You are on page 1of 405

PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED

CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED


Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

1. PRELIMINARY ITEMS AND ENGINEER'S SITE FACILITIES

1.01 PR-GEN-MOBL-0485 06B ENGINEER'S SITE OFFICES Sec 1, Pt. 11 Sec C, Pt. 2, Sec.1 1 NR LOCAL EVALUATION CO

PR-GEN-MOBL-0485 OFFICE PORTA CABIN CONSISTING OF ONE


1.02 06B ROOM, TOILET & KITCHEN
Sec 1, Pt. 11 Sec C, Pt. 2, Sec.1 6 NRS LOCAL EVALUATION CO

PR-GEN-MOBL-0485 TRUSSES FOR MESS HALL AND CLINIC


1.03 06B PORTA CABIN
Sec 1, Pt. 11 Sec C, Pt. 2, Sec.1 LOCAL EVALUATION CO

PR-GEN-MOBL-0638 Sec 1, Pt. 7.9 & Sec. C, SR-6, PT.


1.04 06B SITE PHOTOGRAPHS AND VIDEO Sec 1, Pt. 7.9 5.2 & 5.4
LOCAL EVALUATION CO

1.05 PR-GEN-MOBL-0485 06B PHOTOCOPIER Sec 1, Pt. 11.4.3 Sec 1, Pt. 11.4.3.2 EVALUATION CO

1.06 PR-GEN-MOBL-0485 06B DIGITAL CAMERA Sec 1, Pt. 7.9.1 & Pt. 11.4.3.4 EVALUATION CO

PR-GEN-MOBL-0485 CEILING MOUNTED PROJECTOR & WALL


1.07 06B MOUNTED FOLDING SCREEN
Sec 1, Pt. 11.2.5.14 EVALUATION CO

1.08 PR-GEN-MOBL-0485 06B 42" FLAT PLASMA TV & DVD PLAYER Sec 1, Pt. 11.2.5.14 EVALUATION CO

1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM Sec 1, Pt. 11.4.7 Sec 1, Pt.11.3.4.1 & Pt. 11.4.7.3 LOCAL EVALUATION CO
PROC REP REV 49 Page 1 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM Sec 1, Pt. 11.4.7 Sec 1, Pt.11.3.4.1 & Pt. 11.4.7.3 LOCAL EVALUATION CO

KITCHEN SINK,CUPBOARDS, APPLIANCES ,


1.10 PR-GEN-MOBL-0485 06B CROCKERY & CUTLERY, CUPS, SAUCERS Sec 1, Pt. 11.2.3.16 Sec 1, Pt. 11.2..5.15 INQUIRY ISS
AND GLASSES

PR-GEN-MOBL-0485 PORTABLE DRY POWDER FIRE


1.11 06B EXTINGUISHER
Sec 1, Pt. 11.2..5.16 INQUIRY ISS

1.12 PR-GEN-MOBL-0485 06B ELECTRIC STEEL WATER COOLER Sec 1, Pt. 11.2..5.16 EVALUATION CO

1.13 PR-GEN-MOBL-0485 06B FIRE DETECTION SYSTEM EVALUATION CO

1.14 06B IT NETWORK EQUIPMENT EVALUATION CO

NETWORK SPARES FOR SERVER ROOM AND


1.15 06B DESKTOP CONNECTION
EVALUATION CO

1.16 06B ID CARD PRINTER, USB & ETHERNET EVALUATION CO

1 LOT LOCAL EVALUATION CO

PROC REP REV 49 Page 2 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

LOCAL EVALUATION CO

1.17 PR-GEN-MOBL-0485 046 SURVEYING INSTRUMENTS Sec 1, Pt. 11.4.2 Sec 1, Pt. 11.4.9

LOCAL EVALUATION CO

1.18 046A LASER ROTATOR INSTRUMENT 7 NRS LOCAL EVALUATION CO

PROC REP REV 49 Page 3 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

1.19 046 SURVEYING EQUIPMENT CALIBRATION LOCAL EVALUATION CO

1.20 045 GROUND WATER MONITORING OVERSEAS EVALUATION CO

1.21 045 THERMO COUPLES

CONCRETE REINFORCEMENT COVER METER


1.22 045 / DETECTOR
6 NRS LOCAL EVALUATION CO

ELCOMETER 900 CONCRETE CRACK


1.23 045 MICROSCOPE
1 NRS LOCAL EVALUATION CO

3 NRS LOCAL EVALUATION CO


1.24 PR-GEN-MOBL-0485 030 COMPUTERS & PRINTERS Sec 1, Pt. 11.2.3.13-15 Sec C, Pt. 2, Sec.1
1 NRS LOCAL EVALUATION CO

EVALUATION CO

1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture Sec C, Pt. 2, Sec.1
PROC REP REV 49 Page 4 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2 EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture Sec C, Pt. 2, Sec.1

EVALUATION CO

1.26 PR-GEN-MOBL-0485 833.2 Client Site Office Furniture Sec C, Pt. 2, Sec.1 EVALUATION CO

1.27 833.3 GARAGE OFFICES - SITE FACILITIES EVALUATION CO

1.28 833.4 MATERIAL STORE - SITE FACILITIES EVALUATION CO

1.29 820 KITCHEN EQUIPMENTS EVALUATION CO

PR-GEN-MOBL-0485 AIRCONDITIONING UNITS, SPLIT TYPE


1.30 451 HEAT /COOL 1.5 TON & 2 TON CAPACITY
Sec 1, Pt. 11.4.8 LOCAL EVALUATION CO

PROC REP REV 49 Page 5 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
AIRCONDITIONING UNITS, SPLIT TYPE / IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
1.30 PR-GEN-MOBL-0485 451 Sec 1, Pt. 11.4.8 LOCAL
-CONTRACT EVALUATION
EVALUATCO
HEAT /COOL 1.5 TON & 2 TON CAPACITY SPECS

PR-GEN-MOBL-0485 Sec 1, Pt. 11.2..5.18 &


1.31 06C PROJECT SIGN BOARD
Sec. C, SR-6, Pt.5.5
EVALUATION CO

1.32 PR-GEN-MOBL-0520 06D SITE HOARDING Sec 1, Pt. 11.2..5.18 EVALUATION CO

SUPPLY OF PVC FLEX TARPAULIN PRINTED


1.33 922 BANNER
UNDER EVALU

1.34 PR-GEN-MOBL-0520 06E TEMPORARY TRAFFIC SIGNS Sec. 6, Part 10 Sec C-2, Sec 10 EVALUATION CO

TEMPORARY TRAFFIC SIGNS FOR


1.35 06E J17 &J18 AND FLASHING ARROW
EVALUATION CO

PROC REP REV 49 Page 6 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

TEMPORARY TRAFFIC SIGNS FOR


1.36 06E J17 & J18 ROUNDABOUT (R/A)
EVALUATION CO

1.37 06E FLAG SIGNS WITH POST EVALUATION CO

1.38 06E SOLAR ELECTRONIC ARROW

TEMPORARY TRAFFIC SIGNS for Site Access


1.39 06E Road
EVALUATION CO

1.40 06E SOLAR MESSAGE BOARD EVALUATION CO

EVALUATION CO
1.41 06E REFLECTIVE STICKER
EVALUATION CO

1.42 06E TEMPORARY TRAFFIC SIGNS for J15 EVALUATION CO

PROC REP REV 49 Page 7 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PR-GEN-MOBL-0520 WEBCAMS - FOR SITE MONITORING AND


1.43 06F TIME LAPSE
EVALUATION CO

1.44 06F VIDEOGRAPHY AND PHOTOGRAPHY EVALUATION CO

1.45 PR-GEN-MOBL-0520 06G TRAFFIC CONTROL SYSTEM EVALUATION CO

1.46 06R RADAR SPEED SIGNS INQUIRY ISS

1.47 PR-GEN-MOBL-0520 097 ACCESS TOWERS FOR WEBCAMS EVALUATION CO

SUPPY, INSTALLATION OPERATION AND


1.48 573 TESTING FOR CCTV CAMERA
EVALUATION CO

1.49 790 LOCATION SIGNS EVALUATION CO

2. SITE INVESTIGATION, SURVEYING AND TESTING

PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL


2.01 041 INVESTIGATION & PILE TESTING
Sec. 03 Sec C-2, Sec.3 LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 8 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL
2.01 041 INVESTIGATION & PILE TESTING
Sec. 03 Sec C-2, Sec.3 LOCAL / SUBCONTRACT EVALUATION CO

2.02 PR-GEN-MOBL-0610 041A TOPOGRAPHICAL SURVEY Sec. 03 Sec C-2, Sec.3 LOCAL EVALUATION CO

PR-GEN-MOBL-0610 GEOTECHNICAL, SURVEY & LABORATORY Sec. 03 Sec. C-2, Sec.3,


2.03 041C SERVICES Sec 1, Pt. 9.3.9 Sec 1, Pt. 9.3.9
LOCAL / SUBCONTRACT EVALUATION CO

EVALUATION CO

2.04 PR-GEN-MOBL-0610 045 LABORATORY EQUIPMENT Sec 1, Pt. 9.3.9 Sec. C-2, Sec 1, Pt. 9.3.9 EVALUATION CO

EVALUATION CO

EVALUATION CO

NON NUCLEAR ASPHALT DENSITY GAUGE


2.05 045.5 (MODELPQI-380)
EVALUATION CO

PROC REP REV 49 Page 9 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

2.06 PR-GEN-MOBL-0625 047 GIS FOR WATER, DRAINAGE, POWER Sec 1, Pt. 7.10.2.3.4

2.07

Sec. 03 Sec C-2, Sec 1, Pt. 9.3.9


048 INDEPENDENT LABORATORY TESTING
Sec 1, Pt. 9.3.6 Sec.3
LOCAL / SUBCONTRACT EVALUATION CO

2.08 048 CONCRETE MIX DESIGN TRIALS LOCAL / SUBCONTRACT EVALUATION CO

2.09 048 GROUND WATER TESTING LOCAL / SUBCONTRACT EVALUATION CO

ADDITIONAL SITE INVESTIGATION -


2.10 048 BOREHOLES
LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 10 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

2.11 048 SITE TEST/PIEZOCONE PENETRATION LOCAL / SUBCONTRACT EVALUATION CO

Sec. 5 & 6,
2.12 049 INTERNATIONAL ROUGHNESS INDEX (IRI) Clause 5.11.6.2.1
LOCAL / SUBCONTRACT EVALUATION CO

3. CEMENT & CONCRETE

3.01 MA-MAT-PROCU-0700 61 PILING WORKS Sec 4, Sec 5, IAN 0013 Sec 5 LOCAL / SUBCONTRACT EVALUATION CO

3.02 61.1 CROSS HOLE SONIC LOGGING 685 NRS EVALUATION CO

PILING WORK FOR CANTILEVER


3.03 061.2 STRUCTURES
EVALUATION CO

4,000 LTS
PROC REP REV 49 Page 11 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
4,000 LTS

3.04 101 BATCHING PLANT REQUIREMENT EVALUATION CO


1,000 LTS

1,000 LTS

3.05 MA-MAT-PROCU-0700 101 OPC BULK CEMENT Sec 5, Pt. 1 & 3 Sec 5, Pt. 3.2 3,080 TONS EVALUATION CO

3.06 101.1 MICROSILICA 10 TONS EVALUATION CO

3.07 101.2 SRC BULK CEMENT

3.08 101.3 GGBFS 54 TONS EVALUATION CO

PROC REP REV 49 Page 12 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec.32/00, Cl. 2.4,2.5, 2.11,


MA-MAT-PROCU-0700 SUPPLY OF READY MIX CONCRETE -
3.09 102 VENDOR PREQUALIFICATION
Sec. 5, Pt.1,2,3,4,5,6 & 7 2.13 LOCAL / SUBCONTRACT EVALUATION CO
Sec.29, Cl. 2.6

PROC REP REV 49 Page 13 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROC REP REV 49 Page 14 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

CONCRETE MIX INGREDIENTS


3.10 MA-MAT-PROCU-0700 102 Aggregates, Sand, Portland cement, Sec 5, Pt. 2,3,4,5 & 6 Section 32/00, Part 2.4 LOCAL EVALUATION CO
Water, GGBS, Siilica Fume

PROC REP REV 49 Page 15 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROC REP REV 49 Page 16 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0701 READY-MIX CLASS C20/20 [SRC] -


3.11 102.1 Backfilling Concrete
Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

PROC REP REV 49 Page 17 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MAT-MAT-PROCU READY-MIX CLASS C30/20 [SRC] -


3.12 702 102.2 Blinding Concrete
Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

PROC REP REV 49 Page 18 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0705 READY-MIX CLASS C40/20 [OP+GGBS+SF] -


3.13 102.3 Structural Concrete for Pile Foundations
Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

MA-MAT-PROCU-0705 READY-MIX CLASS C40/20 (SRC+GGBS+SF)


3.14 102.3A Structural Concrete Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

PROC REP REV 49 Page 19 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0706 READY-MIX CLASS C50/20 [OP+GGBS+SF] -


3.15 102.4 Precast Elements
Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

3.16 102.4A READY-MIX CLASS C50/10 FOR SPACER Sec 5, Pt. 2,3,4,5 & 6 EVALUATION CO

PROC REP REV 49 Page 20 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0708 READY-MIX CLASS C50/20 OPC(POST


3.17 102.5 TENSIONED CONCRETE)
Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

3.18 102.6 READY MIX 30/10 SRC SCREED Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

3.19 102.6A READY MIX 30/10 OPC SCREED Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO
PROC REP REV 49 Page 21 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

3.19 102.6A READY MIX 30/10 OPC SCREED Sec 5, Pt. 2,3,4,5 & 6 LOCAL EVALUATION CO

3.20 102.7 READY MIX OPC/SAND 1/20 LOCAL EVALUATION CO

READY MIX OPC C 55/20 (PRECAST BRIDGE


3.21 102.8 SECTIONS)
Sec. 5, Part 2,3,4,5,6 LOCAL EVALUATION CO

PROC REP REV 49 Page 22 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

READY MIX OPC C 55/20 (PRECAST BRIDGE


3.21 102.8 SECTIONS)
Sec. 5, Part 2,3,4,5,6 PROJECT SPECS LOCAL
SUPPLY
EVALUATION CO
ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

READY MIX OPC C 55/10 (PRECAST BRIDGE


3.22 102.9 SECTIONS)
Sec. 5, Part 2,3,4,5,6 LOCAL EVALUATION CO

READY MIX OPC C 55/10 (SF PIPE


3.23 102.9A SURROUND) Sec. 5, Part 2,3,4,5,6 LOCAL EVALUATION CO

6228-E30/004, V.S.L / Part 2.7


3.24 102.10 GROUT MIX DESIGN C40/06MM Grouting 2.7.3
LOCAL EVALUATION CO

4. AGGREGATES, SANDS & SOILS

4.01 111.2 ASPHALT RED SAND

PROC REP REV 49 Page 23 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

4.02 113 SUBBASE & ROAD BASE MATERIAL LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 24 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
4.02
CONTRACT PERIOD : 113 SUBBASE & ROAD BASE MATERIAL LOCAL / SUBCONTRACT EVALUATION CO
Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROC4.03
REP REV 49 114 FILL MATERIAL Page 25 of 405 LOCAL / SUBCONTRACT File: 382684358.xlsx
EVALUATION CO
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

4.03 114 FILL MATERIAL LOCAL / SUBCONTRACT EVALUATION CO

4.04 115 ROCKFILL TYPE 1 ,2&3 LOCAL / SUBCONTRACT EVALUATION CO

4.05 115 SUPPLY AND DELIVERY FILL MATERIALS Sec. 6, Pt. 3 LOCAL / SUBCONTRACT EVALUATION CO

4.06 MA-MAT-PROCU-0740 113.1 GRANULAR BEDDING 3/8" Sec. 8, Pt. 2, Cl. 2.3.1 LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 26 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

BLENDING PLANT FOR ROAD BASE MATERIAL


4.07 113.2 PRODUCTION
Sec. 6, Pt. 4 IAN 0019 LOCAL / SUBCONTRACT EVALUATION CO

4.08 113.3 MIX DESIGNING FOR ROAD BASE Sec 6, Pt.4 IAN0019 LOCAL / SUBCONTRACT EVALUATION CO

PLANT TRAIL FOR SUB BASE MATERIAL AT IAN 0019, Pt. 4 , Cl. 4.1, 4.2,
4.09 113.4 J&P BLENDPLANT J16 4.2.4 & 4.2.5
EVALUATION CO

100 TONS EVALUATION CO


4.10 111C STEEL SLAG FOR BLENDING PLANT
75 TONS

PROC REP REV 49 Page 27 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0750 DUNE SAND for BEDDING & BACKFILLING TO


4.11 111 TRENCHES
EVALUATION CO

EVALUATION CO

4.12 111 WHITE SAND


Sec. 6, Pt. 3 (3.3.5)
EVALUATION CO
Sec. 21, Pt. 6 (6.3.8)

PROC REP REV 49 Page 28 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
4.12 111 WHITE SAND
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
Sec. 6, Pt. 3 (3.3.5)
SPECS -CONTRACT EVALUATION
EVALUATCO
Sec. 21, Pt. 6 (6.3.8)

Sec. 6, Pt. 3 (3.3.5)


4.13 111 SCALPING POWDER FOR ITS
Sec. 21, Pt. 6 (6.3.8)
EVALUATION CO

Sec. 6, Pt. 3 (3.3.5)


4.14 111 SCALPING POWDER FOR MV, LV NETWORKS
Sec. 21, Pt. 6 (6.3.8)
EVALUATION CO

MA-MAT-SUBM-0730 EARTHWORKS MATERIALS - BACKFILL Sec 6, Pt. 1 & 3


4.15 119 MATERIAL Sec. 8, Pt. 2
Sec C, Pt.2, Sec. 6 LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 29 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec. 6, Pt. 3, Cl. 3.5


4.16 119.1 EXCAVATION WORKS Sec. 8, Pt. 2, Cl. 2.2
LOCAL / SUBCONTRACT EVALUATION CO

4.17 10B MICROTUNNELING WORKS LOCAL / SUBCONTRACT EVALUATION CO

HORIZONTAL DIRECTIONAL DRILLING


4.18 10C WORKS
LOCAL / SUBCONTRACT EVALUATION CO

5. CONCRETE ADMIXTURES, ADDITIVES AND CURING

MA-MAT-PROCU-0700 Sec C-2, Sec 32/00 Pt.3.8.E.4,


5.01 121 CURING COMPOUND Sec 5, Pt. 10.2.7
Pt.2.7.E, Pt.2.8 & IAN 00009_12
1,000 LTR LOCAL EVALUATION CO

PROC REP REV 49 Page 30 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IANSec
Sec C-2, / KAHRAMAA
32/00 Pt.3.8.E.4, LOCAL / IMP. /SUB ISSUED / REC
5.01 MA-MAT-PROCU-0700 121 CURING COMPOUND Sec 5, Pt. 10.2.7 1,000 LTR LOCAL
-CONTRACT EVALUATION
EVALUATCO
SPECS
Pt.2.7.E, Pt.2.8 & IAN 00009_12

MA-MAT-PROCU-0700 Sec C-2, Sec 32/00 Pt.3.8.E.4,


5.02 121.1 EVAPORATION RETARDER Pt.2.7.E, Pt.2.8 & IAN 00009_12

MA-MAT-PROCU-0700 CONCRETE ADDITIVES


5.03 122 (CEMENTETIOUS ADDITIONS)
Sec 5, Pt. 5.3 Sec C-2, Sec 32/00 Pt.2.5

MA-MAT-PROCU-0700 FORMWORK RELEASE AGENT Sec C-2: Sec. 32/00 Pt.2, Cl.
5.04 098A (Water Based)
Sec 5, Pt. 9.3.6, Pt 16.6.5(13)
2.1.F
1,000 LTR LOCAL EVALUATION CO

MA-MAT-PROCU-0700 FORMWORK RELEASE AGENT


5.05 098B (Solvent Based)
Sec 5, Pt. 9.3.6, Pt 16.6.5(13) Sec C-2: Sec 32/00 Pt.2.1.F LOCAL EVALUATION CO

6. FORMWORK & SCAFFOLDING

6.01 90 SCAFFOLDING-ACCESSORIES

6.02 MA-MAT-PROCU-0700 94.1 FORM LINERS Sec 5, Pt. 9 EVALUATION CO

6.03 94.1 RMD - DESIGN SERVICES EVALUATION CO

PROC REP REV 49 Page 31 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

SCAFFOLDING ACCESSORIES FOR


6.04 94.1 UNDERPASS
LOCAL EVALUATION CO

LOCAL EVALUATION CO
6.05 94.1 SCAFFOLDING ACCESSORIES FOR BRIDGES
LOCAL EVALUATION CO

6.06 94.1 ACCESS SCAFFOLD AND ACCESSORIES EVALUATION CO

MA-MAT-PROCU-0760 Sec. 5, Pt. 9, Cl 9.3,


6.07 96 FORMWORK-SCAFFOLDING IAN-0013, Sec. 05, Pt. 9.3
Sec C-2: Sec. 5, Pt. 9, Cl.9.4.1 LOCAL EVALUATION CO

6.08 96 RMD FORMWORK ACCESSORIES LOCAL EVALUATION CO

6.09 96 TOOLS FOR FORMWORK LOCAL EVALUATION CO

6.10 96.1 FORMWORK-SCAFFOLDING EVALUATION CO

6.11 96.2 FORMWORK-ABUTMENT WALLS LOCAL EVALUATION CO

7. WATERPROOFING MEMBRANES & PROTECTIVE TREATMENTS

PROC REP REV 49 Page 32 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

WATERPROOFING MEMBRANE (General


MA-MAT-PROCU-0760 Sec 5, Pt. 1 & 14.3
7.01 124 Protection to Buried Concrete) & (Underpass &
IAN 027
Sec.32, Pt.3.11 LOCAL / SUBCONTRACT EVALUATION CO
other Burried structures & elements)

WATERPROOFING MEMBRANE General Sec 5, Pt. 1 & 14.3


7.02 MA-MAT-PROCU-0760 124 Protection to Buried Concrete, Underpass & other Burried Sec.32, Pt.3.11 LOCAL / SUBCONTRACT EVALUATION CO
IAN 027
structures

MA-MAT-PROCU-0760 WATERPROOFING MEMBRANE (Underpass & Sec 5, Pt. 1 & 14.3 Sec C, Pt.2, Sec 32
7.03 124 other Burried structures & elements) IAN 004 ,Clause3.11.1.1
LOCAL / SUBCONTRACT EVALUATION CO

Concrete Protection - Waterproof Membrane for


7.04 124 general protection to buried concrete, DWI Sec. 5, Pt. 14, Cl. 14.3.3 LOCAL / SUBCONTRACT EVALUATION CO
ADESOBIT 1600X Membrane with LAMA primer

Concrete Protection - Waterproof Membrane for


7.05 124 general protection to buried concrete, Sec. 5 Pt. 14, Cl. 14.3.2.3 LOCAL / SUBCONTRACT EVALUATION CO
ARMOPROOF - PROTECTION BOARD

Concrete Protection - General protection to buried


7.06 124 concrete for Kahramaa PW Manhole chambers Sec. 5 Pt. 14, Cl. 14.3.2.3 LOCAL / SUBCONTRACT EVALUATION CO
(ARMOPROOF - PROTECTION BOARD)

Concrete Protection - Waterproof Membrane for


general protection to buried concrete DWI Sec. 5, Pt.14, Cl. 14.3.2.3 &
7.07 124 ADESOBIT1600X & ARMORPROOF Protection 14.3.3
LOCAL / SUBCONTRACT EVALUATION CO

Board

PROC REP REV 49 Page 33 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Concrete Protection - Waterproof Membrane for


general protection to buried concrete, BITUMODE Sec. 5, Pt.14, Cl. 14.3.2 &
7.08 124 - PROTECTION BOARD 6 MM and BITUSELF 14.3.3
LOCAL / SUBCONTRACT EVALUATION CO

1.6 MM XL

Waterproofing System for QP Line and TSE


Works
Sec. 5, Pt.14, Cl. 14.3.2 &
7.09 124 BITUMODE - PROTECTION BOARD 6 MM and
14.3.3
LOCAL / SUBCONTRACT EVALUATION CO
BITUSELF 1.6 MM XL & BITUMODE PRIMER
S.B. INCLUDED WITH BITUMODE PRIMER S.B.

Protection Nord Board 6 MM and Solar Self Sec. 5, Pt.14, Cl. 14.3.2 &
7.10 124 Adhesive 1.6 MM with Premier Primer SB 14.3.3
LOCAL / SUBCONTRACT EVALUATION CO

STRUCTURAL ADHESIVE - EUROSEAL


7.11 124.1 DILATION TAPE
LOCAL / SUBCONTRACT EVALUATION CO

BONDED SYSTEM: SPRAY APPLIED Sec. C - Part 2, Sec. 32, Cl.


