You are on page 1of 68

K Builders Training & Consulting

Norumizafarhana binti Saimun


(2015180263)

CHAPTER 1
Introduction

1
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.1 Introduction of Industrial Training

Each student of UiTM‘s graduates were required to attend industry


training to meet the syllabus of learning set by the institution. Through
industry training, students are exposed to the real environment of the scope
of work related to the field of learning taken at their institution. Therefore, the
true knowledge and experience of a problem can be solved wisely because
theoretical and practical learning itself is something different in which their
skills are tested.

For the first session, I have undergo my practical training at JKR Segamat
in department of Senggara Bangunan. During my training, mostly I am
involved in maintenance works and repair works of building. Besides that, I
have been involved in construction for dining hall of PULAPOL in Batu Anam.
The date that I been started my practical training in JKR Segamat is on 26
January until 2 March 2017.

For the second session, I have undergo my practical training in K Builders


Training and Consulting in Building Surveyor Department from 24th July until
30th September 2017. I was given the opportunity to involve in dilapidation
work of Projek Perumahan Rakyat (PPR) in Kuala Lumpur. It gives me
experiences and strengthen my skills to become a good building surveyor.

2
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.2 Purpose of Industrial Training

Industrial Training refers to work experience done during the program of


study that is relevant to professional development prior to graduation. From
the industrial training, the students will also develop skills in work ethics,
communication, management and others. Moreover, this practical training
program allows students to relate theoretical knowledge with its application in
the manufacturing industry.

1.3 Objectives of Industrial Training

The objectives of industrial training are:


 To provide students the opportunity to test their interest in a particular
career before permanent commitments are made.
 To develop skills in the application of theory to practical work situations.
 To develop skills and techniques directly applicable to their careers.
 Internships will increase a student's sense of responsibility and good work
habits.
 To expose students to real work environment experience gain knowledge
in writing report in technical works/projects.
 Internship students will have higher levels of academic performance.
 Internship programs will increase student earning potential upon
graduation.
 To build the strength, teamwork spirit and self-confidence in students life.
 To enhance the ability to improve students creativity skills and sharing
ideas.
 To build a good communication skill with group of workers and learn to
learn proper behavior of corporate life in industrial sector.

3
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

 The student will be able instilled with good moral values such as
responsibility, commitment and trustworthy during their training.

1.4 Company Background

Students of Building Surveyor in Faculty of Architecture, Planning and


Surveying are required to undergo industrial training for two separate
sessions which at the end of the fourth semester and at the end of the fifth
semester. Every industry training period is approximately for 5 weeks.
Therefore, there are some students who make industrial training at two
different training places.

1.4.1 Jabatan Kerja Raya Segamat

Figure 1: the office of JKR Segamat

For the first session, I have undergo my practical training at JKR


Segamat in department of Senggara Bangunan. The date that I been
started my practical training in JKR Segamat is on 26 January until 2
March 2017.

The Public Works Department Office Building was built in 1959. The
Public Works Department then has sections such as Road Division,
Building Division and Water Division and is led by District Engineer, Road
4
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Engineering Assistant, Building Technical Assistant and Assistant Water


Technique and supported by the Administration, Workshop, Store and
several branch offices to operate and maintain Road Division, Building
Division and Water Division maintenance works.
JKR Segamat District has been tasked with handling outsourced and
urban work, which includes planning, building new works and repairing
and maintaining roads, building and supplying clean water for Federal
and State projects.

5
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Organisation Chart

Figure 2: the organization chart of JKR Segamat

6
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Function of Building Department in JKR

1. Plan, coordinate and oversee the implementation of federal and state


projects that are channeled to the State JKR.

2. Implement structural design work for new projects.

3. Coordinate the progress of physical implementation and financial


progress of building projects.

4. Coordinate Maintenance of State buildings and several Federal


buildings.

5. Provide technical advisory services to government departments and


agencies.

7
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2 K Builders Consulting and Training

Figure 3: Logo of K Builders Training and Consulting

K Builders Training and Consulting was established in 2002 to meet the


high demand for training and consulting in the Malaysian construction
industry.

K Builders is registered with the Ministry of Finance in the area of


Managing Seminars (Pengurusan Seminar), Managing Training & Courses
(Pengurusan Latihan dan Kursus), Training Provider (Pembekalan Tenaga
Pengajar), Managing Events (Pengurusan Pameran dan Pentas) and also
Auditing and Certification for Building Surveying Works (Pengauditan dan
Persijilan untuk Kerja-Kerja Ukur Bangunan).

K Builders specialises in in-house and general training programmes and


consultancy for contractors, developers, construction personnel and
professionals. It also functions as event manager for clients who require
seminars, courses, workshops, conferences and exhibitions to be organised.

K Builders also trains people in other industries in the areas of Human


Asset Management and Organizational Development. K Builders is also an
expert in buildings and facilities management that encompass works of
building surveying and building maintenance
8
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.1 Company Contact

Figure 4: front view of K Builders office

Name of Company

K Builders Training & Consulting

Registered Address

No. 21 Jalan Selasih K U12/K

Taman Cahaya Alam Seksyen U12

40170 Shah Alam.

Tel: 019 – 369 1270

Fax: 03 – 3362 5669

E-Mail: kbuilders08@yahoo.com

Facebook: K Builders Training And Consulting

Business Registration No.: 001363849 – H

Date Established: 1st August 2002


9
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.2 Services

Scope of Services (Ministry of Finance)

330208 – UKUR BANGUNAN (PERTUBUHAN JURUUKUR DIRAJA


MALAYSIA)

221709 - PENGAUDITAN DAN PERSIJILAN BANGUNAN (Auditing &


Certification for Building)

241300 - PENGURUSAN SEMINAR (Managing Seminars)

241200 - PENGURUSAN KURSUS / LATIHAN (Managing Training &


Courses)

220502 - PEMBEKALAN TENAGA PENGAJAR (Training Provider)

Scope of Building Survey Work

K Builders is an expert in buildings and facilities management that


encompass works of building surveying and building maintenance.

