Professional Documents
Culture Documents
SIMATIC PCS 7
Europe: 4.254 Over 11.300 projects* in all sectors of the process industry with Simatic PCS 7 Asia Pacific: 3.121
46,7% 34,2%
Over 42.300 PCS 7 Controllers shipped since PCS 7 Market Lauch.
Austria 198 China 2.258
Azerbaijan 1 Taiwan 104
Bulgaria 12
Croatia 13 Japan 108
Czech Rep. 36
Hungary 18 Australia 72
Israel 13 Finland 163
Kazakhstan 10 New Zealand 3
Russian Fed. 237
Romania 14 Sweden 176
Serbia 2 Netherlands 284 India 266
Germany 1547
Slovakia 37 UK 184 Poland 134 Bangladesh 2
Slovenia 47 France 232
Turkey 136 Canada 38 Belgium 152 Austria 197 Vietnam 28
Ukraine 10 Switzerland 151 Indonesia 56
China 2258 Malaysia 34
Germany 1.547 Italy 203 Slovakia 37
USA 723 Spain 338 Turkey 136 Myanmar 1
Japan 108
Saudi Philippines 22
Denmark 34 Arabia 20
Singapore 17
Estonia 1 Mexico 121
Egypt 31 Thailand 82
Finland 163 Taiwan 104
UAE 29
Iceland 5 Americas: 1.142 India 266
Ireland 18 Korea 68
12,6%
Latvia 6
Lithuania 12 Canada 38
Netherlands 284 USA 723 Africa: 137 Russia & Central Asia, RoW: 261 Middle-East: 188
Norway 33 1,5% 2,9% 2,1%
Poland 134 Argentina 44
Sweden 176 Chile 30 Brazil 134
Algeria 8 Belarus 2 Bahrain 2
UK 184 Colombia 15 Angola 9 Russian Fed. 237 Iran 98
Australia 72
Ecuador 2 Egypt 31 South Iraq 1
Belgium 152 Peru 10 Chile 30 Africa 65 Turkmenistan 3
Kenya 2 Kuwait 1
Cyprus 1 Venezuela 6 Mauritius 1 Uzbekistan 5
Lebanon 3
France 232
Greece 5 Brazil 134
Argentina Morocco 7 Lybia 11
44
Italy 203 Mozambique 1 Rest of World 14 Oman 3
Luxemburg 2 Costa Rica 6 Namibia 2 Pakistan 4
Macedonia 2 El Salvador 2 Qatar 14
Nigeria 7
Malta 2 Guatemala 3
Portugal 22 Honduras 4 South Africa 65 Saudi Arabia 20
*: Estimation based
Spain 338 Mexico 121 Swaziland 2 on reported orders UAE 29
Switzerland 151 Trinidad 4 Uganda 1 May 05, 2011 (9.103) Yemen 2
Moscow Seoul
Paris, Lyon, Lille
Kiev
Tokyo
Springhouse Madrid
Shanghai
Barcelona Milano/Genua
Cairo Taipei
Mexico City Caracas Istanbul Dubai
Manila
Bogota Kuwait Mumbai Pune
Bangkok
Santiago Sao Paulo
Kuala Lumpur
Singapore
Dhahran
Buenos Aires Johannesburg Jedda Jakarta Melbourne
Managers Procurement
PCS 7 provides the best performance and offers the fastest and largest CPU on the market. This is We expect that the PCS 7 Concept will help you to achieve cost savings of about 30%
what you need for success. PCS 7 is freely sellable, and published prices exist.
PCS 7 empowers your users to do their jobs better, faster, more efficiently and cost effectively Siemens offers 3 business models for solutions: Siemens, Siemens with partners, or partner alone.
With Siemens you have access to the Industry-leading Know-How Siemens has a hotline service free of charge.
PCS 7 allows quickly production changes for better meet of market demands SIMATIC PCS 7 reduces the TCO and provids better plant availability
“Normally, changing over from one system to another takes months. With Siemens the operation The power of PCS 7 produces a highly functional, cost-effective Control & MCC Solution
simply involved pressing a button. In addition to complying with all of our specifications, Siemens Advanced control is free of charge and has never been easier
technology enabled us to keep our operations running in order to meet the needs of our customers.
