 7

8:00 surface drying 6.25

7:00 STERTITE/CHILKA 96.7

7:00 surface drying 13.5

7:00 surface drying 16

7:00 80 MVAR 2 NO AND CHILKA 500 MVA/765 KV 150 913.85


Winding VPD Records distillation
Sr.No VPD No Remarks
Job In VPD Start VPD End Job out
Job No Total No of
Date Time Date Time Date Time Date Time Running H ours
13B07333
1 B 2/20/2014 11:30 2/20/2014 12:00 2/21/2014 20:00 2/22/2014 7:53 2 coils(333,308)
13B07306,307,319
2 B 2/22/2014 22:00 2/22/2014 22:00 2/24/2014 7:00 2/24/2014 7:46 3 coils
13B07239
3 B 2/24/2014 17:30 2/24/2014 17:53 2/26/2014 2:30 2/26/2014 8:03 1 coil
13B07308,309,310
4 A 3/11/2014 14:50 3/11/2014 15:15 3/13/2014 7:00 3/13/2014 8:01 3 coils
13B07300,301
5 A 3/18/2014 17:55 3/18/2014 18:25 3/20/2014 7:28 3/20/2014 8:30 2 coils-ICT
13B07239
6 A 3/22/2014 17:15 3/22/2014 17:33 3/25/2014 6:32 3/25/2014 7:30 2 coils
13B07300
7 A 3/26/2014 0:30 3/26/2014 1:11 3/27/2014 15:09 3/27/2014 16:00 2 coils
13B07300,301
8 A 3/28/2014 22:15 3/28/2014 22:33 3/30/2014 14:02 3/30/2014 15:45 3 coils-ICT
13B07300,301
9 A 4/1/2014 14:30 4/1/2014 15:00 4/3/2014 4:10 4/3/2014 9:30 3 coils-ICT
13B07300
10 A 4/3/2014 21:30 4/3/2014 21:50 4/5/2014 16:30 4/5/2014 17:00 1 coil-ICT
13B07300
11 A 4/8/2014 15:30 4/8/2014 15:40 4/10/2014 17:06 4/10/2014 17:20 2 coil assembly(A & X column)
13B07301,302
12 B 4/10/2014 17:48 4/10/2014 18:10 4/12/2014 8:00 4/12/2014 8:30 3 coils- ICT
13B07302
13 A 4/11/2014 11:00 4/11/2014 11:10 4/13/2014 1:08 4/13/2014 7:30 1 coil- ICT + Cylinder insulation
13B07301
14 A 4/14/2014 9:00 4/14/2014 9:30 4/16/2014 4:30 4/16/2014 7:00 2 coil assembly(A & X column)
13B07302
15 B 4/16/2014 12:30 4/16/2014 1:00 4/18/2014 5:30 4/18/2014 7:00 2 coils-ICT
13B07302
16 B 4/18/2014 11:00 4/18/2014 11:40 4/19/2014 7:00 4/19/2014 7:30 2 coils-ICT
13B07302
17 A 4/24/2014 1:35 4/24/2014 2:00 4/26/2014 4:30 4/26/2014 6:30 Coil Assembly(A & X column)
13B07337(lead exit)
18 A 4/26/2014 10:25 4/26/2014 10:30 4/28/2014 9:00 4/29/2014 13:30 Lead exit
Cylinder Insulation
19 B 4/26/2014 11:15 4/26/2014 11:30 4/27/2014 16:00 4/27/2014 16:45 Cylinder Insulation
13B07311/312
20 A 5/2/2014 22:15 5/2/2014 22:35 5/4/2014 13:10 4/5/2014 8:30 2 coils-Reactor
13B07309/310
21 A 5/9/2014 22:30 5/9/2014 22:30 5/11/2014 5:00 5/11/2014 6:30 2 coils-Reactor(re-process)
13B07340,341
22 A 5/16/2014 15:30 5/16/2014 15:55 5/18/2014 2:10 5/20/2014 8:00 2 coils - Reactor
13B07303,311
23 B 5/21/2014 8:15 5/21/2014 9:15 5/23/2014 1:00 5/23/2014 7:30 2 coils(ICT-303[LV], Reactor-311)
13B07300 ICT Insulation
24 A 5/22/2014 16:00 5/22/2014 16:15 5/24/2014 5:00 5/24/2014 9:30 ICT Insulation
13B07303
25 B 5/26/2014 23:45 5/27/2014 1:00 5/28/2014 17:20 5/29/2014 6:30 2 coils - ICT
13B07312,318
26 A 5/28/2014 17:00 5/28/2014 18:00 5/30/2014 13:00 5/30/2014 15:00 2 coils - Reactor
13B07303,320
27 B 5/29/2014 17:25 5/29/2014 21:00 5/31/2014 15:45 6/1/2014 8:00 2 coils-ICT & reactor
13B07330,331
28 A 6/1/2014 17:30 6/2/2014 1:15 6/3/2014 15:10 6/3/2014 17:30 2 coils- Reactor
13B07312,318
29 A 6/4/2014 22:10 6/4/2014 22:50 6/6/2014 14:40 6/8/2014 7:30 2 coils- Reactor
13B07304
30 A 6/8/2014 18:30 6/8/2014 19:10 6/10/2014 7:00 6/10/2014 8:45 1 coil- ICT
13B07319,320
31 A 6/10/2014 21:30 6/10/2014 22:45 6/12/2014 14:30 6/12/2014 19:30 2 coils- Reactor
Insulation Leads
32 B 6/11/2014 19:30 6/11/2014 20:00 6/14/2014 20:35 6/15/2014 10:00
13B07303,320
33 A 6/13/2014 14:20 6/13/2014 15:15 6/15/2014 13:10 6/15/2014 15:00 2 coils- ICT & reactor
13B07303,304
34 A 6/16/2014 15:00 6/16/2014 16:20 6/18/2014 10:00 6/18/2014 13:00 2 coils-ICT
13B07304
35 A 6/20/2014 23:15 6/21/2014 0:00 6/22/2014 20:00 6/23/2014 8:30 1 coil-ICT
13B07303
36 B 6/21/2014 14:20 6/21/2014 15:00 6/23/2014 8:30 6/23/2014 9:30 2 Coils assembly(X and A column)
Reactor insulation
37 B 6/28/2014 16:30 6/29/2014 10:30 6/30/2014 22:00 7/3/2014 11:30
13B07304
38 A 7/3/2014 20:30 7/3/2014 23:15 7/5/2014 12:00 7/6/2014 7:00 1 coil-ICT
Reactor insulation
39 B 7/7/2014 22:45 7/7/2014 23:00 7/10/2014 2:00 7/11/2014 15:45 308,311 reactor insulation
13B07321,322
40 A 7/10/2014 16:50 7/10/2014 18:20 7/12/2014 11:30 7/12/2014 16:30 2 coils- Reactor
13B07304,325
41 A 7/14/2014 23:30 7/15/2014 0:30 7/16/2014 15:30 7/16/2014 18:00 2 coils- 1 ICT and 1 reactor
13B07304
42 A 7/21/2014 2:30 7/21/2014 3:40 7/23/2014 5:30 7/23/2014 8:30 Coil Assembly(A & X column)
13B07326,327
43 A 7/25/2014 9:00 7/25/2014 9:45 7/27/2014 3:15 7/27/2014 8:00 2 coils- Reactor
13B07326
44 A 7/28/2014 14:30 7/28/2014 15:00 7/30/2014 11:00 7/30/2014 13:45 Re-process(Due to uneven pressing)
13B07328,329,330
45 A 8/5/2014 10:30 8/7/2014 11:30 8/7/2014 14:30 8/7/2014 18:15 3 coils-reactor
ICT insulation
46 B 8/6/2014 22:30 8/6/2014 22:45 8/8/2014 21:30 8/12/2014 20:00 13B07304 Insulation
3B07325,326 insulation
47 B 8/19/2014 23:45 8/20/2014 0:00 8/21/2014 19:00 8/21/2014 20:30 Insulation
B07319,332,14B07001
48 A 8/22/2014 20:30 8/23/2014 9:45 8/24/2014 23:15 8/25/2014 8:00 3 reactor coils
Special job(insulation)
49 B 8/24/2014 3:00 8/24/2014 4:45 8/25/2014 10:30 8/25/2014 10:35 315 MVA-short circuit job
13B07331,305(LV)
50 A 8/30/2014 22:30 8/30/2014 23:00 9/1/2014 14:30 9/1/2014 17:30 1 reactor and 1 ICT
13B07342,305(EV)
51 A 9/7/2014 0:00 9/7/2014 0:30 9/8/2014 14:00 9/9/2014 8:00 ICT
3B07305(MV,Regulating)
52 A 9/12/2014 12:30 9/12/2014 13:30 9/14/2014 4:00 9/14/2014 7:00 ICT
13B07305(HV)
53 A 9/20/2014 18:15 9/20/2014 18:50 9/22/2014 17:30 9/22/2014 20:00 ICT
13B07305(X-column)
54 B 9/22/2014 20:15 9/22/2014 21:30 9/24/2014 12:00 9/27/2014 7:00 ICT
13B07305(A- Column)
55 A 9/26/2014 16:30 9/26/2014 17:00 9/28/2014 7:30 9/29/2014 9:00 ICT
13B07342
56 B 10/2/2014 8:45 10/2/2014 9:00 10/3/2014 21:00 10/4/2014 8:00 1 reactor
Insulation
57 A 10/7/2014 19:00 10/7/2014 20::00 10/9/2014 9:30 10/10/2014 15:30 reactor 328,330,305 insulation
13B07332,14B07001
58 A 10/15/2014 12:00 10/15/2014 12:30 10/16/2014 18:00 2 reactor coils
Insulation
59 B 10/18/2014 23:15 10/18/2014 23:50 10/20/2014 17:00 reactor 331,342,312,319 insulation

10/21/2014 12:30 10/22/2014 5:00 Reprocess(oil spray)