 Building Audit.

 Space Audit.

 Condition Survey.

 Give a full report acording to the condition of the building and how
to maintain the building.

 Perform the audit for the building services equipment and


facilities.

 Evaluate and prepare cost estimates for repair work of damage or


increase the building.

10
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

 Provide building maintenance manual.

 Conducting research to improve existing facilities Industrialise


Building Systems, concept of Green Building.

 Look for structural damage, and recommend solutions to the


problems of building.

 Provide detailed plans for building damage.

 Offer advice on many aspects of design and construction


(maintenance, repair, and rehabilitation of the proposed building)

 Investigate the cause of damage occurs to make a full report on


the collapse of the building or structure.

 Investigate the suitability of projects from beginning construction


until the building is fully completed.

 Investigate the cause of the collapse of buildings, structural


damage to buildings and building sites.

1.4.2.3. Vision

‗Building Knowledge Towards The Future‘ is the vision of K Builders with the
purpose to educate and improve the quality of various aspects of building and
construction that covers planning, auditing, inspection, management,
technology, maintenance and finance to any personnel, Clients or
Contractors involved in the building and construction industry.

11
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.4. Company Organization

K Builders Training &


Consulting

Training
Building Surveying
Department
Department

Managing
Managing
Seminar
Training &
Course
Building Audit & Building
Maintenance Forensic
1. Private Agency
1. CIDB / PKK
2. Government
2. MARA
Agency 1. Valuation Survey 1. Structural Analysis
3. Universities/
3. Personal 2. Measured Survey 2. Material Analysis
Polytechnic 3. Construction Analysis
Parties 3. Schedule of Condition
4. JKR
4. Schedule of Dilapidation
5. Building Condition
Survey
6. Building Defect Survey
7. Stock Condition Survey
8. Building Conservation
and Restoration
9. Inspection of Building
Under Construction
10. Reinstatement Cost
Assessment for
Insurance

12
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.5. Training And Consulting Team Of K Builders Company

PRINCIPAL
Sr Ruslan Affendy
Arshad

PRINCIPAL PARTNER
Sr Anuar Haron Muhammad Kamal Ahmad

ADMINISTRATION
OFFICER ADMINISTRATION ASSOCIATE
MANAGER Mohd Rusdi Mamat
Nur Hafizah
Abdullah Aisyah Humaira

13
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

14
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.6 Project Listing

Astronautic Technology (M) Sdn Bhd (ATSB)


1. Renovation Work- Professional Building Survey
2. Condition Survey Report

Reproducing of Infrastructure and Architectural As-Built Drawing For


Balai Polis Lenggeng, Negeri Sembilan

15
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Malacca
Penang

Architectural As-Built Documentation for


Kuala
CIMB Bank Occupied Properties
Lumpur

Survey of Structure and Building Foundation Integrity for NPK Fertilizer (M) Sdn
Bhd

MUZIUM BANK NEGARA, KUALA LUMPUR


Measure the high of the beginning floor work and repair

16
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

KILANG TEPONG LUMUT, PERAK


Remedial work for crack

SLOT BUNKER SULTAN SALAHUDDIN


ABDUL AZIZ SHAH
Power Station Kapar – installation and
monitor settlement work and alignment
support structure.

Repairing of deep honey Comb – MRT Package S2

17
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

BANDAR BARU BANGI, SELANGOR


Condition survey

ALAM IMPIAN, SHAH ALAM,


SELANGOR
Ground settlement marker, water
stand pipe, crack meter, depth
level datum

RAMUNIA, PELABUHAN
KLANG, SELANGOR
Condition survey

18
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

1.4.2.7 Scope of Work Involved

For the second session, I have undergo my practical training in K Builders


Training and Consulting in Building Surveyor Department from 24th July until
30th September 2017. I was given the opportunity to involve in dilapidation work
of Projek Perumahan Rakyat (PPR) in Kuala Lumpur.

List of PPR in Kuala Lumpur that been involved doing inspection work are:

1. PPR Kg. Muhibbah


2. PPR Kerinci
3. PPR Pantai Ria
4. PPR Kg. Limau

19
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

CHAPTER 2
Importance Of Dilapidation Report

20
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.1 Introduction

Building and demolition work normally requires the use of a lot of heavy
machinery and equipment, and sometimes involves some serious changes to the
site it‘s being carried out on. This can include the removal of a lot of soil, existing
slabs or footings and possibly trees. Even if it‘s carefully managed, this sort of
work has the potential to cause damage to adjoining or adjacent houses or other
nearby infrastructure. Above and beyond the requirements for the protection of
adjoining properties, we may also need to arrange to have special reports
undertaken on the state of nearby buildings such as dilapidated survey.