7.12 124.1 MEMBRANE - INTEGRITANK 3.11.1.3.2 & 6
LOCAL / SUBCONTRACT EVALUATION CO

Concrete Protection (Waterproofing System -


Sec. C- Part 2, Sec. 32, Cl.
7.13 124.1 Underpass and other buried structures) - Euroseal 3.11.1.3.1
LOCAL / SUBCONTRACT EVALUATION CO
PVC T- LOCK Membrane

PROC REP REV 49 Page 34 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Crack Inducer - HDPE Flat Sheet Membrane, flat


sheet extruded along its length to mechanically
7.14 124.1 join itself
Sec. 5, Pt. 12, Cl. 12.2.2 LOCAL / SUBCONTRACT EVALUATION CO

into poured concrete.


Euroseal HDPE T-Lock Sheet Membrane
7.15 124.1 waterproofing (Thickness 2.5mm) for Bridge Sec. 32/05 , Cl. 1.2A EVALUATION CO
Foundations
Concrete Protection (Waterproofing System -
7.16 124.1 Underpass and other buried structures)- GSE Sec. C - Pt. 2, Sec. 32/05, Cl. 1.2 LOCAL / SUBCONTRACT EVALUATION CO
STUDLINER

Concrete Protection (Waterproofing System -


Sec. C - Pt 2, Sec. 32/25, Cl. 1, 4,
7.17 124.1 Underpass & other buried structures) - 5&6
LOCAL / SUBCONTRACT EVALUATION CO
Submerged Tunnel

MA-MAT-PROCU-0960 UNBONDED WATERPROOFING SYSTEM Sec. 32/25, Pt 3, Cl. 3.1.2, IAN


7.18 124.1 (FOSROC PRODUCTS) 004 Sec. 5
EVALUATION CO

WATERPROOFING SYSTEM FOR IAN 004 Rev A1


7.19 124.1 SUBMERGED TUNNEL, UNDERPASSES AND Tech. Sub. Sec. C-II-Pt.2, LOCAL / SUBCONTRACT EVALUATION CO
BRIDGE SUBSTRUCTURES Project Spec. Sec 32/25

7.20 MA-MAT-PROCU-0760 124.2 WATERPROOFING MEMBRANE ANNULUS Sec 5, Pt. 1 & 14 Sec.32, Pt.3.11

SPRAY APPLIED WATERPROOFING Sec 5, Pt. 1 & 14


7.21 124.5 MEMBRANE TO BRIDGE DECKS IAN 028
Sec.32, Pt.3.11 & 11.2 LOCAL / SUBCONTRACT EVALUATION CO

ELIMINATOR BRIDGE DECK AND TOP OF


7.22 124.5 BASE SLAB WATERPROOFING
Sec. 32/05, Cl. 1.3 LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 35 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MASTIC FILLET (FORSOC NITOFEAL


7.23 124.6 PRODUCT)
Sec. 5, Part 12 OVERSEAS / U.A.E EVALUATION CO

SUBSTRUCTURE WATERPROOFING SYSTEM


7.24 124.7 FOR TSE
OVERSEAS / U.A.E EVALUATION CO

CONCRETE PROTECTION AND


7.25 127 WATERPROOFING
LOCAL / SUBCONTRACT EVALUATION CO

BRIDGE DECK SPRAY APPLIED -


7.26 128 PITCHMASTIC PmB (International)
Sec C, 32/00, Pt.3, Cl. 3.11.2 LOCAL / SUBCONTRACT EVALUATION CO

LOCAL / SUBCONTRACT EVALUATION CO

PROTECTIVE TREATMENTS TO CONCRETE


PROC REP REV 49 128 (ANTICARBONATION COATING)
Sec 5, Pt.Page
14.4,3614.5
of 405 Sec C-II Pt-2, Sec 32/70 LOCAL / SUBCONTRACT EVALUATION CO
File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROTECTIVE TREATMENTS TO CONCRETE


128 (ANTICARBONATION COATING)
Sec 5, Pt. 14.4, 14.5 Sec C-II Pt-2, Sec 32/70 LOCAL / SUBCONTRACT EVALUATION CO

7.27

LOCAL / SUBCONTRACT EVALUATION CO

PROTECTIVE TREATMENTS TO CONCRETE


128A (ANTICARBONATION COATING)
QP LINE

EPOXY COATING (ABOVE GROUND LEVEL) i.e.


7.28 Sec 5, Pt. 14, Cl. 14.5.4 EVALUATION CO
INSIDE MANHOLES, CHAMBERS ETC

128.1 LOCAL

BITUMINOUS EMULSION COATING (MSE


7.29 IAN 024 Sec. C-2, Sec. 34, Part 4.B(g) EVALUATION CO
WALLS) WEBER.DRY SSP 50

PROC REP REV 49 Page 37 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

128.1 PROJECT SPECS LOCAL


SUPPLY ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Section 5, Part 14 Clause


7.30 MASTERPROTECT 1812 EVALUATION CO
14.5.4

Waterproof Paint Based on Cementitious Material


7.31 128.2 for Portable Water / Valve Chambers (For EVALUATION CO
KAHRAAMA)

7.32 MA-MAT-PROCU-0960 254 BITUMINOUS PAINT (MSE WALLS)

Sec 6, Pt. 14.9.4


GEOTEXTILE FABRIC FOR DRAINAGE &
7.33 133 EARTHWORKS
Sec 6, Pt. 15.1 & 15.2 400,000 m² EVALUATION CO
Sec 8, Pt.2.3.2, Sec 12 Pt.5

PROC REP REV 49 Page 38 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

Sec 6, Pt. 14.9.4 PROJECT SPECS


GEOTEXTILE FABRIC FOR DRAINAGE & SUPPLY ENQUIRY S
7.33 133 EARTHWORKS Sec 6, Pt. 15.1 & 15.2 SECTION C PART2 400,000 m² EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010
Sec 8, Pt.2.3.2, Sec 12 Pt.5 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

GEOTEXTILE FOR ABUTMENT WALLS SAME


7.34 133.1 AS MSE WALLS
SPECIAL PAINTS: ANTICORROSION COATING
7.35 788 (MasterEmaco®8100AP)
EVALUATION CO

8. JOINTS

BITUMEN IMPREGNATED FIBER BOARD (35% Sec 5, Pt. 12.3.2;


8.01 141 Bitumen Impregnated) IAN-0013, Sec.05, Pt.12
1,245 SHT EVALUATION CO

8.02 BARRIER EXPANSION JOINT

8.03 141.1 EXPANDED POLYSTYRENE 25mm EVALUATION CO

JOINT SEALANT
8.04 142 POLYSULPHIDE
Sec 5, Pt. 12.3.3 LOCAL EVALUATION CO

PROC REP REV 49 Page 39 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS
JOINT SEALANT SUPPLY ENQUIRY S
8.04 142 POLYSULPHIDE Sec 5, Pt. 12.3.3 SECTION C PART2 LOCAL EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

LOCAL / SUBCONTRACT EVALUATION CO

JOINT SEALANT
8.05 142 POLYURETHANE
Sec 5, Pt. 12.3.3 IAN Part 12.3.3

OVERSEAS / U.A.E. EVALUATION CO

JOINTS - WATERPROOFING - WATER


8.06 143 SWELLING GASKETS (Superswell 47B)
Sec 5, Pt. 12.5.4 Sec. C-2, Sec. 32, Pt. 3.6.B5 LOCAL / SUBCONTRACT EVALUATION CO

WATER SWELLING GASKETS (WATERSTOP)


8.07 143 FOR TSE CHAMBER
Sec 5, Pt. 12.5.4 Sec. C-2, Sec. 32, Pt. 3.6.B5 2,500 LM LOCAL EVALUATION CO

PROC REP REV 49 Page 40 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. WATER SWELLING GASKETS (WATERSTOP)
8.07 143NO. FOR TSE CHAMBER
DESCRIPTION Sec 5, Pt.QCS
12.5.42010 Sec.SECTION C Pt.
C-2, Sec. 32, PART3
3.6.B5 QTY
2,500 UNIT
LM LOCAL EVALUATION CO
ISSUED / REC
/ IAN / KAHRAMAA LOCAL / IMP. /SUB
SPECS -CONTRACT EVALUAT

SURE-STOP PVC WATER STOPS (INTERNAL - Sec. C - Pt. 2, Sec. 32, Cl.
8.08 143.1 EXTERNAL) 3.11.1.5
LOCAL / SUBCONTRACT EVALUATION CO

JOINTS - WATERPROOFING -REINJECTABLE


8.09 143.2 HOSES SYSTEM
Sec. 32/25, Part 4 LOCAL / SUBCONTRACT EVALUATION CO

9. REINFORCEMENT AND ANCILIARIES , MESH

LOCAL EVALUATION CO

LOCAL EVALUATION CO

PROC REP REV 49 Page 41 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

LOCAL EVALUATION CO

LOCAL EVALUATION CO

Sec C-2, Sec. 5, Pt. 11,


MA-MAT-PROCU-0780 Sec 5, Pt. 11
9.01 151 REINFORCEMENT STEEL
IAN 09 & 013
Pt.14.8.5,
Sec32, Pt. 1, 2.12, 2.2, 2.3, 3.5

PROC REP REV 49 Page 42 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED
LOCAL EVALUATION CO

Sec C-2, Sec. 5, Pt. 11,


MA-MAT-PROCU-0780 Sec 5, Pt. 11
9.01 151 REINFORCEMENT STEEL
IAN 09 & 013
Pt.14.8.5,
PROJECT SPECS
Sec32, Pt. 1, 2.12, SUPPLY ENQUIRY S
SECTION C 2.2, 2.3, 3.5
PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

13,036 TONS LOCAL EVALUATION CO

LOCAL EVALUATION CO

LOCAL EVALUATION CO

OVERSEAS
EVALUATION CO
/ ABU DHABI

LOCAL EVALUATION CO
PROC REP REV 49 Page 43 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

LOCAL EVALUATION CO

MA-MAT-PROCU-0780 STAINLESS STEEL DOWEL BARS IN IAN009(22.9c), IAN013 (Pt.12,


9.02 151.2 UNDERPASS EXPANSION JOINTS
Sec.5, Pt.12, Cl.12.3.1
Cl12.3.1 (4)
EVALUATION CO

9.03 151.2 PVC SLEEVE FOR DOWEL BARS EVALUATION CO

9.04 MA-MAT-PROCU-0780 151.3 STAINLESS STEEL REINFORCEMENT BARS Sec 32, Pt. 2 18,400 KGS EVALUATION CO

MA-MAT-PROCU-0780 STAINLESS STEEL ROUND BAR FOR BRIDGE IAN009(22.9c), IAN013 (Pt.12,
9.05 151.4 BARRIERS
Sec.5, Pt.12, Cl.12.3.1 Cl12.3.1 (4)
EVALUATION CO

9.06 MA-MAT-PROCU-0780 152 GALVANIZED WOVEN WIRE MESH

PROC REP REV 49 Page 44 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

EVALUATION CO

EVALUATION CO

9.07 MA-MAT-PROCU-0780 154.1 MECHANICAL SPLICERS FOR REBARS Sec. 5, Pt. 11, Cl. 11.5.3 Sec. 32/00 Pt. 2, Cl. 2.3(F)

EVALUATION CO

EVALUATION CO

LOCAL EVALUATION CO

LOCAL EVALUATION CO
PROC REP REV 49 Page 45 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
LOCAL EVALUATION CO

LOCAL EVALUATION CO

9.08 MA-MAT-PROCU-0780 154 BINDING WIRE Sec 5, Pt. 11.2.3

5,000 ROLL OVERSEAS EVALUATION CO

EVALUATION CO

EVALUATION CO

LOCAL EVALUATION CO

MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS


9.09 155 CHAIRS & SUPPORTS
Sec. 5, Pt. 11.5.8 11,000 NRS
OVERSEAS /
EVALUATION CO
GERMANY

PROC REP REV 49 Page 46 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS
9.09 155 CHAIRS & SUPPORTS
Sec. 5, Pt. 11.5.8 11,000 NRS
OVERSEAS /
EVALUATION CO
GERMANY

10. SUNDRY METALWORK

10.01 182 CANOPY OVER UNDERPASS LOCAL EVALUATION CO

PROC REP REV 49 Page 47 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

10.02 182.1 HANDRAIL OVER UNDERPASS Sec 17, Part 4 ,6 EVALUATION CO

10.03 182.1 GALVANIZED CHEQUERED PLATE Sec 8, Pt. 6.4.6

11. PRECAST CONCRETE ITEMS

11.00 221 PRECAST CONCRETE SOAKAWAY RINGS QCS 2014Section 6, Part 17 LOCAL EVALUATION CO

MSE WALL MATERIALS :


A). FRICTION TIES FOR MSE WALLS
B). PVC DOWELS FOR MSE WALLS
C). GEOTEXTILE FABRIC FOR MSE
11.01 221.1 WALLS
IAN-0024 Sec C, Pt. 2, Sec. 34 LOCAL / SUBCONTRACT EVALUATION CO

D). BEARING PADS FOR MSE WALLS


E). JOINT FILLER ( For use with
Concrete Face Panels)
PROC REP REV 49 Page 48 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

MSE WALL MATERIALS :


A). FRICTION TIES FOR MSE WALLS PROJECT SPECS SUPPLY ENQUIRY S
B). PVC DOWELS FOR MSE WALLS SECTION C PART2
S. No. ACTIVITY ID SCH. NO. C). GEOTEXTILEDESCRIPTION
FABRIC FOR MSE QCS 2010 SECTION C PART3 QTY UNIT
11.01 221.1 WALLS
IAN-0024 Sec C, Pt. 2,/ KAHRAMAA
/ IAN Sec. 34 LOCAL / SUBCONTRACT
LOCAL / IMP. /SUB EVALUATION
ISSUED CO
/ REC
SPECS -CONTRACT EVALUAT
D). BEARING PADS FOR MSE WALLS
E). JOINT FILLER ( For use with
Concrete Face Panels)

11.02 221.2 PRECAST MANHOLES

11.03 224.2 NEOPRENE PAD FOR TSE CHAMBERS OVERSEAS EVALUATION CO

Sec. 8, Pt. 11.3.1 &


11.03 485 CONCRETE CABLE COVERING TILES
Sec. 21 Pt. 6.3.5

PRECAST CONCRETE SOAKAWAY RINGS Sec. 6, Cl. 14.6 64 NRS LOCAL EVALUATION CO
11.04 904

11.05 MA-MAT-PROCU-0790 913 PRECAST CONCRETE KERB Sec. 6, Pt. 8 Sec. C, Pt. 2, Sec. 6 Pt. 8, EVALUATION CO

PROC REP REV 49 Page 49 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No.
11.05 ACTIVITY ID
MA-MAT-PROCU-0790 SCH.
913NO. PRECAST CONCRETE
DESCRIPTION
KERB Sec. 6, Pt.QCS
8 2010 Sec.SECTION C 6PART3
C, Pt. 2, Sec. Pt. 8, QTY UNIT EVALUATION CO
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

11.06 MA-MAT-PROCU-0800 913.1 PRECAST CONCRETE BARRIERS EVALUATION CO

3,106 NRS LOCAL EVALUATION CO

LOCAL EVALUATION CO

Sec. 5, Pt. 2, Pt. 3, Pt. 4, Pt.


11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS 5.2.1, Pt. 11.1.2, Pt. 6.1a, Pt.
6.1b

4,400 NRS LOCAL EVALUATION CO

PROC REP REV 49 Page 50 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 Sec. 5, Pt. 2, Pt. 3, Pt. 4, Pt. REJECTED
11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS 5.2.1, Pt. 11.1.2, Pt. 6.1a, Pt.
6.1b

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS 4,400 NRS LOCAL
-CONTRACT EVALUATION
EVALUATCO

11.08 MA-MAT-PROCU-0810 912 INTERLOCKING TILES Sec. 6, Pt. 8 , Sec 27, Pt. 2 LOCAL EVALUATION CO

12. RESINS, MORTARS, GROUTS AND CONCRETE REPAIR MATERIALS

sec5, Pt. 16.3 &


12.01 226 NON-SHRINK GROUT
Sec. 13 Pt. 2.5

12.02 227 FLOW GROUT F0R POST TENSIONING DUCTS

12.03 237 BEDDING MORTAR FOR THE BEARINGS Sec. 13 Pt. 2.3 Sec C-2, Sec.32/60

12.04 237.1 EPOXY BONDING AGENT Sec. 5, Pt. 16, Cl. 16.6.5.17 EVALUATION CO

PROC REP REV 49 Page 51 of 405 File: 382684358.xlsx


EPOXY GROUT FOR Section C-II-Part 2 Section
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

EPOXY GROUT FOR Section C-II-Part 2 Section


12.05 237.2 BRIDGE BEARING 32/60
OVERSEAS EVALUATION CO

FLO-GROUT 2 (NON-SHRINK CEMENTITIOUS


12.06 237.3 GROUT)
Sec. 5, Pt 16 350 BAGS LOCAL EVALUATION CO

12.07 237.4 EPOXY ADHESIVE LOCAL EVALUATION CO

CONCRETE REPAIR MATERIAL:


12.08 126 a) Pactorep -PQ-Q (Large areas) Sec. 5, Pt 16.6.3, Pt. 16.6.4 LOCAL EVALUATION CO
b) Pactorep HB 70 (Small areas)

CONCRETE REPAIR MATERIAL:


12.09 126 a) MasterEmaco S 466 (Large areas) Sec. 5, Pt 16.6.3, Pt. 16.6.4 EVALUATION CO
PROC REP REV 49 b) MasterEmaco S 488 (Small areas) Page 52 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
CONCRETE REPAIR MATERIAL: SPECS -CONTRACT EVALUAT
12.09 126 a) MasterEmaco S 466 (Large areas) Sec. 5, Pt 16.6.3, Pt. 16.6.4 EVALUATION CO
b) MasterEmaco S 488 (Small areas)

CONCRETE REPAIR MATERIAL:


a) Weber.tec 311 MC (Large areas)
12.10 126 b) Weber.rep.331 TX (Small areas)
Sec. 5, Pt 16.6.3, Pt. 16.6.4 1,050 BAGS LOCAL EVALUATION CO
c) Weber.rep.332 FR (Small areas)

CONCRETE REPAIR MATERIAL:


Sec. 5, Pt. 16 Cl. 16.6.1.3,
12.11 126 Weber.rep 360 FFR (Pre-mixed cementitious paste
Cl.16.6.2.1
350 BAGS LOCAL EVALUATION CO
for face repair)

CONCRETE REPAIR MATERIAL:


12.12 126 Injectable mortar HIT-HY 200-R 500/2/EE
EVALUATION CO

PROC REP REV 49 Page 53 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

13. DOORS AND WINDOWS

sec. 6, Pt. 11.3.1 &


13.01 303 METAL DOORS FOR ELECT. SUB-STATIONS
Sec. 17 Pt. 3.5
sec. 6, Pt. 11.3.1 &
13.02 317.2 ALUMINIUM LOUVRES FOR SUBSTATIONS Sec. 17 Pt. 2 & Pt.3 &
Sec.22, Pt. 6.6

13.03 565.1 BRIDGE ACCESS DOORS AND FRAMES Sec. 32/80 400 SETS EVALUATION CO

13.04 565.1 ABUTMENT DOORS Sec. 17, Pt. 1 and Pt. 3.5 EVALUATION CO

BRIDGE TOP ABUTMENT DOORS (800 MM X


13.05 565.1 1500 MM)
Sec. 32/80 EVALUATION CO

PROC REP REV 49 Page 54 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

BRIDGE TOP ABUTMENT DOORS (800 MM X PROJECT SPECS


13.05 565.1 1500 MM)
Sec. 32/80
SECTION C PART2
SUPPLY ENQUIRYCO
EVALUATION S
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

ANCHOR ROD FOR BRIDGE TOP ABUTMENT


13.06 565.1.2 DOOR

14. PIPES & FITTINGS FOR VARIOUS NETWORKS (SUPPLY & DRAINAGE)

14.01 901 EXISTING QP LINE PROTECTION WORKS EVALUATION CO

14.02 901 TSE AND WATER WORKS EVALUATION CO

PROC REP REV 49 Page 55 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

2,550 LM EVALUATION CO

Sec. 8 Pt. 3.1 ,3.3 & Pt. 8,


14.03 901.1 RC PIPES
Sec. 20 Pt. 4

EVALUATION CO

14.04 901.3 TSE LINE DUCTILE IRON PIPE INSTALLATIONS LOCAL / SUBCONTRACT EVALUATION CO

OVESEAS / CHINA EVALUATION CO

PROC REP REV 49 Page 56 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

OVESEAS / CHINA EVALUATION CO

OVESEAS / CHINA EVALUATION CO

OVESEAS / USA EVALUATION CO

11,054 LM

1,770 LM

16 NRS
14.04 901.3 DI PIPES & FITTINGS FOR TSE Section 8, Part 3.8

OVERSEAS / FRANCE EVALUATION CO

PROC REP REV 49 Page 57 of 405 File: 382684358.xlsx


PROJECT
14.04 : CONSTRUCTION 901.3
OF NEWDI ORBITAL HIGHWAY
PIPES & FITTINGS & TRUCK ROUTE
FOR TSE (P8,023)
Section Part 3.8 LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
OVERSEAS / FRANCE EVALUATION CO

PROC REP REV 49 Page 58 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

14.05 901.3 D.I. FITTINGS FOR TSE Section 8, Part 3.8 OVESEAS / GERMANY EVALUATION CO

PROC REP REV 49 Page 59 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

968 NRS OVERSEAS EVALUATION CO

Dismantling Joint, Ranger Couplings, Ranger


Flange Adaptors, Dedicated Flange Adaptor,
14.06 901.3B Dedicated Couplings & Restrained Couplings Sec. 8. Part 3.9
(DI FITTINGS FOR TSE)

PROC REP REV 49 Page 60 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND
968 NRS ORDERED
OVERSEAS EVALUATION CO
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED
Dismantling Joint, Ranger Couplings, Ranger
Flange Adaptors, Dedicated Flange Adaptor,
14.06 901.3B Dedicated Couplings & Restrained Couplings Sec. 8. Part 3.9
(DI FITTINGS FOR TSE) PROJECT SPECS SUPPLY ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

OVERSEAS EVALUATION CO

OVERSEAS EVALUATION CO

OVERSEAS EVALUATION CO

DEDICATED STEPPED COUPLINGS PN 16 FOR


14.07 901.3B.1 TSE WASH OUT CHAMBER OVERSEAS EVALUATION CO

394 NRS OVERSEAS / CROATIA EVALUATION CO

PROC REP REV 49 Page 61 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2 394 NRS OVERSEAS / CROATIA EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0910 Sec. 8, Pt. 5; 120 NRS OVERSEAS EVALUATION CO


14.08 902.2 VALVES FOR TSE
Sec. 21, Pt. 33

OVERSEAS EVALUATION CO

OVERSEAS EVALUATION CO

OVERSEAS EVALUATION CO

OVERSEAS EVALUATION CO

PROC REP REV 49 Page 62 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

30,982 SETS OVERSEAS / U.A.E EVALUATION CO

Sec.8, Pt.3, Cl.3.8.2, Pt. 5.2 &


14.09 902.3A BOLTS, NUTS & WASHERS Pt. 6, Cl. 6.2.2;

OVERSEAS / INDIA EVALUATION CO

14.10 902.4 EPDM GASKETS Sec. 8, Pt. 3.8.2 2,003 NRS OVERSEAS / U.A.E EVALUATION CO

PROC REP REV 49 Page 63 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


14.10 902.4 EPDM GASKETS Sec. 8, Pt. 3.8.2 SECTION C PART2 2,003 NRS OVERSEAS / U.A.E EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

DI PIPES & FITTINGS FOR POTABLE WATER KAHRAMAA Specification,


14.11 901.3E (PW) Sec.2
OVERSEAS / KSA EVALUATION CO

KAHRAMAA Specification,
14.12 901.4 DI PIPES FOR POTABLE WATER
Sec.2
360 MTR OVERSEAS / JAPAN EVALUATION CO

14.13 902.4 EPDM GASKETS Sec.8, Pt. 3.8.2 EVALUATION CO

DISMANT. JOINTS, FL. ADAPTORS,


14.14 901.3B COUPLINGS,FLANGED SOCKET, Section 8, Part 3 OVERSEAS / SOUTHAFRICA EVALUATION CO
FLEXIBLE JOINTS for P.W.