13B07332,14B11008(HV),
60 14B12011 A 11/13/2014 23:30 11/14/2014 1:35 11/15/2014 20:30 11/17/2014 8:00 3 coils
008(HV MV),14B12012
61 B 11/15/2014 11:15 11/15/2014 12:30 11/16/2014 9:00 11/17/2014 8:00 3 coils
14B11008(HV,TV,TV)
62 A 11/18/2014 12:15 11/18/2014 13:00 11/20/2014 4:00 11/20/2014 10:00 3 coils
14B11008(MV,MV,HV)
63 B 11/12/2014 16:00 11/18/2014 17:00 11/20/2014 5:30 11/20/2014 9:30 3 coils
14B11008(LV,LV,LV,TV)
64 B 11/21/2014 21:20 11/21/2014 22:05 11/23/2014 10;30 11/23/2014 15:00 4 coils
14B11008(LV,LV,LV,TV)
65 B 11/23/2014 17:15 11/23/2014 18:00 11/24/2014 12:30 **** ***** Customer Inspection(Removal without process completion)
14B11008(LV,LV,LV,TV)
66 B 11/24/2014 17:30 11/24/2014 18:50 11/26/2014 7:00 11/26/2014 10:00
Reactor insulation
67 A 11/26/2014 12:30 11/26/2014 12:30 11/27/2014 15:00 11/27/2014 18:00 Insulation
GETCO job insulation
68 A 12/5/2014 23:00 12/5/2014 23:30 12/7/2014 12:30 12/7/2014 13;00 Insulation
13B07259 Insulation
69 A 12/9/2014 23:00 12/9/2014 23:30 12/11/2014 0:00 12/11/2014 8:00
14B11008 (U,V,W)
70 A 12/14/2014 13:00 12/14/2014 15:25 12/16/2014 3:00 12/17/2014 7:30 GETCO Dummy
13B07259,14B12014
71 B 12/19/2014 6:30 12/19/2014 7:20 12/21/2014 21:00 12/22/2014 11:00 259(3 coils),1 Isolex reactor
Insulation & No.71 coils
72 B 12/21/2014 6:30 12/21/2014 9:00 12/22/2014 10:00 12/22/2014 12:30 For insulation process (24 hrs) - Previous coils reprocessed
B12013,13B07259(MV)
73 B 12/24/2014 17:30 12/24/2014 18:45 12/26/2014 10:00 12/26/2014 12:00 3 coils
4B12013,13B07259(HV)
74 B 12/27/2014 23:00 12/28/2014 0:33 12/29/2014 20:00 12/30/2014 7:30
11008 (U,V,W)(Reprocess)
75 A 12/30/2014 11:00 12/30/2014 11:40 1/1/2015 12:00 1/1/2015 21:00 GETCO Dummy (Reprocess)
4B12013,13B07259(HV)
76 B 12/30/2014 15:30 12/30/2014 18:50 1/1/2015 9:00 1/1/2015 12:00
13F015 (SC 315 MVA)
77 A 1/4/2015 5:50 1/4/2015 7:00 1/5/2015 10:20 1/5/2015 12:20 1 phase Dummy
14B12030
78 B 1/7/2015 21:30 1/7/2015 22:30 1/9/2015 11:30 1/9/2015 15:00 3 LV, 1 HV
14B12030
79 A 1/13/2015 2:20 1/13/2015 2:45 1/14/2015 18:00 1/16/2015 8:00 2 HV, 1 tap
SC Job Insulation
80 A 1/16/2015 17:45 1/16/2015 18:00 1/17/2015 10:00 1/17/2015 11:00 SC job (315 MVA) Insulation
14B12030
81 B 1/17/2015 22:45 1/17/2015 23:15 1/19/2015 16:09 1/19/2015 21:00 2 Tap,1 LV
15B12030
82 A 1/20/2015 0:45 1/20/2015 2:20 1/21/2015 19:20 1/21/2015 23:00 2 LV, 2 HV
14B12030
83 B 1/29/2015 17:30 1/29/2015 18:30 1/31/2015 12:10 1/31/2015 12:45 Coil assembly - u,v,w
15B12030
84 B 1/31/2015 21:20 1/31/2015 21:35 2/2/2015 6:30 2/2/2015 14:45 1 HV,3 Tap
14B12013
85 B 2/3/2015 17:40 2/3/2015 18:00 2/5/2015 14:00 2/5/2015 15:40 Isolux reactor coil
15B12030
86 A 2/4/2015 11:00 2/4/2015 12:00 2/5/2015 20:00 2/5/2015 21:00 Coils assembly- u,v,w
14B12014
87 B 2/11/2015 18:00 2/11/2015 18:15 2/13/2015 4:00 2/13/2015 7:00 Isolux reactor coil
1008 Insulation (GETCO)
88 A 2/11/2015 11:10 2/11/2015 11:30 2/12/2015 4:00 2/12/2015 10:00 Insulation
14B12013 Insulation
89 A 2/12/2015 12:00 2/12/2015 12:40 2/12/2015 9:00 2/13/2015 16:30 Insulation
14B12031
90 A 2/17/2015 20:15 2/17/2015 20:15 2/19/2015 10:00 2/19/2015 12:00 2 HV, 2MV
14B12031
91 B 2/18/2015 22:00 2/18/2015 22:15 2/20/2015 11:00 2/20/2015 14:00 3 LV, 1 Tap
14B12031
92 A 2/20/2015 15:00 2/20/2015 15:15 2/22/2015 4:00 2/23/2015 17:00 HV,MV,Tap
14B12030
93 B 2/23/2015 18:30 2/23/2015 20:30 2/25/2015 9:00 2/25/2015 11:30 HV,MV,LV,Tap
13B07259
94 A 2/25/2015 5:30 2/25/2015 10:00 2/26/2015 19:00 2/26/2015 20:00 A and X column
14B12032
95 B 2/26/2015 9:00 2/26/2015 11:45 2/28/2015 0:00 2/28/2015 9;00 3 LV, 1 Tap
14B12032
96 A 2/28/2015 2:00 2/28/2015 3:30 3/1/2015 19:00 3/2/2015 9:45 2 MV, 1 HV, 1Tap
14B12032
97 A 3/3/2015 18:00 3/3/2015 18:30 3/5/2015 3:00 3/5/2015 3:30 1 HV,1 Tap, 2 MV
13B07259
98 B 3/4/2015 22:00 3/4/2015 22:30 3/6/2015 11:00 3/7/2015 6:30 Coil assembly- A and X column
14B12031
99 B 3/9/2015 9:00 3/9/2015 9:35 3/9/2015 18:00 3/11/2015 7:00 Coil assembly-u,v,w
15B01002 / 15B01003
100 A 3/10/2015 0:00 3/10/2015 2:00 3/11/2015 13:30 3/11/2015 20:00 003- 1 LV, 002 - 3 MV
15B1002
101 A 3/12/2015 17:40 3/12/2015 18:00 3/14/2015 7:00 3/14/2015 9:00
14B12032
102 B 3/13/2015 21:00 3/13/2015 21:30 3/15/2015 5:00 3/16/2015 7:00 Coil Assembly-u,v,w
15B01002 / 15B01003
103 A 3/14/2015 21:30 3/14/2015 22:20 3/16/2015 22:00 3/17/2015 9:00 02(2 HV),03(2 LV)
15B01003
104 B 3/16/2015 22:00 3/17/2015 1:00 3/19/2015 4:30 3/19/2015 8:00 1 LV, 3 MV
15B01003
105 A 3/18/2015 3:40 3/18/2015 5:30 3/20/2015 9:00 3/20/2015 9:30 3 Tap ,1 MV
15B01002
106 B 3/19/2015 2:20 3/19/2015 2:39 3/20/2015 0:00 3/20/2015 5:00 Coil Assembly-u,v,w
15B01003 / 15B01004
107 A 3/20/2015 10:35 3/20/2015 23:20 3/22/2015 15:00 3/23/2015 8:30 2 LV, 2 HV
15B01004
108 B 3/21/2015 5:00 3/21/2015 17:40 3/23/2015 9:15 3/24/2015 7:45 3 MV, 1 LV
15B01003
109 B 3/25/2015 8:20 3/25/2015 9:50 3/26/2015 21:50 3/24/2015 22:50 Coil Assembly-u,v,w
15B01004,15B01005
110 A 3/26/2015 17:30 3/26/2015 18:20 3/28/2015 7:30 3/28/2015 10:00 04-2 HV, 05-2 LV
15B01005
111 B 3/27/2015 14:10 3/27/2015 17:10 3/29/2015 7:30 3/30/2015 7:00 2 HV, 1 MV, 1 LV
15B01005
112 A 3/28/2015 23:00 3/28/2015 23:20 3/30/2015 12:00 3/30/2015 16:00 1 Hv, 3 Tap
15B01005/ 15B01006
113 B 3/30/2015 20:30 3/30/2015 21:15 4/1/2015 11:00 4/1/2015 16:30 2 LV, 2 HV
15B01006
114 A 3/31/2015 5:45 3/31/2015 18:36 4/2/2015 6:00 4/2/2015 11:00 2 MV, 1 HV, 1Tap
15B01004
115 B 4/2/2015 02;20 4/2/2015 17;30 4/4/2015 06;30 4/4/2015 06;45 DUMMY U V W
15B01006/7
116 A 4/2/2015 23;00 4/3/2015 00;05 4/4/2015 09;00 4/4/2015 03;00
15B01006/7
117 B 4/4/2015 19;00 4/4/2015 21;35 4/6/2015 11;00 4/6/2015 13;00
15B01007
118 A 4/5/2015 02;30 4/5/2015 04;37 4/6/2015 17;00 4/6/2015 21;00
15B01007
119 B 4/7/2015 01;30 4/7/2015 02;54 4/8/2015 14;20 4/8/2015 18;35
15B01006/7
120 A 4/8/2015 02;00 4/8/2015 02;18 4/9/2015 16;00 4/9/2015 20;15
15B01006
121 B 4/9/2015 08;50 4/9/2015 09;20 4/10/2015 14;45 4/10/2015 17;00 INSULATION
14B12026
122 A 4/11/2015 11;50 4/11/2015 01;50 4/12/2015 10;25 4/13/2015 07;30 MV LV HV TAP
14B12027
123 B 4/12/2015 10;30 4/12/2015 00;31 4/13/2015 14;05 4/13/2015 16;30 MV LV HV TAP
14B12028/26/27
124 A 4/17/2015 04;40 4/17/2015 06;00 4/18/2015 10;25 4/18/2015 11;45
15B01007/15B12028
125 B 4/17/2015 07;00 4/17/2015 10;00 4/19/2015 04;10 4/20/2015 10;00 MV HV 2 TAP
14B12028/29
126 A 4/18/2015 22;00 4/18/2015 22;35 4/20/2015 07;16 4/21/2015 03;30 HV MV LV
15B01005/6
127 B 4/21/2015 23;00 4/21/2015 23;05 4/23/2015 14;30 4/23/2015 DUMMY U V W
15B01007/8
128 A 4/22/2015 17;10 4/22/2015 18;05 4/22/2015 15;30 4/23/2015 MV HV 2 TAP
15B01008/1412028
129 B 4/26/2015 06;30 4/26/2015 08;02 DUMMY U V TAPW
15B04073/15B1008
130 A 4/25/2015 10;49 4/26/2015 12;48 4/27/2015 06;00 4/27/2015 01;50 LV V
15B01005
131 B 4/26/2015 06;00 4/26/2015 08;00 4/27/2015 16;00 4/28/2015 10;15 DUMMY U V W
15B01006
132 A 4/30/2015 04;00 4/30/2015 05;00 5/1/2015 13;00 5/1/2015 15;00 DUMMY U V W
15B04073/15B1008
133 B 4/30/2015 18;30 4/30/2015 18;50 5/2/2015 07;00 5/2/2015 12;00 MV U V W LV W
15B01008
134 A 5/3/2015 15;30 5/3/2015 16;30 5/5/2015 13;00 5/5/2015 14;00 DUMMY UVW LV W
15B04073
135 B 5/4/2015 11;15 5/5/2015 00;19 5/6/2015 11;25 5/8/2015 12;00 TAP V W LV VW
15B04073/4074
136 A 5/6/2015 11;30 5/6/2015 00;35 5/7/2015 06;00 5/8/2015 11;50 HV UVW /LV W
15B04074
137 A 5/8/2015 11;00 5/9/2015 1;30 5/10/2015 07;00 5/12/2015 01;00 MV U V W LV U ( 75)
15B1008
138 B 5/9/2015 02;30 5/9/2015 03;30 5/11/2015 07;00 5/11/2015 08;00 DUMMY U V W
15b04075/5074
139 B 5/12/2015 02;00 5/12/2015 15;18 5/14/2015 03;00 5/14/2015 05;40 LV UV HV UV
15B04074
140 A 5/12/2015 11;30 5/13/2015 00;45 5/14/2015 07;00 5/14/2015 11;00 TAP U V W HV W
15B04073/75
141 B 5/14/2015 16;00 5/14/2015 18;00 5/16/2015 12;00 5/16/2015 06;00 DUMMY U V W LV V
15B05075
142 A 5/16/2015 06;30 5/16/2015 07;00 5/17/2015 15;10 5/17/2015 17;00 MV V W LV V W
15B05075/4074/75
143 B 5/17/2015 05;45 5/17/2015 07;45 5/18/2015 14;00 5/19/2015 16;00 HV U V / TAP W V
15B04074/5075
144 B 5/20/2015 04;00 5/20/2015 05;35 5/21/2015 13;30 5/21/2015 15;40 DUMMY U V W / TAP W
15B05075/5076
145 A 5/20/2015 09;00 5/20/2015 22;00 5/22/2015 05;00 5/22/2015 7;00 HV W /LV U V W
15B05076
146 B 5/22/2015 14;00 5/22/2015 15;10 5/23/2015 21;00 5/25/2015 09;30 MV U V W TAP
15B05076
147 A 5/24/2015 03;00 5/24/2015 04;15 5/25/2015 10;30 5/25/2015 14;00 HV V W /TAP U V
15B05075/76
148 B 5/25/2015 17;40 5/26/2015 00;40 5/27/2015 09;00 5/27/2015 11;30 DUMMY U V W / MV
15B06077/15B05076
149 A 5/26/2015 21;30 5/26/2015 23;00 5/28/2015 08;30 5/28/2015 10;00
15B06077
150 B 5/28/2015 02;00 5/28/2015 02;34 TAP 1/ MV U V W
15B06076/77
151 B 6/2/2015 03;56 6/2/2015 03;56 6/3/2015 15;00 6/3/2015 16;00 HV U V W / HV W
Cylinder Insulation
152 B 6/10/2015 17;30 6/10/2015 17;30 6/11/2015 14;05 6/11/2015 15;35
15B06077
153 B 5/12/2015 10;00 6/12/2015 12;00 6/13/2015 21;00 6/13/2015 1;00 DUMMY U V W
15B02011
154 A 6/13/2015 13;35 6/13/2015 14;00 6/14/2015 20;35 6/15/2015 09;30 LV U V W TAP
15B02011
155 B 6/16/2015 22;00 6/16/2015 23;00 6/18/2015 18;20 6/18/2015 22;00 HV U V
15B02011
156 A 6/17/2015 22;00 6/18/2015 23;15 6/20/2015 13;15 6/20/2015 15;35 MV HV TAP
15B02011
157 B 6/21/2015 12;30 6/21/2015 01;00 6/22/2015 07;00 6/22/2015 11;00 MV U V
15B02011
158 B 7/8/2015 19;00 7/8/2015 20;45 7/10/2015 06;00 7/10/2015 08;00 DUMMY U V W
14B12015/19
159 A 7/9/2015 23;00 7/10/2015 00;06 7/11/2015 01;00 7/11/2015 08;00 SV U V W/ LV U V W
14B12015/19
160 A 7/13/2015 22;00 7/13/2015 22;45 7/15/2015 05;00 7/15/2015 09;45 HV 3 LV 1
15B12015
161 A 7/13/2015 22;45 7/13/2015 22;45 7/15/2015 05;00 7/15/2015 09;45 HV 123 LV 1
15B04009 / 12015
162 B 7/14/2015 11;15 7/15/2015 01;00 7/16/2015 07;45 7/18/2015 16;00 MV U LV U V /LV V W
15B04009 / 12015
163 A 7/16/2015 06;00 7/16/2015 08;15 7/18/2015 00;15 7/18/2015 07;00 HV U V W LV V W / LV U V W
14B04009
164 B 7/17/2015 02;40 7/17/2015 03;00 7/18/2015 09;05 7/18/2015 11;00 U V W
15B02011
165 B 7/18/2015 16;00 7/18/2015 16;15 7/19/2015 12;30 7/19/2015 12;50 DUMMY U V W
14B12017/14B04009
166 A 7/19/2015 05;15 7/19/2015 07;00 7/20/2015 17;00 7/20/2015 17;00 LV U V TAP V / MV U W
14B12019/20
167 B 7/20/2015 22;30 7/20/2015 23;00 7/22/2015 05;50 7/22/2015 11;30 4NO HV 4NOS LV 3 NO S TAP
14B12017/20/21
168 A 7/21/2015 22;30 7/22/2015 00;00 7/23/2015 06;30 7/23/2015 08;30 LV 1 /4 NOS HV 3 NOS TAP

