Prepared for:
ANCHOR PROPERTIES CORPORATION
th
15 Floor, LV Locsin Building Makati Corner Ayala
Avenue, Makati City
1. INTRODUCTION ......................................................................................................................... 4
1.1. Background ......................................................................................................................... 4
1.2. Study Objective and Main Tasks ......................................................................................... 4
1.3. Scope of Work ..................................................................................................................... 5
2. THE PROPOSED DEVELOPMENT................................................................................................ 7
2.1. Site Location ........................................................................................................................ 7
Project Location and Area ............................................................................................................... 7
2.2. Site Access Arrangement .................................................................................................... 8
2.3. THE PEAK PARKSUITES Project Overview ......................................................................... 15
2.4. Internal Road Network...................................................................................................... 16
3. ANALYSIS EXISTING CONDITIONS ........................................................................................... 16
3.1. Surveys .............................................................................................................................. 16
3.2. Traffic Influence Area ........................................................................................................ 33
3.3. Existing Road Network ...................................................................................................... 35
3.3.1. C.M. Recto Street ........................................................................................................ 35
3.3.2. M. Roxas Avenue ........................................................................................................ 35
3.4. Hierarchy in the Road Network ........................................................................................ 35
3.3.1 Traffic Volume at Approach Routes ............................................................................ 36
3.5. General Traffic Conditions ................................................................................................ 37
3.6. General Observations ....................................................................................................... 38
3.7. Approach Routes to the Development ............................................................................. 38
3.6.1 Entry Routes ................................................................................................................ 38
3.6.2 Exit Routes .................................................................................................................. 38
3.8. Traffic Issues and Concerns .............................................................................................. 39
3.8.1 Intersection of C.M. Recto Street and M. Roxas Avenue ........................................... 39
3.9. Traffic Condition ............................................................................................................... 40
3.9.1 Peak Hour at the Road Network ................................................................................. 40
3.9.2 Travel Speed................................................................................................................ 40
4 TRAFFIC GENERATION AND IMPACT ASSESSMENT ................................................................ 41
4.9 A Trip Generation Estimating Procedure .......................................................................... 41
LIST OF TABLES
LIST OF FIGURES
1. INTRODUCTION
The information used in this Traffic Impact Assessment was based on data,
plans and documents provided by the management of ANCHOR
PROPERTIES CORPORATION. Secondary data sources include previous
studies and reports from the Local Government of Davao City, Davao City
Traffic Enforcer, Department of Public Works and Highways (DPWH),
National Center for Traffic Studies (NCTS) and other pertinent researches
conducted within the vicinity. Primary baseline data were gathered through
reconnaissance survey of the site and its vicinity.
The assessment focused on the description of the project, its location and
evaluation of the projects expected impacts on the existing traffic condition
within the vicinity and its impact to the adjoining community. The Traffic
Impact Assessment attempts to provide definite mitigating measures to abate
any adverse effect on the traffic situation during, the planning, the
construction and the operation phase of the project.
1.1. Background
Assessment of the existing traffic situation in the study area: This entails
an examination of the present condition of traffic flow and transportation
services within the locale. This forms part of the description of the
condition without the development.
Conduct researches and gather data or information on the impact study area
of the project.
Review regulations and standards in use in the Philippines that are relevant to
the project. The Consultant undertook the following schedule:
Project Site
The following are locations related to The Peak Parksuites represented by the
flight path between two points and may not be nearest by road.
Imperial Hotel 20 meters, Hotel Uno 132 meters, Marco Polo Davao 130
meters, are places to stay (hotel, service apartment, inn) located near The
Peak Parksuites.
Aldevinco 20 meters, Gaisano Mall 800 meters, Abreeza Mall 2.2km, are
places to shop (shopping mall, shop houses) located near The Peak
Parksuites.
Freedom Park 130 meters, People’s Park 360 meters, Osmena Park 850
meters, are parks located near The Peak Parksuites.
STI College 380 meters, Ateneo de Davao 200 meters, Rizal Sped Center
680 meters, are places of learning (school, college, university) located near
The Peak Parksuites.
The possible / potential vehicular access point of The Peak Parksuites within
Poblacion are M. Roxas Avenue and C.M. Recto Street.
