A Diversion Tunnel
3 - 3 - 2010
(i) Stoplogs
a) 2nd stage embedded parts completed
b) Radiaal gate
In Progress
c) Hydraulic Hoist.
(i)
15-9-2009 13-9-2009 15-10-2009
80% completed
( ii )
30-9-2010 31-12-2010
30-9-2010 31-12-2010 ( ii )
(i)
C
Tenders called from 5 manufacturers (i)
( iii )
Fortnightly Progress Report No 4
Progress report of Teesta III in respect of Gates and Hoists
dated 16-10-2010
Description Engineering Fabrication Supply Erection
Target Actual Target Actual Target Actual Target Actual
2-3-
2009 to
Diversion Tunnel
3-3-
2010
Stoplogs
a) 2nd stage embeddecompleted 15-9-2010 13-9-2010 15-10-2010
c)
d) Lifting beam 1 no. completed 30-9-2009 -
Monorail
crane
supportin
g completed 30-9-2009
80% completed
structure
8 columns
and crane
Spillway
beamRadial gate
b) Radiaal gate
In Progress
c) Hydraulic Hoist.
a) 2nd sta
b) Stoplog Leaves 8 n To be
started in
the month
d) Lifting beam 1 no. of Nov.10
c) Gantry
crane for
operation
Placement of Order
30 - 9 - 2009 Commercial bids under evaluation with Abir.
Technical Evaluation
26 - 11- 2009 Under progres Technical offer received from two manufacturers.
Placement of Order
20-12-2010
Fortnightly Progress Report No 4
Progress report of Teesta III in respect of Gates and Hoists-HM Equipment.
Dated 16-10-2009
Sr. no Description Engineering Fabrication
Target Actual Target Actual
A Diversion Tunnel
(i) Stoplogs
a) 2nd stage embedded parts completed
All 8nos.
b) Stoplog Leaves 8 nos completed 30-9-2009
1 - 3 -2009 completed
to
d) Lifting beam 1 no. 31 - 07 - 2009 completed 30-9-2009 In progress
To be completed by 10-11-2009
30-9-2010 31-12-2010
30-9-2010 31-12-2010
All 8nos.
b) Stoplog Leaves 8 nos completed 30-9-2009
1 - 3 -2009 completed
to
d) Lifting beam 1 no. 31 - 07 - 2009 completed 30-9-2009 In progress
Supply Erection
Remarks
Target Actual Target Actual
30-9-2010 31-12-2010
Design and engineering inhold for
finalising Civil structure.
30-9-2010 31-12-2010
( ii ) Left Bank Diversion Tunnel -1 Stoplogs for Spillway Radial gate 31-08-2010
a) 2nd stage embedded parts
b) Stoplog Leaves 8 nos
--------------
c) Lifting beam 1 no.
d) Gantry crane for operation
30-9-2010 31-12-2010
Design and engineering shall start
after finalising of Civil structure,
which in progress for firming up size
and no of gates.
30-9-2010 31-12-2010
Design and engineering shall start
after finalising of Civil structure,
which in progress for firming up size
and no of gates.
( ii ) Left Bank Diversion Tunnel -1 Stoplogs for Spillway Radial gate 31-08-2010
a) 2nd stage embedded parts
b) Stoplog Leaves 8 nos
--------------
c) Lifting beam 1 no.
d) Gantry crane for operation
Note:
Manufacturers of Butterfly Valve.
30-9-2010 31-12-2010
30-9-2010 31-12-2010
IA) LIMITED
ed {CIF Mumbai}
Remarks
evaluation.
Fortnightly Progress Report No 8
Progress report of Teesta III in respect of Gates and Hoists-HM Equipment.
Dated 31 -12-2009
Engineering Fabrication Supply Erection
Sr. no Description Remarks
Target Actual Target Actual Target Actual Target Actual
A Diversion Tunnel
(i) Left Bank Diversion Tunnel Stoplogs
( ii ) Left Bank Diversion Tunnel -1 Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010 The earlier order of the radial gates kept on hold. Against
this order 1st stage anchor rods and yoke girder
a) 2nd stage embedded parts 01 - 03 - 2009 In progress fabricated and despatched to site. Are surplus to revised
to scheme.
03
b) Radial gate In progress Design and engineering shall start after
- 03 - 2010
c) Hydraulic Hoist. In Progress finalising of Civil structure drawings, which
is in progress for firming up size and no of
( iii) Left Bank Diversion Tunnel -1 Stoplogs for Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010 gates.
a) 2nd stage embedded parts Design and engineering shall start after
b) Stoplog Leaves 8 nos finalising of Civil structure drawings, which
--------------
c) Lifting beam 1 no. in progress for firming up size and no of
d) Gantry crane for operation gates.
Note:
Manufacturers of Butterfly Valve.
( iii) Left Bank Diversion Tunnel -1 Stoplogs for Spillway Radial gate 31-08-2010
a) 2nd stage embedded parts
b) Stoplog Leaves 8 nos
--------------
c) Lifting beam 1 no.
d) Gantry crane for operation
Note:
Manufacturers of Butterfly Valve.