169 4B02011/14B12017/20 B 7/24/2015 22;45 7/25/2015 07;35 7/26/2015 2;00 7/26/2015 15;40 DUMMY 1, 1 2 3 COILS U PHASE

170 14B12019/20/21 A 7/24/2015 23;00 7/25/2015 07;20 7/26/2015 05;30 7/26/2015 06;55 5 NOS DUMMY/ U V W

171 14B12016/18 A 7/27/2015 18;00 7/27/2015 19;06 7/29/2015 00;00 7/29/2015 07;00 TAP U V W / HV V W , TAP U V W

172 14B12021 B 7/28/2015 04;00 7/28/2015 04;45 7/29/2015 12;50 7/29/2015 16;00 DUMMY U V W

173 14B12016/18 A 8/1/2015 23;30 8/2/2015 02;15 8/3/2015 08;10 8/4/2015 09;30 14B12016 2NOS HV, LV U V W /14B12018 LV U V W

174 14B12015 B 8/6/2015 10;30 8/6/2015 02;00 8/7/2015 20;00 8/7/2015 08;30 DUMMY U V W

175 14B12017 A 8/8/2015 04;15 8/8/2015 05;00 8/9/2015 10;00 8/10/2015 07;30 DUMMY U V W
14B04009
176 B 8/10/2105 15;50 8/10/2015 16;24 8/12/2015 08;00 8/12/2015 08;30 DUMMY U V W
14B12016
177 A 8/12/2015 12;00 8/12/2015 12;42 8/13/2015 20;15 8/13/2015 21;15 DUMMY U V W
14B12016
178 A 8/13/2015 21;50 8/13/2015 22;10 8/14/2015 04;00 Surface heating and vacuum only
14B12016
179 A 8/15/2015 08;30 8/15/2015 08;30 8/16/2015 19;00 8/17/2015 07;00 Surface heating and vacuum only
14B12018
180 B 8/15/2015 08;00 8/15/2015 08;30 8/16/2015 16;56 8/17/2015 14;00 DUMMY U V W

181 14B12034 B 8/18/2015 04;30 8/18/2015 06;00 8/20/2015 00;00 8/20/2015 00;30 3NOS HV U V W

182 14B12034 A 8/18/2015 16;00 8/18/2015 17;17 8/20/2015 09;00 8/20/2015 13;50 3Nos LV +3NOS TV U V W

183 14B12035 B 8/20/2015 14;30 8/20/2015 17;30 8/22/2015 12;18 8/22/2015 17;00 3 NOS HV U V W

184 14B12035 A 8/21/2015 13;25 8/21/2015 15;19 8/23/2015 05;00 8/24/2015 15;30 LV - U, V, W+TAP - U, V , W

185 B 8/24/2015 09;00 8/24/2015 09;20 8/25/2015 09;00 8/25/2015 10;00 ESSEL CYLINDER 500 MVA.

186 Testting job A 8/25/2015 22;00 8/25/2015 23;44 8/27/2015 22;00 8/28/2015 08;00 3 nos MV+ 3NOS LV OF TESTING TRANSFORMER
Testing job
187 B 8/28/2015 00;05 8/28/2015 02;00 8/29/2015 19;00 9/1/2015 10;00 3 NO HV WDG (TESTING TRANSFORMER)
14B12034
188 B 9/2/2015 18;05 9/2/2015 18:40 9/4/2015 11;30 9/4/2015 13;30 40 3 NO DUMY U V W
15B05053
189 A 9/3/2015 04;15 9/3/2015 05;39 9/4/2015 18;20 9/5/2015 07;00 37 2 NOS LV U&V +INSULATION
14B12033
190 B 9/4/2015 23;30 9/5/2015 09;25 9/6/2015 11;30 9/6/2015 14;30 26 1 NO COIL
15B01001/5053
191 A 9/5/2015 21;00 9/5/2015 23;10 9/7/2015 13;00 9/8/2015 16;10 38 15B01001 TAP HV +15B05053 LV , MV
14B12033
192 B 9/6/2015 18;00 9/6/2015 18;10 9/7/2015 13;00 9/7/2015 16;00 19 1 NO COIL

193 14B12033 B 9/7/2015 18;00 9/7/2015 18;50 9/9/2015 11:20 9/15/2015 17:00 37 1 NO COIL( three times process)

194 14b12035 A 9/8/2015 0:00 9/9/2015 1:00 9/10/2015 23:00 9/11/2015 15B01001 46 DUMMY CIOLS U V W +3 NOS REPROCESS COIL
195 15B048/53 A 9/12/2015 11;30 9/13/2015 1:32 9/14/2015 0:00 9/15/2015 7:00 23 15bB5048 U V 5053 U V TAP U
Cylinder Insulation A 9/15/2015 10;40 9/15/2015 10:50 9/17/2015 5:00 9/18/2015 8:00 37

196 15B01001/5053 A 9/18/2015 23:50 9/19/2015 1:45 9/20/2015 17:10 9/21/2015 7:00 36 15B01001 MV,5048 MV -U V,LV W,5053 TAP V W
15B01001/5053
197 B 9/20/2015 0:10 9/20/2015 2:25 9/21/2015 14:30 9/22/2015 17:00 24 HV 1 NO / HV V , W
15B05047/14b12033
198 A 9/22/2015 22:00 9/22/2015 22:45 9/24/2015 11:40 9/24/2015 16:00 36 testing transformer dummy u v w /reactor coil
15B05053/15B01001
199 B 9/24/2015 12:00 9/24/2015 12:20 9/26/2015 8:00 9/26/2015 9:05 44 5053 HV V W /1001 REGULATING
15B05047+INSULATION
200 A 9/25/2015 22:00 9/25/2015 22:50 9/27/2015 13:00 9/28/2015 9:00 38 DUMMY U V W+INSULATION
15B01001/10081
201 B 10/4/2015 18:00 10/5/2015 8:45 10/6/2015 16:30 10/6/2015 17:30 31.25 PGCIL A&X COLUMN+15B10081 HV U PHASE

202 15B10081/15B05048 A 10/6/2015 17:00 10/6/2015 22:30 10/8/2015 19:10 10/8/2015 20:00 44.7 APT HV- U,MV- U V ,LV- U /ESSEL-MV - W, TAP -U V W

203 15B10081/15B05048 B 10/8/2015 5:50 10/8/2015 13:15 10/10/2015 5:50 10/10/2015 23:45 40.55 15B05048 HV- U&W+15B10081 HV- U

204 15B10081/15B10082 A 10/9/2015 12:00 10/9/2015 12:23 10/11/2015 2:00 10/12/2015 9:00 37.6 81 1ST SETMV -U&V+82 -2ND SET MV-U

205 15B05053 B 10/13/2015 1:30 10/13/2015 3:51 10/14/2015 10:00 10/14/2015 11:00 30.2 DUMMY U V W

206 15B10081 A 10/13/2015 16:35 10/13/2015 21:00 10/14/2015 22:00 10/15/2015 7:15 25 TAP U V W

207 15B10082/83 A 10/16/2015 6:00 10/16/2015 7:20 10/17/2015 7:00 10/17/2015 12:15 23.7 HV- U W/ MV- U V

208 15B10081 B 10/17/2015 17:00 10/17/2015 17:10 10/18/2015 8:30 10/18/2015 10:00 15.4 DUMMY U V W
15B10082/83
209 A 10/20/2015 0:00 10/20/2015 2:00 10/21/2015 15:20 10/23/2015 13:20 37.3 MV- W, TAP U&V
Insulation
210 B 10/22/2015 13:10 10/22/2015 13:30 10/23/2015 18:10 10/24/2015 16:51 28.7 Insulation
15B10083
211 A 10/25/2015 4:45 10/26/2015 8:30 10/27/2015 9:00 10/27/2015 14:30 24.5 HV - 1 NO - TAP 2 NOS
15B05048
212 B 10/25/2015 5:45 10/25/2015 8:05 10/26/2015 13:15 10/26/2015 15:20 29.2 DUMMY U V W
15B10084
213 A 10/28/2015 4:30 10/28/2015 5:35 10/29/2015 4:30 10/29/2015 10:10 22.9 TAP-V W + LV- U V W
15B12080
214 A 10/29/2015 11:55 10/30/2015 1:00 10/30/2015 20:30 10/30/2015 22:55 19.5 HV- U V+LV -U
15B12080
215 A 10/31/2015 1:15 10/31/2015 1:45 0111-2015 3:00 11/2/2015 11:30 25.25 3NOS - LV +3 NOS -HV
15B09059
216 A 11/3/2015 13:00 11/3/2015 22:30 11/5/2015 5:00 11/5/2015 7:00 31.5 Ev 1 no+1no lv
3 nos turret
217 B 11/4/2015 17:45 11/4/2015 18:39 40
15B09059
218 A 11/5/2015 23:00 11/6/2015 2:21 11/7/2015 12:40 11/7/2015 13:50 34.4 1 NO HV +1 NO MV
15B09059
219 A 11/7/2015 23:15 11/7/2015 23:56 11/9/2015 1:15 11/9/2015 8:00 25.3 1 NO TAP +1 NO LV
15B09059
220 B 11/12/2015 15:00 11/12/2015 16:10 11/14/2015 10:25 11/15/2015 7:00 42.25 A&X COLUMN +ACTIVE PART INSULATION
15B09060
221 A 11/13/2015 20:30 11/13/2015 21:30 11/15/2015 9:00 11/15/2015 10:00 35.5 EV+MV+COIL ASSEMLY+ACTIVE PART+TANKING BARREIR
15B09060
222 B 11/17/2015 23:30 11/18/2015 0:11 11/19/2015 10:00 11/19/2015 11:00 33.8 HV 1 NO +REGULATING 1 NO OF ICT-2
15B09060
223 B 11/21/2015 12:30 11/21/2015 13:00 11/23/2015 7:00 11/23/2015 7:30 42 A&X column
15B09061
224 A 11/24/2015 0:15 11/24/2015 1:00 11/25/2015 7:00 11/25/2015 8:30 30 lv 3rd +insulation
15B05049
225 A 11/27/2015 3:30 11/27/2015 5:14 11/28/2015 11:15 11/28/2015 12:00 30 ESSEL REACTOR U V W ( 3 PHASE REACTOR)
15B05049
226 A 11/28/2015 13:00 11/28/2015 13:00 11/29/2015 9:00 11/29/2015 10:00 20:00 REPROCESS ESSEL REACTOR S COILS U V W
15B09061/15B10076
227 B 12/1/2015 12:30 12/1/2015 15:20 12/3/2015 3:00 12/3/2015 5:30 35.7 15B09061 TV+15B10076- HV
Testing transformer
228 A 12/5/2015 21:00 12/5/2015 21:30 12/7/2015 7:35 12/7/2015 10:00 34.1 Insulation
15B05050
229 A 12/7/2015 18:00 12/7/2015 18:30 12/9/2015 0:00 12/9/2015 2:00 29.5 REACTOR COILS U V W( 3 PHASE ) ESSEL 125/400KV
15B9061
230 B 12/11/2015 4:10 12/11/2015 7:44 12/12/2015 17:00 12/12/2015 17:30 33.25 MV 1 NO , ENERGIZE 1 NO COIL
15B10076
231 A 12/11/2015 12:30 12/12/2015 9:41 12/13/2015 9:41 12/13/2015 16:30 24 UNNAO REACTOR
15B09061
232 B 12/16/2015 06;30 12/16/2015 9:31 12/17/2015 17:00 12/17/2015 19:40 27.5 HV ICT 3RD