Significant reduction in engineering and commissioning costs
We are proud of that.”
PCS 7 supports beginning with a new version six languages as standard, and the language can be
PCS 7 is the technology you need, the platform your application demand
switched over on every operator station.
With PCS 7 you get higher productivity and quality over the whole life cycle
PCS 7 is based on SIMATIC and is developed and manufactured by Siemens itself. ABB, Emerson,
We offer the greatest variety of DCS configuration options, the lowest automation life cycle costs and Honeywell use 3rd party
the most powerful engineering tools to keep your total enterprise a step ahead of your competition
Operator Eng./Maint.
Information always at the right time and the right place with User-friendly operator navigation PCS 7 process I/O, the right solution for every requirement
Advanced Alarm Management minimizes the no. of alarms by 80% The world‘s first truly integrated safety controller, Absolute Integrity between Control and Safety
PCS 7 is multilingual, clearly structured, ergonomic and easy to understand. PCS 7 bietet die bis heute nicht gekannte Möglichkeit CFC, SFC und Objectview.
PCS 7 reduces the work load of the operating personnel. Intuitive view provides situational awareness PCS 7 ist das erste System, bei dem das HMI mit Hierarchie projektiert werden kann
and better decision support. “The Simatic Route Control software helped us to reduce the configuration overhead in this project by
Getting the right information to the right people at the right time about 25% and to trim 20% off the normal commissioning time"
Geographically super-distributed system with Telecontrol wide area network The Safety Matrix enables automatic program generation from the Cause & Effect matrix and automatic
PCS 7 basiert auf SIMATIC dem mit Abstand am meisten eingesetzten System auf der Welt visualization in PCS 7 with operator functionality.
“We can change over our production faster, which brings us great advantages, especially considering SIMATIC Batch is seamlessly integrated in PCS 7, and can be executed as an OS-based or AS-based
the constantly changing fashions and trends in the industry.” process, as a single or redundant batch.
“We have to supply power round-the-clock, 365 days a year, because when the power station fails, the PCS 7 CFC: Customers can create their own blocks using SCL or chart-in-chart functionality.
entire operation comes to a standstill.” PCS 7 offers better networking possibilities and supports hybrid applications, coupling of package
SIMATIC offers the highest availability and reliability in the industrial automation market units in the engineering, e.g. via HW-Config. SIMATIC is the better approach to Digital Factory
Customers want a simple method for accessing process graphics via intranet/browser. PCS 7 Web Easy to learn, easy to use, easy to maintain, and easy to connect to your existing automation
clients allow operation to different projects with different versions at the same time. PCS 7 is rugged, PCS 7 with APL, pre-configured profiles, faceplates and tools. Faster engineering of large systems by
stable and redundant in all levels. powerful bulk tools
Operation closing
Project
Hardware design
Software design
Sub contractors
Project opening
Commissioning
Site acceptance
Implementation
Manufacturing
Construction
Purchasing &
Organization
specification
Quality plan
acceptance
Installation
Functional
Delivery
Factory
Training
support
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 12 01.08.2011 Industry Sector
Benefits, The Difference
How do I reduce unplanned shutdowns and prolong the time between shutdowns?
Use Use
Functionality
Customer Data Advanced ES (new)
I/O List
Database Tool
Import & CORE
Interlock diagrams
Clarify Consistency Management RATIO
Sequence diagrams Check of changes
HMI sketches etc. COMOS
Generate Generate
Documents PCS 7
SW & HW FAT Result Sheets Loop Check Result Sheets AS OS
Hardware Configuration Consistent Process Displays
Field Termination Schedules Validation Documentation Symbol Table Picture Hierarchy
CFC Archiving
Project Documentation Plant Hierarchy
Customer
Project team
Steering Committee
Customer
Siemens
Customer Customer
Siemens AG
Project Manager Commercial Manager
Headquarters Support
N.N N.N Customer
R&D
Service & Support
Siemens Siemens Siemens
Industry Specifics
Sales Region xxx Project Manager Commercial Manager Siemens
N.N. N.N. N.N.
