You are on page 1of 15

U900+U2100 Site Configuration

Design
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and
service. Please feel free to contact our local office or company headquarters.

Huawei Technologies Co., Ltd.

Address: Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com

Email: support@huawei.com

Copyright © Huawei Technologies Co., Ltd. 2004. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any
means without prior written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions


and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

All other trademarks and trade names mentioned in this document are the property of their
respective holders.

Notice
The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all
statements, information, and recommendations in this document do not constitute the
warranty of any kind, express or implied.
u900+u200 site configuration design INTERNAL

Table of Contents
1 Introduction.............................................................................................................................................. 1

1.1 Scope of this document............................................................................................................... 1

1.2 Objective Of The Trial.................................................................................................................. 1

1.3 Pilot Pre-Requesites.................................................................................................................... 1

2 Hardware Introduction............................................................................................................................. 2

2.1 WBBP board..................................................................................................................................... 2

2.2 WBBPd in the BBU........................................................................................................................... 2

2.3 Baseband Board Specifications......................................................................................................... 3

2.4 Cabling rules in S............................................................................................................................... 3

U900 RRU connected to port 0/1/2; U2100 RRU connected to port 3/4/5...............................................3

2.5 CE Resources Allocation in Baseband Boards.................................................................................4

3 Site Type.................................................................................................................................................. 4

4 Site Configuration.................................................................................................................................... 5

4.1 Hardware 4 WBBPd2 Type U900 3x1 + U2100 3x3:.........................................................................5

4.2 Hardware 3 WBBPd2 Type U900 3x1 + U2100 3x2:.........................................................................7

4.3 Hardware 2 WBBPd2 Type U900 3x1 + U2100 3x1:.........................................................................8

5 Counters.............................................................................................................................................. 9

2018-03-26 HUAWEI Confidential Page1, Total 16


u900+u200 site configuration design INTERNAL

1 Introduction

1.1 Scope of this document

This document describes the strategy for U900+U2100 site configuration.


Parameterization related to the deployment of this strategy is also covered.
Performances monitoring counters are listed at the end of the document.

1.2 Objective Of The Trial

Objective is to validate site configuration and functions.

1.3 Pilot Pre-Requesites

Before starting the pilot network, the following points will be completed:

- Prolog functional validation

The following table describes the software loads that should be on the testbed/network elements
during the pilot:

NE Software Version

OMC M2000 V2R11

RNC/MBSC RAN 13

NodeB/MBTS RAN 13

2018-03-26 HUAWEI Confidential Page1, Total16


u900+u200 site configuration design INTERNAL
2 Hardware Introduction

2.1 WBBP board


The WCDMA Baseband Process Unit (WBBP) in the BBU3900 processes baseband signals.
The panels of WBBP boards applied on S network are as shown in Figure 1, Figure 2 and Figure 3.

Figure 1 Panel of the WBBPb2

Figure 2 Panel of the WBBPb3

Figure 3 Panel of the WBBPd1 or WBBPd2

2.2 WBBPd in the BBU


 WBBP board can be installed in Slots 0 to 5, configured in slot 3 by default. In S project , as the slot 4
is planned for UTRP and the slot 5 is occupied by GTMU board ,only slot 0 to slot 3 available for
WBBP board. For some sites the slot 1 will be used by USCU board.

 WBBPd board supports the IC (interference cancellation) function of uplink data when installed
in slot 2 or slot 3.

2018-03-26 HUAWEI Confidential Page2, Total16


u900+u200 site configuration design INTERNAL

2.3 Baseband Board Specifications

2.4 Cabling rules in S


U900 RRU connected to port 0/1/2; U2100 RRU connected to port 3/4/5.

2018-03-26 HUAWEI Confidential Page3, Total16


u900+u200 site configuration design INTERNAL
2.5 CE Resources Allocation in Baseband Boards
In Huawei DBS3900 base station, the WCDMA baseband processing resource consists of DL and
UP resource which are managed respectively by DL resource group and UP resource group.