233 15B05051 A 12/17/2015 0:10 12/17/2015 1:20 12/18/2015 8:30 12/19/2015 8:00 31.7 08 NOS COILS OF ESSEL
15B05051
234 A 12/20/2015 19:00 12/20/2015 21:00 12/21/2015 2:00 12/22/2015 10:00 29 TAP U W LV W
15B09061
235 B 12/20/2015 16:00 12/20/2015 18:00 12/22/2015 4:00 12/22/2015 8:00 24 A& X COLUMN
15B05052
236 A 12/23/2015 18:30 32-12-2015 21:00 12/25/2015 10:10 12/25/2015 12:00 37.2 15B05052 HV W+15B09062/63 LV
15B5051
237 B 12/27/2015 5:00 12/28/2015 8:30 12/28/2015 14:40 12/28/2015 15:00 30.2 SRIKAKULAM DUMMY U V W
15B05047
238 A 12/29/2015 14::30 12/29/2015 15:45 12/30/2015 16:00 12/30/2015 17:00 24.25 testing transformer 1 NO HV +ESSEL2N0S HV (200/400 KV)
15B06053
239 A 1/1/2016 13:00 1/1/2016 16:20 1/2/2016 23:40 1/3/2016 6:45 ESSEL REACTOR U V W ( 3 PHASE REACTOR)
15B05052
240 A 1/5/2016 23:30 1/6/2016 2:45 1/7/2016 7:00 1/7/2016 8:00 30.25 ESSEL 1NO HV W ,2NOS TAP UV LV UVW
15B5052
241 A 1/8/2016 7:45 1/8/2016 8:15 1/9/2016 11;30 1/9/2016 12:30 27.25 MV U V W
15B05052
242 B 1/12/2016 4:30 1/12/2016 5:00 1/13/2016 9:30 1/13/2016 11:20 28.5 DUMMY U V W
15B09062
243 A 1/13/2016 23:00 1/14/2016 0:10 1/15/2016 20:00 1/16/2016 7:00 34 LV EV TAP
15B09062
244 B 1/14/2016 18:00 1/14/2016 23:00 1/16/2016 13:30 1/16/2016 16:00 38.5 EV TV HV
15B09062
245 A 1/20/2016 4:45 1/20/2016 5:35 1/21/2016 13:35 1/21/2016 15:30 30 model I ct mv coil
srikakulam
246 A 1/22/2016 22:45 1/22/2016 23:20 1/24/2016 10:00 1/24/2016 15:00 34.7 MV coil and 4th HV
15B09062
247 B 1/23/2016 18:00 1/23/2016 18:20 1/24/2016 18:00 1/24/2016 20:00 23.7 MODEL ICT A&X COLUMN
insulation
248 A 1/24/2016 21:30 1/24/2016 21:40 1/25/2016 11:00 1/25/2016 13:25 15.5
15B05057
249 A 1/29/2016 22:35 1/30/2016 0:35 1/31/2016 07;00 2/1/2016 07;00 29.4 ESSEL 3RD UNIT
15B09062
250 B 1/30/2016 20:50 1/30/2016 21:15 2/1/2016 6:00 2/1/2016 9:00 32.7 DUMMY A&X COLOUMN
INSULATION
251 A 2/3/2016 2:00 03-02-20156 2:32 2/4/2016 8:50 2/4/2016 11:20 30.3 INSULATION
15B09063/15B10077
252 A 2/5/2016 2:00 2/5/2016 2:35 2/6/2016 14:20 2/4/2016 16:00 35.75 SHRIKAKULAM/ UNNAO
15B10079/15B09063
253 B 2/11/2016 15:45 2/11/2016 20:10 2/13/2016 12:30 13-20-2016 16:00 39.9 UNNAO REACTOR SHRIKAKULAM MV, HV+INSULTION 1600 KG
15B10063/64
254 A 2/12/2016 17:50 2/12/2016 18:08 2/14/2016 6:00 2/14/2016 9:00 36 TAP,/EV COIL
15B09063
255 B 2/20/2016 4:00 2/20/2016 4:24 2/21/2016 22:05 2/21/2016 22:50 41.7 A &X COLUMN
15B10073
256 A 2/20/2016 23:05 2/21/2016 0:09 2/22/2016 12:00 2/22/2016 13:00 36 MV LV AND TAP
15B10073/74
257 A 2/23/2016 15:30 2/23/2016 17:20 2/25/2016 7:10 2/25/2016 9:20 37.5 HV /MV, LV (333MVA/765KV)
15B10074/75+9064
258 A 2/27/2016 8:00 2/27/2016 20:52 2/29/2016 10:30 2/29/2016 12:30 37.5 64-LV,74- TAP,75- LV 74- MV( REPROCESS)
15B10073/78
259 B 3/1/2016 7:30 3/1/2016 8:50 3/2/2016 17:20 3/2/2016 20:21 32.5 UNNAO REACTOR,15B10073- DUMMI

260 15B10074 A 3/3/2016 21:00 3/3/2016 21:30 3/5/2016 9:00 05--03-2016 12:30 35.5 HV COIL+ INSULATION
261 15B10075 A 3/7/2016 5:00 07-03-2016 5:30 3/8/2016 17:00 3/8/2016 17:30 24.5 MV TAP
262 15B10075 B 3/10/2016 12:15 3/10/2016 12:47 3/11/2016 16:05 3/11/2016 18:20 27.4 DUMMY+ INSULATION
263 15B09064/15B10075 A 3/12/2016 4:30 3/12/2016 5:15 3/13/2016 18:00 3/13/2016 20:00 37 MV/HV COIL

264 15b09064 B 3/13/2016 22:25 3/14/2016 0:10 3/15/2016 13:00 3/13/2016 16:00 37 HV AND TAP
265 15B10075 A 3/15/2016 16:00 3/15/2016 16:40 3/16/2016 22:30 3/16/2016 0:00 29.8 DUMMY UNNAO 3RD+ 2 NO DT JOBS
266 15B10073 B 3/17/2016 18:00 3/17/2016 18:40 3/18/2016 8:00 3/18/2016 9:40 13.3 2 NO BARRIER ONE CARONA
277 15B06054 A 3/22/2016 2:00 3/22/2016 4:30 3/23/2016 12:05 3/23/2016 15:00 31.6 ESSEL REACTOR COILS U V W
278 15B09064 B 3/22/2016 5:00 3/26/2016 18:05 3/28/2016 4:15 3/29/2016 8:00 34.2 DUMMY A&X COLOUMN 2NO DT JOBS
279 15B06055 A 3/26/2016 18:45 3/26/2016 19:45 3/28/2016 8:00 3/28/2016 9:30 36.25 COIL U V W+ACTIVE PART INSULATION +2NO DT JOBS
280 15b06056 A 4/3/2016 1:30 4/3/2016 2:18 4/4/2016 10:15 04-04-20106 13:00 32 COIL U V W +CYLINDERS
181 16B04003 A 4/9/2016 1:30 4/9/2016 14:00 4/10/2016 23:00 4/11/2016 7:00 33 Adani power reactoe coils U V W
182 16B05004 A 4/22/2016 2:10 4/22/2016 2:40 4/23/2016 8:22 4/23/2016 12:15 29.6 RRVPNL REACTOR U V W COILS
183 16B05004 A 4/30/2016 0:00 5/1/2016 0:30 5/2/2016 7:00 5/2/2016 8:30 30.5 RRVPNL HV U V W
184 16B05005, 16B04001 A 5/11/2016 19:00 5/11/2016 21:15 5/13/2016 1:00 5/13/2016 2:25 26.75 RRVPNL&ADANI POWER(125MVAR/400)
185 16B07007/8 A 5/16/2016 18:30 5/16/2016 20:45 5/18/2016 5:00 5/18/2016 8:00 32.25 80MVAR/765 KV REACTOR
186 16B07009 B 5/17/2016 10:00 5/18/2016 10:00 5/19/2016 18:00 5/19/2016 20:00 31.7 80MVAR/765 KV REACTOR
187 16B04002 16B07010 A 5/27/2016 4:00 5/27/2016 5:00 5/28/2016 22:00 6/28/2016 23:30 41 80MVAR/765 KV REACTOR
188 16B07011/12 B 5/28/2016 9:00 5/28/2016 11:15 5/30/2016 7:00 5/30/2016 9:00 44 80MVAR/765 KV REACTOR
169 16B07013 A 5/30/2016 3:00 5/30/2016 3:30 5/31/2016 23:45 6/1/2016 9:25 44.25 80MVAR/765 KV REACTOR
170 16B07011 B 5/31/2016 17:00 5/31/2016 18:00 5/31/2016 23:50 6/1/2016 11:20 5.8 80MVAR/765 KV REACTOR
171 16B8014 B 6/1/2016 18;30 6/1/2016 22:30 6/3/2016 19:00 6/3/2016 20:00 44.5 80MVAR/765 KV REACTOR
172 16B06006/16B04002 A 6/7/2016 19:00 6/7/2016 20:00 6/9/2016 16:00 6/9/2016 18:00 44 80MVAR/765 KV REACTOR
173 16B08016 B 6/9/2016 13:45 6/9/2016 14:05 10-06-20106 18:00 6/10/2016 20:00 28 80MVAR/765 KV REACTOR
174 16B08016 A 6/11/2016 3:00 6/11/2016 3:24 6/12/2016 18:35 6/13/2016 070:00 39.2 80MVAR/765 KV REACTOR
1756B08017/16B09020/21 B 6/12/2016 5:00 6/12/2016 5:47 6/14/2016 5:35 6/14/2016 6:48 47.85 80MVAR/765 KV REACTOR
176B04002/6006/16B9022 A 6/15/2016 5:00 6/15/2016 5:33 6/17/2016 3:30 6/17/2016 7:20 46 80MVAR/765 KV REACTOR
177B09021+ CORONA 4 NO B 6/15/2016 5:00 6/15/2016 5:30 6/16/2016 14:00 6/16/2016 15:00 32.5 80MVAR/765 KV REACTOR
178 16B09023 A 6/18/2016 22:00 6/18/2016 22:20 6/21/2016 3:00 6/21/2016 4:20 52.7 80MVAR/765 KV REACTOR
179 16B09024 B 6/18/2016 10:30 6/18/2016 11:40 6/20/2016 11:12 6/20/2016 12:20 47.5 80MVAR/765 KV REACTOR
180 16B09024/25/26 B 6/21/2016 6:00 6/21/2016 9:40 6/23/2016 8:05 6/23/2016 9:50 46.3 80MVAR/765 KV REACTOR
181 16B04003/16B06006 A 6/24/2016 23:00 6/25/2016 0:00 6/26/2016 12:30 6/26/2016 14:00 36.5 ADANI POWER AND GETCO
182 16B09025/25/3001 B 6/25/2016 13:30 6/25/2016 14:00 6/27/2016 8:00 6/27/2016 15:00 42 PGCIL MODEL I C T
183 16B10027/28 B 6/28/2016 10:00 6/28/2016 12:00 6/30/2016 5:00 6/30/2016 8:00 41 80MVAR/765 KV REACTOR
184 16B04003 A 6/28/2016 16:00 6/28/2016 18:16 6/30/2016 11:00 6/30/2016 17:00 43 ADANI DUMMY COILS ( SURFACE HEATING + VACUUM)
185 16B10029/6006 B 7/1/2016 10:30 7/1/2016 11:15 7/3/2016 4:00 7/4/2016 7:00 40.75 REACTOR,/LV-W,MV-W
186 16B06006/16B06058 A 7/2/2016 23:00 7/3/2016 1:00 7/4/2016 13:00 7/4/2016 16:00 36 16B06058 HV U V AND 16B06006 HV -U
187 16B06006/16B06058 A 7/5/2016 12:00 7/5/2016 14:40 7/7/2016 4:00 7/7/2016 8:00 37.3 HV-V,/HV-W
188 16B06006 W B 7/6/2016 1:00 7/6/2016 2:00 7/7/2016 15:00 7/7/2016 17:00 37 16B6006 HV W PHASE + INSULATION COIL ASSEMLY
189 16B06006/3001/4001 A 7/8/2016 13:00 7/8/2016 14:03 7/10/2016 4:00 7/10/2016 10:00 38 HV-W,/HV-1/MV-U
190 16B04001/10030 A 7/12/2016 23:30 7/13/2016 0:20 7/14/2016 14:00 7/14/2016 15:00 38 ADANI POWER A/ PGCIL
191 16B04002 B 7/14/2016 22:00 7/14/2016 22:44 7/16/2016 12:00 7/16/2016 14:00 37.25 LV-W, MV-V,W
192 16B03001 A 7/16/2016 23:15 7/17/2016 0:20 7/18/2016 9:00 7/18/2016 11:00 34 A&X COLOUMN
193 16B04003/16B01032 B 7/16/2016 23:00 7/17/2016 0:20 7/19/2016 10:00 7/19/2016 11:00 38 MV-U, HV-U / REACTOR PGCIL
194 16B01031 A 7/18/2016 0:00 7/19/2016 1:00 7/20/2016 15:00 7/20/2016 16:00 38 PGCIL REACTOR
195 16B01033/16B04003 A 7/21/2016 0:00 7/22/2016 1:00 7/23/2016 12:00 7/23/2016 16:00 35 PGCIL COIL AND ADANI HV- V W
196 16B04001 B 7/23/2016 23:00 7/24/2016 0:30 7/25/2016 6:50 7/25/2016 7:30 30 DUMMY COIL U VW (WALL HEATING )
197 16b12043/44 A 7/25/2016 11:00 7/25/2016 12:00 7/26/2016 12:00 7/27/2016 2:20 36 REACTOR COILS 2 NOS
198 ADANI INSULATION B 7/26/2016 10:05 7/26/2016 10:30 7/27/2016 0:00 7/28/2016 7:00 37.5 PERMAWOOD RING AND BLOCK AND WASHER
199 16B04002/16B12043 A 7/28/2016 9:10 7/28/2016 10:18 7/29/2016 21:00 7/29/2016 23:40 34.7 LV-UV,TAP-UV,HV 1
200 16B04003 B 7/29/2016 3:55 7/29/2016 4:30 7/30/2016 15:00 7/30/2016 16:00 34.5 MV-V W,TAP-W , LV -V
201 16B12045 A 7/30/2016 23:30 7/31/2016 0:40 8/1/2016 14:00 8/1/2016 16:00 37.3 REACTOR COIL +INSULATION
202 16B12046/47 A 8/2/2016 16:00 8/2/2016 5:00 8/4/2016 5:00 8/4/2016 9:00 36 PGCIL l Reactor 02 nos
203 16B12048/16B08018 A 8/6/2016 0:30 8/6/2016 1:05 8/7/2016 15:00 8/8/2016 7:00 38 PGCIL/ HVPNLLV-UTAP-U
204 16B12047/16B08018 B 8/7/2016 2:30 8/7/2016 3:00 8/8/2016 11:45 8/8/2016 15:00 32.75 HVPNL HV,-01 LV- 01
205 16B8018/16B12050 A 8/9/2016 0:15 8/9/2016 1:15 8/10/2016 13:00 8/10/2016 15:30 35.75 HV-V,LV-W/ REACTOR
206 16B08018 B 8/9/2016 23:00 8/9/2016 0:00 8/11/2016 13:00 8/11/2016 16:00 37
207 DT JOB 1 NO B 8/11/2016 16:50 8/11/2016 17:00 8/12/2016 5:00 8/12/2016 17:00 12 WALL HEATING ONLY
208 16B12051/16B08018 A 8/12/2016 6:38 8/12/2016 7:48 8/13/2016 22:25 8/14/2016 0:10 38 REACTOR,HVPNL HV-W,MV-V, W
209 16B08019/16B12050 B 8/13/2016 21:30 8/13/2016 22:00 8/15/2016 8:00 8/16/2016 10:00 34 REACTOR, HVPNL-TAPU&V
210 16B08019/16B12051 B 8/17/2016 10:00 8/17/2016 10:25 8/19/2016 4:00 8/19/2016 7:00 41.5 REACTOR AND TAP V&W
211 16B08018 B 8/22/2016 20:00 8/22/2016 21:00 8/24/2016 11:20 8/24/2016 13:00 38.3 DUMMY (SURFACE HEATING )
212 16B08019 A 8/22/2016 24:00:00 8/23/2016 1:00 8/24/2016 13:00 8/24/2016 16:30 36 LV-U V W, MV-U V
213 16B08019 A 8/25/2016 11:30 8/25/2016 12:10 8/26/2016 20:30 8/27/2016 6:00 32.3 HV-V,MV-V W +INSULATION APROX .2 TON
214 16B08019 B 8/26/2016 1:55 8/26/2016 2:30 8/27/2016 17:00 8/27/2016 18:00 39 HV- U W
215 16B08019 B 8/29/2016 16:00 8/29/2016 16:30 8/31/2016 8:00 8/31/2016 9:00 39.5 DUMMY COIL U V W
2168052/54/16B09055/56 A 8/31/2016 9:00 8/31/2016 12:10 9/2/2016 14:00 9/2/2016 16:00 49.8 CADAPPAH REACTOR 80 MVAR/765 KV 04 NOS 900 ltrs
217 16B09053 B 9/3/2016 13:00 9/5/2016 13:41 9/7/2016 3:15 9/7/2016 7:00 32.6 CADAPPAH REACTOR 80 MVAR/765 KV
218 16B09057/58 A 9/13/2016 23:25 9/14/2016 1:30 9/15/2016 14:00 9/15/2016 16:00 36.5 CADAPPAH REACTOR 80 MVAR/765 KV
219 085/86/87/75+HUNDAI A 9/21/2016 19:30 9/24/2016 19:00 9/26/2016 8:00 9/26/2016 8:30 37 16b12085/86/87+16b11075+ hundai reactor( 05 nos)
2206B12088/89+16B11075 A 9/28/2016 17:00 9/28/2016 18:30 9/30/2016 7:30 9/30/2016 9:00 36 16B11075/76/77+16B12088/89
2211078/79+16B12090/91 A 10/5/2016 16:00 10/5/2016 18:00 10/7/2016 9:00 10/7/2016 11:00 40 02 NOS 80 MVAR&02 NOS 110 MVAR/ 765 KV
222 BHUSHAN DUMMY B 10/6/2016 0:00 10/7/2016 12:00 10/9/2016 0:00 10/13/2016 7:00 36 200 MVA/220 KV DUMMY U V W
223 16B12086/87/88/89 A 10/13/2016 5:00 10/13/2016 15:45 10/15/2016 7:00 10/15/2016 9:00 39 04 NOS REACTOR 110 MVAR
224 DT JOB -05 NOS B 10/17/2016 18:45 10/17/2016 19:00 10/18/2016 23:00 28
225 16B12092/93 A 10/24/2016 22:00 10/24/2016 22:30 10/26/2016 11:00 10/3/2016 7:00 36.5 02NOS REACTOR 110 MVAR
2266B11080/81/82/12094 A 11/4/2016 20:00 11/4/2016 21:00 11/6/2016 8:00 11/7/2016 11:00 35 03 NOS 80 MVAR ,01 NO 110MVAR
227 16B12083/16B12094 A 11/14/2016 22:00 11/14/2016 22:45 11/16/2016 14:00 11/16/2016 16:00 39 02 NOS REACTOR
22816b12101/2,16b12099 A 11/23/2016 2:00 11/23/2016 3:10 11/24/2016 13:45 11/24/2017 17:00 34.6 02NOS 80 MVAR PGCIL SPARE ,01 NO 110 MVAR ALIGARH SPARE
INSULATION B 11/23/2016 21:50 11/23/2016 22:00 11/24/2016 22:40 12/1/2016 8:00 24.7 INSULATION
229 16B12103 A 11/29/2016 23:30 11/30/2016 0:30 12/1/2016 11:00 12/2/2016 23:00 34.5 LV U,V W TS TRANCO
16B12103
230 A 12/6/2016 4:00 12/6/2016 5:00 12/7/2016 13:30 12/7/2016 16:00 32.5 MV-U,V+ TAP-- U V W
16B12103
231 B 12/7/2016 17:00 12/7/2016 21:30 Dec-16 7:00 12/9/2016 9:00 33.5 HV -U&V+ 14 NO CORONA +CYLINDER
232 16B12103 A 12/8/2016 23:00 12/9/2016 0:20 12/10/2016 7:00 12/10/2016 9:00 30.7 HV MV