Project Structuring, P&I Diagrams Specification of Interlocks, Hardware Design Test Planning (FAT / SAT)
Organisation Responsibilities (Design approved) Closed loop controls Specification incl. Terms of Acceptance
List of Codes and Standards, Instrumentation Safety & Emergency Software Design DCS System
Eviromental Conditions & Control List Shutdown functions Specification Test Specification & Reports
closing
Project
Hardware design
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Proposal
Installation
Feasibility
Delivery
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 19 01.08.2011 Industry Sector
Project opening / Quality plan
Project Quality Plan to ensure qualified project execution according to a signed standard
Project Description
Project Organization (Customer & Siemens)
Roles & Responsibilities (customer & Siemens)
Codes & Standards
Document Management
Communication in Project
Change Management
Working Procedures
Key Milestones, Quality Gates
Test & Approval Procedures
Safety & Security
Sub contractors
Project opening
Functional design
closing
Project
Hardware design
Software design
Site acceptance
Organization
Commissioning
Process design
Implementation
Quality plan
Manufacturing
Cost estimate
Purchasing &
Construction
specification
acceptance
Installation
Feasibility
Proposal
Delivery
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 20 01.08.2011 Industry Sector
Functional specification
closing
Project
Hardware design
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
specification
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
Quality plan
Functional
acceptance
Installation
Feasibility
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 21 01.08.2011 Industry Sector
Hardware design
Functional design
closing
Project
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Hardware
Installation
Feasibility
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 22 01.08.2011 Industry Sector
Software design
closing
Project
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Software
Installation
Feasibility
Hardware
Proposal
Delivery
design
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 23 01.08.2011 Industry Sector
Seite 24
Feasibility
study
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Quality plan
Organization
Sub contractors
Purchasing & Manufacturing
Functional design
specification
Hardware
design
Software design
Purchasing &
Manufacturing
Implementation
Cabinets
Factory
acceptance
Delivery
Third Party Components
Construction
Installation
Operating & Monitoring Components
Commissioning
Site acceptance
Project
Operation closing
support
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
Seite 25
Feasibility
study
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Quality plan
Implementation Hardware
Organization
Sub contractors
Functional design
specification
Hardware
design
Software design
Purchasing &
Manufacturing
Implementation
Factory
acceptance
Delivery
Construction
Installation
Commissioning
Loop Diagrams
Site acceptance
Detailed Cabinet Layout
Project
Operation closing
support
Cable List with termination schedule
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
Implementation Software
Implementation
Functional design
closing
Project
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Installation
Feasibility
Hardware
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 26 01.08.2011 Industry Sector
Implementation – Automated Hardware Configuration
Step 1:
Lead Engineer preselects HW components in central list
Step 2:
Engineers easily design system architecture EXCEL Based
(AS’s, DP’s, Profibus lines) and distribute the I/O’s to the DP’s. Configuration Tool
Automatic name generation for AS’s, DP’s, I/O modules, MTA’s
Step 3:
Export HW Config to PCS7 & Generate I/O List
PCS 7
Implementation
Functional design
closing
Project
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Installation
Feasibility
Hardware
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 27 01.08.2011 Industry Sector
Factory acceptance test FAT
Overview
closing
Project
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
Manufacturing
acceptance
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
Installation
Feasibility
Hardware
Proposal
Delivery
Factory
design
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 28 01.08.2011 Industry Sector
FAT:
Seite 29
Feasibility
study
Examples
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Quality plan
Organization
Sub contractors
Functional design
specification
Hardware
System
design
HW FAT PCS 7
Software design
Purchasing &
Manufacturing
Implementation
Factory
acceptance
Delivery
Construction
Installation
Commissioning
Site acceptance
SW FAT
Typicals
Project
Operation closing
support
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
FAT:
Seite 30
Feasibility
study