30-9-2010 31-12-2010 The earlier order of the radial gates kept on hold. Against
this order 1st stage anchor rods and yoke girder
fabricated and despatched to site. Are surplus to revised
scheme.
om 7 manufacturers
chnical offer received from five manufacturers under evaluation. Technical offer and price for dismentling joint
to be furnished by VAG . Technical evaluation completion targeted for 22nd Jan.2010
Fortnightly Progress Report No 10
Progress report of Teesta III in respect of Gates and Hoists-HM Equipment.
Dated 31-01-2010
Engineering Fabrication Supply Erection
Sr. no Description Remarks
Target Actual Target Actual Target Actual Target Actual
A Diversion Tunnel
(i) Left Bank Diversion Tunnel Stoplogs
b) Stoplog Leaves 8 nos completed 30-9-2009 Completed 26-10-2009 Completed 26.11.09 ---------- Material at site
c) Lifting beam 1 no. 01-03-2009 completed 30-9-2009 Completed 26-10-2009 Completed 26.11.09 ---------- Material at site
to
31-07-2009
Monorail crane supporting structure 8
d) completed 30-9-2009 completed 26-10-2009 Completed 26.11.09 ---------- Material at site
columns and crane beam
e) Monorail crane Hoist completed 30-9-2009 completed 26-10-2009 In progress. Material at site
( ii ) Left Bank Diversion Tunnel -1 Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010
The earlier order of the radial gates kept on
hold. Against this order 1st stage anchor rods
a) 2nd stage embedded parts 01 - 03 - 2009 In progress and yoke girder fabricated and dispatched to
to site, are surplus to revised scheme.
03
b) Radial gate - 03 - 2010 In progress Design and engineering shall start after
c) Hydraulic Hoist. In Progress finalising of Civil structure drawings, which is in
progress for firming up size and no of gates.
Four alternatives of radial gate profiles sent for
( iii) Left Bank Diversion Tunnel -1 Stoplogs for Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010 finalisation by civil dept.
a) 2nd stage embedded parts
Design and engineering shall start after
b) Stoplog Leaves 8 nos
-------------- finalising of Civil structure drawings, which in
c) Lifting beam 1 no. progress for firming up size and no of gates.
d) Gantry crane for operation
Note:
Manufacturers of Butterfly Valve.
b) Stoplog Leaves 8 nos completed 30-9-2009 Completed 26-10-2009 Completed 26.11.09 ---------- Material at site
c) Lifting beam 1 no. 01-03-2009 completed 30-9-2009 Completed 26-10-2009 Completed 26.11.09 ---------- Material at site
to
31-07-2009 Material at site. The erection of the coloumn
Monorail crane supporting structure 8
d) completed 30-9-2009 completed 26-10-2009 Completed 26.11.09 ---------- base and anchors shall be done after
columns and crane beam
completion of the civil structure.
e) Monorail crane Hoist completed 30-9-2009 completed 26-10-2009 In progress. Material at site
( ii ) Left Bank Diversion Tunnel -1 12x7.7m Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010
The earlier order of the radial gates kept on
hold. Against this order 1st stage anchor rods
a) 2nd stage embedded parts 01 - 03 - 2009 In progress and yoke girder fabricated and dispatched to
to site, are surplus to revised scheme.
03
b) Radial gate - 03 - 2010 In progress
c) Hydraulic Hoist. In Progress
The civil structure drawings for providing one no
Radial gate and 1 no. fixed wheel maintenance
gate for Diversion Tunnel no. 1 finalised.
( iii) Left Bank Diversion Tunnel -1 12x11.2m Fixed wheel maintenance gat 31-08-2010 30-9-2010 31-12-2010 Technical specifications under progress.Revised
specifications shall be sent to Abir by 20th
a) 2nd stage embedded parts Feb.10 for revision of order on PES Engineers.
b) Stoplog Leaves 8 nos
--------------
c) Lifting beam 1 no.
d) Gantry crane for operation
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance The civil structure drawings for providing one no
( iv) 31-08-2010 30-9-2010 31-12-2010 Radial gate and 1 no. fixed wheel maintenance
gate for Spillway Radial gate
gate for spillway Diversion Tunnel no. 2
finalised . Technical specifications under
progress.Revised specifications shall be sent to
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance Abir by 20th Feb.10 for calling offer and
( v) 31-08-2010 30-9-2010 31-12-2010
gate for Spillway Radial gate placement of order on GMW.
Note:
Manufacturers of Butterfly Valve Technical Offers under consideration commercially
specifications sent to.
1 FOURESS ENGINEERING(INDIA) LIMITED 1 FOURESS ENGINEERING(INDIA) LIMITED
2 Taihe Electric (Hongkong) Limited {CIF Mumbai} 2 Taihe Electric (Hongkong) Limited {CIF Mumbai}
3 Jyoti Ltd 3 Andritz Hydro Pvt.Ltd
4 Andritz Hydro Pvt.Ltd 4 VAG - Valves(India) Pvt. Ltd
5 VAG - Valves(India) Pvt. Ltd
6 ALSTOM
7 BHEL.
Fortnightly Progress Report No 12
Progress report of Teesta III in respect of Gates and Hoists-HM Equipment.
