1. COMPANY PROFILE
For over two decades, our projects have helped grow local economies and better the
quality of life for societies. PJB constructed several vital road over bridges and
transportation infrastructure in Bangalore that transports over a million vehicles every
day. It designed and executed the coal conveyors for Karnataka Power Corporation
Limited (KPCL) that lights the homes of millions. PJB completed the first phase of the
Sabari Rail project which is projected to transport more than 30 million devotees every
year to the Sabarimala shrine. Its renovation and reclamation project restored the pristine
attributes of the Lalbagh lake. PJB’s completion of the National Thermal Power
Corporation (NTPC) project enabled the state of Kerala industrialise its south western
corridor. Through projects at Indian Oil Corporation (IOC), PJB contributed towards
helping India meet her energy needs. Our infrastructure project at Jindal Steel Works
(JSW) facilitates production of steel, the building blocks of a nation. Our projects with the
Indian railways continue to shorten distances, increase connectivity and bring people
closer.
We apply our infrastructure engineering expertise across industries that are vital to your
wellbeing. We solve the most pressing infrastructure issues facing communities today and
lay the foundation today, for your growth tomorrow. Our projects continue to enable the
lives of millions. We are building your tomorrow!
Problem solving: PJB’s team of experts work with governments and companies to find
solutions to some of the most pressing issues facing citizens today. Our determination to
solve the problem and to enable society’s potential is innate in all the projects we
undertake.
Business Performance: Our projects are scrutinised against quality protocols which
exceeds government norms and legal stipulations. Our business practises and protocols
are the best in class and we continue to stretch our limits and those of industry best
practises.
Construction is the core of PJB’s business and for over two decades we
have pioneered and implemented modern construction techniques. Our integrated
approach to construction has enabled us to innovatively address and successfully
execute challenging infrastructure projects. Execution of multi-million dollar
infrastructure projects entails the services of a number of sub-contractors,
hundreds of workers, suppliers and a large quantity of raw materials. Streamlining
and coordinating these multiple activities require excellent construction
management. Construction and construction management is the essence of PJB.
3 Proof Checking Consultant M/s Infra support Engineering Consultants Pvt Ltd,
Bangalore
2. THE PROJECT
2.1. Introduction
Bangalore Development Authority has award the job of construction of bridge across
Vrishabhavathy valley storm water drain at Lakshmidevinagara Bangalore.
Bangalore is the fifth largest metropolitan city in India, Being an IT&BT capital of India,
is having commercial, industrial& defense bases in south India. Due to the Population
Hike up to 1crore at Bangalore alone, the vehicular growth is tremendous, i.e. reached
nearly 60 lakhs.
The Bangalore Development Authority has formed the outer ring road long back, which is
connecting the national highways, state highways, and high density corridor roads of the
city. This new service road bridge is designed for making way for through traffic on outer
ring roads without any interruptions.
The work is entrusted to M/S PJB ENGINEERS PVT LTD Bangalore, The design
consultant is M/s NAGESHCONSULTANTS PVT LTD Bangalore ,The proof checking
consultant & project management consultancy is M/s INFRASUPPORT ENGINEERING
CONSULTANTS PVT LTD Bangalore .All these agencies are proud, of handling this
prestigious project with BANGALORE DEVELOPMENT AUTHORITY.
The estimated cost of work is Rs 22 crores & contractor price to the above is 21.78 crores.
The date of commencement is 01-08-2016& Date of completion was 31-07-2017, with 12
months of duration of contract.
TECHNICAL FEATURES:
PROJECT SCOPE:
LENGTH OF APPROACH
TOTAL NO OF FOUNDATIONS :
OPEN FOUNDATION : 4 no’s
PILE FOUNDATION : 7no’s
with the instruments.
Sl .
No EQUIPMENTS UNITS QTY
Concrete Batching plant 60 cum per
1 Nos 1
hour including silos, conveyors, DG set.
2 Transit Mixer 6 cum Nos 7
3 Front End Loader Nos 1
4 JCB Nos 1
5 Excavator 1cum Bucket Nos 1
6 Motor Grader 9 (komatsu ) Nos 0
7 Soil compacter Nos 1
8 Lighting sources Nos 1
9 Sludge plumb/dewatering pumps Nos 2
10 Welding generators Nos 2
11 Welding transformers Nos 2
12 D G set -25kva to 75kva Nos 1
13 Tippers Nos 5
14 Conventional rig Nos 1
16 Hydraulic rig Nos 0
16 Hydra 12t capacity Nos 1
17 Vibrating Ruler Nos 0
Sl .