MA-MAT-PROCU-0900 KAHRAMAA Specification, OVERSEAS / AUSTRIA /


14.15 902.2 VALVES - for P. WATER
Sec.6,7 SPAIN
EVALUATION CO

PROC REP REV 49 Page 64 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

14.16 903 FIRE HYDRANTS UNDER EVALU

14.17 MA-MAT-PROCU-0850 901.2 VITRIFIED CLAY PIPES

14.18 901.11 STAINLESS STEEL PIPES & FIITS

14.19 901.5B 2 X 7 MICRONET DUCTS N/A N/A 25,000 LM EVALUATION CO

14.20 901.5B PVC PERFORATED PIPES

14.21 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION CO

14.22 MA-MAT-PROCU-0870 901.5A UPVC DUCT 54D PIPES FOR QNBN EVALUATION CO

14.23 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION CO

PROC REP REV 49 Page 65 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

14.24 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION CO

14.25 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION CO

PROC REP REV 49 Page 66 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

14.26 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION CO

PROC REP REV 49 Page 67 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT
14.26 MA-MAT-PROCU-0870 REPORT
901.5A UPVC- Rev.
DUCT 49 - 20
PIPES February 2018
& FITTINGS REJECTED EVALUATION CO

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

UPVC LONG RADIUS BEND PIPES


14.27 901.5 ( 90⁰, OD 110 mm, Thickness : 3.2 mm, 3,000 NRS EVALUATION CO
Color : Dark Grey)

UPVC PRESSURE PIPES AND FITTINGS FOR


14.28 901.5 TSE WASH OUT SUMP
Sec. 8, Pt. 3 LOCAL EVALUATION CO

PROC REP REV 49 Page 68 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


UPVC PRESSURE PIPES AND FITTINGS FOR SECTION C PART2
14.28
S. No. ACTIVITY ID 901.5
SCH. NO. TSE WASH OUTDESCRIPTION
SUMP
Sec. 8, Pt.QCS
3 2010 SECTION C PART3 QTY UNIT LOCAL EVALUATION CO
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

UPVC DUCT PIPES FOR STORM DRAINS


14.29 901.5.2 SYSTEM LOCAL EVALUATION CO

PROC REP REV 49 Page 69 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

EVALUATION
GRP PIPES & FITTINGS Sec. 8, Pt. 1, 3.1 & 3.4 OVERSEAS / UAE
COMPLETED

14.30 MA-MAT-PROCU-0880 901.7

PROC REP REV 49 Page 70 of 405 File: 382684358.xlsx


EVALUATION
GRP PIPES & FITTINGS Sec. 8, Pt. 1, 3.1 & 3.4 OVERSEAS / UAE
COMPLETED
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
14.30 MA-MAT-PROCU-0880 901.7 Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROC REP REV 49 Page 71 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

GASKET FOR GRP PIPES

LOCAL EVALUATION CO

POLYPROPYLENE ROAD GULLY WITH


14.31 901.7.3 REMOVABLE GRP SAND BASKET Sec. 6, Pt. 14 LOCAL EVALUATION CO

EVALUATION CO

PROC REP REV 49 Page 72 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

EVALUATION CO

MA-MAT-PROCU-0870 HDPE PIPES & FITTINGS (ELECTRICAL-


14.32 901.8A SDR17) LOCAL

EVALUATION CO

EVALUATION CO

25,000 LM LOCAL EVALUATION CO

14.33 MA-MAT-PROCU-0870 901.8A HDPE PIPES & FITTINGS (ITS - SDR 17) Sec. 8, Pt. 3, 3.11

EVALUATION CO

EVALUATION CO

PROC REP REV 49 Page 73 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0890 Sec C, Pt 2
14.34 901.8 HDPE PIPES & FITTINGS (TSE / D315) Sec. 8, Pt. 3 LOCAL EVALUATION CO

EVALUATION CO

HDPE PIPES & FITTINGS (COMMUNICATION


14.35 901.8C REGULARITY AUTHORITY) Sec.8, PT.3, Cl.3.11 LOCAL EVALUATION CO

14.36 901.8.1 WELDING MACHINE FOR HDPE PIPES EVALUATION CO

14.37 901.8.1 HIRING CHARGES OF BUTT FUSION MACHINE EVALUATION CO

PROC REP REV 49 Page 74 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


14.37 901.8.1 HIRING CHARGES OF BUTT FUSION MACHINE SECTION C PART2 EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PROC REP REV 49 Page 75 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

15. PIPE WRAPPING, PROTECTION AND MARKING

FINAL SCHEDULE I
15.01 444 DENSO TAPE Local
QUOTATIO

LOCAL EVALUATION CO

WRAPPING TAPE, PRIMER AND


KAHRAMAA SPECIFICATION,
15.02 445.5 MOULDING PUTTY TAPE DI PIPES FOR PW Section 8, Part 3.8.5 Section 4.1
NETWORK

LOCAL EVALUATION CO

720,000 METER

25,000 LTR

60,000 KG
OVERSEAS / U.K EVALUATION CO

WRAPPING TAPE, PRIMER AND


15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE
PROC REP REV 49 Page 76 of 405 File: 382684358.xlsx
NETWORK
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2 OVERSEAS / U.K EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
WRAPPING TAPE, PRIMER AND
15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE
NETWORK

LOCAL EVALUATION CO

EVALUATION CO

WARNING TAPE - DETECTABLE


15.04 484 252 ROLLS OVERSEAS / U.A.E EVALUATION CO

OVERSEAS / CHINA EVALUATION CO

DETECTAB LE WARNING TAPE FOR TSE QCS 2010 SEC. 8 PART 4,


15.05 484 NETWORKS CLAUSE 4.3.14

PROC REP REV 49 Page 77 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

DETECTAB LE WARNING TAPE FOR TSE QCS 2010 SEC. 8 PART 4,


15.05 484 NETWORKS CLAUSE 4.3.14

OVERSEAS / TURKEY EVALUATION CO

WARNING TAPE - NON DETECTABLE


15.06 484A PW & Electrical Purposes
LOCAL EVALUATION CO

WARNING TAPE - NON DETECTABLE


EVALUATION CO
ITS,TSE AND STREET LIGHT

15.07 484A LOCAL

PROC REP REV 49 Page 78 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

15.07 484A PROJECT SPECS LOCAL


SUPPLY ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

WARNING TAPE - NON DETECTABLE FOR ITS

WARNING TAPE - NON DETECTABLE FOR


STREET LIGHT

15.08 484A WARNING TAPE - NON DETECTABLE SSD/MOI LOCAL EVALUATION CO

15.09 484A WARNING TAPE - NON DETECTABLE QAF LOCAL EVALUATION CO

15.10 485.1 PE CABLE TILE FOR 11KV CABLES LOCAL EVALUATION CO

15.11 486 UTILITY MARKERS

15.12 486 MARKER PLATES

PROC REP REV 49 Page 79 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

15.13 486.1 MARKER POSTS

15.14 445.8 POLYTHENE SHEET - 1000 GAUGE (250micro) LOCAL EVALUATION CO

Sec 6, Pt11.2.3
POLYETHELENE SLEEVING FOR DI PIPES
15.15 445.7 POTABLE WATER
Sec 8, Pt 2.71 LOCAL EVALUATION CO
Sec 8, Pt3.8.5 & 3.8.7

135 ROLLS LOCAL EVALUATION CO

POLYETHELENE SLEEVING FOR DI


15.16 445.7A PIPES FOR TSE
LOCAL EVALUATION CO

LOCAL EVALUATION CO

15.17 445.6 BLACK SELF ADHESIVE TAPE EVALUATION CO

PROC REP REV 49 Page 80 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

16. CHAMBERS, MANHOLES, MANHOLES COVERS AND FRAMES

D.I. MANHOLE COVERS & FRAMES BOXES Sec C, Pt. 2,


16.01 904.1 FOR PORTABLE WATER
Sec. 8, Pt.4, 4.6.2+3
Sec. Pt. 4.6 & Pt.65

CONSTRUCTION OFREINFORCED CONCRETE


16.02 904.1 CHAMBERS - PACK 1,2&3
LOCAL / SUBCONTRACT EVALUATION CO

ALUMINIUM ACCESS COVERS AND FRAMES


16.03 904.1A FOR TSE Sec. 8, Pt. 4, Cl.4.6.3 EVALUATION CO

D.I. MANHOLE COVERS & FRAMES FOR SSD


16.04 904.2 (NOT IN SCOPE LETTER)
EVALUATION CO

PROC REP REV 49 Page 81 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

16.05 904.3 GRP LADDERS FOR TSE MANHOLES EVALUATION CO

GRP LADDERS FOR POTABLE WATER / VALVE


16.06 904.3 CHAMBER (FOR KAHRAMAA)
Sec. 8, Pt. 7 Sec. 20, Pt. 6 EVALUATION CO

16.07 904.4 D.I. MANHOLES FOR QAF EVALUATION CO

PROC REP REV 49 Page 82 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec. 6, Pt. 14 EVALUATION CO

MANHOLE COVERS AND ACCESSORIES FOR


16.08 904.5 ITS

Sec. 6, Pt. 14 EVALUATION CO

Sec.6,Pt.14,Cl.5
EVALUATION CO
Sec.8,Pt.4,Cl.4.6.1

16.09 904.6 D.I. GULLIES FOR BRIDGE DECKS Sec.6, Pt.17, Cl.17.5 90 SETS EVALUATION CO

16.10 904.7 GRATINGS FOR STORM DRAIN MANHOLES Sec. 6, Pt.14, Cl.14.5 EVALUATION CO

DUCTILE IRON GRATING AND DUCTILE IRON


16.11 904.8 MANHOLE COVER AND FRAME FOR Sec. 6, Pt. 14 OVERSEAS /INDIA EVALUATION CO
UNDERPASS

PROC REP REV 49 Page 83 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

DOUBLE TRAINGULAR DUCTILE IRON


Sec. 6, Pt .14, 8, Pt. 4, 20, Pt.
16.11 904.9 MANHOLE COVER AND FRAME FOR WASH
6
LOCAL EVALUATION CO
OUT SUMP

Sec. 8, Pt . 7

LOCAL

GRP SEALING PLATE FOR DOUBLE


16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
COVER AND FRAME FOR WASH OUT SUMP

Sec. 8, Pt . 4

PROC REP REV 49 Page 84 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT -GRP
Rev.SEALING
49 - 20PLATE
February 2018
FOR DOUBLE REJECTED
16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
COVER AND FRAME FOR WASH OUT SUMP
PROJECT SPECS SUPPLY ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
Sec. 8, Pt . 4 LOCAL / IMP. /SUB ISSUED / REC
/ IAN / KAHRAMAA
SPECS -CONTRACT EVALUAT

DRAINAGE CHANNEL WITH DI GRATINGS AND


16.13 904.10 ACCESSORIES Sec. 20, Pt. 6

DUCTILE IRON STEEL GRATING FOR QP LINE


16.14 904.11 PROTECTION AT SECTION 9 & 13
Sec. 6 Part 14 Clause 14.5 OVERSEAS

16.15 905.9 TANK FOR WASH OUT SUMP GRP LINERS Sec. 8, Pt. 7 EVALUATION CO

PROC REP REV 49 Page 85 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

16.16 945 GABION BLANKET OR MATTRESSES Sec. 6, Pt. 16.2 EVALUATION CO

17. ASPHALT WORKS

RED SAND ASPHALT BLANKET TO TOP


17.01 917 SURFACE OF BRIDGE DECK AND APPROACH
SLABS

MA-MAT-PROCU-1000 Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.


17.02 917 ASPHALT WEARING COURSE (PMB) Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 86 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

MA-MAT-PROCU-1000 Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.


17.02 917 ASPHALT WEARING COURSE (PMB) Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
LOCAL / SUBCONTRACT EVALUATION CO

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0990 ASPHALT INTERMEDIATE/ BINDER COURSE Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.
17.03 917 70mm, PMB
Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
LOCAL / SUBCONTRACT EVALUATION CO

17.04 917 ASPHALT ROAD WORKS Section 6, Part 5 LOCAL / SUBCONTRACT EVALUATION CO

PROC REP REV 49 Page 87 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

ASPHALT SURFACING WORKS, BITUMEN


17.05 917 60/70, POLYMER MODIFIED BITUMEN (PG 76- EVALUATION CO
10), PRIME COAT, TACK COAT

MA-MAT-PROCU-0980 ASPHALTIC BASE COURSE - BC-1, 180/250mm Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.
17.06 917.3 THK, BITUMEN GRADE 60/70
Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
EVALUATION CO

PROC REP REV 49 Page 88 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED
ASPHALTIC BASE COURSE - BC-1, 180/250mm Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.
17.06 MA-MAT-PROCU-0980 917.3 THK, BITUMEN GRADE 60/70 Sec. 6, Pt. 1 & 5 EVALUATION CO
14 Pt. 14.9.3

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

17.07 917.3A ASPHALTIC BASE COURSE - BC CLASS A QCS 2014, Sec. 6, Pt. 5 EVALUATION CO

ASPHALTIC CONCRETE BASE COURSE (BC


17.08 917.3A CLASS A 60/70) GABBRO ((MARSHALL MIX QCS 2014, Sec. 6, Pt. 5 EVALUATION CO
DESIGN)

PROC REP REV 49 Page 89 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

ASPHALTIC CONCRETE BASE COURSE (BC


17.09 917.3A CLASS B) GABBRO (MARSHALL MIX DESIGN) QCS 2014, Sec. 6, Pt. 5 EVALUATION CO

ASPHALTIC CONCRETE WEARING COURSE


17.10 917.3A (GABBRO) PMB PG76-10 (MARSHALL MIX QCS 2014, Sec. 6, Pt. 5 EVALUATION CO
DESIGN)

MA-MAT-PROCU-1000 ASPHALTIC WEARING COURSE - SC-1 , Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.
17.11 917.4 BITUMEN GRADE 60/70
Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
EVALUATION CO

PROC REP REV 49 Page 90 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
ASPHALTIC WEARING COURSE - SC-1 , Sec. /C,IAN / KAHRAMAA
Pt. 2, Sec. 6 Pt. 5, Sec. LOCAL / IMP. /SUB ISSUED / REC
17.11 MA-MAT-PROCU-1000 917.4 Sec. 6, Pt. 1 & 5 -CONTRACT EVALUATION
EVALUATCO
BITUMEN GRADE 60/70 14 Pt. 14.9.3 SPECS

ASPHALT MIX DESIGN - WEARING COURSE


17.12 917.4A TYPE-2 EVALUATION CO

ASPHALT MIX DESIGN - WEARING COURSE


17.13 917.4A.1 (MARSHALL MIX DESIGN) EVALUATION CO

ASPHALT PLANT SAMPLES FOR BITUMEN


17.14 917.4B GRADE 60/70 EVALUATION CO

PROC REP REV 49 Page 91 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

ASPHALT PLANT SAMPLES FOR BITUMEN


17.14 917.4B GRADE 60/70 EVALUATION CO
PROJECT SPECS SUPPLY ENQUIRY S
SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

17.15 MA-MAT-PROCU-0960 917.2 BITUMEN 60/70 Sec. 6, Pt. 5 (5.2.4) EVALUATION CO

MA-MAT-PROCU-0950 Sec. C, Pt. 2, Sec. 6 Pt. 5


17.16 917.2A POLYMER MODIFIED BITUMEN (PG 76-10)
(5.2.4)
EVALUATION CO

PROC REP REV 49 Page 92 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0970 Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.


17.17 917.1 PRIME COAT Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
EVALUATION CO

PROC REP REV 49 Page 93 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

MA-MAT-PROCU-0970 Sec. C, Pt. 2, Sec. 6 Pt. 5, Sec.


17.18 917.5 TACK COAT Sec. 6, Pt. 1 & 5
14 Pt. 14.9.3
EVALUATION CO

EVALUATION CO

EVALUATION CO

MA-MAT-PROCU-0970 CEMENT STABILIZED MATERIAL


17.19 917.6 (CSM TYPE-1 MIX DESIGN)

PROC REP REV 49 Page 94 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
CEMENT STABILIZED MATERIAL / IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
17.19 MA-MAT-PROCU-0970 917.6 -CONTRACT EVALUAT
(CSM TYPE-1 MIX DESIGN) SPECS

EVALUATION CO

EVALUATION CO

MA-MAT-PROCU-0940 Sec. C, Pt. 2,


17.20 918 AGGREGATE BASE COURSE Sec. 6, Pt. 1 & 4
Sec. 6 Pt. 4

17.21 918.1 ASPHALT AGGREGATES FOR ASPHALT PLANT EVALUATION CO

18. TRAFFIC SIGNS, TRAFFIC CONTROL AND ROAD MARKINGS

STANDARD TRAFFIC SIGNS, BIKE LANE


18.01 931 SIGNS AND GROUND MOUNTED SIGNS
Sec. 6, Pt. 10 Sec. C, Pt. 2, Sec. 10 EVALUATION CO

PROC REP REV 49 Page 95 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

STANDARD TRAFFIC SIGNS, BIKE LANE


18.01 931 SIGNS AND GROUND MOUNTED SIGNS
Sec. 6, Pt. 10 Sec. C, Pt. 2, Sec. 10 EVALUATION CO

STANDARD TRAFFIC SIGNS, BIKE LANE


Sec. 6, Pt. 10 Sec. C, Pt. 2, Sec. 10 EVALUATION CO
SIGNS

18.02 931

GROUND MOUNTED SIGNS Sec. 6, Pt. 10 Sec. C, Pt. 2, Sec. 10 EVALUATION CO

PROC REP REV 49 Page 96 of 405 File: 382684358.xlsx


18.02 931
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. GROUND MOUNTED SIGNS
DESCRIPTION Sec. 6, Pt.QCS
10 2010 Sec.SECTION
C, Pt. 2, Sec.
C 10
PART3 QTY UNIT EVALUATION CO
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

EVALUATION CO

MA-MAT-PROCU-1030 OVERHEAD SIGN GANTRIES AND


18.03 931 CANTILEVER STRUCTURES
Sec. 6, Pt. 13 Sec. C, Pt. 2, Sec. 13
EVALUATION CO

EVALUATION CO

INSTALLATION OF DIRECTIONAL SIGNS


18.04 931.1 INCLUDING GANTRIES
Sec. 6, Pt. 13 EVALUATION CO

OVER HEAD TRUSS GANTRY AND


18.05 Sec. 6, Pt. 13 IAN 009 EVALUATION CO
CANTILEVER STRUCTURES

OVER HEAD TRUSS GANTRY AND


18.06 MONOTUBE GANTRY, CANTILEVER Sec. 6, Pt. 13 IAN 009
931.1
STRUCTURES

PROC REP REV 49 Page 97 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
931.1 SPECS -CONTRACT EVALUAT

OVER HEAD MONOTUBE GANTRY AND


18.07 Sec. 6, Pt. 10 IAN 014
CANTILEVER STRUCTURES

OVER HEAD TRUST GANTRY AND


18.08 Sec. 6, Pt. 10 IAN 014
CANTILEVER STRUCTURES

EVALUATION CO

Sec. C, Pt. 2,
18.09 933 PAVEMENT MARKINGS / SURFACE MARKINGS Sec. 6, Pt. 10
Sec. 6 Pt. 10

EVALUATION CO

18.10 933.1 THERMOPLASTIC ROAD MARKING Sec. 6, Part 10 EVALUATION CO

PROC REP REV 49 Page 98 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


18.10 933.1 THERMOPLASTIC ROAD MARKING Sec. 6, Part 10 SECTION C PART2 EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec. 6, Pt. 9.5.1 , Sec 17, Pt.


18.11 943 GUARD RAILS AND CRUSH CUSHION
2.1 & 2.2
Sec. 6 Pt. 9 EVALUATION CO

PROC REP REV 49 Page 99 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

X-TENSION GUARDRAIL END TERMINAL - NON


18.12 943 GATING
Sec. 6 Pt. 7 IAN 002 EVALUATION CO

18.13 943 FIXED OBJECT ATTACHMENT (FOA) Sec. 6 Pt. 7 IAN 002 EVALUATION CO

18.14 943 INSTALLATION OF CRASH BARRIERS EVALUATION CO

18.15 943 INSTALLATION OF STEEL GUARDRAILS EVALUATION CO

INSTALLATION OF STEEL GUARDRAILS,


18.16 943 CRASH CUSHIONS, TRANSITION & END Sec. 6 Pt. 7 IAN 002 EVALUATION CO
TERMINAL

18.17 944 CRASH CUSHIONS EVALUATION CO

18.18 938 CATS EYES / ROAD STUDS 600 NRS EVALUATION CO

PROC REP REV 49 Page 100 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
18.18 938 CATS EYES / ROAD STUDS 600 NRS EVALUATION CO

18.19 935 BARRIER BOLLARDS

18.20 941 HANDRAIL & ACCESSORIES

19. FENCING AND GATES

MA-MAT-PROCU-1040 Sec. C, Pt. 2,


19.01 921 CHAIN LINK FENCING & GATES Sec. 6, Pt. 9 , Sec 17, Pt. 2
Sec. 6 Pt. 9
UNDER EVALU

19.02 921 PEDESTRIAN FENCE (GALVANIZED) Sec. 17, Pt. 1, 2 & 6

19.03 921.1 CHAIN LINK RAILING 710mm HEIGHT UNDER EVALU

EVALUATION CO
19.04 921.2 CAMEL FENCE Sec. 6, Pt. 9

EVALUATION CO

PROC REP REV 49 Page 101 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec. C, Pt. 2,
19.05 923 DECORATIVE FENCE Sec. 6, Pt. 10
Sec. 6 Pt. 10

Sec. C, Pt. 2,
19.06 921T TEMPORARY SITE FENCING
Clause 1.6
25 km ENQUIRY IS

19.07 941 ALUMINIUM RAILING

20. BRIDGE BEARINGS AND POST TENSIONING WORKS

PROC REP REV 49 Page 102 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

586 NRS OVERSEAS / GERMANY EVALUATION CO


Sec. C, Pt. 2, Sec. 32/40, IAN
20.01 946 BRIDGE BEARINGS
06, IAN 09

PROC REP REV 49 Page 103 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

OVERSEAS / HUNGARY EVALUATION CO

OVERSEAS / AUSTRIA/
EVALUATION CO
HUNGARY

20.02 947 MODULAR EXPANSION JOINT IAN 031 rev:A1

842.6 lm OVERSEAS / GERMANY EVALUATION CO

20.03 947.1 BITUMEN JOINT FILLER IN ASPHALT OVERSEAS / GERMANY EVALUATION CO


PROC REP REV 49 Page 104 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
20.03 947.1 BITUMEN JOINT FILLER IN ASPHALT OVERSEAS / GERMANY EVALUATION CO

Sec. C, Pt. 2,
20.04 949 POST TENSIONING WORKS Sec. 5, Pt. 1 & 18
Sec. 32 (3210)
SUBCONTRACT SUPPLIED BY

BRIDGES DECK CONSTRUCTION AND


20.05 949 ERECTION

Sec. 5, Pt. 18.2.7, 18.2.8,


20.06 949.1 GROUT FOR POST TENSIONING
18.2.9
Sec. 32/10 Pt. 2.5 & 3.3

SCARIFYING BRIDGE DECK TOP SURFACE


20.07 949.2 CONCRETE
EVALUATION CO

Sec. C-II-Pt. 2,
20.08 949.2 7 WIRE STEEL STRAND Sec. 5,Pt.18, Cl. 18.2 Sec. 5, Pt. 18 & SUPPLIED BY
Sec. 32/10

20.09 949.3 THREADED ZINC INSERT TSI 38 X 138 Sec. 5, Pt. 1 & 18 SUPPLIED BY

PHILIPP FIXING GALVANIZED SOCKETS


20.10 949.12 WAVED END SUPPLIED BY

PROC REP REV 49 Page 105 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. PHILIPP FIXINGDESCRIPTION
GALVANIZED SOCKETS QCS 2010 SECTION C PART3 QTY UNIT
20.10 949.12 WAVED END / IAN / KAHRAMAA LOCAL / IMP. /SUB SUPPLIED
ISSUED BY
/ REC
SPECS -CONTRACT EVALUAT

QCS 2014, Sec. 8, Pt.3, Cl.