The residential and commercial building facility already identified and currently
using the vehicle access is as follows:
2.2.1. Along C.M. Recto Street, one (1) potential/ candidate access points to/
from The Peak Parksuites. Please refer to the figure below:
2.2.2. Along M. Roxas Avenue, one (1) potential/ candidate access points to/
from The Peak Parksuites. Please refer to the figure below:
PROJECT SITE
VICINITY MAP
PROJECT SITE
SATELLITE VIEW OF
THE PROPOSED SITE
PROJECT SITE
SATELLITE VIEW OF
THE PROPOSED SITE
PROJECT SITE
SITE DEVELOPMENT
PLAN
PROJECT SITE
SATELLITE VIEW OF
THE FACILITY
7° 4'14.40"N
P2
125°36'42.41"E
7° 4'14.07"N P1 P5
P3 P6
125°36'45.00"E P4
Project Geographical
Coordinates: 7° 4'15.01"N P2
P4 P3
125°36'46.26"E
7° 4'15.60"N
P5
125°36'45.98"E
7° 4'15.19"N
P6
125°36'45.58"E
The physical characteristics of each of the road within the internal road
network are described in Table below.
3.1. Surveys
Field Sheets
Pencils
Counters
Watch/Timer/Mobile Phone
Sharpeners
Clipboards
Measuring Equipment
Camera
Table 9: AM Vehicle Survey (M Roxas Avenue Left Turn to C.M. Recto, AM, August 9, 2017)
AM Vehicle Survey (M Roxas Avenue Left Turn to C.M. Recto, AM,
August 9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 13 1 0 2 0 19.5 39
7:30-8:00 37 2 0 8 0 60 120
8:00-8:30 24 2 1 11 0 57 114
8:30-9:00 43 2 0 2 1 53.5 107
9:00-9:30 34 1 4 5 1 60.5 121
9:30-10:00 26 3 0 6 1 48 96
10:00-10:30 37 4 0 8 1 65.5 131
10:30-11:00 35 0 0 8 1 57.5 115
Average PCU / Hour (AM) 105
Table 10: PM Vehicle Survey (M Roxas Avenue Left Turn to C.M. Recto, August 9, 2017)
PM Vehicle Survey (M Roxas Avenue Left Turn to C.M. Recto, August
9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 32 3 2 2 0 46.5 93
1:30-2:00 45 0 2 5 1 65 130
2:00-2:30 51 0 0 5 0 63.5 127
2:30-3:00 54 0 2 5 0 71.5 143
3:00-3:30 51 2 0 9 0 76.5 153
3:30-4:00 48 2 0 8 1 73.5 147
4:00-4:30 45 1 2 8 1 74 148
4:30-5:00 57 5 0 6 0 79.5 159
Average PCU / Hour (PM) 138
Table 11: AM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas, AM, Aug. 9, 2017)
AM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas
Avenue, AM, August 9, 2017)
Approaching Ateneo de Davao
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 76 9 0 25 0 152 304
7:30-8:00 138 14 0 43 3 274 548
8:00-8:30 132 20 0 44 3 279.5 559
8:30-9:00 136 24 1 35 3 269.5 539
9:00-9:30 130 25 3 27 0 242.5 485
9:30-10:00 151 15 6 42 3 301 602
10:00-10:30 124 20 3 45 7 291.5 583
10:30-11:00 132 11 4 36 0 248.5 497
Average PCU / Hour (AM) 515
Table 12: PM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas, August 9, 2017)
PM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas
Avenue, August 9, 2017)
Approaching Ateneo de Davao
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 113 10 5 23 2 203 406
1:30-2:00 138 9 5 21 4 226.5 453
2:00-2:30 159 12 2 26 1 249.5 499
2:30-3:00 135 8 2 27 0 219.5 439
3:00-3:30 174 15 10 43 4 339 678
3:30-4:00 162 6 3 26 1 246 492
4:00-4:30 204 12 7 40 9 362 724
4:30-5:00 128 13 1 40 5 262.5 525
Average PCU / Hour (PM) 527
Table 13: AM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas, AM, August 9, 2017)
AM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas
Avenue, AM, August 9, 2017)
Approaching Davao City Central Post Office
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 141 29 1 35 7 292 584
