TELANGANA STATE POLLUTION CONTROL BOARD

REGIONAL OFFICE, HYDERABAD

Dated 06/12/2016
From
The Environmental Engineer,
Regional Office,
T.S.Pollution Control Board,

To

The Member Secretary / The Joint Chief Environmental Engineer (Zonal Office),

Sir,

Sub:PCB – RO- M/S TATA CONSULTANCY SERVICES LIMITED--- Verification report – Submitted-
Regarding.

Ref:The details of the industry and inspection report are submitted as below:

1.Name and Address of the industry: M/S TATA CONSULTANCY SERVICES


LIMITED,M/S Tata Consultancy services
limited,khan Latifkhan Building ,6th Floor,Near LB
Stadium , Nampally, Hyderabad
2.Status of Consent and HWA :
(i)Fresh / Renewal : reNew
(ii)Date of receipt of application / Additional 05.12.2016
information :
3. Project Cost(in Lakhs) : 6.74 Crores
4. Total investment on pollution control measures and recurring cost and percentage :
Latitude :
Longitude :
Total Area of the plant : 31000 Sq ft
Extent of Greenbelt :
(vi)Boundaries of the site
North:
South:
East:
West:
5. Date of commissioning : 28/11/2016
6. Status of E.C :
(i)Line of Activity as per EIA Notification : IT Software Unit
(ii)Environmental Clearance order No. and date : --
(iii)Violations of EIA Notification : --
7. (i)Inspection conducted by DAYANANDMULUGU
(ii)Date of Inspection : 03/12/2016
8. Raw materials / Fuels required for production at Consented capacity per Month :

1
Name of the Major Raw material Quantity Unit
/ material used in the Activity
software unit 0 Kg/day
9. Products & By Products manufactured / Storage capacity of Petroleum products / Mining capacity etc per
Day / Month :
Line of activity / Products Capacity Unit
software unit 0 Kg/day
10. Water Source :
S.No. Source Type Source Name Quantity(KLD)
1. Public Supply tankers/borewell 8.0
11. Average daily consumption of water:
Sl. No. Purpose Quantity Unit
1. Domestic 8 KLD
12. Waste Water Discharge :
Purpose Quantity Units

13. Out let – as per CFO order dt:11/05/2016


Outlet Description Max Daily Discharge Point of Disposal
Domestic 5.0 KLD Septic tank followed by soak pit
14. ETP Details & Mode of Disposal :
Stream Details Treatment units details Point of disposal
-- -- --

Standards stipulated as per CFO order dated 11/05/2016


15. Water Cess
(i)Returns filed upto (Month & Year) --
(ii)Assessment issued upto (Month & Year) --
(iii)Assessment paid upto (Month & Year) --
(iv)Assessment amount due (In Rs.) --
16. Air pollution
Source of Pollution Control equipment Stack height in ms Stack dia in ms Flow Rate m3/hr
provided
DG Set of capacity - - - -
250 KVA
DG Set of capacity -- -- -- --
250 KVA
17. Emissions from chimneys – as per CFO order 11/05/2016
Description of Chimney Quantity of Emissions at peak Limiting Standard(mg/Nm3)
flow m3/hr
-- -- --
18.Hazardous chemicals used and their storage facilities:

2
Name of the Chemical / Fuel Storage capacity in KL or Tons
Used Oil 200 LPA
Oil Filters 50 NPA
Piles Soaked Cotton Waste 50 Kgs/Annum
Batteries 150 Nos/ 3 years
E-waste 3 TPA
Garbage 50 Kgs/Day
19. SOLID WASTES
19.1 HWA Details

3
S.No. Name of Hazardou Quantity Storage Reuse/rec Disposal Permitted Proposed Total
Waste s Waste generated & ycling(in as per the
Descripti per day treatment house) Existing
on /Pre- HWA
treatment
1. 5 Used 200 NA NA shall be NA NA NA
Industri oil/wast LPA sent to
al e authoriz
operatio lubricati ed Re-
ns ng oil process
using ing /Re
mineral/ Cyclers
syntheti of
c oil as waste
lubrican oil
t in
hydrauli
c
system
s
2. 5 oil 50 NPA NA NA shall be NA NA NA
Industri filters sent to
al M/S
operatio HWMO
ns TSDF
using DUNdig
mineral/ al
syntheti
c oil as
lubrican
t in
hydrauli
c
system
s
3. 17 batterie 150 NA NA shall be NA NA NA
Product s no/3 sent to
ion of yers the
acids dealers(
manuac
turer on
but
back
basis)
4. 3 piles 50 NA NA shall be NA NA NA
Cleanin Soaked kgs/ann sent to
g, cotton um M/S
emptyin waste HWMP
g and TSDF
mainten DUNdig
ance of al
petroleu
m oil
storage
tanks
includin
g ships