 Uplink Rules
o Baseband boards (up to 6) can be configured as 1 resource group or as several
resource groups
o CE resources can be shared in one resource pool within 6 cells dynamically
o 1 UL resource group can support up to 6 cells
o Recommended to put intra-frequency cells into the same UL resource group, because
Softer handover may occur in cells within the same UL resource group

 Downlink Rules
o Several WBBPd board can be configured
as 1 resource group
o Same-carrier cells should be configured in
same baseband card
o CE resources can be shared inside only
one WBBP board
o DL resource group can support up to 24
cells;
o

3 Site Type

WBBPd2 # WBBPd2 # WBBPd2 #


U900_111+U2100_1
U900_111+U2100_222 U900_111+U2100_333
11
2 3 4

4 Site Configuration
One cell is allocated to a WBBP card, no matter the RRU is connected to the WBBP:

2018-03-26 HUAWEI Confidential Page4, Total16


u900+u200 site configuration design INTERNAL
1) Create the UL resource group : ADD ULGROUP (one UL group can support maximum 6
locells)
2) Create the DL resource group: ADD DLGROUP (one DL group can support maximum 24
cells)
3) Create the cell with the correct UL/DL resource group: ADD LOCELL

4.1 Hardware 4 WBBPd2 Type U900 3x1 + U2100 3x3:

Downlink: set U900 cells on slot3, 3 cells (U2100_F0) on slot2, 3 cells (U2100_F1) on slot1, 3 cells
(U2100_F2) on slot0.
Uplink: set U900 cells & 3 cells (U2100_F0) sharing uplink resource of slot 3&slot2, 3 cells
(U2100_F1)&3 cells (U2100_F2) sharing uplink resource of slot 1&0.
Each layer attached on one board, four DL Group to be created; two UL Group to be created as
described above:
- DLGroup 0 attached on slot 3 load (locell 0/1/2/)
- DLGroup 1 attached on slot 2 load (locell 3/4/5/)
- DLGroup 2 attached on slot 1 load (locell 6/7/8)
- DLGroup 3 attached on slot 0 load (locell 9/10/11)
- ULGroup 0 attached on slot 3&2 load (locell 0/1/2/3/4/5)
- ULGroup 1 attached on slot 1&0 load (locell 6/7/8/9/10/11)

U900 cells (locell 0,1,2) ,U2100 3_sectors x 3 carrier : F0(locell 3,4,5), F1(locell 6,7,8),
F2(locell 9,10,11);
ADD DLGROUP: DLGROUPN=0, SNE1=3;
ADD DLGROUP: DLGROUPN=1, SNE1=2;
ADD DLGROUP: DLGROUPN=2, SNE1=1;
ADD DLGROUP: DLGROUPN=3, SNE1=0;
ADD ULGROUP: ULGROUPN=0, DEMMODE=DEM_2_CHAN, SNE1=3, SNE2=2;
ADD ULGROUP: ULGROUPN=1, DEMMODE=DEM_2_CHAN, SNE1=1, SNE2=0;
ADD LOCELL: LOCELL=0, STN=xxx, SECN=0, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=60, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;

2018-03-26 HUAWEI Confidential Page5, Total16


u900+u200 site configuration design INTERNAL
ADD LOCELL: LOCELL=1, STN=xxx, SECN=1, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=70, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=2, STN=xxx, SECN=2, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=80, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=3, STN=xxx, SECN=3, SECT=REMOTE_SECTOR, ULGROUPNO=0,
DLGROUPNO=1, SRN1=61, SRN2=61, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=4, STN=xxx, SECN=4, SECT=REMOTE_SECTOR, ULGROUPNO=0,
DLGROUPNO=1, SRN1=71, SRN2=71, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=5, STN=xxx, SECN=5, SECT=REMOTE_SECTOR, ULGROUPNO=0,
DLGROUPNO=1, SRN1=81, SRN2=81, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=6, STN=xxx, SECN=3, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=2, SRN1=61, SRN2=61, SN2=0, ANT2N=ANTB, ULFREQ=9639, DLFREQ=10589,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=7, STN=xxx, SECN=4, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=2, SRN1=71, SRN2=71, SN2=0, ANT2N=ANTB, ULFREQ=9639, DLFREQ=10589,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=8, STN=xxx, SECN=5, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=2, SRN1=81, SRN2=81, SN2=0, ANT2N=ANTB, ULFREQ=9639, DLFREQ=10589,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=9, STN=xxx, SECN=3, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=3, SRN1=61, SRN2=61, SN2=0, ANT2N=ANTB, ULFREQ=9664, DLFREQ=10614,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=10, STN=xxx, SECN=4, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=3, SRN1=71, SRN2=71, SN2=0, ANT2N=ANTB, ULFREQ=9664, DLFREQ=10614,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=11, STN=xxx, SECN=5, SECT=REMOTE_SECTOR, ULGROUPNO=1,
DLGROUPNO=3, SRN1=81, SRN2=81, SN2=0, ANT2N=ANTB, ULFREQ=9664, DLFREQ=10614,
MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;

