You are on page 1of 26

Healthy Check Report

Hop System ABBS0162-ABBS0161

Site A Site B

Site ID ABBS0162 ABBS0161

Site Name

Region R6-AL NIMAS R6- AL NIMAS

Date of Issue 13/DEC/2017

Issued by

Huawei Manage services Zain project

Installation Check Sheet (Site A)


No. Description Check
A In-Door
A.1 In-Door Unit (IDU) Module
-1 Mount Mounting Position OK
-2 Tightness of Cage Screws OK
-3 Power Plug Loose Contact of Connector Pins OK
-4 Power Fuse OK
-5 Frame Ground Loose Contact OK
-6 E1 Port Connector Tightness NA
IF Cable Port Connector Tightness OK
Labeling Description Contents OK
A.2 Power Cable
-1 Wiring Laying (Route) OK
Supporting (Method) OK
Termination Tightness (on PDB) OK
Termination Position (on PDB) OK
A.3 Tributary Cable (E1 Signal Cable)-NA
Laying Route NA
Destination Connect Position NA
Loose Contact NA
E1 Connector Loose Contact of Conductor NA
B Out-Door
B.1 ODU and Antenna
-1 Mounting Mounting Position OK
-2 Tightness of Fixing Bracket OK
-3 Frame Ground Tightness OK
-4 Labeling Description Contents OK
-5 Painting Comes off OK
-6 IF Connector Tightness and water proof OK
-7 AGC Monitor Tightness of Monitor Cap OK
-8 ODU and Antenna Combination of flanges OK
B.2 Hybrid Circuit (In case on 1+1 Configuration)
-1 Mounting Tightness of Fixing Screw OK
-2 ODU and Antenna Combination of flanges OK
B.3 Antenna
-1 Labeling Description Contents OK
Detaches Rubber cap and Drain hole must
-2 Water Drain Hole OK
be bottom
B.4 IF Cable
Laying Support and Fixing method OK
Connector Water Proof OK
Labeling Description Contents Ok
B.5 PM Card
Installation PM Card Installation Status Ok

Installation Check Sheet (Site B)


No. Description Check
A In-Door
A.1 In-Door Unit (IDU) Module
-1 Mount Mounting Position OK
-2 Tightness of Cage Screws OK
-3 Power Plug Loose Contact of Connector Pins OK
-4 Power Fuse OK
-5 Frame Ground Loose Contact OK
-6 E1 Port Connector Tightness OK
IF Cable Port Connector Tightness OK
Labeling Description Contents OK
A.2 Power Cable
-1 Wiring Laying (Route) OK
Supporting (Method) OK
Termination Tightness (on PDB) OK
Termination Position (on PDB) OK
A.3 Tributary Cable (E1 Signal Cable)
Laying Route NA
Destination Connect Position NA
Loose Contact NA
E1 Connector Loose Contact of Conductor NA
B Out-Door
B.1 ODU and Antenna
-1 Mounting Mounting Position OK
-2 Tightness of Fixing Bracket OK
-3 Frame Ground Tightness OK
-4 Labeling Description Contents OK
-5 Painting Comes off OK
-6 IF Connector Tightness and water proof OK
-7 AGC Monitor Tightness of Monitor Cap OK
-8 ODU and Antenna Combination of flanges OK
B.2 Hybrid Circuit (In case on 1+1 Configuration)
-1 Mounting Tightness of Fixing Screw OK
-2 ODU and Antenna Combination of flanges OK
B.3 Antenna
-1 Labeling Description Contents OK
Detaches Rubber cap and Drain hole must
-2 Water Drain Hole OK
be bottom
B.4 IF Cable
Laying Support and Fixing method OK
Connector Water Proof OK
Labeling Description Contents OK
B.5 PM Card
Installation PM Card Installation Status OK
Test Data
No, Test Item Specification Result

Site A Site B

A1 Visual Inspection

-1 Unit Composition Satisfactory OK OK

-2 Structure Satisfactory OK OK
-3 Wiring Satisfactory OK OK

A2 Setting

-1 TX Attenuator Link budget dB dB

-2 TX Frequency Freq plan 10835.000 Mhz 11365.000 Mhz

RX Frequency Freq plan 11365.000 Mhz 10835.000 Mhz

-3 Polarization Freq plan

-4 IDU Configuration 8+0 8+0

A3 Meter Reading

-1 TX Power +/- 1.5dB 22 V 22 V

dB dB

-2 RX Power +/- 3dBm 43.5 V 43.5 V

Link budget dBm dBm

A5 XPD Test

-1 When V OFF 69 43 69.3 43.0

-2 When H OFF 42.3 68.6 42.4 70.2

A6 Link BER

-1 Error Free (No Error) no error No error

Link Performance's Capture


(Configurations/RSL/Performance/XPD Test)
Configuration Current RSL & Interference & XPD(V) & XPD(H)
XPD ABBS0162
Without Interference and gain XPD value range after rectification
Error Free group

XPD ABBS0161
Without Interference and gain XPD value range after rectification
Error Free Group
Installation Photograph (Site A: Out-Door)
Antenna / ODU / IF Cable / IF Cable entrance
Installation Photograph (Site A: In-Door)
B-1,2 Equipment
Rack

B-3 Main Ground


Installation Photograph
Bar (MGB) (Site B: Out-Door)
Installation Photograph (Site B: In-Door)

You might also like