Location: Brgy. Bantug, Science City of Muñoz, N.E. Manager: Engr. Paulino B. Tomas Jr.
Owner: Mrs. Amor A. Manalili
Apprentice: Fernando D. Gagelonia Jr.
Charles Kevin G. Valdez
Marverick Paolo W. Yarcia
WEEK 7
March 12-16, 2018
Foreman Wilson is
levelling the forms
on staircase.
The foreman is
removing forms on
staircase.
Stripping of forms
on staircase. Engr. Marvin Quilanlan
Plastering of outer Field Engineer
left side wall.
14-Mar-18 Preparation for Portal lift Wilson Baltazar
(Wednesday) plastering of One-bagger concrete Foreman The masons are
columns. 1st floor mixer plastering the left
Formworks on Welding Machine Laborers outer wall (lower
beams. Steelman row of wall).
Laying of Mason
steeldecks. Welder
Carpenter
Stripping of forms
on staircase. Engr. Marvin Quilanlan
Plastering of outer Field Engineer
left side wall.
14-Mar-18 Preparation for Portal lift Wilson Baltazar
(Wednesday) plastering of One-bagger concrete Foreman The mason is
columns. 1st floor mixer preparing the
Formworks on Welding Machine Laborers columns for
beams. Steelman plastering.
Laying of Mason (15mins/col)
steeldecks. Welder (.15+.4+.15)*4.15
Carpenter
Laying of
steeldecks. Engr. Marvin Quilanlan
Scaffoldings for Field Engineer
steeldecks.
15-Mar-18 Formworks on Portal lift Wilson Baltazar
(Thursday) beams. One-bagger concrete Foreman The masons are
Plastering of outer mixer plastering the
left wall. Welding machine Laborers firewall.
Preparation for Carpenter
plastering of Mason
columns. 1st floor Welder
The mason is
preparing the
columns on 1st
floor for plastering.
EQUIPMENT PERSON/S INVOLVED
DATE/DAY ACTIVITY OBSERVATION DOCUMENTATION
The carpenter is
fixing the forms on
beam corner.
Laying of
steeldecks. Engr. Marvin Quilanlan
Scaffoldings for Field Engineer
steeldecks.
15-Mar-18 Formworks on Portal lift Wilson Baltazar
(Thursday) beams. One-bagger concrete Foreman
Plastering of outer mixer
left wall. Welding machine Laborers
Preparation for Carpenter
plastering of Mason
columns. 1st floor Welder The laborers are
installing
scaffoldings for
steeldecks.
DATE/DAY ACTIVITY EQUIPMENT PERSON/S INVOLVED OBSERVATION DOCUMENTATION
The laborer is
making and laying
Laying of CHB on rebars for slab.
staircase.
Laying of
steeldecks. Engr. Marvin Quilanlan
Scaffoldings for Field Engineer
steeldecks.
16-Mar-18 Formworks on Portal lift Wilson Baltazar
(Friday) beams. One-bagger concrete Foreman The laborers are
Plastering of outer mixer
installing steeldecks
left wall. Welding machine Laborers
Preparation for Carpenter on third floor.
plastering of Mason
columns. 1st floor Welder
Rebar works on
slab.
Preparation of
flatform for concrete The laborers are
mixer. preparing the
platform for
concrete mixer.
The laborers are
preparing the
platform for
concrete mixer.
steeldecks.
Preparation of
flatform for concrete The laborer is fixing
mixer.
the scaffoldings for
steeldecks.