Dated 28-02-2010
Engineering Fabrication Supply Erection
Sr. no Description Remarks
Target Actual Target Actual Target Actual Target Actual
A Diversion Tunnel
(i) Left Bank Diversion Tunnel Stoplogs
e) Monorail crane Hoist completed 30-9-2009 completed 26-10-2009 In progress. Material at site
( ii ) Left Bank Diversion Tunnel -1 12x7.7m Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010
The earlier order of the radial gates kept on
hold. Against this order 1st stage anchor rods
a) 2nd stage embedded parts 01 - 03 - 2009 In progress and yoke girder fabricated and dispatched to
to site, are surplus to revised scheme.
03
b) Radial gate - 03 - 2010 In progress
c) Hydraulic Hoist. In Progress The Mechanical drawings and Specifications for
providing one no Radial gate and 1 no. fixed
wheel maintenance gate for Diversion Tunnel
no. 1 finalised.Technical specifications
( iii) Left Bank Diversion Tunnel -1 12x11.2m Fixed wheel maintenance gat31-08-2010 30-9-2010 31-12-2010 completed.Revised specifications shall be sent
to Abir by 2nd Mar.10 for revision of order on
a) 2nd stage embedded parts PES Engineers.
b) Maintenance Gate --------------
d) Rope Drum Hoist for operation
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance The civil structure drawings for firming the sizes
( iv) 31-08-2010 30-9-2010 31-12-2010
gate for Spillway Radial gate of one no Radial gate and 1no. fixed wheel
maintenance gate for spillway Diversion
Tunnel no. 2 yet to be finalised.Technical
specifications and drawings under progress
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance shall be finalised after gate sizes are firmed by
( v) 31-08-2010 30-9-2010 31-12-2010
gate for Spillway Radial gate civil after model study results.
Note:
Manufacturers of Butterfly Valve Technical Offers under consideration commercially
specifications sent to.
1 FOURESS ENGINEERING(INDIA) LIMITED 1 FOURESS ENGINEERING(INDIA) LIMITED
2 Taihe Electric (Hongkong) Limited {CIF Mumbai} 2 Taihe Electric (Hongkong) Limited {CIF Mumbai}
3 Jyoti Ltd 3 Andritz Hydro Pvt.Ltd
4 Andritz Hydro Pvt.Ltd 4 VAG - Valves(India) Pvt. Ltd
5 VAG - Valves(India) Pvt. Ltd
6 ALSTOM
7 BHEL.
Fortnightly Progress Report No 13
Progress report of Teesta III in respect of Gates,Hoists and Penstocks-HM Equipment.
Dated 15-03-2010
Engineering Fabrication Supply Erection
Sr. no Description Remarks
Target Actual Target Actual Target Actual Target Actual
A Diversion Tunnel
(i) Left Bank Diversion Tunnel Stoplogs
e) Monorail crane Hoist completed 30-9-2009 completed 26-10-2009 In progress. Material at site
( ii ) Left Bank Diversion Tunnel -1 12x7.7m Spillway Radial gate 31-08-2010 30-9-2010 31-12-2010
The earlier order of the radial gates kept on
hold. Against this order 1st stage anchor rods
a) 2nd stage embedded parts 01 - 03 - 2009 In progress and yoke girder fabricated and dispatched to
to site, are surplus to revised scheme.
03
b) Radial gate - 03 - 2010 In progress
c) Hydraulic Hoist. In Progress The Mechanical drawings and Specifications for
providing one no Radial gate and 1 no. fixed
wheel maintenance gate for Diversion Tunnel
( iii) Left Bank Diversion Tunnel -1 12x11.2m Fixed wheel maintenance gate for Sp 31-08-2010 30-9-2010 31-12-2010 no. 1 finalised.Technical specificationsand
drawings sent to Abir on 2nd Mar.10 for
revision of order on PES Engneers.
a) 2nd stage embedded parts
b) Maintenance Gate --------------
d) Rope Drum Hoist for operation
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance gate for The civil structure drawings for firming the sizes
( iv) 31-08-2010 30-9-2010 31-12-2010
Spillway Radial gate of one no Radial gate and 1no. fixed wheel
maintenance gate for spillway Diversion Tunnel
no. 2 yet to be finalised.Technical specifications
and drawings under progress shall be finalised
Left Bank Diversion Tunnel -2 11x14 m Fixed wheel maintenance gate for after gate sizes are firmed by civil after model
( v) 31-08-2010 30-9-2010 31-12-2010
Spillway Radial gate study results.
D Buried Penstock:
E Steel Plates:
Steel Plates for 1st Consignment
(i)
(253Plates-1556 tons):
Steel Plates for 2nd Consignment
( ii ) Total plates available at site 485 out of 722.
(218Plates-1540.19 tons):
Steel Plates for 3rd Consignment
( iii )
(251Plates-1546.8 tons):
Steel Plates for 4th Consignment
( iv)
(261Plates-1560.44 tons):