20.11 949.5 FIXING SOCKET WITH WAVED END
3.5
SUPPLIED BY

20.12 949.6 HDPE R3962 DEVIATION DIABOLO SUPPLIED BY

20.13 949.7 6" PRE-SHAPED UPVC PIPE SUPPLIED BY

SEALER INJECTION OF CRACK


20.14 949.8 MASTERINJECT 1320
SUPPLIED BY

COSMETIC REPAIR UP TO 10 MM
20.15 949.9 MASTEREMACO N 307
SUPPLIED BY

MASTERINJECT 1315 IS INJECTION EPOXY


20.16 949.10 RESIN Sec. 5, Pt. 16, Cl. 16.6 SUPPLIED BY

INJECTION INTO CRACKS IN CONCRETE OR


QCS 2014, Sec. 5, Pt. 16,
20.17 949.11 MASONRY Table 16.4
SUPPLIED BY
(FOSROC NITOFILL EPLV)

REPAIR MORTAR FOR STRUCTURAL


20.18 949.21 CONCRETE AND MASONRY REPAIRS Sec. 5, Pt. 16.6.4, SUPPLIED BY
(FOSROC RENDEROC HSXTRA)

REPAIR MORTAR FOR STRUCTURAL


20.19 949.13 CONCRETE AND MASONRY REPAIRS Sec. 5, Pt. 16.6.3, SUPPLIED BY
PROC REP REV 49 (FOSROC RENDEROC FCXTRA) Page 106 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
REPAIR MORTAR FOR STRUCTURAL SPECS -CONTRACT EVALUAT
20.19 949.13 CONCRETE AND MASONRY REPAIRS Sec. 5, Pt. 16.6.3, SUPPLIED BY
(FOSROC RENDEROC FCXTRA)

CONCRETE REPAIR MATERIAL (FOSROC


20.20 949.14 NITOMORTAR FC) Sec. 5, Pt. 16, Cl. 16.6 Sec. 32/00 C-II, Pt. 2, Cl. 2.10 SUPPLIED BY

POLYMER MODIFIED CEMEMTITIOUS FOR QCS 2014 Sec 5, Pt. 16,


20.21 949.15 CONCRETE REPAIRS (RENDEROC LAXTRA) Table 16.3
SUPPLIED BY

CONCRETE CURING COMPOUND (CONCURE


20.22 949.16 WB 309) QCS 2014 Sec. 5, Pt. 10.2.8 SUPPLIED BY

20.23 949.17 POST-TENSIONING BAR, NUT AND PLATE SUPPLIED BY

SIKADUR - 31 SBA SEGMENTAL BRIDGE


20.24 949.18 CONSTRUCTION SUPPLIED BY

WATER BASED CONCRETE CURING


20.25 949.19 COMPOUND (MASTERKURE®106) SUPPLIED BY

20.26 949.20 CONCRETE SPACERS MAX FRANK Sec. 5, Pt. 11.5.8 SUPPLIED BY

20.27 949.30 COSMOPLAST PE CORRUGATED CONDUIT SUPPLIED BY

HDPE PIPE & CAP FOR EXTERNAL PT


20.28 949.22 ANCHORAGES Sec32/10, Pt.2, Cl.2.4 SUPPLIED BY

PROC REP REV 49 Page 107 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

SLAB BOLSTER SEMIFIX-SUPER 50 IS MIN Sec. 32/00, Sec. C-II – Pt. 2, Cl.
20.29 949.23 SEGMENT CONCRETE COVER Sec. 5, Pt. 11, Cl.11.5.8
2.3 A
SUPPLIED BY

20.30 949.24 COSMOPLAST - 4" UPVC PIPE Sec. 8, Pt. 3, Cl. 3.5 SUPPLIED BY

HIGH STRENGTH, NON-FLOW, EPOXY


20.31 949.25 BEDDING & REPAIR MORTAR. SUPPLIED BY

HDPE CORRUGATED PLASTIC DUCT FOR


20.32 949.26 BEARING STUD RECESS Sec.32/10 Sec C-II-Pt.2.3 SUPPLIED BY

PLASTIC DUCT FOR INSTALLATION OF


20.33 949.27 TEMPORARY TIE-DOWNS SUPPLIED BY

EPOXY ADHESIVE FOR SEGMENTAL


20.34 949.28 CONSTRUCTION (MASTERBRACE® ADH Sec 5, Pt 11, Cl 11.5.8 SUPPLIED BY
1441)

CONCRETE REPAIR MATERIALS : FOSROC


20.35 949.29 NITOMORTAR S WITH NITOCOTE PRIMER SUPPLIED BY
SEALER

CEMENTITIOUS GROUT for CASTING OF Sec. C-II – Pt. 2, Sec.32/00 Pt. 2.3
20.36 949.30 SPACERS (MASTERFLOW® 928) Sec. 5, Pt. 11, Cl.11.5.8 & 3.5
SUPPLIED BY

PROC REP REV 49 Page 108 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
CONCRETE CURING COMPOUND
20.37 949.31 (FOSROC CONCURE A) Sec C-II, Pt.2.1 F SUPPLIED BY

SLAB BOLSTER (REUSS-SEIFERT GMBH Sec32/00, Sec C-II –


20.38 949.32 TELEFIX-SUPER 50) Sec 5, Pt 11, Cl 11.5.8
Pt 2, Cl 2.3 A
SUPPLIED BY

GROUT FOR POST-TENSIONED CABLES &


20.39 949.33 FIXING ANCHORS/ BOLTS IN CONCRETE Sec. 32/10 Sec. C-II, Pt. 1.5 SUPPLIED BY
(MASTER ROC PLC)

SUPPLIED BY

GROUTING OF BEARINGS &SHEAR KEYS IN Sec C-II, Pt.2


20.40 949.34 SEGMENTAL BRIDGES Sec 32/40 Pt.1,1.3

SUPPLIED BY

CORRUGATED PLASTIC DUCT FOR BEARING


20.41 949.35 GROUTING (50MM DUCT) SUPPLIED BY

EPDM SEALING GASKET PLACED AROUND


20.42 949.36 THE PT DUCT HOLES SUPPLIED BY

CORROSION INHIBITOR POWDER FOR POST Sec. 32/10 Sec. C-II, Pt. 2.1, Sec.
20.43 949.37 TENSIONED SEGMENTAL BRIDGES (MCI-309) 32/15 Sec. C-II, Pt. 2.2
SUPPLIED BY

ACRYLIC BONDING AGENT & CURING AID -


20.44 949.38 MASTEREMACO P210 Sec. 32, Sec. C-II, Pt. 2, Cl. 2.9 D SUPPLIED BY

PROC REP REV 49 Page 109 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

CONCRETE CURING COMPOUND TO TOP


Sec. C-II – Pt 2, Sec. 32/00 Pt. 2,
20.45 949.39 SLAB SURFACE OF THE SEGMENTS Sec. 5, Pt. 10, Cl.10.2
Cl. 2.7 & 2.8
SUPPLIED BY
(MASTERKURE® 181).

WATER BASED CHEMICAL RELEASE AGENT -


20.46 949.40 (MASTERFINISH® RL225) SUPPLIED BY

CEMENTITIOUS GROUT FOR REMEDIAL


20.47 949.41 WORKS (MF®928) Sec. 5, Pt. 16, Cl.16.3 SUPPLIED BY

CEMENTITIOUS GROUT FOR REMEDIAL


20.48 949.41 WORKS (MASTFLOW950) Sec. 5, Pt. 16, Cl.16.3 SUPPLIED BY

20.49
CEMENTITIOUS MICRO CONCRETE FOR
949.42 REMEDIAL WORKS - MF® 980 Sec. 5, Pt. 16, Cl. 16.6 SUPPLIED BY
20.50

EPOXY GROUT FOR REPAIRS IN BRIDGE


20.51 949.43 CONSTRUCTION MS® 915 Sec. 5, Pt. 16, Cl.16.3 SUPPLIED BY

CEMENTITIOUS PINHOLES FILLER SIKAREP®


20.52 949.44 FINE-N SUPPLIED BY

HIGH STRENGTH FREE FLOW MICRO


20.53 949.45 CONCRETE SIKACRETE®114 Sec. 05, Pt 16, Cl.16.3 & 16.6 SUPPLIED BY

NON SHRINK HIGH ST.CEMENTITIOUS GROUT


20.54 949.46 SIKAGROUT®114 Sec. 05, Pt. 16, Cl. 16.6 SUPPLIED BY
PROC REP REV 49 Page 110 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
NON SHRINK HIGH ST.CEMENTITIOUS GROUT
20.54 949.46 SIKAGROUT®114 Sec. 05, Pt. 16, Cl. 16.6 SUPPLIED BY

CEMENTITIOUS PATCH REPAIR MORTAR 5MM Sec. 32/00 Sec.C-II – Pt. 2, Cl.
20.55 949.47 TO 30MM SIKAREP 2.10
SUPPLIED BY

EPOXY CEMENT BASED, BONDING AGENT & Sec. 32, Sec. C-II, Pt. 2, Cl. 2.9
20.56 949.48 REBAR COAT SIKATOP®110 D
SUPPLIED BY

INJECTION TO FILL AND SEAL CRACKS IN


20.57 949.49 STRUCTURES (Sikadur52) SUPPLIED BY

EPOXY BASED BONDING AGENT


20.58 949.50 SIKADUR®32LP Sec. 5, Pt. 16 SUPPLIED BY

EVAPORATION RETARDANT ON TOP DECK Sec.32/00, Sec. C‐II ‐ Pt. 2, Cl.


20.59 949.51 SURFACE(MasterKure111 CF) 2.7(F) & 2.8(A)
SUPPLIED BY

BASED EXPOXY RESIN FOR REPAIR MORTAR


20.60 949.52 SIKADUR - 31CF SLOW SUPPLIED BY

STRUCTURAL REPAIR WORKS SIKADUR 42MP


20.61 949.53 SLOW Sec. 5, Pt. 16.3 SUPPLIED BY

CONCRETE BONDING AGENT FOSROC Sec.32, Sec. CII - Pt. 2, Cl.


20.62 949.54 NITOBOND EP Sec. 5, Pt. 16
2.9.D
SUPPLIED BY
PROC REP REV 49 Page 111 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
CONCRETE BONDING AGENT FOSROC Sec.32, Sec. CII - Pt. 2, Cl.
20.62 949.54 NITOBOND EP Sec. 5, Pt. 16
2.9.D
SUPPLIED BY

EPOXY BONDING AGENT FOR CONCRETE Sec. 32, Sec. C-II Pt.2, Cl.
20.63 949.55 REPAIRS -ADH 1414 2.9D
SUPPLIED BY

HIGH CHEMICAL RESISTANCE, NON TOXIC


20.64 949.56 EPOXY COATING SIKAG®PW SUPPLIED BY

A NON-TOXIC SOLVENT HIGH BUILD


20.65 949.57 PROTECTIVE EPOXY RESIN COATING Sec.5, Pt. 14.2 SUPPLIED BY

GROUTING OF BEARINGS &SHEAR KEYS IN


20.66 949.58 SEGMENTAL BRIDGES SUPPLIED BY

FORM OIL FOSROC REEBOL WB (WATER


20.67 098A BASED)
Sec 5, Pt. 9.3.6, Pt 16.6.5 (13) SUPPLIED BY

21. LANDSCAPING - HARDSCAPING

21.01 965/976 SOFT LANDSCAPING & IRRIGATION Sec. 28 , Pt. 1 & 2 Sec. 28, Pt. 2

21.02 HARD LANDSCAPING

21.03 MA-MAT-PROCU-0920 IRRIGATION NETWORK

21.04 965 LANDSCAPING AND IRRIGATION EVALUATION CO

PROC REP REV 49 Page 112 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

Sec. C, Pt. 2,
21.05 965.1 DUST CONTROL APPLICATION MIXTURE
Sec. 27

UNI-SPRAYTM SERIES AND VARIABLE ARC


21.06 965.2 NOZZLES (VANS)
Sec. 28 , Pt. 2.2.2 EVALUATION CO

1065 & 1068 FORGED BRASS FULLYWAY GATE


21.07 965.3 VALVES
Sec. 28 , Pt. 2.8 EVALUATION CO

21.08 965.4 MASTER CONTROL VALVE Sec. 28 , Pt. 2 EVALUATION CO

21.09 965.5 PLANT REMOVAL LOCAL EVALUATION CO

PROC REP REV 49 Page 113 of 405 File: 382684358.xlsx


RELOCATION OF TREES SECTION 02 QP-MIC
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

RELOCATION OF TREES SECTION 02 QP-MIC


21.10 965.5.1 LIMIT LOCAL EVALUATION CO

PRESSURE COMPENSATING FULL-CIRCLE


21.11 965.6 BUBBLERS 1400 SERIES
Sec. 28 , Pt. 2.5 EVALUATION CO

21.12 965.7 GRAVEL MULCH

XERI-BUGTM EMITTERS & PRESSURE-


21.13 965.8 COMPENSATING MODULES
Sec. 28 , Pt. 2.4 EVALUATION CO

21.14 965.9 PVB PROFESSIONAL SERIES VALVE BOXES Sec. 28 , Pt. 2.11 EVALUATION CO

UPVC PRESSURE S/S PIPES CLASS 'E' (15


21.15 965.10 BAR) Sec. 28 , Pt. 2.2.1 EVALUATION CO

PROC REP REV 49 Page 114 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

PEB AND PESB SERIES VALVES (SOLENOID


21.16 965.11 VALVES) AND PRS-DIAL PRESSURE Sec. 28 , Pt. 2.6 EVALUATION CO
REGULATING MODULE

QUICK-COUPLING VALVES (5-RC), QUICK-


21.17 965.12 COUPLING KEYS (55-K-1) AND HOSE SWIVEL Sec. 28 , Pt. 2.7 EVALUATION CO
(SH-1)

XD (EXTRA DISC) 3" PLASTIC DISC FILTERS,


21.18 965.13 120 MESH (125 MICRON) CODE: IT-ABF7512- Sec. 28 , Pt. 2.12 EVALUATION CO
3X*

21.19 965.14 UPVC FITTINGS (CLASS-E) Sec. 28 , Pt. 2.2.1 EVALUATION CO

CONTROL VALVE WIRES FOR 24 VAC


21.20 965.15 (NOMINAL) CIRCUITS (SINGLE CONDUCTORS, Sec. 28 , Pt. 2.18 EVALUATION CO
TYPE UF)

UNIRAIN ARV-2"-KA (2" KINETIC AND


21.21 965.16 AUTOMATIC AIR RELEASE VALVE) Sec. 28 , Pt. 2.9 EVALUATION CO

PROC REP REV 49 Page 115 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

21.22 965.17 TFS (FLOW SENSORS) Sec. 28 , Pt. 2.2.2 EVALUATION CO

PROC REP REV 49 Page 116 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

SWING PIPE TUBING AND FITTINGS (SPX-


21.23 965.18 FLEX SERIES - SWING PIPE) EVALUATION CO

DBY / DBR WIRE CONNECTOR FOR


21.24 965.19 LANDSCAPING AND IRRIGATION Sec. 28 , Pt. 2.16 EVALUATION CO

SENTINEL CENTRAL CONTROL SYSTEM FOR


21.25 965.20 LANDSCAPING AND IRRIGATION
EVALUATION CO

WARNING TAPE GREEN COLOR, 150 MM


21.26 965.21 WIDTH, THICKNESS 200m Sec. 28 , Pt. 2.15 EVALUATION CO

21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES) Sec. 28 , Pt. 2 EVALUATION CO

PROC REP REV 49 Page 117 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES) Sec. 28 , Pt. 2
-CONTRACT
EVALUATION CO
EVALUAT
SPECS

21.28 965.23 UPVC FITTINGS - UNION Sec. 28 , Pt. 2 EVALUATION CO

21.29 965.24 POLYETHYLENE LIGHT WEIGHT FITTINGS Sec. 28 , Pt. 2 EVALUATION CO

21.30 965.25 PLANTAFLOR SAB PEAT MOSS Sec. 28 , Pt. 1 EVALUATION CO

NDS Standard Series 13" x 24" Rectangular Valve


Boxes- Description - Marking: 13" x 24" x 15" Box,
21.31 965.26 Overloading Bolt-Down Cover-Color: Black Box, Sec. 28 , Pt. 2.11 EVALUATION CO

Green Cover: (Part No. 125BCB)

21.32 965.27 Valve Box Rectangular Super Jumbo 1324-15 Sec. 28 , Pt. 2.11 EVALUATION CO

PROC REP REV 49 Page 118 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

21.33 967 LITTER BINS Sec. 17, Pt. 1, 2 & 6

21.34 950 BIKE SHELTERS Sec. 17, Pt. 1, 2 & 6

21.35 950.1 BIKE RACKS Sec. 17, Pt. 1, 2 & 6

21.36 804 STREET/ PARK BENCHES

22. ARTSCAPING

22.01 968 ARTSCAPING ENQUIRY IS

23. INTELIGENT TRANSPORT SYSTEM

(ITS) INTELIGENT TRANSPORT SYSTEM


GREECE /
23.01 930 Sec. C-2, Sec. 33 SUBCONTRACTOR
EVALUATION CO
OVER HEIGHT DETECTION SYSTEM

ITS EQUIPMENTS (SUPPLY, INSTALLATION,


GREECE /
23.20 897.1 TESTING AND COMMISSIONING OF ITS SUBCONTRACTOR
EVALUATION CO
WORKS

24. ELECTRICAL MATERIALS

24.01 460 HIGH VOLTAGE TOWER RELOCATION Sec.21, Pt.35 , section 1 LOCAL EVALUATION CO

LOCAL / M.E.P
24.02 460 ELECTRICAL WORKS Sec.9, Sec.21
CONTRACTOR
EVALUATION CO

PROC REP REV 49 Page 119 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
LOCAL / M.E.P
24.02 460 ELECTRICAL WORKS Sec.9, Sec.21
CONTRACTOR
EVALUATION CO

LV (415 V) & MV (11 KV) POWER


24.03 460 DISTRIBUTION WORKS
LOCAL EVALUATION CO

24.04 460 STREET LIGHTING WORKS LOCAL EVALUATION CO

TESTING AND COMMISS. WORKS FOR


24.05 460 INDOOR SUB-STATIONS
Sec.21, Pt.23, Cl.23.1.2 LOCAL EVALUATION CO

24.06 460 11 KV OHL WORKS LOCAL EVALUATION CO

MA-MAT-PROCU-1070 MV & LV CABLES AS FEEDERS TO FEEDER


24.07 460 PILLARS AND SUBSTATIONS
Sec. 21 , Pt. 6 LOCAL EVALUATION CO

24.08 MA-MAT-PROCU-1070 460 LV CABLES FOR STREET LIGHTING Sec. 21, Pt. 6 LOCAL EVALUATION CO

MA-MAT-PROCU-1073 COPPER TERMINAL CABLE LUGS FOR Sec. 21, Pt. 1, Cl. 1.1.21(6), Sec.
24.09 460 STREET LIGHTING 6, Pt. 12, Cl. 12.18.1 (7)
OVERSEAS / UK EVALUATION CO

MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM Sec. 21 - Pt. 22,


24.10 460 / WALLIS Sec. 6 - Pt. 12
OVERSEAS / UK EVALUATION CO

PROC REP REV 49 Page 120 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM Sec. 21 - Pt. 22,
24.10 460 / WALLIS Sec. 6 - Pt. 12
OVERSEAS / UK EVALUATION CO

PVC CONDUITS & ACCESSORIES FOR


24.11 MA-MAT-PROCU-1072 460 UNDERBRIDGES, UNDER PASSES & Sec. 21, Pt. 7, Cl. 7.2.1 OVERSEAS / U.A.E EVALUATION CO
PEDESTRIAN / BIKEPATHS

MA-MAT-PROCU-1075 G.I. CONDUITS, PVC COATED G.I., FLEXIBLE


24.12 460 CONDUIT & ACCESSORIES
Sec. 21 - Pt. 7, Cl. 7.2.2 OVERSEAS / MALAYSIA EVALUATION CO

OVERSEAS / ENGLAND EVALUATION CO

24.13 MA-MAT-PROCU-1074 460 CABLE GLANDS Sec. 21, Pt. 6

OVERSEAS / INDIA EVALUATION CO

CABLE TRAY, LADDER, TRUNKING SUPPORT


24.14 460 SYSTEM / ICMS SYSTEMS
Sec. 21, Pt. 9 LOCAL EVALUATION CO

24.15 MA-MAT-PROCU-1077
PYROTENAX MICC CABLES FOR INDOOR
460 SUBSTATIONS
Sec. 21, Pt. 6, Cl. 6.2.2(6) OVERSEAS / UK EVALUATION CO

LUMINARIES FOR MICC CABLE FOR


24.16 460 SUBSTATIONS
BS EN 60702: Part 1 OVERSEAS / UK EVALUATION CO
PROC REP REV 49 Page 121 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
LUMINARIES FOR MICC CABLE FOR
24.16 460 SUBSTATIONS
BS EN 60702: Part 1 OVERSEAS / UK EVALUATION CO

L/M VOLTAGE CABLE JOINTS & TERMINATION Sec. 21, Pt. 6,


24.17 460 Pages: 9-10
OVERSEAS / GERMANY EVALUATION CO
FOR SUBSTATIONS

KAHRAMAA Technical
PACKAGE TYPE SUBSTATION (500kVA,
24.18 460 11/0.433kV)
Specification No.: EP-MS-P4/S2- OVERSEAS / U.A.E EVALUATION CO
091 , Issue: 21-07-2010

OVERSEAS / U.A.E EVALUATION CO


KAHRAMAA Technical
24.19 460 500 KVA OIL FILLED TRANSFORMERS Specification No.: EP-MS-P4/S4-
015, Ver.4 Rev. 5 EVALUATION CO

OVERSEAS / OMAN EVALUATION CO

24.20 460 STREET LIGHTING FEEDER PILLARS Sec. 6, Pt. 12 LOCAL EVALUATION CO

24.21 460 6M STREET LIGHTING COLUMN Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

PROC REP REV 49 Page 122 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

24.22 460 20M STREET LIGHTING HIGH MASTS Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

24.23 460 30M STREET LIGHTING HIGH MASTS Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

30M STREET LIGHTING (8 Lanterns-4 Lanterns


24.24 460 on each Side)
Sec 6, Pt. 12 OVERSEAS/K.SA EVALUATION CO

LUMINARIES FOR STREET LIGHTING


OVERSEAS / U.A.E
(250, 400 & 600WATTS).

24.25 460 Sec. 6, Pt. 12 EVALUATION CO

LUMINARIES FOR STREET LIGHTING 250


OVERSEAS / HUNGARY
WATTS

24.26 460 LUMINARIES FOR SUBSTATION Sec. 21, Pt. 11 OVERSEAS / UK / U.A.E EVALUATION CO

24.27 460 CABLE TIES FOR STREET LIGHTING OVERSEAS / THAILAND EVALUATION CO

8 MTR OCTAGONAL LIGHTING COLUMN WITH


24.28 460 SINGLE OR DOUBLE ARM BRACKET
Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

PROC REP REV 49 Page 123 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

12 MTR OCTAGONAL LIGHTING COLUMN


24.29 460 WITH SINGLE OR DOUBLE ARM BRACKET
Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

14 MTR OCTAGONAL STREET LIGHTING POLE


24.30 460 WITH 6 ARM BRACKET (2.0 M OUTREACH)
Sec. 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

14 M OCTANGONAL STREET LIGHTING POLE


24.31 460 WITH 4 ARM BRACKETS (2.0 M OUTREACH)
Sec 6, Pt. 12 OVERSEAS / K.S.A EVALUATION CO

FLEXIBLE HEAT RESISTANT CABLE 3C X Sec.21, Pt. 1, Cl. 1.1.21(6),


24.32 460 2.5mm² CU/PVC Sec.6, Pt.12, Cl.12.18.1(7)
LOCAL EVALUATION CO

24.33 460 FLEXIBLE HEAT RESISTANT CABLE Sec. 21, Pt 6 OVERSEAS / U.A.E EVALUATION CO

Sec.21, Pt.1, Cl.1.1.21(6), Sec.6,


24.34 460 SINGLE CORE WIRES FOR LV SYSTEM Pt.12, Cl.12.18.1(7)
LOCAL EVALUATION CO

PROC REP REV 49 Page 124 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
Sec.21, Pt.1, Cl.1.1.21(6), Sec.6, / IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
24.34 460 SINGLE CORE WIRES FOR LV SYSTEM Pt.12, Cl.12.18.1(7) SPECS LOCAL
-CONTRACT EVALUATION CO
EVALUAT

24.35 460 MV/LV CABLE JOINTS & TERMINATION KITS Sec. 21, Pt. 6 OVERSEAS / GERMANY EVALUATION CO

UNDER BRIDGE & UNDER PASS LIGHTING Sec.C-II, Pt-2, Sec. 6, Pt 12,
24.36 460 LUMINAIRES Cl.12.5.19
OVERSEAS / U.A.E EVALUATION CO

24.37 460 LUMINAIRES FOR SUBSTATION Sec. 21, Pt. 11 OVERSEAS / EUROPE EVALUATION CO

KAHRAMAA Technical
24.38 460 11 KV SWITCHGEAR PANELS Specification No. ED - 02 - 082 OVERSEAS / MALAYSIA EVALUATION CO
Version 3/2008

24.39 460 11KV INDOOR SWITCHGEAR 25KA, 800A OVERSEAS / KUWAIT EVALUATION CO

FREE STANDING FEEDER PILLAR WITH MAIN


KAHRAMAA Technical
24.40 460 SWITCH OF 800A TP AND 6 NOS OUTGOING Specification No. ED-02-010
OVERSEAS / U.A.E EVALUATION CO
FUSED WAYS OF 2500A TP TYPE-J FUSES.