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Quality plan
Automated Test Software
Organization
Measuring Point List (Customer)
Sub contractors
Functional design
specification
Hardware
design
Software design
compare
Database
Purchasing &
Manufacturing
Access
Delta Report
Implementation
Export
Factory
T15499 Alarm HH 50 °C 100 °C
acceptance
P167543 Range 0 ... 100 bar 0…. 200 bar
Delivery
Construction
PCS 7
Installation
Commissioning
Site acceptance
Project
Operation closing
support
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
Seite 31
Feasibility
study
Delivery
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Quality plan
Organization
Sub contractors
Packaging
Functional design
specification
Customs Clearance
Shipment Documents
Hardware
design
Software design
Purchasing &
Manufacturing
Delivery of Hardware Components to Site
Implementation
Factory
acceptance
Delivery
Construction
Installation
Commissioning
Site acceptance
Project
Operation closing
support
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
Construction / Installation
closing
Project
Software design
Site acceptance
Sub contractors
Construction
Project opening
Commissioning
Process design
Implementation
Manufacturing
Cost estimate
Installation
Purchasing &
Organization
specification
Quality plan
acceptance
Feasibility
Hardware
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 32 01.08.2011 Industry Sector
Commissioning
Commissioning
Functional design
closing
Project
Software design
Site acceptance
Sub contractors
Project opening
Process design
Implementation
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Installation
Feasibility
Hardware
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 33 01.08.2011 Industry Sector
Seite 34
Feasibility
study
Process design
Cost estimate
Proposal
01.08.2011
Delivery Service execution
Project opening
Final Site acceptance
Quality plan
Organization
Sub contractors
Functional design
specification
Hardware
design
Software design
Warranty Start
Purchasing &
Manufacturing
Hand over of the system
Implementation
Factory
acceptance
Delivery
Acceptance Certificate (can be with open points)
Construction
Installation
Commissioning
Typically after operation without errors of a certain duration
Site
acceptance
Project
Operation closing
support
Training
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Industry Sector
Project closing
Project
closing
Functional design
Software design
Site acceptance
Sub contractors
Project opening
Commissioning
Process design
Implementation
Manufacturing
Cost estimate
Purchasing &
Construction
Organization
specification
Quality plan
acceptance
Installation
Feasibility
Hardware
Proposal
Delivery
design
Factory
study
Operation
Training
support
Delivery Service execution
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 35 01.08.2011 Industry Sector
Project management
The DCS project manager is the contact person for the complete engineering process. He is supported by sub-
project managers depending on size of the project. These positions are filled with experienced project managers.
They are continuously monitoring quality, costs, deadlines and resources:
Detailed
Resource Information
Status reports Project plan project
management management
schedule
The DCS plays a central role in the automation of the production process.
A modular concept is the key for a successful realization of the process and automation requirements.
Detailed
Definition Cooperation
Monitoring, Creation of scheduling
of user on process
delivery, function charts aligned
requirements engineering,
assembly S88.01structures to the process
in SW and HW descriptions
engineering
Following the relevant norms and guidelines of the industry in all phases of a project, we define the resulting
requirements in close co-operation with our customers:
Qualification
plan Realization of
Risk analysis SOP creation
for validation supplier audits
master plan
Realization Support
Monitoring of DQ, IQ, OQ IQ, OQ, PQ
Document
according to for the together with
management
GAMP DCS, MES, process
PIMS engineering
The hardware is planed in a close coordination with the DCS realization, the instrumentation and other parts of the
plant construction. In the context of this module we prepare the assembly documentation so executing enterprises
can work according to it. The hardware is planed by modern CAE systems, we adapt to your specifications:
Factory Training
Software Assembly and
Acceptance Test maintenance
application start up
FAT staff
In the instrumentation phase the field controllers for the plant are specified, purchased and the assembly taken
care of. Our services for the hardware are:
We create an energy supply concept for your production plant in the areas of low and small voltage. This concept,
the purchasing of the components and the FAT is part of our standard offer as well as the supervision of the
assembly.
