PROJECT COMMUNICATIONS
MANAGEMENT
Eng.Mukhlis Mirghani
Project Communications Management
It includes the processes that are required to ensure timely and
appropriate:
• Collection, creation, distribution, storage, retrieval,
management, control, monitoring, and the ultimate
disposition of PROJECT INFORMATION.
Eng.Mukhlis Mirghani
COMMUNICATION DIMENSIONS
Eng.Mukhlis Mirghani
10.1 Plan Communications
Eng.Mukhlis Mirghani
.1 Communication
.1 Project mgt plan .1 Comm. Req. mgt plan
.2 Stakeholder analysis .2 Project doc.
register .2 Comm. Tech. updates
.3 EEF .3 Comm. models
.4 OPA .4 Comm. methods
.5 Meetings
Eng.Mukhlis Mirghani
Project Doc.
update
project
management Enterprise/Or
plan 10. 1 Plan g.
Communications
4.2 mgt.
Develop project
management
plan
Communications 13.2 manage
mgt. Plan Stakeholders
Stakeholder engagement
register
13.1
Identify
stakeholders
10.2 manage
Communications
Enterprise/Or
g.
EFF & OPA
Eng.Mukhlis Mirghani
INPUTS
.1 Project mgt plan
• provides information on how the project will be executed, monitored,
controlled, and closed
.2 Stakeholder register
• provides the information needed to plan the communication with project
stakeholders
.
Eng.Mukhlis Mirghani
TOOLS & TECHNIQUES
.2 Comm. technology
.1 Comm. Req. analysis
• brief conversations
• determining the information
needs of the project • meetings
stakeholders. • written documents to extensive
• Comm. channels is n(n – 1)/2, materials (accessible online)
n the number of stakeholders Factors affect the choice of technology
include:
.4 Comm. methods
Urgency of the need for
• Interactive (meetings, phone information.
calls) 2 or MORE
Availability of technology.
• Push (letters, reports, emails)
Ease of Use.
• Pull (intranet sites, e-learning)
Project environment.
confidentiality of the info.
Eng.Mukhlis Mirghani
Encode .3 Comm. Models
Thoughts or ideas into language by
the sender.
Transmit Message
What sent by the sender using comm.
Decode
The message to meaningful thoughts
or ideas y receiver.
Acknowledge
but this does not necessarily mean
agreement with or comprehension of
the message.
Feedback/Response
encodes thoughts and ideas into a
message
Eng.Mukhlis Mirghani
OUTPUTS
.1 Comm. Mgt. plan
• Information to be communicated,
• Reason for communication
• Time frame and frequency of communication
• Person responsible for communicating the information;
• Person responsible for authorizing release of confidential information;
• Person or groups who will receive the information;
• Methods or technologies used to convey the information, such as Se-mail
• Resources allocated for communication (time and budget);
• Escalation process
• Glossary of common terminology;
• Flow charts of the information flow Communication constraints
Eng.Mukhlis Mirghani
10.3 Manage Communications
WPR
Communications
4.3
mgt. Plan
Project Doc.
Monitor and update
control project
work Enterprise/Or
10. 2 manage
g.
Communications
Eng.Mukhlis Mirghani
Tools & techniques
.1 Project communications
performance reports
deliverables status
schedule progress
cost incurred
.4 OPA updates
oStakeholder notifications
oProject reports
oProject presentations
Eng.Mukhlis Mirghani
10.3 Control Communications
Eng.Mukhlis Mirghani
.1 WPI
.2 Change requests
.1 Project mgt. plan
.3 Project mgt.
.2 Project
plan
communications .1 Information updates
.3 Issue log management .4 Project
.4 Work systems documents
performance data .2 Expert judgment updates
.5 OPA .3 Meetings .5 OPA
assets updates
Eng.Mukhlis Mirghani
project
project
management
management
plan Project Doc.
plan update
10.2 manage update
4.2 Communications Enterprise/Or
Develop project g.
management
plan Project
Communications
4.3
direct and WPD
manage project 10. 3 control 4.3
work Monitor and
Communications control project
work
WPI
13.2 manage
Stakeholders
engagement issue log
4.5 Perform
integrated
EFF & OPA Change Request
Enterprise/Or change control
g.
OPA update
Eng.Mukhlis Mirghani
Tools & techniques