PROJECT NAME
615 South College Street
Commercial Office Tower
PROJECT LOCATION
Charlotte, NC
PROJECT TEAM
Owner: Portman Holdings
General Contractor: Holder
Construction Company
Subcontractor: McKenney’s, Inc.
PROJECT COMPLETION
May 2017
SPECIALIZATIONS
Design/Assist
LEED Certification
MARKETS
Commercial Offices
Hospitality
M
cKenney’s installed mechanical towards the end of construction which meant THE SOLUTION
systems at an office building the schedule would be tight, startup and Extensive planning, sequencing of the work and
in downtown Charlotte. commissioning would need to be condensed coordinating with the controls contractor put
and the team needed to be creative about the project schedule back on track and the team
THE CHALLENGE finding a solution to the compacted timeline. moved towards startup and commissioning
The McKenney’s team worked with the In addition, equipment issues impacted the within the tight timeline. Finally, a finishing
general contractor and a team of subs to ability to fly materials to various floors and crew tied up loose ends after installation.
bring a signature high-rise office building— the team was spread throughout the building,
with its unique design, unbeatable location hampering workflow and negatively impacting THE RESULTS
and high-profile neighbors—to life. The key overall schedule control. The project was delivered on time—allowing
mechanical equipment needed to be installed the owners to lease space on schedule.
404-622-5000 704-357-1200
info@mckenneys.com info@mckenneys.com
1056 Moreland Industrial Boulevard 3601 Performance Road
Atlanta, Georgia 30316 www.mckenneys.com Charlotte, North Carolina 28214
© 2018 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
The content of this document is not intended as an endorsement.