2018-03-26 HUAWEI Confidential Page6, Total16


u900+u200 site configuration design INTERNAL
4.2 Hardware 3 WBBPd2 Type U900 3x1 + U2100 3x2:

Downlink: set U900 cells on slot3, 3 cells (U2100_F0) on slot2, 3 cells (U2100_F1) on slot1.
Uplink: set U900 cells on slot3, 6 cells (U2100_F0&U2100_F1) sharing uplink resource of
slot1&slot2.
Each layer attached on one board, three DL Group to be created; three UL Group to be created as
described above:
- DLGroup 0 attached on slot 3 load (locell 0/1/2)
- DLGroup 1 attached on slot 2 load (locell 3/4/5)
- DLGroup 2 attached on slot 0 load (locell 6/7/8)
- ULGroup 0 load (locell 0/1/2)
- ULGroup 1 load (locell 3/4/5/6/7/8)

U900 cells (locell 0,1,2) ,U2100 3_sectors x 2 carrier : F0(locell 3,4,5), F1(locell 6,7,8);
ADD DLGROUP: DLGROUPN=0, SNE1=3;
ADD DLGROUP: DLGROUPN=1, SNE1=2;
ADD DLGROUP: DLGROUPN=2, SNE1=0;
ADD ULGROUP: ULGROUPN=0, DEMMODE=DEM_2_CHAN, SNE1=3;
ADD ULGROUP: ULGROUPN=1, DEMMODE=DEM_2_CHAN, SNE1=2, SNE2=1;
ADD LOCELL: LOCELL=0, STN=xxx, SECN=0, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=60, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=1, STN=xxx, SECN=1, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=70, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=2, STN=xxx, SECN=2, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=80, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=3, STN=xxx, SECN=3, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=1, SRN1=61, ANT1N=ANTA, SRN2=61, SN2=0, ANT2N=ANTB,
ULFREQ=9614, DLFREQ=10564, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=4, STN=xxx, SECN=4, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=1, SRN1=71, ANT1N=ANTA, SRN2=71, SN2=0, ANT2N=ANTB,
ULFREQ=9614, DLFREQ=10564, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;

2018-03-26 HUAWEI Confidential Page7, Total16


u900+u200 site configuration design INTERNAL
ADD LOCELL: LOCELL=5, STN=xxx, SECN=5, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=1, SRN1=81, ANT1N=ANTA, SRN2=81, SN2=0, ANT2N=ANTB,
ULFREQ=9614, DLFREQ=10564, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=6, STN=xxx, SECN=3, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=2, SRN1=61, ANT1N=ANTA, SRN2=61, SN2=0, ANT2N=ANTB,
ULFREQ=9639, DLFREQ=10589, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=7, STN=xxx, SECN=4, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=2, SRN1=71, ANT1N=ANTA, SRN2=71, SN2=0, ANT2N=ANTB,
ULFREQ=9639, DLFREQ=10589, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=8, STN=xxx, SECN=5, SECT=REMOTE_SECTOR, RADIUS=29000,
ULGROUPNO=1, DLGROUPNO=2, SRN1=81, ANT1N=ANTA, SRN2=81, SN2=0, ANT2N=ANTB,
ULFREQ=9639, DLFREQ=10589, MXPWR=430, HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;

4.3 Hardware 2 WBBPd2 Type U900 3x1 + U2100 3x1:

Downlink: set U900 cells on slot3, 3 cells (U2100_F0) on slot2.