Dilapidate means (of a building or object) in a state of disrepair or ruin as


a result of age or neglect. ―Dilapidations‖ refers to breaches of lease covenants
that relate to the condition of a property during the term of the tenancy or when
the lease ends

While Dilapidation Survey is also known as a pre-construction condition


survey in Malaysia (or sometimes called structural survey). A dilapidation survey
done by a Professional Building Surveyor is an inspection of the existing
structural condition of the surrounding buildings and structures before the
commencement of a demolition, construction or development. All prominent
defects in the form of cracks, settlement, movement, water seepage, spalling
concrete, distortion, subsidence and other building defects will be recorded in
photographs together with notes.

A dilapidation report is a report on the condition of a property at a given


point in time. It records any existing damage, and the state of any particular
aspects of the property that are likely to be affected by construction work,
excavation or demolition.

These reports are normally carried out on nearby properties both before
work begins, and after it‘s finished. Comparing the two reports offers a clear
picture of any damage that might have occurred as a result of building,
excavation or demolition work.
21
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.2 When a Professional Dilapidation Survey Report is required

A dilapidation survey or pre-construction survey shall be conducted by a


Professional Building Surveyor to the existing condition of all the adjoining
buildings, including infrastructures before the commencement of demolition,
excavation, piling, construction, renovation or before taking over a superstructure
work

For Contractors & Developers:

 Before carry out any excavation, piling works, demolition, renovation or


construction of a new development. A formal dilapidation survey can save
from thousands or millions of dollars claim from third parties.

For Property Owners:

 Before renovation, alteration & addition (A & A), demolition, construction


or reconstruction work carried out at neighboring areas.

 Before any underground construction works carried out in the surrounding


areas of property.

In a post construction condition survey, a building inspection and a comparison


will be made against the dilapidation survey/ pre-construction condition survey.

22
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.3 Purpose of a Dilapidation Survey?

The purpose of dilapidation surveys or pre construction condition survey


is a survey for landlord or tenant to record defects and wants of repair,
sometimes cost. It also to provide an accurate record, preconstruction and post
construction works, of the condition of the buildings. While it is not expected that
neighboring construction will cause damage to any building, the survey is
undertaken as a precautionary measure.

The survey report done by a Professional Building Surveyor will assist the
building owners, contractors and developers in the event of a claim for damage,
as the dilapidation survey report provides written documentation on the
preconstruction condition of the property.

In addition, the dilapidation report also involves towards lease property.


Leases spell out who is responsible for repair and maintenance. A dilapidation
survey may be required during the lease or at the end to require landlord or
tenant to keep their part of the bargain.

Dilapidation Report acting on behalf of the landlord or tenant to provide


professional advice in respect of disrepair claims during or at the end of the
lease, all the terms including the preparation of Schedules of Dilapidations and
subsequent negotiation of the claim.

23
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.4 Dilapidation report contains

Dilapidation reports are normally carried out by experienced building


surveyor, who has a good understanding of the aspects of a house or property
that are likely to be affected by nearby works, and who know exactly what to look
for.

Dilapidation reports typically include things like notes, measurements,


photographs and diagrams which give an accurate picture of the state of the
buildings being inspected, and are normally signed by both the owner of the
property being inspected, and the party having construction work done.

2.5 Importance of Dilapidation

Dilapidations claims are vitally important to any occupier because:

 Cost – the cost of fulfilling repairing and other obligations can run into
millions of pounds
 Reputational risk – dilapidations claims can end up in court
 Time – managing a claim can take up significant time and effort
 Limit your options – if occupiers do not plan properly for dilapidations
lease break options can be voided

Before signing a lease


The principles of buyer beware holds as true for leases as for any other
purchase. Occupiers should familiar themselves with the repairing
obligations under the terms of a lease and, as far as possible, limit their
obligations prior to signing the lease. Tenants should consider:

 Whether the repairing obligation is fair or is the liability potentially


onerous?

24
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

 If an occupier has negotiated a rent-free period in a lease to compensate


for a building‘s poor condition, will the savings in rent be sufficient to meet
their repairing obligations?
 What are the occupier‘s liabilities when the lease does expire?
 What proportion of alterations to the building will need reinstating, if at all?
 What repairs will need to be undertaken, and when, leading up to lease
end?
 What needs to be redecorated and cleaned, how often and to what
standard?
 What is the potential diminution in the value of the landlord‘s reversion at
the projected lease end?

Knowing the answers to these questions will enable an occupier to decide how
much money they will need to set aside throughout the term of the lease to
finance any repairs by lease expiry. It also avoids substantial and unbudgeted
dilapidations claims.

During The Lease

A landlord can serve an Interim Schedule of Dilapidations at any point during the
lease term. However, it may be possible for a tenant to negotiate relief from
some of these repairs.

In addition, some leases allow tenants to exercise a break clause after a


specified period of time before the lease expires.

A landlord may have imposed strict conditions under which this can be exercised,
including compliance with the tenant‘s repair and other obligations.

25
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

At The End Of A Lease

Negotiating dilapidations is invariably an adversarial process so


developing a strategy for a proactive approach to managing a potential claim,
including opening an early dialogue with the landlord can help ensure a smooth
exit at lease end.

At lease end, an occupier will need to:

 Determine what repairs need completing and how these can be


implemented in the lead up to exit
 Understand what the landlord wants done with alterations made to the
building by the occupier and whether they need to be reinstated
 Check the lease to understand what needs to be redecorated and
cleaned, and to what standard
 Assess whether a defense exists with regard to the diminution in the
value of the landlord‘s reversion (Section 18 of the Landlord and
Tenant Act 1927)

Schedules of Dilapidations are typically served by the landlord in the last six
months of a lease (a ‗terminal‘ Schedule of Dilapidations). These are intended to
outline all the alleged breaches of the lease and stipulate the required remedies.