OVERSEAS / U.A.E EVALUATION CO

24.41 460 COMMON FEEDER PILLAR Sec 6, Pt. 12, Cl. 12.14
PROC REP REV 49 Page 125 of 405 LOCAL EVALUATION CO
File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
24.41 460 COMMON FEEDER PILLAR Sec 6, Pt. 12, Cl. 12.14
LOCAL EVALUATION CO

Electricity Ntework Affairs


24.42 460 6 Way Free Standing Feeder Pillar Specification No. ED 02010
OVERSEAS/INDIA EVALUATION CO

24.43 460 DISTRIBUTION BOARD FOR MV SUBSTATION Sec. 21, Pt 2.2.4 OVERSEAS / U.A.E EVALUATION CO

24.44 460 CUT-OUT BOX FOR STREET LIGHTING POLE Sec. 6, Pt 12,Cl.12.13 OVERSEAS / U.K EVALUATION CO

24.45 460 MARSHALLING BOXES FOR SUBSTATIONS OVERSEAS / INDIA EVALUATION CO

24.46 460 ELECTRICAL WIRING ACCESSORIES Sec. 21, Pt 10 OVERSEAS / U.K EVALUATION CO

KAHRAMAA Technical
24.47 460 MULTICORE PILOT CABLE JOINT KIT Specification No. EP-MS-P4/S3- OVERSEAS / GERMANY EVALUATION CO
120 Iss:0-2003

PROC REP REV 49 Page 126 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS
KAHRAMAA Technical SUPPLY ENQUIRY S
SECTION C PART2
24.47 460 MULTICORE PILOT CABLE JOINT KIT Specification No. EP-MS-P4/S3- OVERSEAS / GERMANY EVALUATION CO
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3
120 Iss:0-2003 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

24.48 460 INDOOR TYPE SUBSTATION ENQUIRY IS

24.49 460 STREET LIGHTING COLUMNS AND BRACKETS

24.50 460 CABLE DUCTS AND ACCESSORIES

24.51 MA-MAT-PROCU-1060 460 HV/EHV CABLES

24.52 460 STREET LIGHTING LANTERNS & LUMINAIRS

24.53 MA-MAT-PROCU-1080 460 BRIDGE / UNDERPASS LIGHTING

24.54 460 14M STREET LIGHTING POLES Sec. 6, Pt. 12 OVERSEAS / KSA EVALUATION CO

KAHRAMAA Specs. ED-02-060


Version 2/2009
OVERSEAS / MALAYSIA EVALUATION CO
24.55 460 11 KV RING MAIN UNIT (RMU)

KAHRAMAA SpecS. EP-MS-


P4/S2-060
OVERSEAS / GERMANY EVALUATION CO

24.56 460 LUMINAIRES FOR STREET LIGHTING Sec.6, Pt.12 OVERSEAS / HUNGARY EVALUATION CO
PROC REP REV 49 Page 127 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

24.56 460 LUMINAIRES FOR STREET LIGHTING Sec.6, Pt.12 OVERSEAS / HUNGARY EVALUATION CO

14 M STREET LIGHTING POLE OF DOUBLE


24.57 460 ARM BRACKET ON ONE SIDE
Sec.6, Pt.12 OVERSEAS / KSA EVALUATION CO

24.58 460 11 KV JOINT & TERMINATION KIT Sec.6, Pt.6 OVERSEAS / INDIA EVALUATION CO

24.59 460 LV CABLE & STRAIGHT JOINT KIT Sec.6, Pt.6 OVERSEAS / INDIA EVALUATION CO

Kahramaa Specification-EP-MS-
24.60 460 CAST RESIN TEE JOINTS P4/S3-090
OVERSEAS/INDIA EVALUATION CO

24.61 460 BARE COPPER CABLE Sec.21, Pt.22 LOCAL EVALUATION CO

PROC REP REV 49 Page 128 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
24.61 460 BARE COPPER CABLE Sec.21, Pt.22 SPECS LOCAL
-CONTRACT EVALUATION CO
EVALUAT

24.62 460 KWH METER SERVICE CABINETS LOCAL EVALUATION CO

STREET LIGHTING COLUMN (6 M, 12 M & 14


24.63 460 M) & HIGH MAST (30 M)
Sec.06, Pt.15 OVERSEAS/CHINA EVALUATION CO

STREET LIGHTING COLUMN (6 M, 12 M & 14


24.64 460 M) WITH SINGLE / DOUBLE ARM
Sec.6, Pt.12 OVERSEAS/TURKEY EVALUATION CO

24.65
460 Underpass Lighting Luminaire Sec.6, Pt.12 OVERSEA/EUROPE EVALUATION CO

PROC REP REV 49 Page 129 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

OVERSEA/UNITED KINGDOM
24.66 460 LIGHTING CUT-OUTS -STREET LIGHTING QCS 2014 Section 6 Part 15
(UK)
EVALUATION CO

LV (415 V) & MV (11 KV) POWER


25.00 460 PL1 DISTRIBUTION WORKS LOCAL / SUBCONTRACTOR EVALUATION CO

CONSTRUCTION OF INDOOR / OUTDOOR AND


25.01 460 PL2 PACKAGE FOR ELECTRICAL SUBSTATIONS LOCAL / SUBCONTRACTOR EVALUATION CO

Kahramaa Specification No. EP-


25.02 460 PL1 PE CABLE TILE FOR ELECTRICAL CABLES MS-P4/S3-150 Issue:0 - 30-04- OVERSEAS / U.A.E EVALUATION CO
2003

Kahramaa Specification No.


25.03 460 PL2 WARNING TAPE FOR ELECTRICAL CABLES ED/03-160 VERSION 4/2003
OVERSEAS / U.A.E EVALUATION CO

SUBSTRUCTURE WATERPROOFING SYSTEM


25.04 460 PL3 FOR POWER SUBSTATION Sec. 5, Pt. 14.3.2, 14.3.3 OVERSEAS / U.A.E EVALUATION CO

PROC REP REV 49 Page 130 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

CONCRETE HOLLOW BLOCKS FOR WALLS OF


25.05 460 PL4 POWER SUBSTATION LOCAL EVALUATION CO

READY MIX CONCRETE FOR POWER Sec. 5, Pt. 2, Pt. 3, Pt. 4, Pt. 5,
25.06 460 PL5 SUBSTATIONS Pt. 6
LOCAL EVALUATION CO

POLYETHYLENE SHEET(1000 GAUGE -


25.07 460 PL6 250MIC) FOR POWER SUBSTATION) Sec. 5, Pt. 10, Cl. 10.2.6 LOCAL EVALUATION CO

25.08 460 PL7 GRC WORKS FOR POWER SUBSTATION Kahramaa Specification LOCAL EVALUATION CO

GALVANIZED STEEL DOOR & VENTILATORS


25.09 460 PL8 FOR SUBSTATION Kahramaa Specification LOCAL EVALUATION CO

WASHED SAND FOR BLOCK WORK &


25.10 460 PL9 PLASTERING FOR SUBSTATION Sec. 5, Pt. 2 LOCAL EVALUATION CO

OPC CEMENT FOR BLOCK WORK &


25.11 460 PL10 PLASTERING FOR SUBSTATION Sec. 5, Pt. 3 LOCAL EVALUATION CO

PROC REP REV 49 Page 131 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

BITUPLUS MEMBRANE FOR ROOF


25.12 460 PL11 WATERPROOFING FOR SUBSTATION Sec. 14, Pt. 2 & 2.11 OVERSEAS / U.A.E EVALUATION CO

POLYSTRENE BOARD FOR ROOF


25.13 460 PL12 WATERPROOFING FOR SUBSTATION Sec. 15, Pt 2 LOCAL EVALUATION CO

GEOTEXTILE MEMBRANE FOR ROOF


25.14 460 PL13 WATERPROOFING FOR SUBSTATION Sec. 14, Pt. 2.9.1 OVERSEAS / U.K EVALUATION CO

FLOOR EPOXY PAINT- SUBSTATION (FOSROC


25.15 460 PL14 NITOFLOR FC150 & FC140) OVERSEAS / U.A.E EVALUATION CO

EXTERNAL & INTERNAL WALL FACE COATING


25.16 460 PL15 SYSTEM FOR SUBSTATION LOCAL EVALUATION CO

PROC REP REV 49 Page 132 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

HIGH YIELD STEEL DEFORMED REBARS


25.17 460 PL16 (NORMAL AND EPOXY COATED) Sec.5, Pt.11 LOCAL EVALUATION CO

BITUMEN FIBER JOINT FILLER BOARD 12 MM


25.18 460 PL17 THICKNESS Sec. 5, Pt. 12, Cl. 12.3.2 OVERSEAS / INDIA EVALUATION CO

BLACK ANNEALED WITH PVC COATED


25.19 460 PL18 BINDING WIRE (1.6 MM THICKNESS) Sec. 5, Pt. 11 OVERSEAS / CHINA EVALUATION CO

READY MIX CONCRETE FOR POWER Sec. 5, Pt. 2, Pt. 3, Pt. 4, Pt. 5,
25.20 460 PL19 SUBSTATIONS Pt. 6
LOCAL EVALUATION CO

25.21 460 PL20 PLASTERING ACCESSORIES Sec. 24, Pt. 2 & Sec. 13, Pt. 3 LOCAL EVALUATION CO

Sec. 5, Pt. 14, Cl. 14.3.2 &


25.22 460 PL21 WATERPROOFING SYSTEM 14.3.3
LOCAL EVALUATION CO

Sec. 21, Pt. 2, Clause 2.2.5; Pt


25.23 460 PL22 DB Box, MCCBs, ELCB 3, Clause 3.2.2, 3.2.4
LOCAL EVALUATION CO

Substation Lighting Features - Philips (France) / Sec. 21, Pt. 11.1, 11.2.1, 11.2.2
25.24 460 PL23 Flourescent Light Fittings 2,
LOCAL EVALUATION CO
PROC REP REV 49 Page 133 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT
Substation Lighting Features - Philips (France) / Sec. 21, Pt. 11.1, 11.2.1, 11.2.2
25.24 460 PL23 Flourescent Light Fittings 2,
LOCAL EVALUATION CO

Sec. 21, Pt. 11.1, 11.2.1, 11.2.2


25.25 460 PL24 Weather proof light 2,
LOCAL EVALUATION CO

25.26 460 PL25 Exit Light Fittings for Substation Sec. 21, Pt. 12.2.1, 12.2.3 LOCAL EVALUATION CO

Sec. 21, Pt. 11.1, 11.2.1, 11.2.2


25.27 460 PL26 Strata Primer SF 25359, Strata Epoxy HT 35599 2,
LOCAL EVALUATION CO

EARTH HOLE DRILLING FOR EARTHING ROD


26.00 461.01 INSTALLATION LOCAL EVALUATION CO

1222/122 INSTRUMENTATION CONTROL AND


27.00 LOCAL EVALUATION CO
3/1224 AUTOMATION

PROC REP REV 49 Page 134 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) LEGEND ORDERED
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 NOT ORDERED
Completion Date: 21 Jan 2017 SUB CONTRACT
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 REJECTED

PROJECT SPECS SUPPLY ENQUIRY S


SECTION C PART2
S. No. ACTIVITY ID SCH. NO. DESCRIPTION QCS 2010 SECTION C PART3 QTY UNIT
/ IAN / KAHRAMAA LOCAL / IMP. /SUB ISSUED / REC
SPECS -CONTRACT EVALUAT

1222/122 SCADA PROVISION RTU CONTROL PANEL


27.01 QCS 2014, Sec.10, Pt. 2 LOCAL EVALUATION CO
3/1224 FOR TSE

ENDRESS & HAUSER INSTRUMENTS (FLOW


1222/122 METER, PRESSURE TRANISMITTER AND QCS 2014, Sec.10, Pt. 2
27.02 LOCAL EVALUATION CO
3/1224 LEVEL SWITCH) AND AUMA ACTUATORS FOR QCS 2014, Sec.21, Pt. 33
TSE

1222/122
27.03 AUMA ACTUATORS FOR TSE QCS 2014, Sec.21, Pt. 33 LOCAL EVALUATION CO
3/1224

PROC REP REV 49 Page 135 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

1. PRELIMINARY ITEMS AND ENGINEER'S SITE FACILITIES

TN-00021 CA 6-Mar-14 B 22-May-14


1.01 PR-GEN-MOBL-0485 06B ENGINEER'S SITE OFFICES EVALUATION COMPLETED AL WASIT CABINS
TN-00021 CB 21-Apr-14 B 25-Mar-15

PR-GEN-MOBL-0485 OFFICE PORTA CABIN CONSISTING OF ONE


1.02 06B ROOM, TOILET & KITCHEN
EVALUATION COMPLETED MIDMAC CONTRACTING CO. 18-May-15

2-Jun-15
PR-GEN-MOBL-0485 TRUSSES FOR MESS HALL AND CLINIC
1.03 06B PORTA CABIN
EVALUATION COMPLETED ALHAMADI TRADING
11-Aug-15

1.04 PR-GEN-MOBL-0638 06B SITE PHOTOGRAPHS AND VIDEO EVALUATION COMPLETED GULF COLOURS WLL PQ-00004 CA 10-Aug-14 A

1.05 PR-GEN-MOBL-0485 06B PHOTOCOPIER EVALUATION COMPLETED GULF ENERGY TECHNOLOGY 24-Dec-15

1.06 PR-GEN-MOBL-0485 06B DIGITAL CAMERA EVALUATION COMPLETED LU-LU HYPERMARKET 23-Dec-14

PR-GEN-MOBL-0485 CEILING MOUNTED PROJECTOR & WALL


1.07 06B MOUNTED FOLDING SCREEN
EVALUATION COMPLETED ALMANA & PARTNERS 25-May-15

ALMANA & PARTNERS 25-May-15


1.08 PR-GEN-MOBL-0485 06B 42" FLAT PLASMA TV & DVD PLAYEREVALUATION COMPLETED
SHARAF DG 10-Aug-15

7-Jun-14
1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM
EVALUATION COMPLETED WONDER NETWORKS
PROC REP REV 49 Page 136 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM
EVALUATION COMPLETED WONDER NETWORKS
9-Aug-15

KITCHEN SINK,CUPBOARDS, APPLIANCES ,


1.10 PR-GEN-MOBL-0485 06B CROCKERY & CUTLERY, CUPS, SAUCERS
INQUIRY ISSUED
AND GLASSES

PR-GEN-MOBL-0485 PORTABLE DRY POWDER FIRE


1.11 06B EXTINGUISHER
INQUIRY ISSUED

1.12 PR-GEN-MOBL-0485 06B ELECTRIC STEEL WATER COOLER EVALUATION COMPLETED 8-Sep-15

3-Jun-15

1.13 PR-GEN-MOBL-0485 06B FIRE DETECTION SYSTEM EVALUATION COMPLETED PHOENIX INTERNATIONAL 8-Jul-15

15-Aug-15

11-Jul-15
1.14 06B IT NETWORK EQUIPMENT EVALUATION COMPLETED
3-Aug-15

NETWORK SPARES FOR SERVER ROOM AND


1.15 06B DESKTOP CONNECTION
EVALUATION COMPLETED AL RAFEE ENTERPRISES 1-Sep-15

1.16 06B ID CARD PRINTER, USB & ETHERNET


EVALUATION COMPLETED AL JAFFAL CENTER 15-Aug-15

MS-00001 CA 20-Apr-14 B 21-Apr-14


EVALUATION COMPLETED SIGMA
MS-00001 CB 17-Jun-14 A

PROC REP REV 49 Page 137 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

12-Nov-14

12-Feb-15

EVALUATION COMPLETED SIGMA 31-May-15

1.17 PR-GEN-MOBL-0485 046 SURVEYING INSTRUMENTS 24-Oct-15

24-Oct-15

15-Nov-14

29-Jan-15
LAND & MARINE OIL
EVALUATION COMPLETED
FIELDS
20-Feb-16

25-Apr-15

LAND & MARINE OIL


FIELDS
29-Jan-15

5-May-15

1.18 046A LASER ROTATOR INSTRUMENT EVALUATION COMPLETED 17-Nov-15


SIGMA
13-Dec-15

19-Jul-16

PROC REP REV 49 Page 138 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

1.19 046 SURVEYING EQUIPMENT CALIBRATION


EVALUATION COMPLETED

1.20 045 GROUND WATER MONITORING EVALUATION COMPLETED VAN WALT 30-Mar-15

1.21 045 THERMO COUPLES

2-Aug-15

CONCRETE REINFORCEMENT COVER METER


1.22 045 / DETECTOR
EVALUATION COMPLETED HILTI QATAR 8-Aug-15

17-Dec-15

ELCOMETER 900 CONCRETE CRACK


1.23 045 MICROSCOPE
EVALUATION COMPLETED INTERMODAL SERVICES 5-Feb-17

QATAR BUSINESS SYSTEMS


EVALUATION COMPLETED
WLL
16-Jun-14
1.24 PR-GEN-MOBL-0485 030 COMPUTERS & PRINTERS
EVALUATION COMPLETED FAMILY COMPUTERS 25-Jul-14

27-Apr-14

25-Jan-15

5-Apr-15

EVALUATION COMPLETED AL MAAREF INTERNATIONAL 10-May-15

17-May-15
1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture
PROC REP REV 49 Page 139 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
EVALUATION COMPLETED AL MAAREF INTERNATIONAL ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture
18-Jun-15

16-Nov-15

18-Jun-15

EVALUATION COMPLETED MIDAS INTERNATIONAL 11-Oct-15

16-Nov-15

MS-00171 CA 27-May-15 B 17-May-15

PR-GEN-MOBL-0485 AL MAAREF INTERNATIONAL


1.26 833.2 Client Site Office Furniture EVALUATION COMPLETED
TRADING MS-00171 CB 8-Jun-15 B 4-Aug-15

MS-00171 CC 4-Nov-17 A 15-Jan-17

BANIYAS BUILDING
1.27 833.3 GARAGE OFFICES - SITE FACILITIES
EVALUATION COMPLETED
MATERIALS CO.
16-Aug-15

TECHNICAL SUPP & SERV CO.


W.L.L.
16-Aug-15
1.28 833.4 MATERIAL STORE - SITE FACILITIESEVALUATION COMPLETED
AL MOUSAWI BUILD.
MATERIALS
16-Aug-15

1.29 820 KITCHEN EQUIPMENTS EVALUATION COMPLETED INOX 7-Jul-15

MS-00172 CA 27-May-15 W 17-May-15

PR-GEN-MOBL-0485 AIRCONDITIONING UNITS, SPLIT TYPE


1.30 451 EVALUATION COMPLETED
HEAT /COOL 1.5 TON & 2 TON CAPACITY
ELEKTA MS-00172 CE 7-Jul-15 A 9-May-15

PROC REP REV 49 Page 140 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
AIRCONDITIONING UNITS, SPLIT TYPE DATE
1.30 PR-GEN-MOBL-0485 451 EVALUATION COMPLETED ELEKTA
HEAT /COOL 1.5 TON & 2 TON CAPACITYEVALUATED

20-May-15

TN-00332 CA 22-Jan-15 W 23-Nov-14


1.31 PR-GEN-MOBL-0485 06C PROJECT SIGN BOARD EVALUATION COMPLETED GREEN ARROW
TN-00032 CD 21-Feb-15 A

MS-00159 CA 17-May-15 B 31-May-15

1.32 PR-GEN-MOBL-0520 06D SITE HOARDING EVALUATION COMPLETED CHAIN LINK SECURITY MS-00159 CD 3-Aug-15 A 8-Feb-16

23-Jun-16

SUPPLY OF PVC FLEX TARPAULIN PRINTED PLASMA TRADING &


1.33 922 BANNER
UNDER EVALUATION
CONTRACTING.

22-Nov-14
MIDSIGN TRADING
1.34 PR-GEN-MOBL-0520 06E TEMPORARY TRAFFIC SIGNS EVALUATION COMPLETED 21-Sep-15

GREEN ARROW 13-Mar-16

MS-00111 CA 29-Mar-15 W 24-Feb-15

MS-00111 CC 29-Apr-15 B 28-May-15


TEMPORARY TRAFFIC SIGNS FOR
1.35 06E J17 &J18 AND FLASHING ARROW
EVALUATION COMPLETED ELECTRO INDUSTRIES
23-Jul-15

25-Jul-15

PROC REP REV 49 Page 141 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

15-Jul-15

TEMPORARY TRAFFIC SIGNS FOR


1.36 06E J17 & J18 ROUNDABOUT (R/A)
EVALUATION COMPLETED ELECTRO INDUSTRIES 20-Aug-15

23-Nov-15

30-Aug-15
1.37 06E FLAG SIGNS WITH POST EVALUATION COMPLETED ELECTRO INDUSTRIES
20-Sep-15

1.38 06E SOLAR ELECTRONIC ARROW JNP TRADING 4-May-15

TEMPORARY TRAFFIC SIGNS for Site Access


1.39 06E Road
EVALUATION COMPLETED MIDSIGN TRADING 1-Mar-15

15-Jun-15
1.40 06E SOLAR MESSAGE BOARD EVALUATION COMPLETED JNP TRADING
20-Jul-15

EVALUATION COMPLETED JNP TRADING 25-May-15


1.41 06E REFLECTIVE STICKER
EVALUATION COMPLETED ELECTRO INDUSTRIES 28-May-16

29-Jan-15

ELECTRO
1.42 06E TEMPORARY TRAFFIC SIGNS for J15
EVALUATION COMPLETED
INDUSTRIES
16-Mar-15

18-Nov-15

PROC REP REV 49 Page 142 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

PR-GEN-MOBL-0520 WEBCAMS - FOR SITE MONITORING AND INTERNATIONAL FILM & VIDEO
1.43 06F TIME LAPSE
EVALUATION COMPLETED
PROD. LTD.
25-Jul-15

1.44 06F VIDEOGRAPHY AND PHOTOGRAPHY


EVALUATION COMPLETED BEE GLOBAL W.L.L. 14-Aug-17

13-Jun-15

28-Nov-16
1.45 PR-GEN-MOBL-0520 06G TRAFFIC CONTROL SYSTEM EVALUATION COMPLETED KTC INTERNATIONAL CO.
28-Dec-16

18-Apr-17

1.46 06R RADAR SPEED SIGNS INQUIRY ISSUED

1.47 PR-GEN-MOBL-0520 097 ACCESS TOWERS FOR WEBCAMS EVALUATION COMPLETED

SUPPY, INSTALLATION OPERATION AND


1.48 573 TESTING FOR CCTV CAMERA
EVALUATION COMPLETED AL EMADI SOLAR 2-Aug-15

1.49 790 LOCATION SIGNS EVALUATION COMPLETED TUNGSTON CONTRACTING 10.10.2015

2. SITE INVESTIGATION, SURVEYING AND TESTING

PQ-00008 CA 13-May-14 A
ACTS
PQ-00008 CB 22-Feb-16 A

13-Dec-14
PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL
2.01 041 INVESTIGATION & PILE TESTING
EVALUATION COMPLETED
GULF LABORATORIES Co.
PROC REP REV 49 Page 143 of 405 W.L.L. File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL
2.01 041 INVESTIGATION & PILE TESTING
EVALUATION COMPLETED
GULF LABORATORIES Co.
W.L.L.
10-Nov-15

19-Nov-15

ARAB CENTER 21-Jun-15

PQ-00001 CA 10-Feb-14 W 4-Feb-14


PR-GEN-MOBL-0610 MTC, Al MUSTAFAWI TRDG &
2.02 041A TOPOGRAPHICAL SURVEY EVALUATION COMPLETED
ENG Co. WLL
PQ-00001 CD 24-Feb-14 B 1-Nov-15

PQ-00003 CA 12-Apr-14 A
PR-GEN-MOBL-0610 GEOTECHNICAL, SURVEY & LABORATORY FUGRO PENINSULAR
2.03 041C SERVICES
EVALUATION COMPLETED
SERVICES
PQ-00003 CB 30-Apr-14 A

11-Apr-15
EVALUATION COMPLETED INTERMODAL SERVICES
7-Dec-15

5-Nov-15
2.04 PR-GEN-MOBL-0610 045 LABORATORY EQUIPMENT EVALUATION COMPLETED SIGMA
19-Nov-15

EVALUATION COMPLETED ELEKTA GULF 13-Dec-15

EVALUATION COMPLETED TECNOTEST 17-Nov-15

NON NUCLEAR ASPHALT DENSITY GAUGE INTERMODAL


2.05 045.5 (MODELPQI-380)
EVALUATION COMPLETED
SERVICES
29-Jun-16

PROC REP REV 49 Page 144 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

2.06 PR-GEN-MOBL-0625 047 GIS FOR WATER, DRAINAGE, POWER

GULF LABORATORIES PQ-00019 CA 16-Jul-14 A


All
TECHNICAL LABORATORIES PQ-00020 CA 16-Jul-14 A
requir
PQ-00025 CA 14-Aug-14 A 30-May-15 ed
2.07
EXOVA 18-Jun-15
testin
g
2-Jul-15 being
048 INDEPENDENT LABORATORY TESTING
EVALUATION COMPLETED
ACES PQ-00024 CA 14-Aug-14 A 1-Jul-15
perfo
rmed
PQ-00115 CA 21-Jan-18 B
STRAINSTALL MIDDLE EAST
PQ-00115 CB 6-Feb-18 A

ADVANCE CONSTRUCTION
TECHNOLOGY SERVICES PQ-00116 CA 20-Jan-18 A
(ACTS)

