You are on page 1of 1

Ehab Khadr

Oracle Manufacturing & Supply Chain Consultant & Project Manager


Ehab Khadr has 12 years of functional Ehab Khadr is having excellent functional knowledge in Oracle ERP Applications and successfully performed leading roles for
experience in Oracle 11i & R12 around12 yrs in various Oracle ERP development & Support projects. Recognized as a hands-on, pro-active troubleshooter who can
Manufacturing & Supply Chain modules. rapidly identify business problems, formulate strategic plans, lead manufacturing consultants, participate in project management
structure, initiate change and implement new processes in challenging and diverse financial and manufacturing environments. Lead
Throughout his consulting career, he was
and manage other consultants to execute the project plan tasks on time. Recognized for exceptional perception and ability through
engaged in 14 Oracle projects in USA and progressive, challenging assignments in Oracle 11i implementations and operations systems enhancements. Prior to Oracle,
overseas (China, Malaysia, Bangkok, and experience emphasis was in public accounting and feasibility analysis (1985-1991).
UAE) . -- (Work Status : U.S. Citizen)
 Oracle Modules: WIP, OSFM, INV, His major projects are (for more details review resume & cover letter):
1. FormFactor: [PM & Solution Architect] Redesign OSFM, WIP, Costing, BOM and implement Best Business Practice.
BOM/ENG, Cost, WMS, Quality, ASCP, 2. UTStarcom: [Manufacturing & Costing Lead] Implement WMS and restructure a Global Product Cost in China & USA
MRP, Capacity, MFG Scheduling, PJM, 3. Western Digital: [Manufacturing, Costing & ASCP Lead] Implement ASCP & all manufacturing modules.
4. FP Interna’l: [PM & Manufacturing Lead] Implement all Manufacturing modules
ODP, OM, PO. GL. 5. Jeraisy: [Site Manager & Manufacturing Lead] Implement MRP and all manufacturing modules.
Oracle Projects FormFactor,
UTStarcom, Amkor, Visitome, USGypsum, FormFactor Project – “Full Cycle” (October 2007 - Present)
. Restructuring the manufacturing (OSFM 11.5.10) and Costing (Standard method) configuration and business processes.
LaserScope, Western Digital, FP Inter’l, . Propose a complete (As-Is) assessment and (To-Be) solution to improve the OSFM network routings, operation yield, estimated
Jeraisy, Coherent, Zues, ViaSat, Net.com, scrap analysis, manufacturing cost variances analysis, cost rollup process, Excess & Obsolete (E&O) Inventory Reservation and
Clarent. month-end closing processes.
. Conduct a Global Product Cost Rollup simulation process and modify new product families configuration (BOM, Routings, Item
Industries: Manufacturing, Semi attributes) to meet business requirements.
Conductor, Telecommunications, PM: Prepare a detailed Project Plan, Cutover Plan, Steering Committee weekly status report, and managed the functional and
Technical team.
Software, Financial Services, Printing &
Personalization, Packaging, computer UT Star.com Project – “Full Cycle” (January – October 2007)
media storage, Laser Equipments, . Conducted an assessment and gathered business requirements from Hangzhou, China and USA plants. Traveled to China to
demonstrate Oracle R12 functionality and discuss gaps.
Medical Equipments, and Construction. . Implementing Oracle R12 Manufacturing modules (WIP, BOM/, WMS, Inventory, & STD Cost).
 Education: (MBA) degree in . Designed various manufacturing scenarios such as (i) WMS Manufacturing Allocation [FIFO Picking Rules by Item Revision,
Subinventory, Locator and Lot number], (ii) Inter-company & Transfer Pricing transactions, and (iii) outsourcing scenarios.
“Accounting”, (MS) in “Project and System . Proposed a complete Costing solution to sync cost in all Inventory Orgs and OU to eliminate the Inter-company PPV transactions.
Management” (Operation Management . Conducted and documented Gap Analysis in various areas in supply chain modules.
. Assisted the ASCP team in various areas such as Lead Time, analyzing Planned Orders, meet Scheduled Shipping Dates (SSD),
focus), 8 years of experience in Analyze Supply & Demand, and Forecast consumption.
Accounting and Auditing (Public
Accounting Firm). Throughout these projects, His main responsibilities were:
.Responsible for developing separate project plans for business requirements, gap analysis, user training, user acceptance testing,
Ehab worked in Oracle Corp for 6 years reconciliation between the two systems and data conversion.
(’96-’01), in Accenture (Sr. Manager 2/05 - .Designed, reviewed and executed manufacturing integration test scripts for Conference Room Pilot (CRP) and System Acceptance
1/06) and as an independent consultant Testing (SAT), and assisted super users in training and reporting gap analysis.
. Performed detailed analysis of various client requirements and documented the specifications using Oracle AIM methodology tool.
(’01-’09). . Participated in troubleshooting and solving all types of functional or technical issues throughout the implementation project.

You might also like