Unless an occupier has completed the work required under their lease
obligations in advance of lease end the landlord will usually issue a terminal
Schedule of Dilapidations. This schedule will outline the works the landlord
deems necessary and include a claim for damages (Quantified Demand).

Disputes frequently arise over whether all items identified by the landlord‘s
surveyor really are a breach of the tenant‘s covenants and over what would be
an appropriate remedy.

26
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.6 Dealing with Dilapidations Through The Term Of A Lease

Dealing With Repairs at Outset

For an occupier it is important to avoid adopting a potentially onerous


repairing liability at commencement of a lease.

The most common way an occupier can limit their obligations is by


recording the property‘s state of repair prior to the lease commencement in a
Schedule of Condition. To be effective, this schedule must be agreed by both
parties and annexed to the lease. These schedules provide a snapshot of the
condition at commencement and are by no means infallible. The level of detail
provided by the Schedule of Condition and subsequent deterioration during the
term will determine liability in line with the wording of the lease.

A common misconception is that if a particular part of a property is in


disrepair at the start of a lease, repairs are not required for that element. This is
rarely the case: a tenant is often required to make good or ‗put into repair‘ that
element. If repair of the element is not possible, many leases require the
occupier to renew it.

Repairs: During A Lease

An occupier will also need to decide how much it would be prudent to set
aside during the term of the lease to finance repairs on termination. Dilapidation
is a relevant matter under International Accounting Standard 37. The Financial
Reporting Standard 12 allows for future repairing liability to be treated as an
expense, which can be included within the profit and loss account of the firm. It
will then be excluded from the company‘s tax computation until it is incurred.

27
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Repairs: Lease Break

Some leases allow tenants the option to exercise a break clause after a
specified period of time, but before the lease expires, for example an occupier
might be able to break a 10 year lease after five years.

Often a landlord will put conditions on a lease break such as vacant


possession, payment of rent and full or material compliance with the repair and
decorating covenants. If a tenant fails to comply with the break conditions, then
the option will be invalidated.

Dilapidations: Lease Expiry

At the end of the lease an occupier can be hit with a claim for all the
tangible aspects the landlord believes are wrong with the building. This is listed in
a Schedule of Dilapidations, usually compiled by the landlord‘s building surveyor.

A landlord, however, is not obliged to serve a Schedule of Dilapidations


before the lease expires so it would be prudent for the tenant to take advice from
a chartered building surveyor on potential liabilities in time to carry out any
necessary remedial works.

A landlord will typically serve a terminal Schedule of Dilapidations and a


Quantified Demand during the last six months of the lease and may follow this up
with an updated terminal schedule or ‗final‘ schedule prepared at or after lease
end. This includes details of what the landlord estimates to be the cost of the
remedial works. It also outlines what the landlord considers to be additional
losses as a result of the breaches of the repair and other covenants, including
loss of rent while works that should have been undertaken by the tenant are
undertaken.

It is often impractical for occupiers to carry out many of the repairs whilst
still in occupation. However, if the landlord then proceeds to undertake all the

28
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

repairs, the tenant may be liable for the costs and professional fees incurred,
over which they have no control.

Occupiers should take advice on whether to complete the works


themselves before the end of the lease or wait for the landlord to serve a
Terminal Schedule and Quantified Demand.

2.7 The Dilapidations Protocol

Common areas of dispute:

The Dilapidations Protocol sets out the steps the court would normally
expect prospective parties to have followed at lease end and prior to the
commencement of proceedings.

It establishes a reasonable process and timetable for the exchange of


information relevant to the dispute. It also sets standards for the content and
quality of the schedules of dilapidations and quantified demands and the conduct
of pre-action negotiations. Its ultimate aim is to enable tenant and landlord to
avoid litigation and agree a settlement of their dispute.

29
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

2.8 Fees and Mesne Profits in Dilapidations

Mesne Profits (pronounced mean profits) are the additional losses that a landlord
may suffer as a result of a tenant allowing a premises to fall into disrepair.

What Are Mesne Profits?

In a nutshell, they are the losses the landlord incurs for the rent, rates and
service charges for the period necessary for carrying out the repair works
required where the tenant has failed to do so. This period will include the time
required to prepare specifications, put out, receive and analyse tenders, select
and negotiate with a contractor and to supervise and sign off the works.
However, often the landlord will be expected to have taken appropriate steps
prior to the end of the term.

The landlord will have to be able to demonstrate that he has suffered a


loss of rent as a result of the disrepair in question and not as a state of the
property market at the time.

The fact that premises may have been re-let will not necessarily
extinguish or limit a claim for loss of rent, if the landlord can prove that in order to
secure the new lease he had to make concessions either in the form of reduced
rent, or a rent free period on recognition of the disrepair. However, this in itself
may not be sufficient evidence of loss of rent, as another tenant may have been
found who would have accepted the property in its state of disrepair without
requiring a rent free period.

A landlord should be careful, though. A schedule of dilapidations served


prior to the expiry of the lease will probably include mesne profits; but if the
property stands empty for several months after expiry, and the landlord has not
carried out any works, then he might find that a claim for mesne profits falls on
deaf ears

30
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Surveyor’s Fees

The statement of claim may also include any reasonable costs and fees
incurred in obtaining advice on the extent of the works, preparing specifications for
the works and supervising the works. However, damages will not extend to the cost
of ascertaining whether or not the tenant has breached an obligation to repair, nor to
the costs of compiling or serving a schedule of dilapidations unless there is an
express covenant within the lease allowing the landlord to do so.