This service module is our interface to the process engineering. With our process know-how and experiences in
the requirements of the chemical, petrochemical and pharmaceutical industries we represent the process in
software structures according to ISA S88.01. The resulting function plans are the basis for the DCS software:
Function charts
Consulting in Module
Software according to
process specification /
planning IEC61512-1
engineering typicals
S88.01
Continuous Sequential
Batch, phases, Version
Function Function
receipes management
Charts CFC Charts SFC
Following the relevant norms and guidelines of the industry in all phases of a project, we define the resulting
requirements in close co-operation with our customers:
Support
GAMP training
for IQ, OQ, PQ
and Design
Risk analysis SOP definition together with
Project specifications
process
specification
engineering
Implementation
Test Tests, Traceability Document
according
specifications Test reports Matrix management
to GAMP
Detailed Planning of
Inventory in Cost
Concept study planning of assembly and
SW and HW estimation
rewiring disassembly
Delivery, Actualization
DCS Internal Test,
assembly and of the
Realization FAT, SIT, SAT
commissioning documentation
Cost savings during project execution and over the total plant life cycle
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 47 01.08.2011 Industry Sector
Influence of MAV (Early Vendor Involvement)
+ Integrated Engineering on Project Lifecycle
classical
approach
Cost and Staffing level
MAV
(early vendor
Involvement)
MAV
+ Integrated
Engineering
Time
Design
Specifications
Bidding
Negotiations
Manufacturing
Installation
Commissioning
Concept Training
Basic
Detailed Engineering
Construction
Concept Operation
100 %
Examples of
Commissioning, start up, training cost saving potentials
Project phase Classical % Eng MAV approach Effect by MAV relative typ. relative typ.
acc. to NAMUR approach acc. to Effect absol. Effect €/$ absol.
NAMUR Effect Effect
Conc. Engineer. general Definition 7% general definition +/- Time reduction due to Inetgrated +/- 0% +/- 0% +/- 0% +/- 0%
engineering
FEED Basic generic tender 11% MAV partner involvement more effort by MAV selection +10 … +70% +3,3% +20 … 70% + 3,9%
Engineering typ. +30% typ. +35%
EPC Bidding EPC engineering 12% EPC quote with predefined much shorter clarification and -20 … -70% - 4,8% -20 … -70% - 4,8%
vendor quotations prices and specs bidding phase, typ. -40% typ. -40%
technical clarifications
Detail Engineering Approval phase, FEED – 24% approval based on predefined shorter and easier engineering and -15 … -60% - 8,4% -15 … -60% - 8,4%
EPC - vendors clarifications specifications approval phase typ. -35% typ. -35%
Procurement negociations with several 3% Procurement based on predefined easier and shorter procurement -20 … -70% - 1,2% -20 … -70% - 1,2%
vendors specs, prices, Terms&Conditions typ. -40 % typ. -40 %
Construction construction, QM, Factory 28% automatic software generation more tests in factory possible, as all +20 … -40% - 2,8% +20… -40% - 2,8%
Acceptance tests additional integration tests in factory automation equipment is available typ. -10% typ. - 10%
possible -> more cost
Installation Installation of equipm. of 10% installation of equipment of one less equipment types, ratio effect -10 … -50% - 2,5% -10 … -50% - 2,5%
several vendors vendor for installation staff typ. -25% typ. -25%
Commissioning Integration tests on site, 5% Commissioning of pretested systems much less effort on site -15 … -60% - 2,3% -15 … -60% - 2,3%
Commissioning typ. -45% typ. -45%
Subject Classical approach MAV / MIV approach Typical effort Typical Effect Typical
cost rel. % cost
min/typ/max effect
Operator & Operator training and Training for one system family with 15 manweeks - 20%... -50%
Maintenance maintenance training for unique Human Machine Interface (HMI) trainers and trainees typ. - 30 %
Training equipment of multiple Use of Integrated Engineering for
vendors training
Service / Service / maintenace for the service only for one equipment brand 4 manyears -15% … -50%
Maintenance equipment of several vendors (24/7, if required) typ. - 30 %
Spare parts Spare part storage and management reduced spare part capacity necessary, in total typically 2,5% of Hardware cost / a -20% … -80%
for the equipment of multiple less part handling, less fixed capital typ. - 40 %
vendors
Operation different HMIs of different vendors same "look and feel" in the total plant one total plant shutdown less per year savings depend on
in use reduces operating errors with 1 day production loss means ~ 0,27% training status,
risk of operating errors less plant failures more productivity skills, operating
philosophy, etc.
