Project Eagle

QUALITY MANAGEMENT Date: 22/11/2017


INSPECTION REPORT Revision: 00
FORM PEQC 001-17 IR Pages: 1 of 1

Project No.: CKN17156 Date: Report No.:


Package/Contract: Lime Kiln Cooler S/Steel Piping 01/03/2018 007PE2018

Location: Sappi Ngodwana

Vendor: Endeto

Applicable Codes &


ASME B31.3, Sappi Specifications – Piping, Inspection and Testing
Standards:
Equipment Description: Stainless Steel Piping

Equipment No.: Various Pipes in laydown area


Visual
☒ Dimensional Inspection ☐ Fit-up Inspection ☐
Inspection
Inspection Activity: Material ID ☐ Surveillance Inspection ☐ Performance Test ☐

Other ☐ Specify other

Findings/Recommendations: Slight contamination of stainless steel piping


Random visual inspection carried out on various spool pieces at contractor’s yard. The following was noted:

1) General appearance of welding is acceptable

2) Slight contamination (external) on elbow. Possible cause reasonably assumed as coming from grinding sparks

3) Slight contamination (internal) on weld. Possible cause not apparent, request contractor response?

The contractor is hereby requested to grind, pickle and passivate the areas and present for re-inspection once complete.

Vendor Rep: Client Rep: R. Pretorius

Signature: Signature:
Date: Date: 01/03/2018
Note: This report does not relieve vendor of contractual obligation to supply equipment compliant to relevant codes, standards or
regulations.

1 Project Eagle Phase II


Sappi Ngowana
Quality Control Department
N4 Highway, Ngodwana, 1209
Project Eagle

Figure 1 Contamination on weld and bend

2 Project Eagle Phase II


Sappi Ngowana
Quality Control Department
N4 Highway, Ngodwana, 1209