Similarly, the claim might include the landlord’s surveyor’s fees for
negotiating the claim. However, this can only be included where the lease explicitly
makes provision for this – otherwise, these fees are to be borne by the landlord.

31
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

CHAPTER 3
The project

32
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.1 Project Background

The report title is about The Process of Dilapidation Report for


Conservation Building. This scope of report is about the process of
dilapidation report that been made after dilapidated survey.

The official name of this project is Dilapidation Report of Old Mosque of


Kg Laut, Nilam Puri, Kota Bharu, Kelantan Darul Naim. This scope of report
is about the step that been taken in preparing the dilapidation report after
inspection work in site. The main objective for this conservation project is to
relocate the current Mosque of Kampong Laut, currently located in Nilam
Puri, Kota Baru, Kelantan, back to its former site in Kampong Laut, in the
District of Tumpat, Kelantan.

This project was executed because of the new site reserved for the
relocation program is not the exact original site as to when the building was
dismantled and relocated in 1967. The original site has been over the years
been washed away into the river as a result of continuous erosion and
sedimentation of the river banks due to repeated flooding of Kelantan River.
As the building surveyor company, K Builders has been responsible to do
dilapidation survey and dilapidation report of Old Mosque of Kg Laut.

Image 1.1: Old Mosque of Kampung Laut at Nilam Puri

33
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

In this relocation project, only the main prayer hall will be dismantled and
relocated. This is because most other additions to the mosque complex were
added in later years when it came under the management of Department of
Museum some years after relocation. These additions were also done in later
stage to meet the increasing demand from local community. Another reason is
that, the new site offered for this relocation program in Kg Laut, is rather tight to
accommodate the whole complex of the mosque. The additional components that
were added were the ablution structures, the entrance foyer on the rear and right
of the main prayer hall and a few gazebos.

Image 1.2 : The original site of the mosque and the current location at Nilam Puri

The relocation program will also include relocation of ‗missing‘ furniture


that belongs to the mosque, now in possession of some other mosques. These
items must be returned; they are the ‗mimbar‘ (pulpit) which is in Pasir Pekan old
mosque, the ‗kolah‘ (water tank for ablution) now in the current new mosque of
Kampong Laut and the ‗beduk‘ now in Muhammadi Mosque in Kota Bharu.
These items need to be repaired, restored and treated before fixing into the
mosque (a separate instruction will be given on the way these items shall be
restored).
34
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

When these items are placed into the mosque, they help to enhance the
character and historic value of the mosque. This help to re-establish the nostalgic
feeling amongst the local community while at the same time alleviating the
mosque back to its original authenticity.

Image 1.3 & 1.4: ‗mimbar‘ (pulpit) which is in Pasir Pekan old mosque, and the
‗beduk‘ now in Muhammadi Mosque in Kota Bharu, which are included in the
relocation programme.

Image 1.5 & 1.6: intricate carvings of ‗mimbar‘ (pulpit) currently in Pasir Pekan
old mosque

35
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Although National Heritage Department (Jabatan Warisan Negara) has not


formally gazetted the building as National Heritage, this project shall refer to
conservation guidelines that has been published by the department. All
documentation process, approaches to conservation shall be in line with
international charters and conservation guidelines of the National Heritage
Department.

Image 1.7: A plaque on the wall of the mosque, indicating conservation works
carried out by National Heritage Department in 2006

36
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.2 Historic and Background of the Building

3.2.1 Historical background of Kampung Laut Old Mosque

Kampong Laut Mosque is currently located in Nilam Puri, about 18 km


from Kota Bharu town, Kelantan Darul Naim. The building serves as a
congregation place and activity centre for students of two neighbouring
universities, ie. Academy of Islamic Studies, University of Malaya and secondly
the Kolej Islam Antarabangsa Sultan Ismail Petra (KIAS)

The mosque was relocated from the original site, Kampong Laut which is
on the western bank of Kelantan River about 18 Km away. This relocation was
seen as one of the best options to save the building from further damage due to
frequent floodings of Kelantan River. Since 1966, the mosque in its new setting
has served well to students, staff and the local community here in Nilam Puri.

Although in the beginning the mosque was far from the river, frequent
flooding of Kelantan River has resulted in serious erosion to river bank and today
part of the original site is in fact in the river. The 1966 flood, known as ‗banjir
merah‘ had caused serious damage. The old mosque began to lean and tilt
further into the river. The extended spaces at the rear and right side of the
mosque has been washed into the river (refer photo next page). Soon a joint
effort by the ‗Persatuan Sejarah Malaysia‘ and the State Government began to
make efforts to save and to relocate the mosque. It was decided to be relocated
to Nilam Puri, next to Centre of Islamic Studies, University of Malaya.

The building was dismantled in November 1967 by a group of carpenters


headed by Encik Hussein bin Salleh from Kampung Bunut Payong under the
supervision of Tuan Haji Zain bin Haji Awang Kechik*. The mosque was
reconstructed base on the original forms using as much materials as possible.
Only the main prayer hall was reconstructed due to lack of information on the
building and measurements.

37
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

On May 8th 1970 (23 Rabiul Awal 1389), Tun Haji Hamdan bin Sheikh
Tahir on behalf of ‗Persatuan Sejarah Malaysia‘ (Malaysian Historical Society)
officially handed over the old mosque to the then Chief Minister of Kelantan, YAB
Dato‘ Haji Mohd Asri bin Haji Muda, who received on behalf of the State
Government.