Modernization Modernization of plant involves the Only the equipment of one vendor Less engineering, as only one equipment savings depend on
equipment of multiple vendors involved brand has to be modernized plant
structure,degree od
modernization, etc.
Savings sum up to ~ 1 … 2% of DCS CAPEX/year, i.e. ~ 10 … 20% savings of DCS OPEX / year
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 53 01.08.2011 Industry Sector
Solutions from Siemens
We provide not just the technology but also the know-how and expertise you need to maximize the
profitability of your business
New ways to extend the life of your systems and maximize the value of installed equipment
Modular Siemens solutions… free to select any combination of products and professional services you need
Lifetime services: Commitment of Siemens to ensure the long term value of your plant
We just do not improve the performance of isolated areas in your plant. We deliver measurable performance
improvements across your entire operation, including all of its processes and assets
Customer: Cargill
Location: Botlek – Rotterdam, The Netherlands
Solution provider:
Siemens Industry automation Ltd, Shanghai (SIAS)
Project characteristics:
Decision for Siemens: Turn-key project
DCS+ESD
Safety integrated solutions
High availability e.g.:
Competitive price
redundant controller, system bus, I/O bus, I/O modules
Good relationships with customers
Commissioning at the beginning of 2008
Siemens scope supply:
AS: 22 417 H ( 5 F/H)
I/O: 21,000 (1300 Failsafe)
OS: 30 OS Client, 4 ES, 4 OS servers.
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 70 01.08.2011 Industry Sector
SIMATIC PCS 7 Reference Example Bioethanol
Bioethanol and Sugar Plant, Klein Wanzleben, Germany
Project Partners:
Siemens, AGA, ACC, Raute, Scoda, Kaibel+Sieber, Martek, ABB, Valmet, Mostostal,
MIMET, PEAB
Project characteristics:
Gas/Oxygen melting furnace 120t/day
Siemens scope supply: Form giving by TEL procedure 6 fiberiser units 4 forming
drums.
20kV Medium-Voltage Switch gear
Motor Control Center Curing Oven for drying coating unit.
Simovert Masterdrive Cutting and packaging units for volls and plates
Converter units and Electrical drives Inputs: Sand, soda, feldspat, dolomit, borax .... cullets
Distributed Control System PCS 7
Uninterruptible power supply
Analysis technique, Camera system, …
Completion: 2007
Nur für internen Gebrauch / © Siemens AG 2011. Alle Rechte vorbehalten.
Seite 72 01.08.2011 Industry Sector
SIMATIC PCS 7 Reference Example Paraffinsulfonat
Sasol, PCS 7 Replacements, Germany
1x AS 417H controller
1400 I/Os partial Profibus PA
4x Clients, 1x ES, 1x red. Server
F-Technology and connection to HIMA via PROFIBUS
Plant: Paraffinsulfonat
Site for Acrylic acid and Superabsorber polymers (SAP)
Production Startup 2001 (worldwide BASF > 1 Mio. t/yr)
New ASF7 Assapan Plant (Greenfield) to increase production site capacity up to 335.000
t/yr (there of new plant 160.000 t/yr.)
Plant startup 2008
Customer Goal:
Project characteristics:
Respond quicker the growing European market-demand from its EU-based production sites
Replacement of ABB (Contronic P) with Siemens DCS
Use of latest technology to improve its competitiveness and strengthen its global market
(PCS 7 V7.0)
leadership.