27-Sep-2014
2.08 048 CONCRETE MIX DESIGN TRIALS EVALUATION COMPLETED EXOVA
08-Sep-2015

2.09 048 GROUND WATER TESTING EVALUATION COMPLETED GULF LABORATORIES 27-Sep-14

4-Jul-15
ADDITIONAL SITE INVESTIGATION -
2.10 048 BOREHOLES
EVALUATION COMPLETED GULF LABORATORIES
10-Dec-15

PROC REP REV 49 Page 145 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

2.11 048 SITE TEST/PIEZOCONE PENETRATION


EVALUATION COMPLETED GULF LABORATORIES 20-Jan-15

FUGRO
2.12 049 INTERNATIONAL ROUGHNESS INDEX (IRI)
EVALUATION COMPLETED
PENINSULAR PQ-00059 CA 10-Dec-15 A

3. CEMENT & CONCRETE

PQ-00037 CA 11-Nov-14 B 22-Mar-15


DUTCH FOUNDATIONS
3.01 MA-MAT-PROCU-0700 61 PILING WORKS EVALUATION COMPLETED PQ-00037 CB 19-Nov-14 A

TERRATEST PQ-00038 CA 24-Nov-14 W

MS-00177 CA 24-Jun-15 B 17-Jun-15

MS-00177 CB 15-Oct-15 B 21-Jun-15

EASY CONTRACTING AND


3.02 61.1 CROSS HOLE SONIC LOGGING EVALUATION COMPLETED
TRADING MS-00177 CC 3-Nov-15 B 18-Oct-15

MS-00177 CD 2-Dec-15 B 9-Dec-15

MS-00177 CE 4-Nov-17 A

PQ-00102 CA 1-Jul-17 B
PILING WORK FOR CANTILEVER
3.03 061.2 STRUCTURES
EVALUATION COMPLETED EXTREME PILING TECH W.L.L.
PQ-00102 CB 10-Jul-17 A

8-Nov-15

PROC REP REV 49 Page 146 of 405 BASF / CONSTRUCTION File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

BASF / CONSTRUCTION 15-Dec-15


3.04 101 BATCHING PLANT REQUIREMENT EVALUATION COMPLETED
4-Apr-16

SODAMCO 4-Apr-16

23-Dec-15

10-Jan-16
3.05 MA-MAT-PROCU-0700 101 OPC BULK CEMENT EVALUATION COMPLETED UNITED GULF CEMENT
13-Jan-16

3-Feb-16

3.06 101.1 MICROSILICA EVALUATION COMPLETED MICRO CHEM TRADING 14-Dec-15

3.07 101.2 SRC BULK CEMENT

3.08 101.3 GGBFS EVALUATION COMPLETED UNITED GULF CEMENT CO. 13-Dec-15

PQ-00014 CA 26-Jun-14 W
SMEET
READYMIX
PQ-00014 CC 11-Oct-14 A

PQ-00012 CA 26-Jun-14 W
QATAR ALPHA BETON
PQ-00012 CB 6-Aug-14 B

PQ-00015 CA 2-Jul-14 W
UNIBETON
READYMIX

PROC REP REV 49 Page 147 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
UNIBETON
READYMIX
PQ-00015 CB 6-Aug-14 B

BARZAN
SUPPLY OF READY MIX CONCRETE - READY MIX
3.09 MA-MAT-PROCU-0700 102 EVALUATION COMPLETED
VENDOR PREQUALIFICATION
PQ-00032 CA 21-Oct-14 W
HASSANESCO
PQ-00032 CB 11-Nov-14 B

PQ-00040 CA 22-Jan-15 W
RABBAN
READY MIX
PQ-00040 CB 2-Feb-15 B

PQ-00083 CA 10-Oct-16 W

AL WATANIYA PQ-00083 CC 26-Nov-16 W

PQ-00083 CD 7-Dec-16 B

MS-00026 CC 10-Nov-14 B

MS-00026 CD 24-Jun-17 A

MS-00027 CC 10-Nov-14 B

MS-00027 CD 24-Jun-17 A

MS-00028 CC 10-Nov-14 B

MS-00028 CD 5-Jul-17 B

PROC REP REV 49 Page 148 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00028 CE 18-Jul-17 INV

SMEET MS-00029 CC 10-Nov-14 B

MS-00029 CD 5-Jul-17 B

MS-00029 CE 18-Jul-17 INV

MS-00030 CC 10-Nov-14 B

MS-00030 CD 24-Jun-17 A

MS-00031 CC 10-Nov-14 B

MS-00031 CD 24-Jun-17 A

MS-00093 CD 28-Jan-16 A

MS-00020 CC 24-Nov-14 B

MS-00020 CD 5-Jul-17 B

MS-00021 CC 24-Nov-14 B

MS-00021 CD 5-Jul-17 B

MS-00021 CE 2-Oct-17 A

MS-00022 CC 24-Nov-14 B

PROC REP REV 49 Page 149 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00022 CD 4-Jul-17 INV

MS-00023 CC 24-Nov-14 B
CONCRETE MIX INGREDIENTS QAB
3.10 MA-MAT-PROCU-0700 102 Aggregates, Sand, Portland cement, EVALUATION COMPLETED
Water, GGBS, Siilica Fume MS-00023 CD 5-Jul-17 B

MS-00023 CE 2-Oct-17 A

MS-00024 CC 24-Nov-14 B

MS-00024 CD 4-Jul-17 INV

MS-00025 CC 24-Nov-14 B

MS-00025 CD 4-Jul-17 INV

MS-00144 CA 4-May-15 B

MS-00144 CB 19-Sep-17 A

MS-00036 CA 21-Oct-14 W

MS-00036 CD 29-Dec-14 W

MS-00036 CE 10-May-15 B
UNIBETON
MS-00036 CF 20-Nov-17 A

PROC REP REV 49 Page 150 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER
UNIBETON NUMBER DATE
DATE
EVALUATED

MS-00252 CA 7-Oct-15 B

MS-00252 CE 22-Sep-16 A

MS-00075 CA 31-Jan-15 W
HASSANESCO
MS-00075 CD 4-Jul-17 INV

MS-00092 CA 25-Feb-15 W

MS-00092 CB 5-Apr-15 B

RABAN MS-00092 CC 5-Jul-17 A

MS-00222 CA 25-Aug-15 B

MS-00222 CC 22-Nov-15 A

MS-00412 CA 1-Nov-16 B
J&P BATCHING PLANT J-18
MS-00412 CB 4-Jul-17 INV

MS-00098 CA 25-Feb-15 B 7/Jun/15

MS-00098 CC 24-Feb-16 A 26/Oct/15


SMEET
MS-00307 CA 17-Jan-16 B 5/Apr/16

PROC REP REV 49 Page 151 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER
SMEET NUMBER DATE
DATE
EVALUATED

MS-00307 CB 24-Feb-16 A 5/Apr/16

MS-00106 CA 10-Mar-15 B 16/May/15

MA-MAT-PROCU-0701 READY-MIX CLASS C20/20 [SRC] -


3.11 102.1 Backfilling Concrete
EVALUATION COMPLETED QATAR ALPHA BETON MS-00106 CC 5-Jul-17 B 7/Jun/15

MS-00106 CD 2-Oct-17 A 16/Jun/15

MS-00173 CA 28-May-15 B 13/Jul/15


UNIBETON
MS-00173 CC 9-Oct-16 A 11/Aug/15

MS-00211 CA 25-Aug-15 B 20/Sep/15


RABBAN
READY MIX
MS-00211 CC 10-Dec-15 A 26/Mar/16

MS-00097 CA 21-Feb-15 W 7/Jun/15

MS-00097 CD 24-Feb-16 A 16/Jun/15


SMEET
MS-00309 CA 17-Jan-16 B 9/Aug/15

MS-00309 CB 24-Feb-16 A 5/Apr/16

MS-00107CA 10-Mar-15 B 20/Apr/15

QATAR ALPHA BETON MS-00107CC 5-Jul-17 B 21/Apr/15

PROC REP REV 49 Page 152 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED QATAR ALPHA BETON

MS-00107CD 2-Oct-17 A 16/Jun/15

MS-00174 CA 30-May-15 W 16/Jul/15


MAT-MAT-PROCU READY-MIX CLASS C30/20 [SRC] -
3.12 702 102.2 Blinding Concrete
EVALUATION COMPLETED UNIBETON
MS-00174 CD 9-Oct-16 A

MS-00214 CA 25-Aug-15 B 20/Sep/15

RABBAN
READY MIX MS-00214 CB 22-Sep-15 B

MS-00214 CC 5-Jul-17 A

MS-00404 CA 12-Oct-16 B

MS-00404 CB 8-Nov-16 W
AL WATANIYA
MS-00404 CC 7-Dec-16 W

MS-00450 CA 25-Feb-17 B

MS-00099 CA 25-Feb-15 B 16/Jun/15

MS-00099 CC 24-Feb-16 A 9/Aug/15


SMEET
MS-00310 CA 17-Jan-16 B

MS-00310 CB 24-Feb-16 A

MS-00142 CA 4-May-15 B 16/Jun/15

PROC REP REV 49 Page 153 of 405 QAB File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

QAB MS-00142 CC 5-Jul-17 B

MS-00142 CD 2-Oct-17 A
MA-MAT-PROCU-0705 READY-MIX CLASS C40/20 [OP+GGBS+SF] -
3.13 102.3 EVALUATION COMPLETED
Structural Concrete for Pile Foundations
MS-00182 CA 29-Jun-15 B 16/Jul/15
UNIBETON
MS-00182 CC 9-Oct-16 A 11/Aug/15

MS-00208 CA 25-Aug-15 W
RABBAN
READY MIX
MS-00208 CD 10-Dec-15 A

MS-00209 CA 25-Aug-15 B 20/Sep/15


RABBAN
READY MIX
MS-00209 CC 10-Dec-15 A

AL WATANIYA MS-00404 CA UR

MS-00394 CA 24-Aug-16 B
SMEET
MS-00394 CB 23-Nov-16 A
MA-MAT-PROCU-0705 READY-MIX CLASS C40/20 (SRC+GGBS+SF)
3.14 102.3A Structural Concrete EVALUATION COMPLETED
MS-00395 CA 24-Aug-16 B
UNIBETON
MS-00395 CB 23-Nov-16 A

MS-00105 CA 9-Mar-15 B 16/Jun/15


SMEET
MS-00105 CC 24-Feb-16 A

PROC REP REV 49 Page 154 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00141 CA 4-May-15 B
QAB
MS-00141 CB 4-Jul-17 INV

MS-00183 CA 29-Jun-15 B
UNIBETON
MS-00183 CC 9-Oct-16 A
MA-MAT-PROCU-0706 READY-MIX CLASS C50/20 [OP+GGBS+SF] -
3.15 102.4 Precast Elements
EVALUATION COMPLETED
MS-00210 CA 25-Aug-15 B
RABBAN
READY MIX
MS-00210 CC 10-Dec-15 A

MS-00404 CA UR

MS-00451 CA 27-Feb-17 B
AL WATANIYA
MS-00451 CB 16-Mar-17 B

MS-00451 CC 4-Jul-17 INV

MS-00150 CA 10-May-15 B
3.16 102.4A READY-MIX CLASS C50/10 FOR SPACER
EVALUATION COMPLETED SMEET
MS-00150 CB 4-Jul-17 INV

MS-00104 CA 9-Mar-15 B 5/Apr/16

MS-00104 CC 24-Feb-16 A
SMEET

PROC REP REV 49 Page 155 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
SMEET
MS-00311 CA 17-Jan-16 B

MS-00311 CC 20-Apr-16 A

MS-00140 CA 4-May-15 W
QAB
MA-MAT-PROCU-0708 READY-MIX CLASS C50/20 OPC(POST
3.17 102.5 TENSIONED CONCRETE)
EVALUATION COMPLETED MS-00140 CC 4-Jul-17 INV

MS-00181 CA 29-Jun-15 B
UNIBETON
MS-00181 CC 9-Oct-16 A

MS-00207 CA 25-Aug-15 B
RABBAN
READY MIX
MS-00207 CC 10-Dec-15 A

AL WATANIYA MS-00404 CA UR

MS-00139 CA 2-May-15 B
3.18 102.6 READY MIX 30/10 SRC SCREED EVALUATION COMPLETED QAB
MS-00139 CB 4-Jul-17 INV

MS-00138 CA 2-May-15 B 42171

MS-00138 CB 4-Jul-17 INV


SMEET
MS-00308 CA 17-Jan-16 B

3.19 102.6A READY MIX 30/10 OPC SCREED


EVALUATION COMPLETED
PROC REP REV 49 Page 156 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER
SMEET NUMBER DATE
DATE
EVALUATED

MS-00308 CB 24-Feb-16 A
3.19 102.6A READY MIX 30/10 OPC SCREED
EVALUATION COMPLETED
MS-00180 CA 29-Jun-15 B
UNIBETON
MS-00180 CC 9-Oct-16 A

MS-00213 CA 25-Aug-15 B
RABBAN
READY MIX
MS-00213 CC 10-Dec-15 A

MS-00151 CA 11-May-15 B 12/May/15

3.20 102.7 READY MIX OPC/SAND 1/20 EVALUATION COMPLETED SMEET MS-00151 CD 2-Aug-15 B

MS-00151 CE 9-Jul-17 A

MS-00212 CA 25-Aug-15 B
RABBAN
READY MIX
MS-00212 CC 10-Dec-15 A

MS-00312 CA 17-Jan-16 B 7-May-16


SMEET
MS-00312 CC 20-Apr-16 A
READY MIX OPC C 55/20 (PRECAST BRIDGE
3.21 102.8 SECTIONS)
EVALUATION COMPLETED
MS-00247 CA 28-Sep-15 B 42497
UNIBETON
MS-00247 CB 9-Oct-16 A

PROC REP REV 49 Page 157 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

READY MIX OPC C 55/20 (PRECAST BRIDGE


3.21 102.8 SECTIONS)
EVALUATION COMPLETED
ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00418 CA 5-Nov-16 B
J&P J-18 READY MIX
MS-00418 CB 4-Jul-17 INV

MS-00417 CA 5-Nov-16 B
J&P J-18 READY MIX
MS-00417 CB 4-Jul-17 INV

READY MIX OPC C 55/10 (PRECAST BRIDGE


3.22 102.9 SECTIONS)
EVALUATION COMPLETED MS-00421 CA 1-Nov-16 B

SMEET MS-00421 CB 23-Nov-16 B

MS-00421 CC 21-Dec-16 A

MS-00494 CA 1-Jul-17 B 3-Jul-17


READY MIX OPC C 55/10 (SF PIPE
3.23 102.9A SURROUND) EVALUATION COMPLETED UNIBETON
MS-00494 CB 16-Jul-17 A

MS-00456 CA 25-Feb-17 B
3.24 102.10 GROUT MIX DESIGN C40/06MM EVALUATION COMPLETED J&P
MS-00456 CD 19-Sep-17 A

4. AGGREGATES, SANDS & SOILS

4.01 111.2 ASPHALT RED SAND

12-May-15

AL MOHSEN ENGINEERING
CO.
PROC REP REV 49 Page 158 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
AL MOHSEN ENGINEERING
CO.
26-Jul-15

26-Jul-15

MS-00390 CA 8-Aug-16 W

MS-00390 CD 1-Nov-17 A

AL MOHSEN BLENDING
PLANT-J16 MS-00400 CA 24-Sep-16 W

MS-00400 CB 17-Oct-16 W

MS-00400 CC 24-Nov-16 B

MS-00392 CA 20-Aug-16 W

MS-00392 CF 1-Nov-17 A

J&P MS-00416 CA 2-Nov-16 B


4.02 113 SUBBASE & ROAD BASE MATERIALEVALUATION COMPLETED
MS-00423 CA 9-Nov-16 B

MS-00423 CD 1-Nov-17 A

AL-EKLILL TRADING &


CONTRACTING PQ-00113 CA 20-Nov-17 W

ASWAN 14-Mar-15

19-May-15

PROC REP REV 49 Page 159 of 405 MARCO TRAD & CONT CO. File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
4.02
CONTRACT PERIOD : 113 SUBBASE & ROAD BASE MATERIALEVALUATION COMPLETED
Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

24-May-15
MARCO TRAD & CONT CO.
31-May-15

13-Oct-15

2-Jun-15
DOHA EXPRESS
16-Sep-15

MOHAMMED AL OTAIBI 23-Jun-15

15-Apr-15

9-Aug-15
UNITED GROUP
11-Oct-15

17-May-15

2-Jun-15

SARAM 30-Sep-15

12-Jan-16

WELL DONE TRADING 6-Jun-15

GULF UNION TRNSPORT 23-Jun-15

PROC REP REV 49 4.03 114 FILL MATERIAL EVALUATIONPage 160 of 405
COMPLETED File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

CASTE DOHA GENERAL CONT. 6-Jul-15


4.03 114 FILL MATERIAL EVALUATION COMPLETED
ROCKS TRADING &
CONTRACTING
6-Jul-15

QATAR QUARRY 26-Apr-15

13-Jul-15
HASSAN MOSTAFA
10-Sep-15

HOLDERS GROUP 10-Sep-15

MESHARI TRADING 14-Sep-15

AL TAJ AL DAHABI 4-Aug-15

TRI VALLEY 16-Sep-15

31-Aug-15
PROJECTS & PLANTS (P&P)
10-Sep-15

4.04 115 ROCKFILL TYPE 1 ,2&3 EVALUATION COMPLETED SARAM 30-Sep-15

PQ-00082 CA 29-Aug-16 W 14-May-16


4.05 115 SUPPLY AND DELIVERY FILL MATERIALS
EVALUATION COMPLETED DAMAS CONTRACTING
PQ-00082 CB 3-Jan-17 A

MA-MAT-PROCU-0740 SAND AND ROCK CRUSHERS


4.06 113.1 GRANULAR BEDDING 3/8" EVALUATION COMPLETED
(SARC) MS-00059 CA 24-Dec-14 W

PROC REP REV 49 Page 161 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00158 CA 16-May-15 B
J&P / J&P-AVAX S.A. J.V.
MS-00158 CD 1-Nov-17 A
BLENDING PLANT FOR ROAD BASE MATERIAL
4.07 113.2 PRODUCTION
EVALUATION COMPLETED
MS-00169 CA 27-May-15 B
AL MOHSEN ENGINEERING
CO.
MS-00169 CD 1-Nov-17 A

MS-00267 CA 26-Oct-15 B
AL MOHSEN ENGINEERING
4.08 113.3 MIX DESIGNING FOR ROAD BASE EVALUATION COMPLETED CO.
MS-00267 CE 1-Nov-17 A

MS-00348 CA 28-Mar-16 B

PLANT TRAIL FOR SUB BASE MATERIAL AT


4.09 113.4 J&P BLENDPLANT J16
EVALUATION COMPLETED J&P / J&P-AVAX S.A. J.V. MS-00348 CK 3-Apr-17 B

MS-00348 CL 29-Apr-17 B

EVALUATION COMPLETED 19-Jan-16


4.10 111C STEEL SLAG FOR BLENDING PLANT
30-Jun-16

NOOR AL KHALEEJ 4-May-15

20-Apr-15

20-Sep-15
DOHA EXPRESS
11-Jan-16

PROC REP REV 49 Page 162 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER
DOHA EXPRESS NUMBER DATE
DATE
EVALUATED

18-Jan-16

11-Jun-15
GULF UNION TRNSPORT
23-Jun-15

HOLDERS GROUP
MA-MAT-PROCU-0750 DUNE SAND for BEDDING & BACKFILLING TO
4.11 111 TRENCHES
EVALUATION COMPLETED
MANAGEMENT FOR TRADING
CO.

AL ZELAL 14-Jun-15

RISE HOLDINGS 2-Jul-15

RIFFA CONTRACTING 6-Jul-15

EXCEL GLOBE TRAD & CONT. 4-Jul-15

GOLDEN TIME SERVICES 8-Jul-15

31-Aug-15
SADDAL TRADING
11-Oct-15

EVALUATION COMPLETED J&P CRUSHER AREA J16 MS-00501 CA 6-Aug-17 W

MS-00502 CA 6-Aug-17 W
4.12 111 WHITE SAND
EVALUATION COMPLETED J&P SCREEN J16 MS-00502 CB 21-Sep-17 B

PROC REP REV 49 Page 163 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
4.12 111 WHITE SAND ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATION COMPLETED
EVALUATED J&P SCREEN J16

MS-00502 CC 6-Nov-17 B

4.13 111 SCALPING POWDER FOR ITS EVALUATION COMPLETED J&P SCREEN J16 MS-00564 CA 8-Feb-18 B

4.14 111 SCALPING POWDER FOR MV, LV NETWORKS


EVALUATION COMPLETED J&P SCREEN J16 MS-00567 CA 12-Feb-18 B

PQ-00034 CA 20-Oct-14 W
PROJECTS & PLANTS
PQ-00034 CB 15-Dec-14 B

SARC PQ-00042 CA 8-Feb-15 B

PQ-00039 CA 29-Dec-14 B
MBD
PQ-00039 CB 13-Jan-15 A

MA-MAT-SUBM-0730 EARTHWORKS MATERIALS - BACKFILL


4.15 119 MATERIAL
EVALUATION COMPLETED PQ-00043 CA 14-Feb-15 W
SARAM TRANSPORT
PQ-00043 CC 23-Sep-17 A

PQ-00045 CA 21-Apr-15 B
ASWAN TRADING
PQ-00045 CB 1-Nov-17 A

PQ-00062 CA 17-Jan-16 W
AL-MOHSEN ENGINEERING
CO.
PQ-00062 CC 25-Feb-16 A

PROC REP REV 49 Page 164 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

PQ-00041 CA 24-Jan-15 B
AL-WAKEEL TRADING &
4.16 119.1 EXCAVATION WORKS EVALUATION COMPLETED
CONT
PQ-00041 CC 8-Feb-15 A

FULLBORE DRILLING &


LINING W.L.L
PQ-00049 CA 28-Jun-15 W

PQ-00056 CA 17-Nov-15 W

DESERT DIAMOND
4.17 10B MICROTUNNELING WORKS EVALUATION COMPLETED
CONTRACTING
PQ-00056 CB 13-Dec-15 B

PQ-00056 CC 11-20-17 A

PLAINS TRADING &


CONTRACTING CO.
PQ-00054 CA 3-Nov-15 W

PQ-00070 CA 27-Feb-16 B
GULF TUNNELING
PQ-00070 CC 11-May-16 A

HORIZONTAL DIRECTIONAL DRILLING


4.18 10C WORKS
EVALUATION COMPLETED PQ-00072 CA 5-Mar-16 W

INTERNATIONAL
DRILLING GROUP
PQ-00072 CD 1-May-16 B

PQ-00072 CE 24-May-16 A

5. CONCRETE ADMIXTURES, ADDITIVES AND CURING

MS-00006 CA 27-Jul-14 B 17-Jan-15

5.01 MA-MAT-PROCU-0700 121 CURING COMPOUND EVALUATION COMPLETED SODAMCO QATAR MS-00006 CC 30-Aug-14 A 13-Feb-16

PROC REP REV 49 Page 165 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
5.01 MA-MAT-PROCU-0700 121 CURING COMPOUND EVALUATION COMPLETED
EVALUATED SODAMCO QATAR

PQ-00023 CA 19-Aug-14 A

5.02 MA-MAT-PROCU-0700 121.1 EVAPORATION RETARDER

MA-MAT-PROCU-0700 CONCRETE ADDITIVES


5.03 122 (CEMENTETIOUS ADDITIONS)

MS-00003 CA 2-Jul-14 B 17-Jan-15

MA-MAT-PROCU-0700 FORMWORK RELEASE AGENT


5.04 098A (Water Based)
EVALUATION COMPLETED SODAMCO QATAR WLL MS-00003 CB 13-Aug-14 A 14-Apr-15

11-Apr-16

MS-00004 CA 2-Jul-14 B 14-Apr-15

MA-MAT-PROCU-0700 FORMWORK RELEASE AGENT Don Construction Products Qatar


5.05 098B (Solvent Based)
EVALUATION COMPLETED
WLL MS-00004 CB 18-Aug-14 A 27-Mar-16

26-Apr-16

6. FORMWORK & SCAFFOLDING

6.01 90 SCAFFOLDING-ACCESSORIES

6.02 MA-MAT-PROCU-0700 94.1 FORM LINERS EVALUATION COMPLETED LOMACKE / FORMA 3-Sep-15

5-May-15
6.03 94.1 RMD - DESIGN SERVICES EVALUATION COMPLETED R.M.D. KWIKFORM
8-Nov-15

PROC REP REV 49 Page 166 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

SCAFFOLDING ACCESSORIES FOR


6.04 94.1 UNDERPASS
EVALUATION COMPLETED HARSCO AL-DARWISH UNITED 5-May-15

TECHNICAL SUPP & SERV CO.


