BASIC WIND VELOCITY CALCULATION


******************
Directional factor is 1.000 Season factor is 1.000
Basic wind velocity is vb,0 x c_dir x c_season = 28.570 x 1.000 x 1.000 =28.570
Basic wind velocity vb = 28.570 (m/s)

******************
BASIC VELOCITY PRESSURE CALCULATION
******************
Basic velocity pressure qb = 510.153 (N/m2)

******************
PEAK VELOCITY PRESSURE CALCULATION
******************
-------------
MEAN VELOCITY PRESSURE CALCULATION
-------------
Terrain Type II Selected: Area with low vegetation such as grass and isolated
obstacles (trees, buildings) with seperations of at least 20 obstacles heights
Mean wind velocity v_m(z)=cr_z*c0_z*vb=1.071 x 1.000 x 28.570= 30.587 (m/s)
Mean wind velocity v_m(z)= 30.587 (m/s)
-------------
PEAK VELOCITY PRESSURE CALCULATION
-------------
Peak velocity pressure is qp(z)= 1311.153 (N/m2)=1.311 (kN/m2)
******************
PRESSURE COEFFICIENT FOR BUILDING CALCULATION
******************
A= 630.000 (m2)
h/d = 0.583 between 0.25 and 1
-------------ZONE A-------------
Zone A: c_pe= -1.200
-------------ZONE B-------------
Zone B: c_pe= -0.800
-------------ZONE C-------------
Zone C: c_pe= -0.500
-------------ZONE D-------------
Zone D: c_pe= 0.744
-------------ZONE E-------------
Zone E: c_pe= -0.389
********************************
PRESSURE COEFFICIENT FOR DOU-ROOF CALCULATION
********************************
-------------ZONE F-------------
Pitch angle alpha is 9.460 degree, which is between 5.000 and 15.000 degree
Zone F: c_pe= -1.343
-------------ZONE G-------------
Pitch angle alpha is 9.460 degree, which is between 5.000 and 15.000 degree
Zone G: c_pe= -1.022
-------------ZONE H-------------
Pitch angle alpha is 9.460 degree, which is between 5.000 and 15.000 degree
Zone H: c_pe= -0.466
-------------ZONE I-------------
Pitch angle alpha is 9.460 degree, which is between 5.000 and 15.000 degree
Zone I: c_pe= -0.511
-------------ZONE J-------------
Pitch angle alpha is 9.460 degree, which is between 5.000 and 15.000 degree
Zone J: c_pe= -0.335
*************************NET PRESSURE W ON ALL ZONE*************************
-------------ZONE A-------------
Pressure W on zone A is -16.521 (kN/m)
-------------ZONE B-------------
Pressure W on zone B is -11.800 (kN/m)
-------------ZONE C-------------
Pressure W on zone C is -8.260 (kN/m)
-------------ZONE D-------------
Pressure W on zone D is 8.785 (kN/m)
-------------ZONE E-------------
Pressure W on zone E is -6.949 (kN/m)
-------------ZONE F-------------
Pressure W on zone F is -18.210 (kN/m)
-------------ZONE G-------------
Pressure W on zone G is -14.415 (kN/m)
-------------ZONE H-------------
Pressure W on zone H is -7.861 (kN/m)
-------------ZONE I-------------
Pressure W on zone I is -8.388 (kN/m)
-------------ZONE J-------------
Pressure W on zone J is -6.316 (kN/m)

Note: C_pi taken to be -0.200

*************************SNOW LOAD CALCULATION*************************

**************PARAMETERS INPUT**************
From table 5.3 EC 1-1-3, mu_1 is determined to be = 0.800

Using Greece relationship for snow load, sk_snow = 0.810 ||Zone = 2 ||Altitude
above sea level = 20

**************SNOWLOAD OUTPUT**************
Snow load pressure = 0.648 (kN/m2)
Snow load distributed on frame = 5.835 (kN/m)