233 17B01002 A 12/13/2016 23:00 12/14/2016 1:00 12/15/2016 8:00 12/15/2016 10:00 30 U AND V PHASE (80MVAR/400 KV )

234B01002+ 16B09059/60 B 12/16/2016 20:00 12/16/2016 21:00 12/18/2016 12:00 12/18/2016 13:00 39 KPTL-LV-W, 02 NO BHUJ REACTOR 80 MVAR/400 KV

235 17B02005 A 12/17/2016 15:00 12/17/2016 18:45 12/19/2016 3:45 12/19/2016 7:00 33 LV- U, V, W TAP- V,MV-U TS TRANSCO 2ND

23617B01002/3/17B02005 A 12/20/2016 5:30 12/20/2016 7:21 12/21/2016 14:50 12/21/2016 15:35 31.25 DUMMY U V W (17B01002) MV-V TAP-V , HV-U (17B01003)

237 16B09061/17B01001 A 12/22/2016 11:30 12/22/2016 12:35 12/23/2016 18:15 12/23/2016 21:00 30 110 MVAR/765KV +80 MVAR/765 LAKHNOW REPAIR

238 17B02005 B 12/22/2016 21:00 12/22/2016 22:00 12/24/2016 5:20 12/24/2016 7:00 31.3 T S TRANSCO. 2 ND HV-V W MV- W, TAP-

239 17B02005 A 12/24/2016 3:40 12/24/2016 4:00 12/25/2016 11:00 12/25/2016 12:00 30.5 HV-V +17B01001 ( LAKHNOW REPAIR REPROCESS)

240 17B01003 B 12/25/2016 4:30 12/25/2016 5:30 26-12-2016: 12:25 12/27/2016 13:30 31.1 KPTL 80 MVAR/400 KV HV- V, W

241 17B01004 B 12/28/2016 10:00 12/28/2016 12:00 12/29/2016 19:20 31.4 L&T 125 MVAR/400 KV
17B01004 B 12/31/2106 6:40 12/31/2016 6:40 12/31/2016 16:00 12/31/2016 16:30 7 425.7 HRS
16B09062 A 12/31/2016 20:00 12/31/2016 21:00 1/2/2017 7:00 1/2/2017 10:00 34 110 MVAR/765 KV REACTOR

242 16B12097 B 1/1/2017 23:30 1/1/2017 0:25 1/2/2016 7:26 1/2/2016 9:00 31 TECHN0 POWER U V W

244 16B12098/16B09063 A 1/3/2017 14:00 1/3/2017 14:40 1/4/2017 22:00 1/5/2017 7:00 31.3 LV -U, TV - U /BHUJ 110 MVAR/765 KV

245 17B01003 B 1/3/2017 5:30 12/3/2017 8:00 1/3/2017 23:00 1/5/2017 008:00 15 KPTL DUMMY U V W 80 MVAR/400 KV ( SURFACE DRYING )

246 16B12098 B 1/4/2017 16:30 1/4/2017 17:45 1/6/2017 1:00 1/6/2017 7:00 31.7 LV-U VTAP-V MV-U 16B09064 REACTOR

247 16B12098 A 1/6/2017 18:30 Jan-17 20:07 1/8/2017 3:25 1/9/2017 7:00 31.1 HV -U, V MV-V

248 16B12098 B 1/7/2017 22:20 1/7/2017 23:18 1/9/2017 8:18 1/9/2017 9:30 32 MV-V HV- U, V

249 16B12098 B 1/10/2017 13:00 1/10/2017 14:00 1/11/2017 14:00 1/10/2017 15:45 24 HV-W,LV-W ,TAP -W
17B01005
250 B 1/12/2017 12:00 1/12/2017 12:45 1/13/2017 21:00 1/17/2017 7:00 32 HV , MV LV TAP ( SINGLE PHASE)
16B12098
251 A 1/14/2017 5:45 1/14/2017 7:56 1/16/2017 1:00 1/16/2017 8:00 41.1 DUMMY COIL U V W ( WBSETCL 315 MVA/400 KV )
17B01006
252 B 1/17/2017 21:00 1/17/2017 21:30 1/19/2017 2:00 1/19/2017 3:30 28.5 HV , MV LV TAP ( SINGLE PHASE) 105MVA 400 KV
17B01007/3014
253 A 1/19/2017 14:30 1/19/2017 18:00 1/21/2017 2:00 1/21/2017 4:00 32 sterling 3rd HV MV LV / KEC HV
17B03014/17B01007
254 B 1/21/2017 14:30 1/21/2017 16:33 1/23/2017 1:00 1/23/2017 7:00 32.45 KEC133 MVA -LV MV /STERLING -TAP 396.15 hrs
17B01008/17B3014
255 A 1/24/2017 0:00 1/24/2017 1:10 1/25/2017 8:43 1/25/2017 11:00 31.5 17B01008 HV LV +17B03014 EV+3015 MV
17B01008/17B03015
256 A 1/26/2017 6:00 1/26/2017 7:30 1/27/2017 16:00 1/28/2017 7:00 32 17B01008 LV MV /17B01009 LV/17B03015 LV
17B03014/15/2010
257 A 1/29/2017 7:00 1/29/2017 8:00 1/30/2017 15:00 1/30/2017 18:30 31 17B03014 TAP,17B03015LV,1/B02010-HV +COIL490.65HRS IN JAN 2017
17B03015/3016/1009
258 A 1/31/2017 20:00 1/31/2017 21:15 2/2/2017 6:00 2/2/2017 7:30 31.4 17B03015-HV,17B03016HV,17B01009 TAP
17B03016/17B01009
259 A 2/4/2017 2:00 2/4/2017 3:12 2/5/2017 11:15 2/5/2017 15:00 32 17B03016 HV MV ,LV / 17B01009 MV
17B03014
260 B 2/6/2017 0:00 2/6/2017 1:00 2/7/2017 8:00 2/7/2017 9:00 31 DUMMY A &X 133 MVA /500 KV
17B02010 /17B03015
261 A 2/6/2017 23:30 2/7/2017 1:20 2/8/2017 9:00 2/9/2017 9:30 31.7 17B01010- HV, LV /17B03015 ,TAP, EV

262 17B03015/17B02010 B 2/13/2017 14:45 2/13/2017 15:40 2/14/2017 13:30 2/14/2017 15:30 21.8 A &X COLUMN/STERLING 6TH TAP ( SURFACE HEATING )

263 17B02006 A 2/13/2017 23:00 2/14/2017 0:01 2/15/2017 10:30 2/15/2017 12:30 34.5 LV-U V W

2647B03016/17/17B02010 A 2/16/2017 9:00 2/16/2017 10:00 2/17/2017 10:06 2/17/2017 12:00 24.1 17B03016-TAP,3017- HV, 17B02010 -MV

265 17B03017 B 2/18/2017 16:00 2/18/2017 17:00 2/20/2017 4:30 2/20/2017 6:30 35.5 X COLUMN (SURFACE HEATING ONLY)

266 17B03017/17B02006 A 2/21/2017 1:30 2/21/2017 2:36 2/22/2017 10:00 2/22/2017 12:00 31.4 KEC-MV, EV/ SHYAM INDUSTRIES TAP- U V

2671/17B02006/17B03017 B 2/22/2017 16:00 2/22/2017 18:00 2/24/2017 1:30 2/24/2017 6:00 31.5 17B02011-HV 17B02006 HV V PHASE, MV- W PHASE ,17B03017-TV

268 17B02006 A 2/24/2017 17:00 2/24/2017 17:30 2/26/2017 1:00 31.6 SHYAM INDUSTRY 500 MVA/400 KV LV U V W, HV

269 17B03017 /17B02010 B 2/26/2017 0:00 2/26/2017 0:55 2/26/2017 8:00 2/26/2017 9:00 7 Surface heating and vacuum only

270 17B03017 /17B02010 B 2/26/2017 16:00 2/26/2017 16:30 2/27/2017 9:00 2/27/2017 10:00 16.5 Surface heating and vacuum only

271 17B02010/17B02006 A 2/27/2017 22:00 2/27/2017 23:00 3/1/2017 6:45 3/1/2017 9:00 31.9 STERLING - DUMMY, 17B02006-MV - U&V