Image 1.8: Tuan Haji Hamdan speaking, before handing back the
Mosque to the State Government in May 1970

In February 1988, some additional spaces were added to the building,


this include the minaret, serambi besar, serambi kecil, balai lintang, wakaf orang
kaya, toilets and ablution tubs for men and women. Even the roof tiles were
replaced.

Based on the oral history, passed down over generations, the current
Penghulu, Encik Mohd Ghazali Harun, mentioned his grandmother used to tell
that the mosque originally had tall columns, creating a huge and tall space
underneath the building. Such height allows an elephant with its standing mahout
with a sword pointing up, to pass through.

38
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Another villager, in an interview session, Pak Su Harun who inherited the


‗siak‘ job from his father, mentioned that the columns of the mosque were
actually buried under the sand when the dismantling process took place. To
make job much easier, the columns were sawn off, leaving some deep in the
sand. This is why the current mosque in Nilam Puri has very low gap between
floor and ground level.

Image 1.9: The photo of the mosque, showing the degree of destructions ,
exposing the columns that have been buried under the sand (right photo) after
the 1966 flood. This proves the mosque was built on high columns.

39
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.2.2 The original site

Due to continuous erosion, most of the original site of the mosque has now been
displaced in the River Kelantan. A recent visit to the site, saw only a portion of
original site and cemetery are left. Some remaining tombstones were displaced
due to recent 2014 flood water. The site also, seems to be raised slightly higher
than the road level, due to sedimentation, when flood water has reseeded.

Image 2.0: Original site of the old mosque in Kampong Laut.

3.2.3 The New mosque of Kampong Laut

Soon after the old mosque was relocated to Nilam Puri, a new mosque were built
about 350 further west of the original site. It is a larger building, incorporating
conventional construction techniques of post and beam, using more durable
materials of bricks and reinforced concrete. The current mosque also serves as
jamek mosque, where Friday prayers are held.

40
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.2.4 Location of The Project

Image 2.1: Key Plan and the Proposed Site for the relocation program of
Kampung Laut Old Mosque, from current site about 18 Km distance, in Nilam
Puri Kota Bharu

41
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Image 2.2 Ground floor plan of current Masjid Kampung Laut, Nilam Puri, Kota
Bharu, Kelantan

42
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.3 Element

3.3.1 Wall Elements

The external wall at the mosque is made of solid timber wall paneling,
known as ‗Janda Berhias‘. It is believed the wood is from ‗Merbau‘ species.
However a recognized authority or department such as MTIB (Malaysia
Timber Industry Board) may need to be called in to check and confirm this.

There are a series of full height windows placed at the external wall,
directly connected to the aisle (‗serambi‘). The surface area of the wall at the
Main Prayer Hall is the largest which is approximately 126.4m², followed by
the external wall of ―Wakaf Orang Kaya‖ which is 53.6m². The least external
wall area is at the ―Balai Lintang‖ and Verandah which is 20.4m² because this
area has hardwood railings (‗Pagar Musang‘) at the perimeter.

At the Main Prayer Hall, the height of the wall is 1.9m for the lowest and
2.8m at the highest wall. Whereas at the ―Wakaf Orang Kaya‖, the lowest wall
is 2.2m and the highest wall height is 2.8m. The thickness of the wall at the
Main Prayer Hall and ―Wakaf Orang Kaya‖ is 25mm with 40mm structure
while the hardwood railing is 15mm thick.

3.3.2 Openings Elements

There are two types of openings at the mosque. The window openings
along the ‗serambi‘ on the left side is of full height with double swing panels,
while at the ‗Wakaf Orang Kaya‘ (right side wall are provided with rather
unique sliding windows. The hardwood grill is openable from inside. There
are 12 full height windows at the Main Prayer Hall with each window has the
dimension of 1780mm * 960mm.

43
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.3 3 Floor Elements

The floor to the Main Prayer Hall is raised about 910mm from the ground
while at the serambi is about 760mm from the ground (due to a drop in floor
level inside the mosque. The floor height is much lower than the original
height as seen in the original site.

The timber columns were buried deep in the sand due to erosion and
sedimentation. As such it was very difficult to lift and dismantle the posts. A
quick solution to dismantle was the timber columns were cut off, leaving the
remaining columns buried in the ground.

The story passed down for generations, mentioned that the mosque was
very tall. The space in between the floor and the ground was tall enough to
allow an elephant and its sword wielding mahout to pass through.

The floor boards are rather large thick, 100mmX75mm. this massive floor
has eliminated the use of floor joists to support, The Main Prayer Hall has the
largest area, which is about 222.4m. The ―Balai Lintang‖ and Verandah has
an area of 121.5m², while the ‗Wakaf Orang Kaya‘ is about 49.7m².

All columns are placed on a concrete base or known as ‗tuku‘ in Malay.


Floor boards are supported by long timber bearers or beam that pass through
a cut opening in the posts/columns.

44
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.4. Building Defects and Overall Condition

The description on major defects and condition of the mosque is divided


into a few components, such as underneath the floors (including timber flooring,
bearers and joists), columns and wall plates, the roof, singgora tiles, doors and
windows. This three century old mosque, uses timber as its main construction
material. As such, main defect are all related to timber rot and splits/cracks.