Uplink: U900 cells & 3 cells (U2100_F0) sharing uplink resource of slot2& slot3
Considers each layer attached on one board, two DL Group to be created; two UL Group to be
created as described above:
- DLGroup 0 load (locell 0/1/2)
- DLGroup 0 load (locell 3/4/5)
- ULGroup 0 load (locell 0/1/2/3/4/5)

U900 cells (locell 0,1,2) ,U2100 3_sectors x 1 carrier : F0(locell 3,4,5) ;


ADD DLGROUP: DLGROUPN=0, SNE1=3;
ADD DLGROUP: DLGROUPN=1, SNE1=2;
ADD ULGROUP: ULGROUPN=0, DEMMODE=DEM_2_CHAN, SNE1=3, SNE2=2;
ADD LOCELL: LOCELL=0, STN=xxx, SECN=0, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=60, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=1, STN=xxx, SECN=1, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=70, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;
ADD LOCELL: LOCELL=2, STN=xxx, SECN=2, SECT=REMOTE_SECTOR, RADIUS=35000,
SRN1=80, ANT1N=ANTB, ULFREQ=2850, DLFREQ=3075, MXPWR=447, HISPM=FALSE,
RMTCM=TRUE, RMTCGRPID=0, VAM=FALSE;

2018-03-26 HUAWEI Confidential Page8, Total16


u900+u200 site configuration design INTERNAL
ADD LOCELL: LOCELL=3, STN=xxx, SECN=0, SECT=REMOTE_SECTOR, DLGROUPNO=1,
SRN1=61, SRN2=61, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564, MXPWR=430,
HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=4, STN=xxx, SECN=1, SECT=REMOTE_SECTOR, DLGROUPNO=1,
SRN1=71, SRN2=71, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564, MXPWR=430,
HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;
ADD LOCELL: LOCELL=5, STN=xxx, SECN=2, SECT=REMOTE_SECTOR, DLGROUPNO=1,
SRN1=81, SRN2=81, SN2=0, ANT2N=ANTB, ULFREQ=9614, DLFREQ=10564, MXPWR=430,
HISPM=FALSE, RMTCM=FALSE, VAM=FALSE;

5 Counters
All the contractual KPIs will be followed to verify the global performances. Also, traffic distribution on the
different layers will be evaluated, to monitor wether the traffic segmentation is effective or not.
Also, traffic load on the different layer will be evaluated.
Specific counters listed hereafter will be monitored.

LDR Counters:

ID Counter Description

67203991 VS.LCC.LDR.Time.ULPower Duration of Cell in LDR State Due to UL Power


(Equivalent Number of Users) Congestion

67203992 VS.LCC.LDR.Time.DLPower Duration of Cell in LDR State Due to DL Power


(Equivalent Number of Users) Congestion

67203993 VS.LCC.LDR.Time.DLCode Duration of Cell in LDR State Due to Downlink Code


Resource Congestion

67203994 VS.LCC.LDR.Time.ULCE Duration of Cell in LDR State Due to Uplink Channel


Element Resource Congestion

2018-03-26 HUAWEI Confidential Page9, Total16


u900+u200 site configuration design INTERNAL
ID Counter Description

67203995 VS.LCC.LDR.Time.DLCE Duration of Cell in LDR State Due to Downlink Channel


Element Resource Congestion

67203996 VS.LCC.LDR.Time.ULIub Duration of Cell in LDR State Due to Uplink Iub


Transmission Resource Congestion

67203997 VS.LCC.LDR.Time.DLIub Duration of Cell in LDR State Due to Downlink Iub


Transmission Resource Congestion

67192637 VS.LCC.LDR.Num.ULPower Number of Times that Cell is in LDR State Due to UL


Power (Equivalent Number of Users) Congestion

67192638 VS.LCC.LDR.Num.DLPower Number of Times that Cell is in LDR State Due to DL


Power (Equivalent Number of Users) Congestion

67192639 VS.LCC.LDR.Num.DLCode Number of Times that Cell is in LDR State Due to DL


Code Congestion

67192640 VS.LCC.LDR.Num.ULCE Number of Times that Cell is in LDR State Due to UL CE


Congestion

67192641 VS.LCC.LDR.Num.DLCE Number of Times that Cell is in LDR State Due to DL CE


Congestion

67192642 VS.LCC.LDR.Num.ULIub Number of Times that Cell is in LDR State Due to UL Iub
Transmission Congestion

67192643 VS.LCC.LDR.Num.DLIub Number of Times that Cell is in LDR State Due to DL Iub
Transmission Congestion

67192644 VS.LCC.LDR.HSUPA.InterFreq Number of HSUPA Users Perform Inter-Frequency Load


Handover when Cell is in LDR State

67192645 VS.LCC.LDR.HSUPA.InterRATPS Number of HSUPA Users Perform PS Inter-RAT Handover


when Cell is in LDR State

67190435 VS.LCC.LDR.InterFreq Number of UEs Performing Inter-Frequency Handover to


Reduce Cell Load in Basic Congestion for Cell

67191151 VS.HSDPA.LDR.InterFreq Number of HSDPA UEs Performing Inter-Frequency


Handover to Reduce Cell Load in Basic Congestion for
Cell

67190436 VS.LCC.LDR.BERateUL Number of UEs Performing BE Service Rate Decreasing


in UL Basic Congestion for Cell

67190437 VS.LCC.LDR.BERateDL Number of UEs Performing BE Service Rate Decreasing


in DL Basic Congestion for Cell

2018-03-26 HUAWEI Confidential Page10, Total16


u900+u200 site configuration design INTERNAL
ID Counter Description

67190440 VS.LCC.LDR.InterRATCS Number of UEs Performing CS Inter-RAT Handover to


Reduce Cell Load in Basic Congestion for Cell

67190441 VS.LCC.LDR.InterRATPS Number of UEs Performing PS Inter-RAT Handover to


Reduce Cell Load in Basic Congestion for Cell

67191152 VS.HSDPA.LDR.InterRATPS Number of HSDPA UEs Performing PS Inter-RAT


Handover to Reduce Cell Load in Basic Congestion for
Cell

67192426 VS.LCC.LDR.AMRRateUL Number of UEs Performing AMR Rate Decreasing in UL


Basic Congestion for Cell

67192427 VS.LCC.LDR.AMRRateDL Number of UEs Performing AMR Rate Decreasing in DL


Basic Congestion for Cell

67192397 VS.LCC.LDR.CodeAdj Number of UEs Performing Code Reconfiguration in Basic


Congestion for Cell

67195992 VS.LCC.HSDPA.CodeAdj Number of UEs for Code Adjustment Based on HSDPA for
Cell

67196029 VS.LCC.LDR.HSUPA.InterRATCS Number of HSUPA UEs Performing CS Inter-RAT


Handover in LDR State for Cell

67196030 VS.LCC.LDR.HSDPA.InterRATCS Number of HSDPA UEs Performing CS Inter-RAT


Handover in LDR State for Cell

Load counters:

ID Counter Description

67199618 VS.MeanTCP Mean Transmitted Power of Carrier for Cell

67199682 VS.MaxTCP Maximum Transmitted Power of Carrier for Cell

67199683 VS.MinTCP Minimum Transmitted Power of Carrier for Cell

67202902 VS.MeanTCP.NonHS Mean Transmitted Power of Carrier for Non-


HSDPA Cell

67202900 VS.MaxTCP.NonHS Maximum Transmitted Power of Carrier for Non-


HSDPA Cell

67202901 VS.MinTCP.NonHS Minimum Transmitted Power of Carrier for Non-


HSDPA Cell

67202984 VS.HSDPA.MeanRequiredPwr Mean Power Required by HS-DSCH for Cell

2018-03-26 HUAWEI Confidential Page11, Total16


u900+u200 site configuration design INTERNAL
ID Counter Description

67202982 VS.HSDPA.MaxRequiredPwr Maximum Power Required by HS-DSCH for Cell

67202983 VS.HSDPA.MinRequiredPwr Minimum Power Required by HS-DSCH for Cell

67199617 VS.MeanRTWP Mean Power of Totally Received Bandwidth for


Cell

67199680 VS.MaxRTWP Maximum Power of Totally Received Bandwidth


for Cell

67199681 VS.MinRTWP Minimum Power of Totally Received Bandwidth


for Cell

2018-03-26 HUAWEI Confidential Page12, Total16