No LABOUR REPORT UNITS QTY
1 Mason Nos 6
2 Carpenter Nos 14
3 Plumber Nos 1
4 Welder Nos 4
7 Mechanic Nos 0
8 Electrician Nos 0
14 Labour Nos 22
Description of Quantity
Sl.No Location Rate Amount
work Unit /no
1 EXCAVATION - 350 -
Cum -
2 PCC - 6300 -
Cum -
3 PILING - 10000 -
Rmt -
4 FOOTING - 8200 -
Cum -
-
9 RE PANEL - Sqm - 7500
10 DRAIN - 8000 -
Rmt -
3. REFLECTION NOTES
3.1. Reflection
The Steel Temporary chambers in the camp site was a cool (literally) experience,
where we would shuffle through all the design drawings of the SUB STRUCTURE, SUPER
STRUCTURE, GAD & RE WALLS , critically discussing the various pieces trying to make
sense initially of the document at hand.
The long discussions in the office with the engineer in charge Er.Yogesh Sir over various
technical aspects and he also shared his insightful over the years experiences at various
other site works he was associated with such a kanteerava studio grade separator which
was also a project concluded by his team in association with the same firm.
The Labour friends constantly working with rebars also had a lot of knowledge to offer
just by observing their work on site.
I was accustomed to working with labours of the southern region in the construction area,
but in the company majority of the labour were from Northern India , I was moderately
successful in connecting and communicating with them , which was a new experience for
me.
Before my internship with PJB , I had only experience with private building construction.
I wanted to transition in to the public domain projects with road infrastructure
development, now that I feel like I have found my direction and confidence as I am
familiar with the procedures, processes and functioning of a successful firm.
3.3. Learning's
4. Field methods of translating drawing data such as levels on the site using auto
level.
9. Many Critical aspects which we fail to encounter in the class room environment
The Specimen Cubes being cast for lab testing and Concreting of Dirt Wall.
The Supporting Truss being jacked in place as foundation for the formwork of the
succeeding deck slab segment.
1. Company Profile 1
2. The Project 4
3. Reflection Notes 10
The contentment and happiness that accompanies the successful completion of any task would
be incomplete without the mentioned people, who made it possible with their constant
guidance and encouragement which crowns my efforts with success.
I extend my deepest gratitude to my guide Sunil sir, Assistant Professor RVCE Bengaluru
for his undoubting support, encouragement and guidance throughout my endeavor.
I would like to thank Er. Yogesh Sir, for under his patient, knowledgeable discussions and
supervision, enabled me to take away a lot of learning , I thank you for the time and energy
you spared for me, also Er. Dayanand sir, Er, Venkatesh sir , Er. Ganesh sir , Er. Vijay sir
& Mr. Paul Raja sir for warm and hearty conduct.
I would like to express my sincere thanks to Miss. Sharu John for providing me this
opportunity to undertake internship at PJB Engineers.
I express my profuse gratitude to Dr. M.V. RENUKADEVI MADAM, Professor and head of
the Department of Civil Engineering, R.V.C.E Bangalore, for providing all kind of possible
help for the preparation of this internship work.
Lastly, I thank all those who are involved directly and indirectly in completion of the present
work.
CONSTRUCTION OF BRIDGE ACROSS
VRISHABHAVATHY VALLEY STORM WATER DRAIN
AT LAKSHMIDEVI NAGARA, BANGALORE.
Internship Project Report
Submitted in partial fulfillment of the requirements for the degree of
MASTER OF TECHNOLOGY
In
HIGHWAY TECHNOLOGY
By
B.R.GAUTHAM RAJ
(1RV16CHT03)
Certified that the Internship work with M/s PJB Engineers Pvt Ltd., titled
“CONSTRUCTION OF BRIDGE ACROSS VRISHABHAVATHY VALLEY
STORM WATER DRAIN AT LAKSHMIDEVI NAGARA, BANGALORE.” was
carried out by B R GAUTHAM RAJ (1RV16CHT03) who is a bonafied student of
R V College of Engineering, Bangalore, in partial fulfillment for the award of degree of
Master of Technology in HIGHWAY TECHNOLOGY of Visvesvaraya Technological
University, Belagavi during the year 2017. It is certified that all corrections indicate
during the internal assessment have been incorporated in the report deposited in the
departmental library. The Internship report has been approved as it satisfies the academic
requirements in respect of the work prescribed by the institution for the said degree.
_________________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
SUNIL S Head of the Department P r i n c i p a l
Assistant professor Department of Civil Engg R V College of Engg.
Department of Civil Engg