In the space underneath the raised timber flooring, some columns suffer
serious cracks and rot. Most appear to have larger gap at the base and gets
smaller as it reaches the area where bearers run through. All columns are placed
on concrete base/plinth measuring about 405mm cube. The base is also tied via
metal plates fixed into the top surface of the concrete base. The plate helps to
give extra hold and strength to column, even though serious cracks are
happening. The ground seems dry and thus, there is less threat to dampness
and water getting into the end grain via capillary action, ie from ground to
columns.

Images 2.3, 2.4 & 2.5: Some indications on condition level at column base. There
is clear a evident that serious rots inside the wood is taking place. These may
need repair or replacement with proper treatment.

45
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Serious end rots at almost all joints and connections involves connections
between hip ridge and purlin. This is dangerous because poor and displacement
of connections may result in slips or chipping off. This may lead the timber to fall
down, posing injuries to people in the prayer hall.

The top tier roof, is reachable via a cat ladder permanently fixed on a landing
near the niche (‗mihrab‘) area. The ladder connects to the attic floor right
underneath the top tier roof. The attic floor is made of tounge and grooved timber
boardings.

Images 2.6, 2.7 & 2.8: Other component that show signs of rot is the end of hip
ridge (‗kasau perabong‘) and at connections between purlins (‗gulung-gulung‘)
and the hip ridge.

46
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.4 List of columns, column base, defects and conditions

BIL GRID DEFECTS AND GENERAL


PHOTO 1 Repair/ NOTES
NO. CONDITION

Repair should
1. E1 Still in good condition.
refer method A

Serious cracks on the inside.


The tenon part has grown Repair should
2. E2
bigger and is out of shape. refer B method
Serious internal rot

In good condition. This


column may have been
Repair should
3. E3 replaced. From external
refer method A
appearance, the wood may
be from a different species.

This too, seems in good Repair should


4. F6
condition refer method A

47
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

The inside is hollow due to


rots the cracks is getting
Repair should
5. F2 bigger too, though slightly
refer B method
concealed by the metal
plates.

6. In fair condition, needs Repair should refer


F4 B method
repair

Rather serious, inside wood


may become hollow due to
rots. The big hole at the
7. base of wood, reveals the Repair should refer
F5 B method
internal rots. The tenoned
area has become large and
a wood peg has been in
place.

8. Reasonably in strong Repair should refer


F6 B method
condition

Table 1: List of Column and Column Base, Defects and Condition

48
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.5 Measured Drawing

Floor Plan

49
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Arrangement of floor boards

50
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Location of stump

51
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Left Elevation

Right Elevation

52
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Front Elevation

Rear Elevation

53
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

3.6 Appendices

Photo Documentation of Building Defects

Column at Grid B2 Column at Grid B3


Defects: Defects:
Rot in the wood. The height of the Cracks from the base up to tenon
rot reaches 1200mm . area of the bearer. Outside skin is
Suggestion of repair: rough in texture.
Use Method B Suggestion of repair:
Use Method B

54
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Column at Grid B4 Column at Grid B5


Defects: Defects:
Serious rot on the inside. Clearly Overall condition, fair
has become hollow, There is a big Suggestion of repair:
cracks but partly concealed by the Use Method A
metal plates.
Suggestion of repair:
Use Method B

55
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Column at Grid C2 Column at Grid C3


Defects: Defects:
The rot is at serious level and Fairly in good condition. The
dangerous. The column is hollow concrete base has been raised.
with large cracks reach the Could be to math the height of
tenoned section. The tenoned column during re-assembly work
section also rots badly, and is or this column has been replaced.
unable to hold the bearers Suggestion of repair:
perfectly. Additional wood peg is Use Method A
inserted to stabile the
components.
Suggestion of repair:
Use Method B

56
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Column at Grid C5 Column at Grid C6


Defects: Defects:
Fairly in good condition. The Serious rot inside column. The
concrete base has been raised. cracks reach 40mm wide and
Could be to math the height of reaches the tenoned section of the
column during re-assembly work column.
or this column has been replaced. Suggestion of repair:
The tenon section seems much Use Method B
bigger than the running bearers.
Suggestion of repair:
Use Method A

57
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

CHAPTER 4
Problem Identify

58
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

4.1 Transportation to relocate the structure

Problem:

Suitable procedure and transportation is required to relocate the Old


Mosque of Kampong Laut, currently located in Nilam Puri, Kota Baru, Kelantan,
back to its former site in Kampong Laut, in the District of Tumpat, Kelantan. The
distance between two locations is about 15 miles which requires a considerable
distance to move. The structure of the building is quite old and using materials
from the timber requires careful observation and maintenance. Therefore, the
difficulty in finding appropriate methods and safe transportation takes a long time
to obtain.

Solution:

K Builders as the Building Surveyor consultant should monitor the


condition of the structure before, during and after the relocate of Old Mosque of
Kampung Laut to make sure the condition of the structure is good and no defect
were recorded cause by the transportation.

59
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

4.2 Maintenance and monitoring to protect the timber structure

Problems:

A coherent strategy of regular monitoring and maintenance is crucial for


the protection of historic timber structures and their cultural significance. Due to
old structure by timber as major material in Old Mosque of Kampung Laut, it
need specific maintenance and special method to protect the timber from
deteriorate its function.

Solutions:

Neglect of routine small repairs inevitably leads to greater efforts and


expense and ultimately to major repairs, which might have been avoided or at
least postponed. Maintenance of buildings is generally regarded as a continuous
process to prevent the decay of the materials and the deterioration of the
structure, such as regular repainting and removal of leaves from gutters.