272 17B02006/7 B 3/1/2017 15:00 3/1/2017 16:30 3/3/2017 0:30 3/3/2017 7:00 32 392 HRS IN FEBUARY 2017

273 17B02007 A 3/2/2017 21:00 2/2/2017 22:00 3/4/2017 1:30 3/4/2017 6:30 27.5 LV-U&V TAP U ( SURFACE HEATING CYCLE )

274 17B02007 A 3/8/2017 16:30 3/8/2017 17:15 3/10/2017 1:00 3/10/2017 7:00 31.4 17B02007- MV - U V W TAP- U V

275 17B02008/17B02011 A 3/15/2017 15:00 3/15/2017 16:10 3/16/2017 24:00:00 3/17/2017 6:30 31.9 17B02008-LV-U V W /17B02011-TAP

276 A 3/18/2017 23:00 3/18/2017 0:00 3/19/2017 8:00 3/19/2017 12:00 32

277 17B02006 B 3/19/2017 1:00 3/19/2017 2:00 3/20/2017 14:00 3/20/2017 16:00 36.1 DUMMY U V W

B 3/21/2017 19:00 3/21/2017 19:00 3/22/2017 5:00 3/22/2017 15:00 11:00 17B02006 DUMMY ( SHYAM INDUSTRY) SURFACE DRYING

278 17B02008/17B02011 A 3/21/2017 17:30 3/22/2017 19:00 3/23/2017 2:00 3/23/2017 6:00 31 17B02008-MV-U,V / 17B02011 HV
17B05001
180 A 3/24/2017 5:30 3/24/2017 7:00 3/25/2017 14:10 3/26/2017 7:00 31.4 HV- U V W
17B02011/17B02008
181 B 24-03-207 13:00 3/24/2017 13:40 3/25/2017 17:25 3/25/2017 8:00 27.1 s/w dummy and 17b02008 - HV + INSULATION
17B02008/17B04001/
181 A 3/26/2017 9:00 3/26/2017 9:45 3/27/2017 17:00 3/27/2017 20:00 31.25 17B02008 TAP, HV /17B04001 TAP
17b02008
182 B 3/28/2017 17:30 3/28/2017 18:00 3/29/2017 14:00 3/29/2017 16:00 20 SURFACE DRYING
17B2007
183 B 3/29/2017 23:00 3/30/2017 0:15 4/1/2017 4:30 4/1/2017 6:30 52.3 DUMMY UV W (500 MVA /400 KV ) 384 HRS
17B04001
184 A 3/30/2017 23:00 3/31/2017 0:30 4/1/2017 5:00 4/1/2017 6:00 28 LV U V W, TAP- SURFACE HEATING 28
17B04001
185 A 4/2/2017 3:00 4/2/2017 Apr-24 4/3/2017 13:00 4/3/2017 16:00 32.6 MV-U V W 32.6
17B04001
186 B 4/4/2017 3:30 4/4/2017 4:20 4/5/2017 9:00 4/5/2017 12:00 29.6 HV- U V W 29.6
17B04002
187 A 4/4/2017 23:00 4/5/2017 0:24 4/6/2017 10:35 4/6/2017 13:00 34.2 BHALLABGRAH REACTOR 125 MVAR/400 KV U V W 34.2
17B05001
188 A 4/6/2017 22:00 4/6/2017 23:00 4/8/2017 7:00 4/8/2017 8:00 32.3 125 MVAR/400 KV MSETCL DUMMY U V W 32.3
17B02008
189 B 4/5/2017 23:00 4/6/2017 0:25 07-04-207 16:00 4/7/2017 17:00 37.2 shyam indus dummy u v w 500 mva/ 400 kv 37.2
17B04001
190 B 4/8/2017 20:30 4/8/2017 21:38 4/10/2017 6:42 4/11/2017 6:00 32.5 DUMMY U V W 32.5

191 17B05004 A 4/9/2017 0:00 4/9/2017 1:30 4/10/2017 9:00 4/10/2017 12:00 30.9 LV- U V W, 30.9

192 17B06003 A 4/11/2017 6:00 4/11/2017 7:30 4/12/2017 10:22 4/12/2017 12:30 27 MV-03 , 01 TAP 27

193 17B06003 B 4/12/2017 1:00 4/12/2017 2:16 4/13/2017 9:20 4/13/2017 11:00 31.1 HV - U V W 315 MVA/ 400KV 31.1

194 17B06003 A 4/13/2017 3:30 4/13/2017 4:00 4/14/2017 9:00 4/14/2017 12:00 29.3 MV- TAP 29.3

195 17B05002 B 4/13/2017 23:20 4/14/2017 2:00 4/15/2017 10:00 4/15/2017 15:00 32 HV U V W 32

196 17B04002/17B05002 A 4/14/2017 23:25 4/15/2017 1:38 4/16/2017 11:00 4/1/2017 7:00 33.3 DUMMMY U V W /LV- 33.3

197 17B05003/5004 A 4/17/2017 22:50 4/17/2017 23:25 4/19/2017 7:10 4/19/2017 9:00 31.8 REACTOR/5004-LV 31.8

198 17B05002 A 4/19/2017 23:30 4/20/2017 1:00 4/21/2017 11:50 4/22/2017 10:00 34.9 03 NOS MV AND 03 NOS LV 34.9

199 17B06003 B 4/20/2017 23:30 4/21/2017 1:00 4/21/2017 14:40 4/21/2017 16:00 13.7 DUMMY COIL 03 NOS SURFACE HEATING ONLY 13.7

200 17B05002/17B05003 A 4/22/2017 22:45 4/22/2017 23:10 4/24/2014 12:40 4/24/2017 14:40 36 MV TAP AND/ DUMMY 36

201 17B05004/16B10066 A 4/25/2017 17:30 4/25/2017 18:00 4/27/2017 3:00 4/27/2017 9:00 33 LV -U V W / REACTOR COIL BHUJ 33

202 17B05004 B 4/27/2017 15:00 4/27/2017 15:30 4/28/2017 23:00 4/29/2017 1:00 31.3 HV- U V W 31.3

203 17B05004 A 4/28/2017 13:50 4/28/2017 13:10 4/28/2017 14:00 4/29/2017 22:00 32 MV AND TAP 622.7 32

2046B10065/17B05004/05 A 5/1/2017 19:00 5/1/2017 22:40 5/3/2017 6:00 5/3/2017 8:00 31.2 HV, MV , LV -U V W 31.2 31.2

205 17B05005 B 5/1/2017 1:25 5/1/2017 1:50 TAP - U V W , MV - V, W

206 17B05005 B 5/4/2017 13:30 5/4/2017 14:00 5/5/2017 21:00 5/5/2017 11:00 31 HV- U V W 31
17b05005

207 17B06002 A 5/6/2017 6:00 5/6/2017 7:30 5/7/2017 15:00 5/8/2017 6:30 31.4 HV - U V W 31.4
17B05004
208 B 5/7/2017 7:10 5/7/2017 8:00 5/8/2017 22:00 5/8/2017 23:00 38.5 DUMMY U V W 38.5
PGCIL BHUJ
209 A 5/7/2017 19:00 5/7/2017 20:57 5/8/2017 7:00 5/8/2017 9:00 10 PGCIL BHUJ SURFACE HEATING 10
17B05004
210 B 5/7/2017 7:00 5/7/2017 7:55 5/8/2017 22:47 5/8/2017 0:00 38.5 DUMMY U V W 38.5
17B06002
211 A 5/9/2017 18:00 5/9/2017 18:45 5/10/2017 15:40 5/10/2017 17:30 21 DUMMY U V W 125MVAR/400 KV (SURFACE HEATING) 21
17B05005/17B11088
212 A 5/11/2017 4:00 5/11/2017 5:00 5/12/2017 9:38 5/12/2017 12:00 28.7 MV- BALLABGRAH 315/400 KV LV -U V W 500/400 KV ACAS 28.7
17B11088
213 B 5/11/2017 22:00 5/11/2017 23:00 5/13/2017 8:00 5/13/2017 16:00 33.6 HV COILS 03 NOS 33.6
17B011088
214 A 5/13/2017 2:40 5/13/2017 3:10 5/14/2017 9:14 5/14/2017 12:00 30 TAP U V W 30
174B05005
215 B 5/14/2017 8:30 5/14/2017 9:27 5/16/2017 2:46 5/16/2017 6:00 42 DUMMY U V W 315MVA/400 KV 42
17B11088
216 A 5/15/2017 15:30 5/15/2017 16:30 5/16/2017 23:00 5/17/2017 2:00 30.6 MV- U V W 30.6
17B05006
217 A 5/18/2017 1:30 5/18/2017 2:50 5/19/2017 10:10 5/19/2017 12:00 31.3 LV- UV W TAP- UV W 315 MVA/400 KV 31.3
17B05006
218 B 5/18/2017 16:00 5/18/2017 17:00 5/20/2017 4:20 5/20/2017 6:00 35.4 HV - UV W 35.4
17B05006/17B06005
219 A 5/20/2017 16:30 5/20/2017 17:47 5/22/2017 2:00 5/22/2017 6:00 31.5 03 NO MV 315 MVA/500 MVA-02 NO COILS 31.5
220 17B06005 A 5/23/2017 3:30 5/23/2017 4:18 5/24/2017 11:30 5/24/2017 20:00 37 LV- V, TAP- U V W 37

221 17B06005 A 5/25/2017 13:20 5/25/2017 14:05 5/26/2017 22:00 5/27/2017 7:00 31.7 MV- U V HV- V LV - V

222 BINA S C. INSULATION B 5/25/2017 4:00 5/25/2017 4:45 5/26/2017 6:00 5/26/2017 7:00 25.25 INSULATION 800 MVA/400 KV CYLINDER

223 17B05006 B 5/26/2017 14:00 5/26/2017 14:26 5/27/2017 5:20 5/27/2017 7:00 15 DUMMY U V W SURFACE HEATING

224 17B06051 A 5/28/2017 18:00 5/28/2017 18:45 5/30/2017 9:00 5/30/2017 10:00 38 HV MV LV EV TAP 05 NO COILS 500MVA/400 KV

225 17B06005 B 5/28/2017 1:30 5/28/2017 2:20 5/29/2017 10:00 5/29/2017 11:00 31.7 HV U V + INSULATION 643.35 HRS

226 17B06006 A 5/31/2017 5:30 5/31/2017 7:10 6/1/2017 12:20 5/1/2017 17:30 31.3 LV-U V ,MV- V, TAP- REPROCESS OF 17B06051

227 17B06006 A 6/2/2017 15:30 6/2/2017 17:00 6/4/2017 0:00 6/4/2017 6:00 31 LV -U V

228 17B06005 B 6/2/2017 15:50 6/2/2017 16:45 6/5/2017 4:00 6/5/2017 7:00 59.1 DUMMY U V W ( 500/400 KV )

229 17B06051 B 6/5/2017 23:30 6/6/2017 0:37 6/7/2017 5:00 6/7/2017 7:00 26.6 PERMAWOOD INSULATION

230 17B06052 A 6/9/2017 4:30 6/9/2017 5:30 6/10/2017 18:00 6/10/2017 20:00 36.5 HV -1, TAP-1, 17B06006 -LV (W)

231 17B06051 B 6/8/2017 18:00 6/8/2017 19:00 6/10/2017 4:00 6/10/2017 7:00 33 A &X COLUM

232 17B06006 A 6/11/2017 7:30 6/11/2017 9:00 6/12/2017 14:57 6/12/2017 16:00 30.1 TAP U V W AND HV 500MVA/400 KV

233 17B07056 A 6/15/2017 17:30 6/15/2017 18:26 6/17/2017 4:00 6/17/2017 7:00 33.5 MV, EV +CYLINDER AND P.W INSULATION

234 17B06006 B 6/17/2017 4:30 6/17/2017 5:15 6/17/2017 19:00 6/17/2017 20:00 14 DUMMY U V W 50% PRESSURE APPLY ( SURFACE HEATING)

235 BINA S C. INSULATION A 6/18/2017 3:00 6/18/2017 3:25 6/19/2017 12:00 6/19/2017 13:00 32.1 BINA CKT INSULATION

236 17B06006 B 6/18/2017 1:00 6/18/2017 1:30 6/19/2017 7:30 6/19/2017 8:00 30 DUMMY U V W 500MVA/400KV

237 ACTIVE PART INSULATION A 6/21/2017 2:00 6/21/2017 2:20 20

237 17B06052 B 6/22/2017 11:20 6/22/2017 15:40 6/24/2017 23:00 6/25/2017 0:30 31.3 A&X COLUMN
17B05002
238 A 6/22/2017 16:00 6/22/2017 17:20 6/24/2017 3:00 6/24/2017 6:00 33.7 HV -U V W 125 MVAR/400 KV
17B07010
239 B 6/25/2017 7:40 6/25/2017 10:40 6/26/2017 15:00 6/26/2017 16:30 28.3 DUMMY U V W
17B06001
240 A 6/25/2017 15:00 6/25/2017 15:35 6/27/2017 0:40 6/27/2017 2:35 33 HV- U V
17B06001/17B11089
241 B 6/27/2017 4:50 6/27/2017 5:30 6/28/2017 14:00 6/28/2017 16:00 32.5 HV- W / 17B11089- HV- V W
17B11089
242 A 6/28/2017 14:30 6/28/2017 15:30 6/29/2017 18:40 6/29/2017 20:00 26.4 LV- UV W /TAP -U V W
17B11089
243 B 6/29/2017 3:40 6/29/2017 5:45 7/1/2017 14:00 7/1/2017 17:00 32.3 HV- U ,MV-U W 5947 hrs
17b11089/16b11067
244 A 6/30/2017 6:15 6/30/2017 8:05 7/1/2017 15:30 7/1/2017 16:30 32
17B06001/16B10067
245 A 7/2/2017 2:45 7/2/2017 3:18 7/3/2017 4:00 7/3/2017 7:00 24.7 Surface heating and vacuum only DUMMY
17B06053
246 A 7/6/2017 12:00 7/6/2017 13:30 6/7/2017 23:00 7/7/2017 0:00 31.6 500 MVA/765 KV HV, TAP, MV, LV, EV
17B07002/3/4
247 B 7/7/2017 6:00 7/7/2017 8:00 7/8/2017 19:00 7/8/2017 20:00 35 HV-03 NOS
17B07003/04
248 A 7/10/2017 1:30 7/10/2017 2:00 7/10/2017 7:30 7/10/2017 8:30 5.5 SURFACE HEATING
249 17B07003/17B07001 A 7/12/2017 7:30 7/12/2017 8:00 7/13/2017 10:30 7/14/2017 1:00 26.5 RE/ U V W