Done inside a 2 weeks time frame
Integration of Asset Management and predictive maintenance (Siemens decision)
Engineering:
Automation: Siemens Industry
Failsafe applications SIL 3 (system-integrator)
Project Scope:
Phase 1 (finished August 2010)
Development of URS (DCS) and FS (DCS and Process) Project characteristics:
Opener for opportunity “Phase 2” (development of quantity structure together with Julphar)
Large Greenfield project for human insulin with 1.500 kg / year
Project divided in two parts
Phase 2 (ongoing from June 2010 – November 2011)
Phase 1 was base to get Phase 2
Design, implementation, commissioning and qualification/validation of plant
More than 10 PU supplier incorporated
Customer: Cargill
Location: Gent, Belgium
Plant: Biodiesel
PCS 7 – quantity:
12 Controllers S7 417
Project characteristics:
1 redundant OS-Server Re-Design of existing Semi-Refinery
Simatic Batch Upgrade of the plant during short downtime
Route Control
7 Clients
2 Engineering Stations
Klüber Lubrication is a worldwide acting enterprise in the sector of chemical industry / mineralic oil solutions. The
Headquarter is located in Munich (Bavaria). Klüber is the leading supplier of special lubricants and offers tribologic solutions
for various industries: Automotive, Food Industrie, Tool- Machine Engineering, wind energy, etc.
Customer: SABIC
SABIC is the Saudi Basic Industries Corporation, one of the world’s leading manufacturers
of chemicals, fertilizers, plastics and metals. They supply these materials to other
companies, who use them to make the products on which the world has come to depend.
Project Scope
Hardware: Engineering / Services:
1 redundant server pair PCS 7 Engineering
1 Controller (417-4HF) IO Cabinets
1 Engineering Station Marshalling Cabinets
3 Clients FAT
Customer: Syabas
SYABAS (Syarikat Bekalan Air Selangor) provides water supply to the state of Selangor in
Malaysia.
The raw water are sourced mostly from surface water collected by several dams,
lakes and rivers, and treated at nearby water treatment plants.
Supervise
Plant Cabinet/ Ineter-
HW & SW Instrument Ethernet Interfaces As built Docu
Layout & Application Operability
Spec. Specification & Fieldbus to OEM Units Cabinets
Design Prototypes FAT
Install.
Training
User Site Commiss- Operator Cover
OEMs on MCC Software
Requirement Supervision ioning & Service Warranty Client
HW/SW Specification FAT
Spec & Mgmt. Support Training Period EPC
Spec.
EPC
Package MAV
Site
Equipment Installation Units Provisional Final
Approvals Approvals Acceptance
List Locations Commissioned Acceptence Acceptence
Test MAV
& Running
Specifications Application Support Project Management Maintenance (contract) Survey of I/O Signals
Conception Consulting System Startup Software update Expansion
Configuration Check Configuration Optimization Services Optimization Services Online Support
Abnormal Situation Management Design Personnel Support Online Support Site Support Specialist Technical Support
Budget Proposals Project Management Technical Support Online Support Conception
Quotation Training Training Technical Support Configuration Check
Financing Technical Support Personnel Support Spare Parts Configuration
Siemens
corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and
then insert it again.
hardware and Siemens project
software specialist management
Siemens Experienced
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been
Partner
corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and
then insert it again.
hardware and external
software specialist
The image cannot be displayed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open The image cannot be displayed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open The image cannot be displayed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer,
System Responsibility
the file again. If the red x still appears, y ou may have to delete the image and then insert it again.
Project Execution
the file again. If the red x still appears, y ou may have to delete the image and then insert it again.
Project Responsibility
and then open the file again. If the red x still appears, y ou may have to delete the image and then insert it again.
Gateway /
Automation Automation Protocol Converter
Control Controller Controller Protocol 1
Protocol 3
Fieldbus Protocol 2
Local I/O
IED IED IED
Marshalling Rack
Generator Protection, Transformer Protection
Process Fieldbus Device Drives LV Swg Motors
Automation
Control Controller
Fieldbus IEC61850 station bus
IED IED
Fieldbus Motor
Drives LV Swg
Process Instrument starters
ABB