4
5. 36 E waste 3 TPA NA NA shall be NA NA NA
Hazard sent to
ous authoriz
Waste ed E
treatme waste
nt Recycle
process rs
es like
incinera
tion,
distillati
on,
separati
on and
concent
ration
techniq
ues
6. 19 Garbag 50 NA NA shall be NA NA NA
Product e kgs/day sent to
ion of GHMC
phenol Authorit
ies
19.2 Solid Wastes Details
Nature Quantity Mode of Disposal
20. HWA Details
(i) Particulars of Authorisation obtained under 11.05.2016
HW(M&H) Rules, 2016(No. & Validity date):
(ii) Particulars of on-site Secured Storage (Capacity --
with dimensions) and mention period for which
secured storage is sufficient:
(iii) Quantity of Haz Waste stored on-site presently: --
(iv) Quantity of Hazardous waste disposed for last --
six months as per the following break-up:
(v) Whether industry has submitted annual returns, --
date of latest submission :
(vi) Whether industry has installed incinerator or --
sending to common HW Incinerator :
(vii) Particular of own incinerator (if applicable) : --
(viii) Whether log books are maintained for --
incinerator(if applicable) :
(ix) Whether industry has taken adequate steps to --
prevent contaminated runoff from storage areas
of Hazardous Waste :
(x) Steps taken by industry towards waste --
minimization and cleaner production :
(xi) Future plan for waste minimization : --
(xii) Facilities available with, industry for waste --
characterization :
(xiii) Overall House Keeping within the factory Good
premises :
(xiv) Details of disposal of lead acid batteries along --
with nos and agencies to whom they are
disposed :
21.Compliance of the industry on Conditions of CFO (Schedule- B) order dt :11/05/2016
CFO Conditions Compliance status
Compliance report Enclosed
21.1.Compliance of the industry on previous Hazardous Waste Authorisation conditions :

5
HWA Conditions Compliance status
-- --
22.Compliance For the TasK force Directions :11/05/2016
Directions Compliance status
-- --
Inspection Officer’s Remarks :
1.M/s Tata Consultancy Services Ltd., is located Khan Lathif Khan
Building, Near L.B.Stadium, Nampally, Hyderabad for is a IT/Software unit
.
2.The industry has obtained CFO Order No: 145-
HYD/TSPCB/ZOH/CFO/2016-209 Dt: 11.05.2016 which is validity upto
31.12.2016.
3.Now, the industry has applied CFO renewal of the Board manufacturing of
IT/Software unit .
4.The industry total water consumption is 8.0 KLD i.e., Domestic – 8.0 KLD
and waste water generation is domestic effluent – 5.0 KLD and which is
disposed into septic tank followed by soak pit.
5.The industry has DG sets of capacity 250 KVA X 2 Nos with acoustic
enclosure.
6.The industry has generated total solid waste i.e., Used Oil – 200 LPA (Sent
to authorized Re-Processors / Re-cyclers of waste oil), Oil Filters – 50 NPA
(Sent to M/s HMWP, TSDF, Dundigal), Piles Soaked Waste- 50 Kgs/Annum
(Sent to M/s HMWP, TSDF, Dundigal), Batteries – 150
Nos/Annum(3)(Retuned to the dealer / manufacturer on buy – back basis), E-
Waste – 3 TPA ( Authorized E-Waste recyclers) and Garbage – 50 Kgs/ Day
(sent to GHMC Authorities.
7.The unit has take lease 6th floor for period upto 5years (Copy Enlosed).
8.The industry has paid for Consent fee of Rs. 1,08,800/- on project cost Rs.
6.74 Crores under Orange Haz Catageory i.e., upto 31.12.2021.

Yours faithfully

DAYANANDMULUGU

RO Remarks
In view of the above, the issue may be examined before committee
M Dayanand
Environmental Engineer