EVALUATION COMPLETED
W.L.L.
15-Aug-15
6.05 94.1 SCAFFOLDING ACCESSORIES FOR BRIDGES
EVALUATION COMPLETED MALZAMAT QATAR 15-Aug-15

6.06 94.1 ACCESS SCAFFOLD AND ACCESSORIES


EVALUATION COMPLETED HARSCO AL-DARWISH UNITED 28-Jul-15

AL SINA TN-01090 CA 25-Jun-15 B 26-May-15

17-May-15
6.07 MA-MAT-PROCU-0760 96 FORMWORK-SCAFFOLDING EVALUATION COMPLETED
R.M.D. KWIKFORM 4-Feb-16

6.08 96 RMD FORMWORK ACCESSORIES EVALUATION COMPLETED R.M.D. KWIKFORM 16-Jun-15

6.09 96 TOOLS FOR FORMWORK EVALUATION COMPLETED THASAAMAH TECHNOLOGY 9-Aug-15

6.10 96.1 FORMWORK-SCAFFOLDING EVALUATION COMPLETED PAVLOS ZENONOS & SONS 7-Jul-15

6.11 96.2 FORMWORK-ABUTMENT WALLS EVALUATION COMPLETED R.M.D. KWIKFORM 28-Sep-15

7. WATERPROOFING MEMBRANES & PROTECTIVE TREATMENTS

PROC REP REV 49 Page 167 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

WATERPROOFING MEMBRANE (General


7.01 MA-MAT-PROCU-0760 124 Protection to Buried Concrete) & (Underpass & COMPLETED
EVALUATION ASTEL W - INTERTECTRA JV PQ-00011 CA 24-Jul-14 A
other Burried structures & elements)

WATERPROOFING MEMBRANE General


7.02 MA-MAT-PROCU-0760 124 Protection to Buried Concrete, Underpass & EVALUATION
other Burried COMPLETED BMC Qatar W.L.L. PQ-00026 CA 19-Aug-14 A
structures

MA-MAT-PROCU-0760 WATERPROOFING MEMBRANE (Underpass &


7.03 124 other Burried structures & elements)
EVALUATION COMPLETED AMC Qatar W.L.L. PQ-00028 CA 1-Sep-14 A

Concrete Protection - Waterproof Membrane for MS-00008 CA 20-Aug-14 W 9-Dec-15


ASTEL W - INTERTECTRA JV /
7.04 124 general protection to buried concrete, DWI
EVALUATION COMPLETED
DWI
ADESOBIT 1600X Membrane with LAMA primer MS-00008 CC 8-Nov-14 A

Concrete Protection - Waterproof Membrane for MS-00007 CA 23-Aug-14 B 9-Dec-15


ASTEL W - INTERTECTRA JV /
7.05 124 general protection to buried concrete, EVALUATION COMPLETED DWI
ARMOPROOF - PROTECTION BOARD MS-00007 CC 8-Nov-14 A

MS-00384 CA 19-Jul-16 B

Concrete Protection - General protection to buried


ASTEL W - INTERTECTRA JV /
7.06 124 concrete for Kahramaa PW Manhole chambers
EVALUATION COMPLETED
DWI MS-00384 CB 25-Aug-16 B
(ARMOPROOF - PROTECTION BOARD)

MS-00384 CC 9-Nov-16 A

Concrete Protection - Waterproof Membrane for MS-00015 CA 30-Aug-14 W


general protection to buried concrete DWI
7.07 124 ADESOBIT1600X & ARMORPROOF Protection
EVALUATION COMPLETED BMC Qatar W.L.L.

Board MS-00015 CB 5-Nov-14 A

PROC REP REV 49 Page 168 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

Concrete Protection - Waterproof Membrane for


general protection to buried concrete, BITUMODE BITUMODE QATAR /
7.08 124 - PROTECTION BOARD 6 MM and BITUSELF
EVALUATION COMPLETED
INTERTECTRA MS-00495 CA 5-Jul-17 INV
1.6 MM XL

MS-00499 CA 6-Jul-17 B
Waterproofing System for QP Line and TSE
Works
BITUMODE QATAR /
7.09 124 BITUMODE - PROTECTION BOARD 6EVALUATION
MM and COMPLETED INTERTECTRA MS-00499 CB 22-Jul-17 A
BITUSELF 1.6 MM XL & BITUMODE PRIMER
S.B. INCLUDED WITH BITUMODE PRIMER S.B.
MS-00499 CC 6-Nov-17 A

MATCO ITALY / Satco


Protection Nord Board 6 MM and Solar Self
7.10 124 EVALUATION COMPLETED
Adhesive 1.6 MM with Premier Primer SB
International Trading & MS-00560 CA 14-Jan-18 B
Contracting (SATCO)

MS-00010 CA 2-Sep-14 B
STRUCTURAL ADHESIVE - EUROSEAL ASTEL W - INTERTECTRA JV /
7.11 124.1 DILATION TAPE
EVALUATION COMPLETED
EURO POLYMER
MS-00010 CC 8-Nov-14 A

MS-00011 CA 4-Sep-14 W 26-Mar-16


BONDED SYSTEM: SPRAY APPLIED ASTEL W - INTERTECTRA JV /
7.12 124.1 MEMBRANE - INTEGRITANK
EVALUATION COMPLETED
STERLING LLOYD
MS-00011 CC 2-Nov-14 A

Concrete Protection (Waterproofing System - MS-00013 CA 30-Aug-14 B


ASTEL W - INTERTECTRA JV /
7.13 124.1 Underpass and other buried structures)EVALUATION
- Euroseal COMPLETED NATUREL LTD
PVC T- LOCK Membrane MS-00013 CE 28-May-15 A

PROC REP REV 49 Page 169 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

Crack Inducer - HDPE Flat Sheet Membrane, flat


sheet extruded along its length to mechanically ASTEL W - INTERTECTRA JV /
7.14 124.1 join itself
EVALUATION COMPLETED
NATUREL LTD MS-00096 CA 26-Feb-15 B
into poured concrete.
Euroseal HDPE T-Lock Sheet Membrane
ASTEL W - INTERTECTRA JV /
7.15 124.1 waterproofing (Thickness 2.5mm) for Bridge
EVALUATION COMPLETED
NATUREL LTD MS-00148 CA 10-May-15 B
Foundations
Concrete Protection (Waterproofing System -
BMC Qatar W.L.L. / GSE LINING
7.16 124.1 Underpass and other buried structures)-
EVALUATION
GSE COMPLETED TECHNOLOGY MS-00016 CA 3-Sep-14 INV
STUDLINER

Concrete Protection (Waterproofing System - MS-00017 CA 3-Sep-14 B


BMC Qatar W.L.L. / SIKA UAE
7.17 124.1 Underpass & other buried structures)EVALUATION
- COMPLETED LLC
Submerged Tunnel MS-00017 CB 5-Nov-14 A

MA-MAT-PROCU-0960 UNBONDED WATERPROOFING SYSTEM AMC Qatar W.L.L. / AL GURG


7.18 124.1 (FOSROC PRODUCTS)
EVALUATION COMPLETED
FOSROC LLC MS-00034 CA 1-Oct-14 INV

WATERPROOFING SYSTEM FOR


7.19 124.1 SUBMERGED TUNNEL, UNDERPASSES AND COMPLETED
EVALUATION BMC QATAR W.L.L. MS-00422 CA 21-Nov-16 INV
BRIDGE SUBSTRUCTURES

7.20 MA-MAT-PROCU-0760 124.2 WATERPROOFING MEMBRANE ANNULUS

SPRAY APPLIED WATERPROOFING


7.21 124.5 MEMBRANE TO BRIDGE DECKS
EVALUATION COMPLETED ASTEL W - INTERTECTRA JV PQ-00011 CA 24-Jul-14 A

MS-00009 CA 1-Sep-14 W
ELIMINATOR BRIDGE DECK AND TOP OF ASTEL W - INTERTECTRA JV /
7.22 124.5 BASE SLAB WATERPROOFING
EVALUATION COMPLETED
STERLING LLOYD
MS-00009 CC 2-Nov-14 A

MS-00480 CA 18-May-17 B
ALGURG FOSROC /
INTERTECTRA
PROC REP REV 49 Page 170 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
ALGURG FOSROC /
INTERTECTRA
MS-00480 CB 8-Jun-17 INV
MASTIC FILLET (FORSOC NITOFEAL
7.23 124.6 PRODUCT)
EVALUATION COMPLETED
MS-00497 CA 17-Jul-17 W 12-Aug-17
DEKOTEC / AL DANA TECH.
SERV. & ENG.
MS-00497 CC 10-Aug-17 A

MS-00486 CA 10-Jun-17 B 3-Jun-17


SUBSTRUCTURE WATERPROOFING SYSTEM HENKEL POLYBIT INDUSTRIES
7.24 124.7 FOR TSE
EVALUATION COMPLETED
/ H. POLYBIT TRADING LTD /.
MS-00486 CB 20-Aug-17 A 3-Jun-17

CONCRETE PROTECTION AND


7.25 127 WATERPROOFING
EVALUATION COMPLETED ASTEL W - INTERTECTRA JV PQ-00011 CA 24-Jul-14 A

MS-00014 CA 4-Sep-14 B
BRIDGE DECK SPRAY APPLIED - BMC Qatar W.L.L. / Pitchmastic
7.26 128 PITCHMASTIC PmB (International)
EVALUATION COMPLETED
PmB LLC
MS-00014 CB 5-Nov-14 A

TADMUR PQ-00063 CA 23-Jan-16 A

MS-00314 CA 27-Jan-16 B 29-Sep-16


EVALUATION COMPLETED
TADMUR / BASF MS-00314 CC 13-Mar-16 A 18-Oct-16

MS-00314 CD 19-Mar-17 A

EMCON PQ-00060 CA 29-Dec-15 A

PROTECTIVE TREATMENTS TO CONCRETE


PROC REP REV 49 128 (ANTICARBONATION COATING)
EVALUATIONPage
COMPLETED
171 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

PROTECTIVE TREATMENTS TO CONCRETE


128 (ANTICARBONATION COATING)
EVALUATION COMPLETED MS-00300 CA 14-Jan-16 B
EMCON / JOTUN
7.27
MS-00300 CB 25-Feb-16 A

AL ZAAROUR PQ-00064 CA 23-Jan-16 B

MS-00315 CA 27-Jan-16 B
EVALUATION COMPLETED
INTERTECTRA / HEMPEL MS-00315 CB 2-Mar-16 A

MS-00315 CC 4-Jan-16 A

PROTECTIVE TREATMENTS TO CONCRETE


128A (ANTICARBONATION COATING)
INTERTECTRA / HEMPEL MS-00571 CA 19-Mar-18 B

MS-00420 CA 9-Nov-16 W 6-Apr-17

EPOXY COATING (ABOVE GROUND LEVEL) i.e.


7.28 EVALUATION COMPLETED
INSIDE MANHOLES, CHAMBERS ETC
SODAMCO MS-00420 CB 14-Dec-16 B

MS-00420 CC 4-Jan-17 A
128.1
MS-00046 CA 24-Nov-14 W 7-Nov-15
BITUMINOUS EMULSION COATING (MSE
7.29 EVALUATION COMPLETED SODAMCO-WEBER
WALLS) WEBER.DRY SSP 50
MS-00046 CE 9-Jul-15 A

PROC REP REV 49 Page 172 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

128.1 ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00562 CA 23-Jan-18 W
GULF ADDITIVE FACTORY
7.30 MASTERPROTECT 1812 EVALUATION COMPLETED (GAF)
MS-00562 CB 27-Feb-18 A

SODAMCO MS-00438 CA 30-Jan-17 INV

Waterproof Paint Based on Cementitious Material SODAMCO MS-00455 CA 7-Mar-17 INV


7.31 128.2 for Portable Water / Valve Chambers (For
EVALUATION COMPLETED
KAHRAAMA) AQUASEAL MS-00471 CA 1-May-17 INV

MS-00481 CA 29-May-17 B 26-Aug-17


SODAMCO
MS-00481 CD 16-Aug-17 A

7.32 MA-MAT-PROCU-0960 254 BITUMINOUS PAINT (MSE WALLS)

MS-00068 CA 28-Dec-14 W 31-Dec-14

MS-00068 CE 10-May-15 B 19-Jan-15


BARDAWIL / BONAR
GEOTEXTILE FABRIC FOR DRAINAGE &
7.33 133 EARTHWORKS
EVALUATION COMPLETED MS-00068 CF 4-Nov-17 A 11-Oct-15

16-Oct-16

PROC REP REV 49 Page 173 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

GEOTEXTILE FABRIC FOR DRAINAGEENQUIRY


& STATUS

APPROVAL
7.33 133 EVALUATION COMPLETED ORDER

STATUS
EARTHWORKS SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MANNAI MS-00069 CA 28-Dec-14 W

GEOTEXTILE FOR ABUTMENT WALLS SAME


7.34 133.1 AS MSE WALLS
SPECIAL PAINTS: ANTICORROSION COATING
7.35 788 (MasterEmaco®8100AP)
EVALUATION COMPLETED BASF MS-00385 CA 13-Jul-16 B

8. JOINTS

MS-00047 CA 26-Nov-14 B 17-Jan-15

BITUMEN IMPREGNATED FIBER BOARD (35% MODERN BUILDERS / STEICO /


8.01 141 Bitumen Impregnated)
EVALUATION COMPLETED
SPECIALIZED IMPORT MS-00047 CB 11-Dec-14 A 4-Feb-15

18-Oct-15

8.02 BARRIER EXPANSION JOINT

MS-00443 CA 6-Feb-17 B 1-Mar-17


8.03 141.1 EXPANDED POLYSTYRENE 25mm EVALUATION COMPLETED QATAR STYROPOR FACTORY
MS-00443 CC 20-Aug-17 A

MS-00077 CA 4-Feb-15 W
BARDAWIL
MS-00077 CE 10-Jun-15 B

JOINT SEALANT
8.04 142 POLYSULPHIDE
EVALUATION COMPLETED MS-00080 CA 4-Feb-15 W
SODAMCO
MS-00080 CE 28-Nov-15 A

PROC REP REV 49 Page 174 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

JOINT SEALANT ENQUIRY STATUS

APPROVAL
8.04 142 EVALUATION COMPLETED ORDER

STATUS
POLYSULPHIDE SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

DON CONSTRUCTION
PRODUCTS (DCP) MS-00085CA 9-Feb-15 INV

MS-00132 CA 20-Apr-15 W
BARDAWIL
MS-00132 CC 3-Jun-15 INV

SODAMCO MS-00133 CA 20-Apr-15 W


EVALUATION COMPLETED
MS-00186 CA 6-Jul-15 W
JOINT SEALANT DON CONSTRUCTION
8.05 142 POLYURETHANE PRODUCTS (DCP)
MS-00186 CB 20-Sep-15 W

DON CONSTRUCTION
PRODUCTS (DCP) MS-00229 CA 29-Aug-15 W

MS-00188 CA 6-Jul-15 W
EVALUATION COMPLETED CONMIX
MS-00188 CB 8-Sep-15 W

MS-00019 CA 30-Aug-14 W 8-Sep-15


JOINTS - WATERPROOFING - WATER ASTEL W - INTERTECTRA JV /
8.06 143 EVALUATION COMPLETED
SWELLING GASKETS (Superswell 47B) CCORKJOINT
MS-00019 CC 8-Nov-14 A

MS-00296 CA 17-Jan-16 B 7-Mar-16


DON CONSTRUCTION
PRODUCTS (DCP)
MS-00296 CC 2-Mar-16 A
WATER SWELLING GASKETS (WATERSTOP)
8.07 143 FOR TSE CHAMBER
EVALUATION COMPLETED
MS-00414 CA 24-Oct-16 B 29-Oct-16
SODAMCO
PROC REP REV 49 Page 175 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
WATER SWELLING GASKETS (WATERSTOP) SELECTED SUBMITTAL RESPONSE
S. No.
8.07 ACTIVITY ID SCH.
143NO. FOR TSE CHAMBER
DESCRIPTION EVALUATION COMPLETED RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
SODAMCO
MS-00414 CB 9-Nov-16 A

MS-00012 CA 30-Aug-14 W
SURE-STOP PVC WATER STOPS (INTERNAL - ASTEL W - INTERTECTRA JV /
8.08 143.1 EXTERNAL)
EVALUATION COMPLETED CCORKJOINT
MS-00012 CC 2-Nov-14 A

MS-00018 CA 30-Aug-14 B
ASTEL W - INTERTECTRA JV /
CCORKJOINT
MS-00018 CC 2-Nov-14 A
JOINTS - WATERPROOFING -REINJECTABLE
8.09 143.2 HOSES SYSTEM
EVALUATION COMPLETED
MS-00161 CA 10-May-15 B
ASTEL W - INTERTECTRA JV /
SIKA
MS-00161 CC 15-Jul-15 A

9. REINFORCEMENT AND ANCILIARIES , MESH

EVALUATION COMPLETED QATAR STEEL PQ-00017 CA 24-Jul-14 A

PQ-00013 CA 16-Jul-14 A 1-Nov-15

EVALUATION COMPLETED ERF 1-Jan-16

1-Mar-16

PQ-00016 CA 24-Jul-14 A 11-Apr-15

18-Jun-15

PROC REP REV 49 Page 176 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

23-Jun-15

29-Jun-15

BIN AL SHEIKH REBAR


EVALUATION COMPLETED
FACTORY
8-Dec-15

23-Feb-16

1-Feb-16

26-Jul-17

21-Dec-17

PQ-00033 CA 22-Oct-14 B 15-Feb-15

PQ-00033 CB 26-Oct-14 A 3-May-15

4-Jul-15

28-Jul-15
EVALUATION COMPLETED MERCO
22-Nov-15
9.01 MA-MAT-PROCU-0780 151 REINFORCEMENT STEEL
27-Jan-16

1-Jan-16

PROC REP REV 49 Page 177 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
EVALUATION COMPLETED MERCO

9.01 MA-MAT-PROCU-0780 151 REINFORCEMENT STEEL


ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

11-Feb-16

PQ-00055 CA 14-Nov-15 B 10-Oct-15


EVALUATION COMPLETED BLUE STEEL FACTORY (BSF)
PQ-00055 CB UR 1-Mar-16

PQ-00066 CA 30-Jan-16 B

PQ-00066 CB 11-Feb-16 A
EVALUATION COMPLETED REDCO CICON
MS-00321 CA 13-Feb-16 B 23-Jan-16

MS-00321 CB 2-Mar-16 A

(QRC) QATAR
EVALUATION COMPLETED
REINFORCEMENT CO PQ-00053 CA 4-Nov-15 A

PQ-00035 CA 20-Oct-14 W

PQ-00068 CA 11-Feb-16 W

EVALUATION COMPLETED KHALIFA STEEL INDUSTRY PQ-00068 CB 28-Apr-16 A

MS-00327 CA 8-Feb-16 W

MS-00327 CC 16-Apr-16 A

PQ-00069 CA 11-Feb-16 B

EVALUATION COMPLETED MOKASCO EXPRESS


PROC REP REV 49 Page 178 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

EVALUATION COMPLETED MOKASCO EXPRESS PQ-00069 CB 8-Mar-16 A

MS-00333 CA 27-Feb-16 B

MS-00094 CA 19-Feb-15 W 16-Mar-15


MA-MAT-PROCU-0780 STAINLESS STEEL DOWEL BARS IN
9.02 151.2 UNDERPASS EXPANSION JOINTS
EVALUATION COMPLETED ACCIAIERIE / VALBRUNE
MS-00094 CC 21-Mar-15 A

MS-00112 CA 2-Apr-15 B 16-Mar-15

MODERN BUILDING
9.03 151.2 PVC SLEEVE FOR DOWEL BARS EVALUATION COMPLETED
ACCESSORIES MS-00112 CB 17-Apr-15 A 14-Sep-16

19-Mar-17

MS-00268 CA 26-Oct-15 B 8-Dec-15


9.04 MA-MAT-PROCU-0780 151.3 STAINLESS STEEL REINFORCEMENT BARS COMPLETED
EVALUATION ACCIAIERIE / VALBRUNE
MS-00268 CB 2-Dec-15 A 28-May-17

MS-00381 CA 23-Jun-16 W 1-Jun-16


ACCIAIERIE / VALBRUNE
MS-00381 CF 24-Oct-16 A
MA-MAT-PROCU-0780 STAINLESS STEEL ROUND BAR FOR BRIDGE
9.05 151.4 BARRIERS
EVALUATION COMPLETED
MS-00506 CA 13-Aug-17 W 12-Sep-17
CHANDAN STEEL LTD
MS-00506 CB 28-Aug-17 A

9.06 MA-MAT-PROCU-0780 152 GALVANIZED WOVEN WIRE MESH

PROC REP REV 49 Page 179 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00146 CA 7-May-15 B 11-Apr-16


EVALUATION COMPLETED MERCO
MS-00146 CE 28-Jan-16 A 15-Apr-16

MS-00320 CA 11-Feb-16 B 20-Mar-16


EVALUATION COMPLETED REDCO CICON
MS-00320 CC 20-Apr-16 A
9.07 MA-MAT-PROCU-0780 154.1 MECHANICAL SPLICERS FOR REBARS
MS-00143 CA 6-May-15 B 12-Apr-16
EVALUATION COMPLETED BIN AL SHEIKH
MS-00143 CE 6-Dec-15 A

MS-00359 CA 16-May-16 B
EVALUATION COMPLETED KHALIFA STEEL INDUSTRIES
MS-00359 CB 21-Jun-16 A

MS-00002 CA 2-Jul-14 W 17-Jan-15

MS-00002 CC 25-Sep-14 A 30-Mar-15

ENGINEERING BUILDING
EVALUATION COMPLETED
MATERIALS Co WLL
11-Apr-16

13-Jun-16

13-Jun-16

MS-00045 CA 12-Nov-14 B 26-Mar-15


MIDDLE EAST BUILDING
EVALUATION COMPLETED
MATERIALS Co.
PROC REP REV 49 Page 180 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
MIDDLE EAST BUILDING
EVALUATION COMPLETED
MATERIALS Co.
MS-00045 CB 24-Nov-14 A 7-Feb-16

MS-00339 CA 13-Mar-16 B 13-Jun-16


HEBEI, CHINA /
EVALUATION COMPLETED
JNP TRADING
9.08 MA-MAT-PROCU-0780 154 BINDING WIRE MS-00339 CB 6-Apr-16 A

MS-00127 CA 13-Apr-15 A 30-May-15

19-Sep-15
EVALUATION COMPLETED ATLAS TRADING CO.
17-Oct-15

10-Dec-15

AL SABEEL / DINGZHOU
EVALUATION COMPLETED
ZHONGCHENG MS-00396 CA 25-Aug-16 B

MS-00388 CA 24-Jul-16 B

PROGRESSIVE TRADING /
EVALUATION COMPLETED
SHIJIAZHUANG MS-00388 CC 24-Oct-16 B

MS-00388 CD 9-Nov-16 A

EVALUATION COMPLETED CASTLE MS-00178 CA 25-Jun-15 W

MS-00192 CA 28-Jul-15 W 12-Aug-15


MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS
9.09 155 CHAIRS & SUPPORTS MODERN BUILDERS
EVALUATION COMPLETED
MERCHANT CO.

PROC REP REV 49 Page 181 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS
9.09 155 CHAIRS & SUPPORTS MODERN BUILDERS
EVALUATION COMPLETED
MERCHANT CO.
9-Dec-15

MS-00192 CB 11-Jan-18 B

10. SUNDRY METALWORK

PQ-00088 CA 28-Nov-16 W

PQ-00088 CB 7-Dec-16 A
PLASMA TRADING &
CONTRACTING
MS-00419 CA 12-Nov-16 W

MS-00419 CE 25-Feb-17 A

PQ-00090 CA 26-Nov-16 W
10.01 182 CANOPY OVER UNDERPASS EVALUATION COMPLETED
PQ-00090 CB 1-Dec-16 A
GULF SHADE
MS-00424 CA 28-Nov-16 W

MS-00424 CE 25-Feb-17 A

PQ-00089 CA 26-Nov-16 W
EBTEKARAT ALSHARQ
PQ-00089 CB 5-Dec-16 A

MS-00479 CA 24-May-17 B

PROC REP REV 49 Page 182 of 405 SIGMA File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

SIGMA MS-00479 CC 16-Jul-17 A

PQ-00108 CA 29-Aug-17 A
10.02 182.1 HANDRAIL OVER UNDERPASS EVALUATION COMPLETED
PQ-00109 CA 19-Sep-17 A

PLASMA TRADING &


CONTRACTING MS-00487 CA 19-Jun-17 B

MS-00487 CC 2-Oct-17 A

10.03 182.1 GALVANIZED CHEQUERED PLATE

11. PRECAST CONCRETE ITEMS

MS-00558 CA 11-Jan-18 B

QATAR BUILDING COMPANY


11.00 221 PRECAST CONCRETE SOAKAWAY RINGS COMPLETED
EVALUATION
(QBC) - DOHA MS-00558 CB 1-Feb-18 B

MS-00558 CC 18-Feb-18 A 24-Feb-18

MSE WALL MATERIALS : PQ-00030 CA 29-Sep-14 B


A). FRICTION TIES FOR MSE WALLS
B). PVC DOWELS FOR MSE WALLS
PQ-00030 CB 12-Oct-14 A
C). GEOTEXTILE FABRIC FOR MSE
11.01 221.1 WALLS
EVALUATION COMPLETED VSL MIDDLE EAST

D). BEARING PADS FOR MSE WALLS MS-00033 CA 29-Sep-14 B


E). JOINT FILLER ( For use with
Concrete Face Panels)
PROC REP REV 49 Page 183 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

MSE WALL MATERIALS :


A). FRICTION TIES FOR MSE WALLS ENQUIRY STATUS

APPROVAL
B). PVC DOWELS FOR MSE WALLS ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. C). GEOTEXTILEDESCRIPTION
FABRIC FOR MSE RELEASE
11.01 221.1 EVALUATION
ISSUED COMPLETED/
/ RECEIVED SUPPLIER
VSL MIDDLE EAST NUMBER DATE
WALLS DATE
D). BEARING PADS FOR MSE WALLS EVALUATED
E). JOINT FILLER ( For use with
Concrete Face Panels) MS-00033 CE 3-Nov-15 A

11.02 221.2 PRECAST MANHOLES

DUTCO TENANT MS-00485 CA 8-Jun-17 W


11.03 224.2 NEOPRENE PAD FOR TSE CHAMBERS
EVALUATION COMPLETE
QATAR GERMAN GASKET
FACTORY MS-00493 CA 1-Jul-17 INV

11.03 485 CONCRETE CABLE COVERING TILES

MS-00262 CA 20-Oct-15 W 10-Dec-15

QATAR BUILDING CO.