250 BINA - B 7/13/2017 13:00 7/13/2017 14:00 7/15/2017 0 7/15/2017 4:00 34 LV-1,LV-2 HV

251 17B06054 A 7/15/2017 19:00 7/15/2017 21:10 7/17/2017 9:00 7/17/2017 11:00 36 500 MVA/765 KV HV, TAP, MV, LV, EV

252 16B10068 B 7/16/2017 17:00 7/16/2017 17:35 7/17/2017 23:00 7/17/2017 6:00 30 110 MVAR/765 KV

253 17B07001 A 7/18/2017 6:00 7/18/2017 7:35 7/18/2017 15:00 7/18/2017 16:00 30.5 DUMMY U VW SURFACE HEATING

254 17B08006 A 7/19/2017 5:45 7/19/2017 7:20 7/20/2017 15:00 7/21/2017 9:30 31.7 UV W

255 17B06055/17B11090 A 7/22/2017 15:00 7/22/2017 16:20 7/24/2017 4:00 7/24/2017 6:00 35.7 EV, HV /LV-U V W

256 17B11090 B 7/23/2017 7:30 7/23/2017 8:00 7/24/2017 16:00 7/24/2017 17:30 32 MV- U V

257 17B08006/17B11090 A 7/25/2017 7:30 7/25/2017 8:35 7/26/2017 14:00 7/26/2017 16:00 31.5 U V W/ MV- W AND 17B06055 -LV

258 17B07055/16B10069 B 7/25/2017 23:00 7/26/2017 0:20 7/27/2017 6:00 7/27/2017 7:30 30 MV,TAP/ HV

259 INSULATIOPN A 7/28/2017 23:00 7/29/2017 1:30 7/30/2017 0:30 7/31/2017 1:30 24 PERWOOD INSULATION 473.7

260 17B11090 A 7/31/2017 21:30 7/31/2017 22:30 8/1/2017 7:30 8/1/2017 9:00 34.2 TAP HV

261 B 13:00 8/1/2017 0:00 35

262 17B11090 B 8/1/2017 12:00 8/1/2017 13:00 8/2/2017 23:00 8/3/2017 1:00 34 HV-V&W

26317B11090 1/16B10070 A 8/2/2017 17:00 8/2/2017 18:00 8/4/2017 0:30 8/4/2017 1:00 31 LV- U VW / HV

264 17B07005/17B11091 B 8/4/2017 10:30 8/4/2017 12:45 8/5/2017 19:00 8/5/2017 20:30 30.25 HV / LV - U V W

265 17B07004/16B10071 A 8/5/2017 17:00 8/5/2017 17:45 8/7/2017 4:00 8/8/2017 6:00 34.25 U V W/ HV

266-1, HV COL A/ 17B07005 B 8/6/2017 15:00 8/6/2017 16:00 8/8/2017 2:00 8/8/2017 6:00 34 03 NO COIL

267 07056/16b10068 (72) A 8/9/2017 17:00 8/9/2017 17:30 8/11/2017 4:00 8/11/2017 7:00 34.5 LV - EV / HV
17B06055/17BB11090
268 A 8/12/2017 13:50 8/12/2017 14:45 8/14/2017 1:00 8/14/2017 3:00 34 TAP U V / HV
17B11091/
269 B 8/13/2017 4:20 8/13/2017 5:00 8/14/2017 14:00 16-08-20107 8:00 34 HV - U VW
17B7056/17B05005
270 A 8/14/2017 6:00 8/14/2017 7:00 8/16/2017 18:00 8/16/2017 20:00 32.2 MV- /TAP- U
17B07056/17B08002
271 A 8/17/2017 5:30 8/17/2017 6:00 8/18/2017 13:00 8/18/2017 14:00 32 HV/ HV
17B07011/17B08002
272 B 8/18/2017 5:30 8/18/2017 6:00 8/19/2017 15:30 8/19/2017 16:30 31
2737/17B07011/17B05005 A 8/19/2017 22:30 8/19/2017 8/21/2017 7:00 8/21/2017 8:25 31.5
274 16B12097 A 8/22/2017 13:30 8/22/2017 14:00 8/23/2017 22:00 8/23/2017 23:50 32
275 17B08003 B 8/23/2017 0:30 8/23/2017 1:00 32 CHILKA +INSULATION
276 17B07006 A 27-08-02017 1:00 8/27/2017 2:00 8/28/2017 7:00 8/28/2017 8:40 29 LV-U V TAP- U HV- UMV-U V
277 17B07057/17B07006 A 8/30/2017 16:30 8/30/2017 17:00 9/1/2017 4:00 9/1/2017 7:00 35 S/W-MV-W LV- W HV- V W TAP - V
278 16B10073 B 8/30/2017 23:30 8/31/2017 1:00 9/1/2017 11:00 9/1/2017 12:30 34 BHUJ + CHILKA BLOCK ,WASHER 500 MVA 1ST JOB)
279 17B03018/17B07006 B 9/2/2017 3:30 9/2/2017 4:00 9/3/2017 18:00 9/3/2017 19:00 38 TAP W CHILKA 500 MVA 02 NO TAP 623.9
280 17B06004 A 9/2/2017 18:00 9/2/2017 18:30 9/4/2017 7:00 9/4/2017 14:30 36.5 50 MVA LV- TAP HV U BHUJ 14
281 Cylinder Insulation B 9/5/2017 10:30 9/5/2017 11:00 9/6/2017 6:00 9/6/2017 8:00 17
282 17B06004 A 9/6/2017 19:10 9/6/2017 20:00 9/8/2017 6:00 9/8/2017 9:00 34 HV-V W TAP-V W LV-U V
283 17B11091/ B 9/10/2017 4:50 9/10/2017 7:10 9/12/2017 12:00 9/11/2017 14:00 53.2 DUMMY ARASUE
284 17B08004/3018 A 9/11/2017 18:35 9/11/2017 20:20 9/13/2017 7:00 9/13/2017 9:00 34.6 HV , MV LV
285 17B08005/17B3018 B 9/14/2017 2:30 9/14/2017 3:00 9/15/2017 14:00 9/15/2017 15:00 35 REACTOR/ HV- TAP
286 17B07006 A 9/14/2017 4:00 9/14/2017 5:00 9/15/2017 19:00 9/15/2017 20:00 38 STERLING WILSON DUMMY U VW
287 17B07005/17B03018 A 9/16/2017 22:30 9/16/2017 22:45 9/18/2017 8:45 9/18/2017 10:00 34 LV- U V W TAP-U V /CHILKA EV ( 2ND)
288 17B06004/17B07056 A 9/19/2017 5:45 9/19/2017 8:00 9/20/2017 19:00 9/19/2017 20:00 35 S/W DUMMY / A&X COLUMN
289 17B07005 B 9/21/2017 6:05 9/21/2017 8:36 9/22/2017 17:00 9/22/2017 20:00 32 MV-U V, TAP , HV- U
290 17B08005/17B07005 A 9/21/2017 16:00 9/21/2017 16:40 9/23/2017 6:00 9/23/2017 9:00 34.9 GETCO 500/400KV - HV-U, LV-U/ S/W 200 MVA HV-V,W MV-W
291 17b05034 A 9/23/2017 23:00 9/24/2017 0:00 9/26/2017 10:30 9/26/2017 12:00 34.5 vemagiri 80 mvar/765 kv + getco- hv - u
292 17b03018/ CHILKA A 9/27/2017 4:10 9/27/2017 4:30 9/28/2017 12:38 9/28/2017 16:50 32.2 A and X column
293 BINA & 17B05034 B 9/27/2017 5:15 9/27/2017 5:40 9/28/2017 15:40 9/28/2017 16:40 35 BINA REPAIR AND VEMAGIRI(17B05035) 523.9
294 17B03018 A 9/29/2017 1:45 9/29/2017 2:00 A&X
295 BINA REPAIR B 9/29/2017 23:00 9/30/2017 4:00 10/1/2017 14:40 10/1/2017 16:00 31.7 LV-1-X, A, lv-2nd x
296 BINA REPAIR B 10/3/2017 12:30 10/3/2017 1:30 10/4/2017 10:10 10/4/2017 12:00 33.7 HV-X
297 17B08005 A 10/3/2017 2:00 10/3/2017 2:30 10/4/2017 14:00 10/4/2017 18:20 36.5 LV-U,MV-U,TAP-/17B05036= HV
298 17B05037/38 B 10/5/2017 6:30 10/5/2017 7:30 10/6/2017 17:00 10/6/2017 20:00 32.5 02 NO HV
299 17B08005 A 10/6/2017 21:00 10/6/2017 21:30 10/8/2017 12:00 10/9/2017 15:00 38.5 GETCO LV- W , M V -V/W TAP-V
300 17B08005 B 10/7/2017 13:30 10/7/2017 14:00 10/9/2017 2:00 10/9/2017 9:00 36 HV- V, W TAP-W
301 17B04023 A 10/11/2017 19:00 10/10/2017 20:00 10/12/2017 2:00 10/13/2017 9:00 30 COIL A&X DUMMY
302 BINA B 10/13/2017 22:00 10/13/2017 22:30 10/16/2017 9:00 10/16/2017 9:30 58.6 X&X COLOUMN
303 17B07059/17B09002 A 10/14/2017 6:00 10/14/2017 7:30 10/15/2017 23:00 10/16/2017 2:00 39.5 02 NOS COIL HV 40
30417B05039/9003/4024/ A 10/17/2017 13:00 10/17/2017 14:00 10/19/2017 4:00 10/19/2017 7:00 38 HV- 02 NOS HV / 4024-LV, TAP, MV 60
305 17B07005 B 10/17/2017 23:15 10/18/2017 2:00 10/20/2017 15:00 10/22/2017 63 DUMMY U V W 80
306 17B01086/17B09024 A 10/19/2017 15:30 10/19/2017 18:00 10/21/2017 4:00 10/23/2017 7:00 34 MV-U V W/ 17B04024- EV 50
307 17B04024/17B11092 A 10/24/2017 22:30 10/24/2017 23:15 10/26/2017 9:30 10/26/2017 12:00 34 HV/ LV-U V W TAP- 60
308 17B10006/17B11092 A 10/27/2017 15:00 10/27/2017 16:00 10/28/2017 8:00 10/28/2017 9:00 16 DUMMY AND HV SURFACE HEATING 0
309 17B11092 B 10/27/2017 1:00 10/27/2017 2:18 10/28/2017 10:00 10/28/2017 11:00 31.6 MV-U V TAP-V W 45
310 17B11092 A 10/29/2017 3:00 10/29/2017 3:30 10/30/2017 11:20 10/30/2017 16:00 32 HV-V MV-U, 17B09004 50
311 17B09060/17B11092 B 10/30/2017 22:30 10/30/2017 23:00 11/1/2017 6:30 11/1/2017 9:00 31.5 HV,/ HV- V, W 584 45
312 17B04025/17B09061 A 11/3/2017 8:30 11/3/2017 10:00 11/4/2017 20:00 11/6/2017 7:00 34 HV,LV,MV, EV/HV REACTOR 70
313 17B07062/17B05047 A 11/7/2017 23:20 11/8/2017 0:38 11/9/2017 5:30 Sep-17 7:00 29 HV/ HV- U V W 60
314 17B07061 B 11/9/2017 13:00 11/9/2017 14:40 11/13/2017 10:00 11/14/2017 7:00 91.3 REACTOR PROCESS 35
315 17B05047/17B11001 A 11/10/2017 16:30 11/10/2017 17:00 11/11/2017 4:00 11/11/2017 7:00 11 SURFACE HEATING 0
316 17B04024/17B07063 A 11/14/2017 7:00 11/14/2017 9:00 11/15/2017 15:00 11/15/2017 16:00 30 A&X COLOUMN/REACTOR 80 MVAR/765 KV 80
317 17B12001 A 11/17/2017 17:00 11/17/2017 17:30 11/18/2017 14:30 11/18/2017 15:30 21 SURFACE HEATING 0
318 17B07064+GE B 11/17/2017 4:00 11/17/2017 5:00 11/18/2017 12:20 11/18/2017 13:00 31.4 HV/ HV- U V 45
319 17B02001/17B11001 A 11/18/2017 21:30 11/18/2017 22:30 11/20/2017 6:30 11/20/2017 8:30 32 LV U V W, TAP U V/ HV W 70
320 17B04024/17B01001 B 11/19/2017 3:30 11/19/2017 4:20 11/20/2017 16:00 11/20/2017 17:00 36 a &x column/ 17b01001 hv -w 90
32107065/17B02001/2001 A 11/21/2017 2:10 11/21/2017 3:00 11/22/2017 11:00 11/22/2017 13:00 32 HV/ MV- UVW/ HV- V TAP W 75
322 17B11001 B 11/23/2017 1:30 11/23/2017 2:00 11/24/2017 5:15 11/24/2017 7:30 27.5 DUMMY U V W( SURFACE HEATING) 0
323 17B05048/2001/3001 A 11/23/2017 22:30 11/24/2017 0:00 11/25/2017 5:00 11/25/2017 7:30 29 HV , -U V W HV- W, LV U V 60