7:30-8:00 92 50 1 41 5 284.5 569
8:00-8:30 119 78 0 38 4 341 682
8:30-9:00 132 98 2 37 2 381.5 763
9:00-9:30 123 95 6 33 7 380.5 761
9:30-10:00 133 69 7 43 0 361.5 723
10:00-10:30 163 76 5 33 2 377 754
10:30-11:00 142 68 12 36 1 366.5 733
Average PCU / Hour (AM) 696
Table 14: PM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas, August 9, 2017)
PM Vehicle Survey (M Roxas Avenue Straight Thru to M Roxas
Avenue, August 9, 2017)
Approaching Davao City Central Post Office
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 160 68 10 45 1 402 804
1:30-2:00 144 50 5 36 4 331.5 663
2:00-2:30 135 53 10 30 4 324.5 649
2:30-3:00 175 48 6 49 0 384.5 769
3:00-3:30 168 75 12 58 3 463 926
3:30-4:00 161 60 12 44 7 408.5 817
4:00-4:30 187 65 4 56 5 447 894
4:30-5:00 201 69 8 60 7 492 984
Average PCU / Hour (PM) 813
Table 15: AM Vehicle Survey (M Roxas Avenue Right Turn to C.M. Recto, August 9, 2017)
AM Vehicle Survey (M Roxas Avenue Right Turn to C.M. Recto,
August 9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 59 18 0 4 1 98.5 197
7:30-8:00 51 37 1 11 2 141.5 283
8:00-8:30 72 60 2 16 1 209.5 419
8:30-9:00 81 47 2 18 4 211.5 423
9:00-9:30 69 42 2 12 2 172 344
9:30-10:00 107 39 2 10 1 198 396
10:00-10:30 80 46 2 16 0 194 388
10:30-11:00 186 38 17 10 2 315.5 631
Average PCU / Hour (AM) 385
Table 16: PM Vehicle Survey (M Roxas Avenue Right Turn to C.M. Recto, August 9, 2017)
PM Vehicle Survey (M Roxas Avenue Right Turn to C.M. Recto,
August 9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 80 37 4 11 0 173 346
1:30-2:00 66 24 1 13 0 137 274
2:00-2:30 82 38 1 8 1 164 328
2:30-3:00 105 36 1 17 0 204 408
3:00-3:30 111 34 1 18 0 209.5 419
3:30-4:00 86 40 0 16 0 186 372
4:00-4:30 115 38 1 10 5 212 424
4:30-5:00 90 30 1 10 2 167.5 335
Average PCU / Hour (PM) 363
Table 17: AM Vehicle Survey (C.M. Recto Left Turn to M. Roxas Avenue, August 9, 2017)
AM Vehicle Survey (C.M. Recto Left Turn to M. Roxas Avenue, August
9, 2017)
Approaching Davao City Central Post Office
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 25 30 4 50 3 212.5 425
7:30-8:00 15 20 0 30 0 120 240
8:00-8:30 50 30 1 40 1 200 400
8:30-9:00 30 20 0 30 0 135 270
9:00-9:30 21 15 2 45 2 166 332
9:30-10:00 30 27 2 35 0 163 326
10:00-10:30 35 32 0 20 16 173 346
10:30-11:00 35 7 0 9 4 78 156
Average PCU / Hour (AM) 311
Table 18: PM Vehicle Survey (C.M. Recto Left Turn to M. Roxas Avenue, August 9, 2017)
PM Vehicle Survey (C.M. Recto Left Turn to M. Roxas Avenue, August
9, 2017)
Approaching Davao City Central Post Office
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 64 10 3 38 2 186.5 373
1:30-2:00 38 8 5 20 0 112.5 225
2:00-2:30 59 24 5 41 1 212.5 425
2:30-3:00 60 24 7 50 0 238.5 477
3:00-3:30 55 35 3 40 2 220 440
3:30-4:00 53 20 0 27 0 150.5 301
4:00-4:30 86 9 3 46 0 222 444
4:30-5:00 70 10 0 32 3 172.5 345
Average PCU / Hour (PM) 379
Table 19: AM Vehicle Survey (C.M. Recto Straight to C.M. Recto Street, August 9, 2017)
AM Vehicle Survey (C.M. Recto Straight to C.M. Recto Street, August
9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 155 473 1 79 6 1079.5 2159
7:30-8:00 167 455 2 85 5 1079.5 2159
8:00-8:30 85 225 0 60 0 572.5 1145
8:30-9:00 162 525 6 74 0 1149.5 2299
9:00-9:30 142 394 12 55 10 925.5 1851
9:30-10:00 83 290 4 38 0 623 1246
10:00-10:30 75 225 1 40 0 515 1030
10:30-11:00 177 449 7 99 4 1125.5 2251