When buildings are regularly maintained, the period between more drastic
interventions can be greatly prolonged. For instance in Japan, at Himeji Castle,
built at the beginning of the seventeenth century, the castle lords checked
vertical and horizontal distortions every twenty to thirty years, and reinforced or
repaired the buildings as required, by adding braces and supports, and replacing
roof-tiles. This was regarded as regular maintenance.

Regular inspections are a vital part of the procedure for building


maintenance and for the monitoring of the development of a structure. A
systematic approach using a manual for guidance will help in planning the time
scale and scope of inspections. The interval between inspections may be
governed by local needs and uses of the building and the environmental
conditions. Records of all inspections should be kept. The inspection should be
carried out by a professional, such as an architectural conservator or a master
builder who is able to draw up a report containing recommendations.

60
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Maintenance work can be divided into two main categories: routine or


day-to-day maintenance and periodic maintenance. The first depends on the
constant vigilance of the building owner. It includes actions that can usually be
dealt with without the need to employ outside labor. On the other hand, periodic
maintenance is more in the nature of minor repairs and therefore requires the
assistance of a professional craftsman, preferably with knowledge of historic
timber structures.

Day-to-day maintenance includes actions such as clearing leaves and


accumulated silt from gutters, controlling plant growth, checking faults in
rainwater receptacles, removing bird droppings and checking ventilation. Minor
repairs and maintenance involving professional assistance includes maintenance
of eaves gutters and downpipes, repair to metal coverings, adjustment of roof
covering such as slates and roof tiles and repainting. In both categories the main
issue to remember is that prevention is best achieved by ensuring that the timber
is kept dry and well ventilated

61
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

CHAPTER 5
Conclusion

62
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Starting from 24th July until 30th September 2017 had been placed at K
Builders Training and Consulting for my Industrial Training. I am very thankful
and fell very honoured for the opportunity given to me to learn and gain
experience in the industrial life. Being placed at the Building Survey agency is
very different situation from working at the goverment sector.

From my perspective and what I have learn and observed, K Builders


Training and Consulting is an agency that really close to the construction
community which specialize in in-house and general training programmes and
consultancy for contractors, developers, construction personnel and
professionals. It also functions as event manager for clients who require
seminars, courses, workshops, conferences and exhibitions to be organized.

During my internship, I am glad to have encountered a positive working


environment. All the staffs in building surveyor department is very supportive
towards me, shared their experiences working over the years at building surveyor
sector, allowed me to get involved in the projects especially in inspection works
that I have been involved from the early stages until now the report is done. AtK
Builders, I also learned and observed how the Building Surveyor deal with the
owner of the building, public and occupant involved in inspection work and to
solve the problem that occur during the inspection and sometimes there is
unexpected problem occur.

In the industry of building survey, there are many aspect the must be
taken seriously. Quality, money, time and disciplines are very important aspects
that affecting the field work. The culture in works is vital in every industries, it
teaches people on how to manage their work. The difference of working culture
between in the office and construction sites must be familiarized. Working in the
private sector is not easy as they always need to pay attention to various projects
at the same time. They need to analyze and making decision when it comes to
choose the suitable method to ensure that the defect of the building that have
been inspect can be overcome. They also must make sure that all the projects

63
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

done meet the standard and requirement that have been set up by all the act and
guidelines of Building Surveyor that have been set out.

To be concluded, Building Surveyors are allowed to comment on the


condition of the property, outline areas of concern and propose resolution of
these concerns. They can highlight issues with the building and identify potential
problems in the future. It will cost more than a straight forward valuation, but this
reflects the work involved. So the building surveyor is important to make sure the
building maintain its function.

64
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

REFERENCES

65
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

A clear, impartial guide to Dilapidations. (2013). Retrieved from


http://www.rics.org/Global/RICS-Dilapidations-consumer-guide.pdf

Assessment of Significant Causes to School Building Defects. (2014).


Retrieved from https://www.e3s-
conferences.org/articles/e3sconf/pdf/2014/02/e3sconf_etsdc2014_01002.pdf

Building Inspecton Houspect. How You Benefit from Dilapidation and


Condition Reports. (2015). Retrieved from
https://www.houspect.com.au/nsw/how-you-benefit-from-dilapidation-and-
condition-reports/

Building Surveying. Dilapidations. (2017). Retrieved from


http://www.buildingsurveying.info/

Dilapidations A Step By Step Guide For Landlords And Tenants.


Retrieved from http://www.tftconsultants.com/files/Insight/Dilapidations-Guide.pdf

Internship Report. Retrieved by http://veena15.weebly.com/objective-of-


industrial-training.htmces

School of Materials, Sciences & Engineering. Industrial Training


Guidelines. (2014). Retrieved from
http://www.materials.unsw.edu.au/sites/default/files/Industrial%20Training%20Gu
idelines%20-%20v4%20Dec%202014.pdf

Keith & Michael. (2011). Dilapidations—Landlord‘s Costs and Fees.


Retrieved from
https://www.shulmans.co.uk/sites/default/files/landlord_and_tenant_review_-
_dilapidations-landlords_costs_and_fees.pdf

66
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

APPENDICES

67
K Builders Training & Consulting
Norumizafarhana binti Saimun
(2015180263)

Doing inspection work for dilapidation survey in Projek Perumahan Rakyat (PPR)

Some of PPR in Kuala Lumpur that involved in Dilapidation Survey

Doing report after having inspection work

68