Project Name/ Office Location: Al Geemi Main Office Project No.: J22 Date:14/06/2017 Rev.:02
Layout of area ensures circulation spaces provide None Required HSE Monthly
clear means of escape to exit points Basis
Regular checks undertaken to ensure means of escape Monthly
None Required HSE
maintained and not used as storage spaces. Basis
1.4 Escape route
Large quantities of open combustible materials kept Monthly
None Required HSE
positioned away from exit points where possible. Basis
Clear access maintained to any fire fighting equipment Monthly
Do not use Lift during fire emergency, use only HSE
and/or fire alarm call points. Basis
stair case
Mock Drill
Occupants fully aware of their actions to take in the event of
Training-
discovering a fire or on hearing the fire alarm particularly HSE
Inappropriate every 6
where occupants are unfamiliar.
action in Areas need to have equipped Emergency months
Monthly
1.5 discovering a fire Exit points from rooms clearly identifiable, do not use sign alarms systems and more fire fighting HSE
Basis
or hearing the fire shall be posted and message shall be conveyed equipments.
alarm.
Assessment area covered by fire risk assessment should
Regular
be given Instruction, information, training and HSE
Basis
supervision
Poor Rubbish not allowed to over accumulate and should be Office Monthly
housekeeping properly disposed. Cleaner Basis
increasing
1.6 potential spread None Required Office
Good housekeeping maintained through regular checks and Monthly
of an unwanted Secretary/
fire. occupants awareness of their role. Basis
HSE
Approval
General Notice:
Monthly Inspection should take over after this Risk Assessment, Any changes or additional activity, should be mention and record in this assessment. Any
observation in the monthly inspection should be close out as per the level of risk