Average PCU / Hour (AM) 1768
Table 20: PM Vehicle Survey (C.M. Recto Straight to C.M. Recto Street, August 9, 2017)
PM Vehicle Survey (C.M. Recto Straight to C.M. Recto Street, August
9, 2017)
Approaching City Triangle
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 170 351 4 78 4 911.5 1823
1:30-2:00 140 266 3 77 2 744 1488
2:00-2:30 178 368 5 63 2 905 1810
2:30-3:00 202 326 5 65 6 881 1762
3:00-3:30 191 416 5 94 4 1072.5 2145
3:30-4:00 177 327 5 62 4 845 1690
4:00-4:30 210 473 7 79 4 1144.5 2289
4:30-5:00 140 321 2 60 8 796.5 1593
Average PCU / Hour (PM) 1825
Table 21: AM Vehicle Survey (C.M. Recto Straight Right Turn to M. Roxas, August 9, 2017)
AM Vehicle Survey (C.M. Recto Straight Right Turn to M. Roxas
Avenue, August 9, 2017)
Approaching Ateneo de Davao
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
7:00-7:30 63 87 1 6 0 211 422
7:30-8:00 52 55 2 11 0 167 334
8:00-8:30 42 109 1 7 0 225.5 451
8:30-9:00 55 95 0 7 0 215 430
9:00-9:30 56 66 0 7 1 175 350
9:30-10:00 55 52 0 9 0 155.5 311
10:00-10:30 57 47 3 11 1 165 330
10:30-11:00 71 63 5 14 4 223 446
Average PCU / Hour (AM) 384
Table 22: PM Vehicle Survey (C.M. Recto Straight Right Turn to M. Roxas, August 9, 2017)
PM Vehicle Survey (C.M. Recto Straight Right Turn to M. Roxas
Avenue, August 9, 2017)
Approaching Ateneo de Davao
Rate of
Time Jeep Motor Flow
Car Truck Bicycle (PCU)
Period cycle (PCU/
Hour)
1:00-1:30 61 47 1 10 0 159 318
1:30-2:00 70 53 0 6 0 164.5 329
2:00-2:30 62 50 3 6 0 159.5 319
2:30-3:00 51 43 3 11 0 150.5 301
3:00-3:30 81 55 2 16 1 211 422
3:30-4:00 76 71 8 23 2 265 530
4:00-4:30 66 78 3 28 6 275.5 551
4:30-5:00 50 65 2 18 0 197.5 395
Average PCU / Hour (PM) 396
Location of survey
Location of survey
Location of survey
THE PEAK PARKSUITES ANCHOR PROPERTIES CORPORATION
Figure 13: Location of Road Inventory Survey Along CM Recto Street
Location of survey
Figure 15: Vehicle Volume Count, C.M. Recto Street corner M. Roxas Avenue
Above figure shows the area influence by the operation of the residential/
commercial building facility of ANCHOR PROPERTIES CORPORATION
C.M. Recto Street is a four lane one way road parallel to C. Bangoy
Street.
Project Site
The figure shows the Davao City Diversion Road (yellow line) serves as
primary road linking municipalities within Davao del Sur. Davao City Diversion
Road is 18.33 kilometers in length. Meanwhile C.M. Recto Street and M.
Roxas Avenue are considered as secondary road, serving as the main
strategic road providing access to the project site.
DIRECTION
AM PERCENTAGE OF VEHICLES
Car Jeepney Trucks Motorcycles Bicycle Total
C.M. Recto Left Turn to
M. Roxas Avenue 241 181 9 259 26 716
C.M. Recto Thru C.M.
Recto 1046 3036 33 530 25 4670
C.M. Recto Right Turn to
M. Roxas Avenue 451 574 12 72 6 1115
TOTAL 1738 3791 54 861 57 6501
Percentage % 26.73 58.31 0.83 13.24 0.88 100
DIRECTION
PM PERCENTAGE OF VEHICLES
Car Jeepney Trucks Motorcycles Bicycle Total
C.M. Recto Left Turn to
M. Roxas Avenue 485 140 26 294 8 953
C.M. Recto Thru C.M.
Recto 1408 2848 36 578 34 4904
C.M. Recto Right Turn to
M. Roxas Avenue 517 462 22 118 9 1128
TOTAL 2410 3450 84 990 51 6985
Percentage % 34.50 49.39 1.20 14.17 0.73 100
Based on the above table it shows that Jeepney has the highest
percentage traversing the C.M. Recto Street both morning and
afternoon peak hours.