324 18B03001 B 11/25/2017 0:00 11/25/2017 0:30 11/26/2017 8:00 11/27/2017 6:00 32 LV W, TAP U V W MV- U 50
325 18B03001 A 11/26/2017 4:45 11/26/2017 5:25 11/27/2017 12:30 11/27/2017 15:00 31 MV- U V/ LV - U V W 433.2 50
326 17B02001 B 11/28/2017 2:40 11/28/2017 3:10 11/29/2017 10:00 11/29/2017 12:30 31 DUMMY (SURFACE HEATING ) 730
3278B03001 /17B11002/ A 11/29/2017 1:00 11/29/2017 2:00 11/30/2017 5:30 11/30/2017 7:30 27.5 03 NO LV. MV /17B10001 30
328 17B11002/17B05041 A 12/1/2017 15:00 12/1/2017 16:15 12/2/2017 22:55 12/3/2017 0:30 30.7 MV- U V W/ TAP U V W 50
329 17B03001 B 12/3/2017 2:00 12/3/2017 2:40 12/4/2017 14:25 12/14/2017 15:00 35.6 DTL-2 DUMMY U V W 5000 MVA/400 KV 60
330 17B11003/ A 12/5/2017 8:00 12/5/2017 21:00 12/7/2017 1:00 12/7/2017 2:00 29 LV- U V W TAP- U V W, MV- V 45
331 17B11002 B 12/5/2017 12:00 12/5/2017 13:00 12/6/2017 13:00 12/6/2017 15:00 24 HV- U V W 35
332 17B11003/4 A 12/7/2017 16:00 12/7/2017 17:00 12/9/2017 1:00 12/9/2017 3:00 32 MV-V W LV- U V W 40
333 17B1001 B 12/7/2017 21:00 12/7/2017 21:48 12/9/2017 7:50 12/9/2017 10:00 34 DUMMY U V W 60
33417B10002/3,17B11004 A 12/10/2017 5:00 12/10/2017 6:00 12/11/2017 17:00 12/11/2017 18:30 35 03 NOS 80/765 KV GE-4 TAP U V W MV- V 55
335 17B11003 B 12/9/2017 19:00 Dec-17 20:00 12/11/2017 3:00 12/11/2017 6:30 31 HV- U V W 25
336 17B11004 B 12/11/2017 14:30 12/11/2017 15:21 12/12/2017 22:50 12/13/2017 5:40 31 HV U V W 25
337 17B04026 B 12/16/2017 18:00 12/16/2017 18:45 12/18/2017 5:00 12/18/2017 9:00 34.25 MV HV + INSULATION 20
338 17B05043/1002/ L&T A 12/14/2017 3:00 12/14/2017 3:40 12/15/2017 14:00 12/15/2017 16:00 34.3 02 NO REACTOR 03 NOS DUMMY 50
339 17B11003 B 12/14/2017 4:00 12/14/2017 5:00 12/16/2017 5:00 12/16/2017 7:00 47.9 DUMMY U V W 60
340 17B04026 B 16-121-2017 18:00 12/16/2017 18:45 12/18/2017 5:00 12/18/2017 7:00 34.25 MV HV + INSULATION 25
341 17B04026/17B05044 A 12/18/2017 0 OK 0
342 17B10004 A 12/18/2017 18:00 12/18/2017 18:50 12/20/2017 5:00 12/20/2017 7:30 34.2 4026- EV LV TAP / HV REACTORS 35
343 17B11004 B 12/22/2017 6:30 12/22/2017 7:00 12/25/2017 8:00 12/25/2017 10:00 73 DUMMY U V W 60
34417B12001/17B5045/46 A 12/22/2017 23:15 12/22/2017 2:38 12/24/2017 14:00 12/24/2017 16:30 35.5 LV- U V W,HV- U V W / HV REACTORS 45
345 17B04027 B 12/27/2017 3:30 12/27/2017 4:30 12/28/2017 15:00 12/28/2017 17:00 35.5 A&X COLOUMN 50
611.2 740 740
Assemb
Job In VPD Start
Sr.No Job No VPD No
Date Time Date Time
1 17B06052/17B07009 D 7/1/2017 0:30 7/2/2017 1:10
D 7/9/2017 20:10 7/9/2017 20:25
2 17B06001/17B10067 C 7/8/2017 20:48 7/8/2017 21:00
17B06001/17B10067 C 7/13/2017 21:05 7/13/2017 21:30
17B06001 C 7/15/2017 11:00 7/15/2017 12:00
3 17B11089/17B07003 D 7/12/2017 23:00 7/12/2017 23:30
17B11089/17B07003 D 7/19/2017 15:00 7/19/2017 16:00
4 17B05005 C 7/18/2017 13:00 7/18/2017 14:25
5 17B07001/16B10068 C 7/21/2017 15:00 7/21/2017 15:30
6 17B06053/17B07002/4 D 7/21/2017 13:00 7/21/2017 13:40
17B07001 C 7/25/2017 22:00 7/25/2017 22:25
17B06053 D 7/28/2017 23:30 7/28/2017 0:00
17B07001 C 7/27/2017 23:30 7/28/2017 0:00
17b08006/7 C 7/30/2017 13:40 7/30/2017 14:00
7 17b08006/7 C 8/3/2017 22:00 8/3/2017 22:30
17B08007 C 8/4/2017 7:00 8/5/2017 18:00
17B08007 C 8/6/2017 15:00 8/6/2017 15:00
8 17B06054/16B10069 D 7/30/2017 14:45 7/30/2017 15:00
17B06054 D 8/6/2017 15:00 8/6/2017 15:20
9 17B07001/16B10070/17B07007 C 8/10/2017 18:00 8/10/2017 18:50
10 17B07055/17B07008/16B010071 D 8/12/2017 23:25 8/12/2017 23:30
17B07055/17B07008/16B010071 D 8/21/2017 16:00 8/21/2017 16:10
17B07055/17B07008/16B010071 D 8/22/2017 16:30 8/22/2017 16:40
17B07008/16B10071 D 8/23/2017 16:38 8/23/2017 17:00
11 16B10072/17B07011/17B08001 C 8/23/2017 22:10 8/23/2017 22:40
16B10072/17B07011/17B08001 D 8/28/2017 21:50 8/28/2017 22:10
16B10072/17B07011/17B08001 D 8/29/2017 13:00 8/29/2017 13:26
16B10072/17B07011/17B08001 D 8/30/2017 18:00 8/30/2017 18:15
16B10072/17B07011/17B08001 9/1/2017 1:00 9/1/2017 1:00
16B10072 D 9/1/2017 14:35 9/1/2017 14:51
12 17B11090 C 8/28/2017 21:50 8/28/2017 22:00
17B11090 C 9/2/2017 23:30 9/3/2017 0:11
13 17B08002/3/17B05005 D 9/2/2017 16:30 9/2/2017 17:00
14 16B12097/1B10073 C 9/5/2017 13:00 9/5/2017 13:30
17B05005/17B08002/3 D 9/7/2017 23:30 8/8/2017 0:30
16B12097 D 9/14/2017 3:30 9/14/2017 3:40
16B12097 D 9/14/2017 14:00 9/14/2017 14:00
16B12097 D 9/15/2017 18:00 9/15/2017 18:00
16B12097 D 9/16/2017 15:30 9/16/2017 15:30
16B12097 D 9/20/2017 5:00 9/20/2017 5:00
15 17B08004/16B10074 C 9/15/2017 21:40 9/15/2017 22:02
17B08004/16B10074 C 9/20/2017 20:00 9/20/2017 20:30
16B10074 C 9/21/2017 23:30 9/22/2017 0:30
16 17B11091/17B07006 D 9/22/2017 11:30 9/22/2017 12:15
17B11091/17B07006 D 9/29/2017 5:53 9/29/2017 11:30
17B11091/17B07006 D 10/1/2017 5:40 10/1/2017 22:00
17B11091 10/2/2017 7:00 10/2/2017 15:15
17B07008 C 9/23/2017 23:00 9/23/2017 23:30
17 17B05034/17B09001 C 9/28/2017 22:30 9/28/2017 23:00
Assembly VPD Records
VPD End Job out Remarks
Date Time Date Time
7/9/2017 4:00 7/9/2017 7:00 500 MVAQ/765 KV /125 MVAR/420 KV
7/10/2017 6:30 7/10/2017 7:30 surface drying
7/13/2017 0:00 7/13/2017 7:00 surface drying
7/15/2017 6:45 7/15/2017 7:30 surface drying
7/18/2017 5:30 7/18/2017 6:50 surface drying
7/17/2017 4:05 7/19/2017 7:00 500MVA/400 KV /80 MVAR/400 KV
7/20/2017 5:30 7/20/2017 7:00 surface drying
7/20/2017 15:00 7/21/2017 9:00 315 MVA/400KV ROR DISTILLATION
7/25/2017 10:00 7/25/2017 15:00 80/400KV /110MVAR/765 KV
7/28/2017 6:00 7/28/2017 8:00 500/765, 80/765 KV - 02 NOS
7/26/2017 5:00 7/26/2017 7:00 surface drying
7/29/2017 6:00 7/29/2017 7:00 surface drying
7/28/2017 15:00 7/29/2017 15:00 surface drying
8/3/2017 11:35 8/3/2017 12:15 KEC 1/2 50MVAR/400 KV
8/4/2017 6:00 8/4/2017 7:00 surface drying
8/6/2017 13:00 8/6/2017 15:00 surface drying
8/7/2017 13:00 8/8/2017 7:00 surface drying
8/6/2017 11:28 8/6/2017 13:00 BADLA2ND /BHUJ -11
8/7/2017 12:00 surface drying
8/14/2017 19:00 8/16/2017 6:30 80 MVAR /400 KV, 80 MVAR /765 KV NOS /110 MVAR/765 KV
8/19/2017 23:00 8/21/2017 7:00 500/80/110 MVA/765 KV
8/22/2017 5:30 8/22/2017 6:30 surface drying
8/23/2017 5:30 8/23/2017 6:30 surface drying
8/24/2017 5:00 8/24/2017 7:00 surface drying
8/27/2017 21:25 8/28/2017 6:30 02 NO 80 MVAR/765 KV , 110 MVAR/765 KV
8/29/2017 5:00 8/29/2017 6:30 surface drying
8/30/2017 5:00 8/30/2017 11:25 surface drying
8/31/2017 15:00 8/31/2017 16:00 surface drying
9/1/2017 5:00 9/1/2017 7:00 surface drying
9/2/2017 5:00 9/2/2017 7:00 surface drying
9/2/2017 14:00 9/2/2017 15:00 500 MVA/ 400KV ICT
9/4/2017 5:00 9/4/2017 7:00 surface drying
9/7/2017 14:00 9/7/2017 15:00 80 MVAR/765 KV 02 NO ,315 MVA/400 KV
9/9/2017 7:00 110 MVAR/765 KV ,125 MVAR/400 KV
9/8/2017 5:30 surface drying
9/14/2017 8:40 surface drying ( TANK NOT AVAILABLE)
9/15/2017 5:00 surface drying ( TANK NOT AVAILABLE)
9/16/2017 8:00 surface drying ( TANK NOT AVAILABLE)
9/17/2017 15:00 surface drying ( TANK NOT AVAILABLE)
9/20/2017 14:00 surface drying ( TANK NOT AVAILABLE)
9/19/2017 21:00 9/20/2017 11:45 CHILKA 80 MVAR /BHUJ 110 MVAR/765
9/21/2017 6:00 9/21/2017 16:00 17B08004 TANK ( 21-09-2017 )
9/23/2017 5:00 9/23/2017 7:00 surface drying
9/27/2017 12:00 9/29/2017 5:53 500/400 KV ARASUR AND 160 MVA STERLING WILSON
9/29/2017 23:00 9/30/2017 5:40 surface drying
10/2/2017 05::00 10/2/2017 7:00 surface drying
10/2/2017 22:30 10/3/2017 6:00 surface drying
9/25/2017 13:14 9/27/2017 8:00 80 MVAR/765 KV FOR DISTILLATION
10/2/2017 15:14 VEMAGIRI AND CHILKA 80 MVAR /765 KV
Total No of Running Hours
170.9
10
99
32.25
29.5
100
13.5
49
90.3
160
7.5
7
6 774.95
103.6 774.95
7.5
19
22
134.6
20.7
101.7
167.5
13.3
12.8
12
94.8
7
15
13
4
14
111.8
5
117
89.7
5
5
15
14
23.5
9
95
9.5
28.5
119.75
11.5
7
7.25
37.8
88.2

You might also like