Republic of the Philippines
ENERGY REGULATORY COMMISSION
San Miguel Avenue, Pasig City
20
RESOLUTION NO, » Series of 2017
ARESOLUTION ADOPTING THE ERC RULES FOR
SETTING THE DISTRIBUTION SYSTEM LOSS CAP AND
ESTABLISHING PERFORMANCE INCENTIVE SCHEME FOR
DISTRIBUTION EFFICIENCY
WHEREAS, Section 43 (£) of Republic Act No. 9136, otherwise
known as the Electric Power Industry Reform Act of 2001 (EPIRA)
provided that the cap on the recoverable rate of system loss prescribed
in Section 10 of Republic Act No. 7832 is amended and shall be
replaced by caps which shall be determined by the Energy Regulatory
Commission (ERC) based on load density, sales mix, cost of service,
delivery voltage and other technical considerations it may promulgate;
WHEREAS, on September 2016, the Commission, after public
bidding, engaged the services of a consultant, PowerSolv Inc. to conduct a
study on system loss for purposes of establishing new caps based on the
abovementioned parameters;
WHEREAS, said engagement required PowerSolv Inc. to: 1) come
up with a new distribution system loss caps (technical and non-technical
losses) including incentive scheme fof system loss reduction based on the
criteria provided in the EPIRA; 2) review and enhance, if necessary, the
existing models/methodology for segregating the technical and non-
technical losses; and 3) prepare the draft rules for the determination of
caps for recoverable levels of distribution system losses;
WHEREAS, PowerSolv Inc. was instructed that the methodology
should consider characteristics that include load density, sales mix, cost of
service, delivery voltage and any other technical considerations, as
provided in the EPIRA, necessary for establishing different caps for
different customer classes for different Distribution Utilities (DUs);20
Resolution No.__"_, Series of 2017
A Resolution Adopting the ERC Rules for Setting the Distribution System Loss Cap
and Establishing Performance Incentive Scheme for Distribution Efficiency
Page 2 of 3
—.S
WHEREAS, Public Consultations on the draft rules were
conducted in Manila on May 29-30, 2017 for the Luzon Stakeholders; in
Cebu City for Visayas Stakeholders on June 01, 2017 and in Manila and
Davao for Mindanao Stakeholders on August 09, 2017, and August 31,
2017, respectively;
WHEREAS, on July 05, 2017 and July 06, 2017 a Focus Group
Discussion (FGD) was conducted at the Distribution Management
Committee (DMC) conference area for Electric Cooperatives and Private
Distribution Utilities, respectively;
‘WHEREAS, after said public consultations and FGDs, PowerSolv
Inc. submitted its proposed Rules for Setting the Distribution System Loss
Cap and Establishing Performance Incentive Scheme for Distribution
Efficiency (Rules);
WHEREAS, the proposed Rules was presented to the Senate
Committee on Energy and the Committee on Energy of the House of
Representatives on separate committee hearings;
WHEREAS, the Commission it its 05 December 2017 Regular
Commission Meeting resolve to approve the Rules for Setting the
Distribution System Loss Cap and Establishing Performance Incentive
Scheme for Distribution Efficiency, hereto attached as Annex “A” and made
an integral part of this Resolution; ~ “"" *
WHEREAS, the new Rules grouped the Distribution Utilities into
four (4) clusters based on similar technical considerations as discussed in
the “Methodology on the Determination of System Loss Caps”, hereto
attached as Annex “B” and made an integral part of this Resolution;
NOW, THEREFORE, the ERC, after thorough and due
deliberation, hereby RESOLVES, as it is hereby RESOLVED, to
APPROVE and ADOPT, the Rules for Setting the Distribution System
Loss Cap and Establishing Performance Incentive Scheme for Distribution
Efficiency attached as Annex “A” of this resolution and the new caps shall
be effective starting May 2018 billing.20
Resolution No. » Series of 2017
A Resolution Adopting the ERC Rules for Setting the Distribution System Loss Cap
and Establishing Performance Incentive Scheme for Distribution Efficiency
Page 3 of 3
as eeeSSSSSSSSSSSSSS
This Resolution shall take effect after fifteen (15) days following the
completion of its publication in a newspaper of general circulation in the
Philippines or in the Official Gazette.
Let copies of this Resolution be furnished the University of the
Philippines Law Center-Office of the National Administrative Register
(UPLC-ONAR), the Senate Committee on Energy, the House of
Representatives Committee on Energy, the Department of Energy (DOE),
and all Distribution Utilities.
Pasig City, 05 December 2017.
ae
AGNES VST DEVANADERA.
Chaiypeyson and CEO
Qui, Meelis it
ALFREDO J. NON GI VICTO) YAP- TARUC
Commissioner i.
JOSEFINA PA‘ A. MAGPALE- ASIRIT frroxt1o D. STA. ANA
\issioner Commissioner
nos.scunMbeairerryps