M. Roxas Avenue and C.M. Recto Street as the access route of The Peak
Parksuites is regarded as an important road after serving as an access for
Barangay 34-D and other neighboring Barangays of South and North part of
Davao City. Traffic conditions along Roxas Avenue reflect the importance of
key development areas located along the road like Ateneo de Davao and
other commercial and institutional facilities. In general terms, traffic condition
along Roxas Avenue are busy during the peak AM and PM periods.
Traffic behavior within the area is generally acceptable given the Philippines
road user environment. The traffic problems which can be readily observed
along within the project area arise as a result of:
The section of C.M. Recto Street where the proposed residential and
commercial building facility is only four (4) lane one (1) way twelve (12)
Meter wide road. Traffic is expected whenever there is a vehicular
accident, peak AM and PM period.
Parking and loading and unloading activities interrupting traffic flow.
Such activities include vehicles blocking through traffic lanes were
observed along C.M Recto Street but doesn’t build up to many vehicles
to cause traffic in the area
Public transport operations such as jeepney stopping at non-
designated spots to load and unload passengers along C.M. Recto
Street and M. Roxas Avenue.
The strategic approach to and from the development site are illustrated in
Figure 11.
Results of the analysis on the traffic count data suggest that the flow in
the road network follow the so-called “traditional” peaking condition. On
a typical day, the morning peak hour occurs from 7:00 am to 9:00 am
while the afternoon peak occurs from 5:00 pm to 6:00 pm. Traffic flow
conditions are as illustrated in Figure 9
Figure 18: AM Peak Hour Traffic Condition along C.M. Recto Street
Estimates are also made regarding the general growth of ambient traffic along
the direct approach routes (external) to obtain a forecast of future ambient
traffic conditions. The net future development traffic generation therefore is
superimposed onto the existing traffic to provide an estimate on future road
traffic conditions.
Sample
Computation
PCU
(2020) =3006 (1+0.0270)^3
=3006 (1.027)^3
=3256
Traffic generation rates for the various land uses of the proposed
development have been established from the consideration of Institute of
Transportation Engineers database rates. The database provides trip
generation rates for residential/commercial building use.
Based on the table above, there will be an additional 782 Passenger Car
Unit (PCU)/ Hour upon the completion and full occupancy of The Peak
Parksuites. This additional figure to the volume of traffic will take effect on
year 2022, the projected date of the project completion.
The existing primary traffic routes that carry existing traffic demand and are
expected to service the potential generated traffic by the facility
This distribution is expected with high proportion of generated traffic which will
be traveling between areas in Metro Davao while the expected second most
traveled direction is towards North of the facility which is to include the
Northern part of Davao City
Based on the traffic impact assessment made above, maximum traffic volume
generation is estimated additional 782 PCU per hour for PM peak conditions
by the year 2022 as additional volume for existing traffic condition in the area
for residential units upon full operation of The Peak Parksuites. This figure will
varies upon the utilization of the existing public transport within the area or
other mode of ride sharing transportation. Other trips generation will vary
depending on the type for tenant for commercial/retail establishments. Overall
traffic condition along C.M. Recto Street and M Roxas Avenue is generally
within the same level of congestion with manageable impact to traffic.
activities at the side of the streets must also be given attention and
apprehended by the authority.
I. Construction Phase:
b. Delivery vans, visitor’s cars and the likes may also add up to the
traffic congestion within the vicinity of the project development.
b. Operating Hours
d. Parking Space
6 CONCLUSIONS
Based on the traffic impact assessment made above, maximum traffic volume
generation is estimated additional 782 PCU per hour for PM peak conditions
by the year 2022 as additional volume for existing traffic condition in the area
for residential units upon full operation of The Peak Parksuites. This figure will
vary upon the utilization of the existing public transport within the area or other
mode of ride sharing transportation. Other trips generation will vary depending
on the type for tenant for commercial/retail establishments. Overall traffic
condition along C.M. Recto Street and M Roxas Avenue is generally within
the same level of congestion with minimal impact to traffic.
Traffic level is estimated to be within the capacity limit of the existing road.
Proper implementation of traffic rules and traffic management plan of the
proponent will help maintain the passable traffic situation in the project site.
Prepared by:
JEFFREY A. TORRES
TAC14-016-2015
Documentations Head
BROADFIELD Engineering Technologies
& Integrated Services
PROJECT SITE
In
Out
Of the Facility
PROJECT SITE
EXISTING ROAD
NETWORK
ANNEXES
ANNEXES A
ANNEXES B
ANNEXES C
PLANS