PRECAST CONCRETE SOAKAWAY RINGS
EVALUATION COMPLETED
( QBS ) - DOHA MS-00262 CC 24-Dec-15 B 23-Dec-15
11.04 904
MS-00262 CD 1-Feb-18 B 11-Apr-16

MS-00262 CE 18-Feb-18 A

MS-00434 CA 18-Jan-17 B 19-Apr-17

MS-00434 CD 10-Apr-17 A

AAMAL CEMENT MS-00470 CA 29-Apr-17 B

MS-00470 CB 25-May-17 B
11.05 MA-MAT-PROCU-0790 913 PRECAST CONCRETE KERB EVALUATION COMPLETED

MS-00470 CC 10-Jun-17 A

PROC REP REV 49 Page 184 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No.
11.05 ACTIVITY ID
MA-MAT-PROCU-0790 SCH.
913NO. PRECAST CONCRETE
DESCRIPTION
KERB EVALUATION COMPLETED RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00436 CA 30-Jan-17 W

SMEET MS-00436 CD 21-Jun-17 W

MS-00436 CE 11-Jul-17 A

MS-00504 CA 9-Aug-17 W

11.06 MA-MAT-PROCU-0800 913.1 PRECAST CONCRETE BARRIERS EVALUATION COMPLETED TAYOUNEH CONCRETE MS-00504 CB 28-Aug-17 B

MS-00504 CC 19-Sep-17 B

PQ-00022 CA 2-Aug-14 W 26-Jul-14


QD-CPC PREMCO PRECAST
EVALUATION COMPLETED
QATAR
PQ-00022 CB 28-Aug-14 A

MS-00131 CA 17-Apr-15 W 22-Apr-15


EVALUATION COMPLETED UNITED PRECAST CONCRETE

MS-00131 CC 7-Jun-15 W
11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS
MS-00193 CA 28-Jul-15 W 27-Jun-15

MS-00193 CC 12-Oct-15 B 26-Aug-15

EVALUATION COMPLETED SMEET PRECAST 27-Sep-15

PROC REP REV 49 Page 185 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATION COMPLETED
EVALUATED SMEET PRECAST

10-Feb-16

29-Aug-16

MS-00109 CA 31-Mar-15 B

MS-00109 CC 27-May-15 B
11.08 MA-MAT-PROCU-0810 912 INTERLOCKING TILES EVALUATION COMPLETED QATAR PAVING STONES
MS-00109 CD 11-Jul-17 A

MS-00109 CE 23-Nov-17 A

12. RESINS, MORTARS, GROUTS AND CONCRETE REPAIR MATERIALS

12.01 226 NON-SHRINK GROUT

12.02 227 FLOW GROUT F0R POST TENSIONING DUCTS

12.03 237 BEDDING MORTAR FOR THE BEARINGS

MS-00163 CA 18-May-15 B
DON CONSTRUCTION
12.04 237.1 EPOXY BONDING AGENT EVALUATION COMPLETED
PRODUCTS (DCP)
MS-00163 CB 3-Jun-15 B

MS-00202 CA 16-Aug-15 W
BASF
MS-00202 CB 21-Oct-15 W

PROC REP REV 49 Page 186 of 405 File: 382684358.xlsx


EPOXY GROUT FOR
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00270 CA 3-Nov-15 W
EPOXY GROUT FOR CONMIX /
12.05 237.2 BRIDGE BEARING
EVALUATION COMPLETED
AL MISNAD
MS-00270 CB 2-Dec-15 W

MS-00281 CA 24-Nov-15 B
SIKA
MS-00281 CD 23-Jan-16 A

MS-00253 CA 5-Oct-15 B 6-Oct-15

MS-00253 CB 12-Nov-15 A 18-Nov-15


FLO-GROUT 2 (NON-SHRINK CEMENTITIOUS DON CONSTRUCTION
12.06 237.3 GROUT)
EVALUATION COMPLETED
PRODUCTS (DCP)
31-Mar-16

MS-00256 CA 5-Oct-15 B 16-Sep-15

12.07 237.4 EPOXY ADHESIVE EVALUATION COMPLETED SIKA MS-00256 CD 1-Feb-16 A 22-Sep-15

6-Oct-15

CONCRETE REPAIR MATERIAL: MS-00083 CA 11-Feb-15 B


12.08 126 a) Pactorep -PQ-Q (Large areas) EVALUATION COMPLETED PAC TECHNOLOGIES
b) Pactorep HB 70 (Small areas) MS-00083 CB 25-Mar-15 INV

CONCRETE REPAIR MATERIAL: BASF / MS-00086 CA 12-Feb-15 B


12.09 126 a) MasterEmaco S 466 (Large areas) EVALUATION COMPLETED CONSTRUCTION
PROC REP REV 49 b) MasterEmaco S 488 (Small areas) Page 187 of 405 MATERIALS File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
CONCRETE REPAIR MATERIAL: EVALUATED BASF /
12.09 126 a) MasterEmaco S 466 (Large areas) EVALUATION COMPLETED CONSTRUCTION
b) MasterEmaco S 488 (Small areas) MATERIALS MS-00086 CB 25-Mar-15 A

MS-00087 CA 17-Feb-15 B 28-May-15

MS-00087 CD 24-May-15 A 9-Aug-15

CONCRETE REPAIR MATERIAL: 17-Oct-15


a) Weber.tec 311 MC (Large areas)
12.10 126 b) Weber.rep.331 TX (Small areas)
EVALUATION COMPLETED SODAMCO
c) Weber.rep.332 FR (Small areas) 18-Oct-15

21-Oct-15

11-Apr-16

MS-00293 CA 31-Dec-15 B 2-Nov-15

CONCRETE REPAIR MATERIAL: MS-00293 CC 25-Feb-16 A 28-Feb-16


12.11 126 Weber.rep 360 FFR (Pre-mixed cementitious paste COMPLETED
EVALUATION SODAMCO
for face repair) 27-Mar-16

8-May-16

MS-00468 CA 12-Apr-17 B 5-Apr-17

CONCRETE REPAIR MATERIAL:


12.12 126 Injectable mortar HIT-HY 200-R 500/2/EE
EVALUATION COMPLETED HILTI MS-00468 CB 29-Apr-17 B

MS-00468 CC 21-Jun-17 B

PROC REP REV 49 Page 188 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

13. DOORS AND WINDOWS

13.01 303 METAL DOORS FOR ELECT. SUB-STATIONS

13.02 317.2 ALUMINIUM LOUVRES FOR SUBSTATIONS

MS-00250 CA 22-Sep-15 B 30-Sep-15


13.03 565.1 BRIDGE ACCESS DOORS AND FRAMES
EVALUATION COMPLETED REMAL AL MOSTAQBAL

MS-00250 CD 24-May-16 A

MS-00382 CA 5-Jul-16 B 27-Apr-17

QATAR METAL CONST. IND.


13.04 565.1 ABUTMENT DOORS EVALUATION COMPLETED
LLC (QMI) MS-00382 CB 18-Aug-16 B

MS-00382 CC 2-Oct-16 A

MS-00425 CA 12-Dec-16 B 6-Mar-17

REMAL AL MOSTAQBAL MS-00425 CB 23-Jan-17 B

BRIDGE TOP ABUTMENT DOORS (800 MM X


13.05 565.1 1500 MM)
EVALUATION COMPLETED MS-00425 CC 25-Feb-17 A

MS-00426 CA 12-Dec-16 B
ASMA

PROC REP REV 49 Page 189 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

BRIDGE TOP ABUTMENT DOORS (800 MM X


13.05 565.1 ENQUIRYCOMPLETED
EVALUATION STATUS

APPROVAL
1500 MM) ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
ASMA

MS-00426 CC 2-Feb-17 INV

ANCHOR ROD FOR BRIDGE TOP ABUTMENT


13.06 565.1.2 DOOR HILTI 5-Apr-17

14. PIPES & FITTINGS FOR VARIOUS NETWORKS (SUPPLY & DRAINAGE)

PQ-00073 CA 20-Mar-16 B

NGE CONTRACTING PQ-00073 CB 31-Mar-16 A

PQ-00073 CC 19-Feb-17 A

14.01 901 EXISTING QP LINE PROTECTION WORKS


EVALUATION COMPLETED PQ-00075 CA 2-Apr-16 B
SOLID GENERAL
CONSTRUCTION
PQ-00075 CB 18-Apr-16 A

PQ-00100 CA 1-Mar-17 W
AMBALI TRADING &
CONTRACTING
PQ-00100 CB 13-Mar-17 A

14.02 901 TSE AND WATER WORKS EVALUATION COMPLETED NEW HORIZON CONTRACTING PQ-00074 CA UR

MS-00084 CA 9-Feb-15 B 7-Sep-15

MS-00084 CD 2-Dec-15 A 22-Oct-15

5-Dec-15

PROC REP REV 49 Page 190 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

20-Jan-16

EVALUATION COMPLETED DOHA PRECAST FACTORY 1-Jan-16

14.03 901.1 RC PIPES 31-May-16

22-Jun-16

15-Nov-16

23-Feb-17

MS-00079 CA 4-Feb-15 W
EVALUATION COMPLETED ADVANCED PIPES
MS-00079 CE 24-Aug-15 B

PQ-00078 CA 5-Jun-16 W

AL-WAKEEL TRADING &


14.04 901.3 TSE LINE DUCTILE IRON PIPE INSTALLATIONS
EVALUATION COMPLETED
CONTRACTING PQ-00078 CC 19-Sep-16 B

PQ-00078 CD 4-Oct-16 A

MS-00048 CA 3-Dec-14 W

EVALUATION COMPLETED INCOP - BENXI BEITAI MS-00048 CC 17-Feb-15 B

MS-00048 CD 18-Mar-15 W

PROC REP REV 49 Page 191 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00049 CA 3-Dec-14 W
EVALUATION COMPLETED ASMA - XINXING
MS-00049 CF 9-Apr-15 INV

MS-00073 CA 26-Jan-15 W
EVALUATION COMPLETED US PIPES / CHINA
MS-00073 CB 25-Feb-15 INV

MS-00054 CA 4-Dec-14 W
US Pipe & Foundry Company -
EVALUATION COMPLETED
Globe Construction Co.
MS-00054 CE 27-Oct-15 A

MS-00176 CA 20-Jun-15 B 1st Ship (1a)

MS-00176 CC 5-Aug-15 A 1st Ship (1b)

1st Ship (1c)


14.04 901.3 DI PIPES & FITTINGS FOR TSE
1st Ship (1d)

2nd Shipmt.

3rd Shipmt.

4th Shipmt.

SAINT-GOBAIN PAM / MANNAI 4th Shipmt.


EVALUATION COMPLETED
TRADING

PROC REP REV 49 Page 192 of 405 File: 382684358.xlsx


PROJECT
14.04 : CONSTRUCTION 901.3
OF NEWDI ORBITAL HIGHWAY
PIPES & FITTINGS & TRUCK ROUTE (P 023)
FOR TSE
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED SAINT-GOBAIN PAM / MANNAI
EVALUATION COMPLETED
TRADING

5th Shipmt.

6th Shipmt.

7th Shipmt.

1th Shipmt.

1st Shipmt.

2nd Shipmt.

MS-00100 CA 8-Mar-15 B 1st Shipmt.

MS-00100 CB 8-Apr-15 A 2nd Shipmt.

3rd Shipmt.

4th Shipmt.

5th Shipmt.

6th Shipmt.

7th Shipmt.

8th Shipmt.

PROC REP REV 49 Page 193 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

9th Shipmt.

10th Shipm.

11th Shipm.

12th Shipm.

13th Shipm.

14.05 901.3 D.I. FITTINGS FOR TSE EVALUATION COMPLETED AHMAD ALUTHMAN / DUKER 14th Shipm.

15th Shipm.

16th Shipm.

17th Shipm.

18th Shipm.

19th Shipm.

20th Shipm.

21st Shipm.

22ndShipm.

23rdShipm.

PROC REP REV 49 Page 194 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

24thShipm.

25thShipm.

27-Feb-17

MS-00194 CA 29-Jul-15 B 1st LOT

2nd LOT
MS-00194 CC 1-Oct-15 A
(Part-1)

2nd LOT
(Part-2)

2nd LOT
(Part-3)

2nd LOT
(Part-4)
1st LOT
(Part-1)
2nd LOT
(Part-1)
EVALUATION COMPLETED DUTCO TENNANT / KLAMFLEX
2nd LOT
(Part-2)
2nd LOT
(Part-3)
Dismantling Joint, Ranger Couplings, Ranger
Flange Adaptors, Dedicated Flange Adaptor, 3rd LOT (Part-
14.06 901.3B Dedicated Couplings & Restrained Couplings 1)
(DI FITTINGS FOR TSE) 3rd LOT (Part-
2)

1st LOT

PROC REP REV 49 Page 195 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE
EVALUATION (P 023)
COMPLETED DUTCO TENNANT / KLAMFLEX
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
Dismantling Joint, Ranger Couplings, Ranger
Flange Adaptors, Dedicated Flange Adaptor,
14.06 901.3B Dedicated Couplings & Restrained Couplings
(DI FITTINGS FOR TSE) ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

16-Feb-17

23-Aug-17

MS-00195 CA 4-Aug-15 B
AL OBEIDLY & GULF ETERNIT /
EVALUATION COMPLETED
VIKING JOHNSON
MS-00195 CB 20-Sep-15 INV

EVALUATION COMPLETED PETROFAC QATAR MS-00189 CA 9-Jul-15 INV

MS-00200 CA 5-Aug-15 B
EVALUATION COMPLETED VETURE GLOBAL
MS-00200 CC 17-Sep-15 A

MS-00429 CA 22-Dec-16 B 1st LOT


DEDICATED STEPPED COUPLINGS PN 16 FOR
14.07 901.3B.1 TSE WASH OUT CHAMBER EVALUATION COMPLETED DUTCO TENNANT / KLAMFLEX
MS-00429 CD 13-Mar-17 A 23-Aug-17

MS-00205 CA 24-Aug-15 B 1st LOT

2nd LOT
MS-00205 CB 17-Sep-15 A
(Part-1)

2nd LOT
(Part-2)
AL RAIDA ENGINEERING /
EVALUATION COMPLETED METALSKA (MIV) 3rd LOT

4th LOT

PROC REP REV 49 Page 196 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS AL RAIDA ENGINEERING /

APPROVAL
EVALUATION COMPLETED METALSKA (MIV) ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

5th LOT

27-Sep-17

MS-00257 CA 26-Oct-15 B 1-Dec-15


SIBTA / D.F.C.
14.08 MA-MAT-PROCU-0910 902.2 VALVES FOR TSE EVALUATION COMPLETED
(VENT-O-MAT)
MS-00257 CB 21-Nov-15 A

FIELD INDUSTRIAL SUPPLIER MS-00057 CA 23-Dec-14 B


EVALUATION COMPLETED (FIS)
(HAWLE & TTV)
MS--00057 CD 15-Oct-15 A

MS-00184 CA 2-Jul-15 W
AL OBEIDLY & GULF ETERNIT
EVALUATION COMPLETED
(OGE) / AVK / WOUTER WITZEL
MS-00184 CC 22-Sep-15 INV

MS-00203 CA 16-Aug-15 B
DUTCO TENNANT / SCI
EVALUATION COMPLETED
CORPORATION / IRUA
MS-00203 CB 17-Sep-15 INV

AL RAIDA ENGINEERING /
EVALUATION COMPLETED
D.F.C. (VENT-O-MAT) MS-00225 CA 2-Sep-15 INV

MS-00154 CA 16-May-15 B 1st Del

MS-00154 CD 3-Nov-15 A 2nd Del

3rd Del

PROC REP REV 49 Page 197 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

4th Del

5th Del

OSECC / TECHNICAL METAL


EVALUATION COMPLETED
(UAE)
6th Del

14.09 902.3A BOLTS, NUTS & WASHERS 7th Del

8th Del

9th Del

10th Del

26-Sep-16

MS-00164 CA 21-May-15 B 13-Jun-15


TEYSEER /
EVALUATION COMPLETED
KAPIL ENTERPRISES
MS-00164 CE 26-Oct-15 A

MS-00128 CA 17-Apr-15 B 1st Del

MS-00128 CC 1-Jun-15 A 2nd Del


UPTC /
14.10 902.4 EPDM GASKETS EVALUATION COMPLETED OCEAN RUBBER FACTORY 3rd Del
(UAE)

10-Oct-16

PROC REP REV 49 Page 198 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS UPTC /

APPROVAL
14.10 902.4 EPDM GASKETS EVALUATION COMPLETED OCEAN RUBBER FACTORY ORDER

STATUS
SELECTED
(UAE) SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

21-Jan-17

MS-00076 CA 3-Feb-15 B 30-Mar-15

MS-00076 CE 18-Jun-15 A 26-Apr-15


SADIP /
TRADING & AGENCY
SERVICES 7-Oct-15
DI PIPES & FITTINGS FOR POTABLE WATER
14.11 901.3E (PW) EVALUATION COMPLETED
12-Jun-16

MS-00511 CA 23-Aug-17 B 14-Aug-17


DUKER / TROUVAY & CAUVIN
MS-00511 CC 2-Oct-17 A

MS-00165 CA 25-May-15 A 2-Jul-15


KUBOTA /
14.12 901.4 DI PIPES FOR POTABLE WATER EVALUATION COMPLETED
AL TAWFEEQ
9-Jul-16

KUBOTA / VIP POLYMERS / AL


14.13 902.4 EPDM GASKETS EVALUATION COMPLETED
TAWFEEQ MS-00175 CA 13-Jun-15 B/A 9-Jul-16

DISMANT. JOINTS, FL. ADAPTORS,


14.14 901.3B COUPLINGS,FLANGED SOCKET, EVALUATION COMPLETED DUTCO TENNANT MS-00167 CA 21-May-15 B/A
FLEXIBLE JOINTS for P.W.

MS-00166 CA 21-May-15 B
MA-MAT-PROCU-0900 FIELD INDUSTRIAL SUPPLIER
14.15 902.2 VALVES - for P. WATER EVALUATION COMPLETED
(HAWLE & TTV.C)
MS-00166 CB 3-Jun-15 A

PROC REP REV 49 Page 199 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

14.16 903 FIRE HYDRANTS UNDER EVALUATION

14.17 MA-MAT-PROCU-0850 901.2 VITRIFIED CLAY PIPES

14.18 901.11 STAINLESS STEEL PIPES & FIITS

01-08-15
MS-00160 CA 17-May-15 W
01-01-16
14.19 901.5B 2 X 7 MICRONET DUCTS EVALUATION COMPLETED AL BAUD TECHNOLOGY
MS-00160 CE 17-Nov-15 A 4-Oct-16

14.20 901.5B PVC PERFORATED PIPES

14.21 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL MS-00284 CA 6-Dec-15 B

MS-00336 CA 17-Mar-16 B
HEPWORTH P.M.E QATAR WLL
MS-00336 CC 13-Jun-16 B
14.22 MA-MAT-PROCU-0870 901.5A UPVC DUCT 54D PIPES FOR QNBN EVALUATION COMPLETED
QATAR PIPELINE MS-00337 CA 17-Mar-16 B

QATAR NATIONAL PLASTIC


FACTORY MS-00338 CA 17-Mar-16 B

14.23 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL MS-00055 CA 4-Dec-14 W

MS-00065 CA 4-Jan-15 W 17-Mar-15

HEPWORTH P.M.E QATAR WLL MS-00065 CH 21-Dec-15 A 5-Nov-15

PROC REP REV 49 Page 200 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED HEPWORTH P.M.E QATAR WLL

8-Sep-16

MS-00063 CA 4-Jan-15 W 17-May-15


14.24 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION COMPLETED
QATAR PIPELINE MS-00063 CF 21-Dec-15 A 13-Jun-15

28-Jul-15

MS-00137 CA 29-Apr-15 W
CASTLE
MS-00137 CB 13-Jun-15 INV

MS-00066 CA 4-Jan-15 W 17-Mar-15

MS-00066 CF 15-Nov-15 A 29-Aug-16


HEPWORTH P.M.E QATAR WLL
19-Feb-17

9-Oct-17
14.25 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION COMPLETED
MS-00062 CA 3-Jan-15 W
QATAR PIPELINE
MS-00062 CE 15-Nov-15 A

MS-00136 CA 29-Apr-15 W 13-Jun-15


MODERN /
CASTLE
MS-00136 CC 15-Nov-15 A 28-Jul-15

PROC REP REV 49 Page 201 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00067 CA 4-Jan-15 W 17-Mar-15

MS-00067 CE 25-Aug-15 B/A 3-Jun-15

28-Jul-15

14-Nov-15

29-Aug-16
HEPWORTH P.M.E QATAR WLL
19-Feb-17

MS-00290 CA 21-Dec-15 B 29-Dec-15

MS-00290 CB 23-Jan-16 A 16-Apr-16

27-Apr-17

3-Oct-17

14.26 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS EVALUATION COMPLETED 21-Jan-18

MS-00478 CA 18-May-17 B

PETRO PLASTIC
MANUFACTURERS MS-00478 CB 10-Jun-17 B/W

MS-00478 CC 16-Aug-17 B/W

PROC REP REV 49 Page 202 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT
14.26 MA-MAT-PROCU-0870 REPORT
901.5A UPVC- Rev.
DUCT 49 - 20
PIPES February 2018
& FITTINGS EVALUATION COMPLETED

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00064 CA 3-Jan-15 W 13-Jun-15

MS-00064 CD 15-May-15 B/A 28-Jul-15


QATAR PIPELINE
MS-00291 CA 24-Dec-15 B

MS-00291 CB 23-Jan-16 INV

MS-00135 CA 29-Apr-15 W

MODERN /
CASTLE MS-00135 CC 17-Nov-15 INV

MS-00289 CA 24-Dec-15 INV

MS-00168 CA 21-May-15 W 14-Feb-16


UPVC LONG RADIUS BEND PIPES
QATAR NATIONAL PLASTIC
14.27 901.5 ( 90⁰, OD 110 mm, Thickness : 3.2 mm,
EVALUATION COMPLETED FACTORY MS-00168 CE 24-Dec-15 A 5-Mar-17
Color : Dark Grey)
3-Apr-17

MS-00432 CA 2-Jan-17 W
HEPWORTH P.M.E QATAR WLL

MS-00432 CB 6-Feb-17 INV


UPVC PRESSURE PIPES AND FITTINGS FOR
14.28 901.5 TSE WASH OUT SUMP
EVALUATION COMPLETED
MS-00440 CA 6-Feb-17 W
CASTLE

PROC REP REV 49 Page 203 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
UPVC PRESSURE PIPES AND FITTINGS FOR ORDER

STATUS
14.28 901.5 EVALUATION COMPLETED SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. TSE WASH OUTDESCRIPTION
SUMP RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
CASTLE

MS-00440 CB 25-Feb-17 INV

MS-00279 CA 12-Nov-15 W 31-Jan-16

MS-00279 CD 2-Mar-16 A 27-Mar-16

13-Apr-16
UPVC DUCT PIPES FOR STORM DRAINS MODERN /
14.29 901.5.2 SYSTEM EVALUATION COMPLETED
CASTLE
2-Aug-16

18-Jan-17

13-Nov-17

MS-00032 CA 18-Sep-14 W 22-Dec-14

MS-00032 CD 13-Nov-14 A 15-Mar-17

21-Feb-15

6-Jun-15

25-Jun-15

3-Oct-15

1-Nov-15

PROC REP REV 49 Page 204 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

2-Nov-15

17-Nov-15

22-Nov-15

6-Jan-16

8-Jan-16

17-Feb-16

14-May-16

29-May-16

GRP PIPES & FITTINGS 1st LOT


ASMA /
SMITHLINE
2nd LOT
14.30 MA-MAT-PROCU-0880 901.7

3rd LOT

4th LOT

5th LOT

PROC REP REV 49 Page 205 of 405 File: 382684358.xlsx


GRP PIPES & FITTINGS
ASMA /
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023) SMITHLINE
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
14.30 MA-MAT-PROCU-0880 901.7 Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

6th LOT

7th LOT

PROC REP REV 49 Page 206 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

8th LOT

24-Nov-16

23-Oct-16

29-Jan-17

30-Mar-17

30-Mar-17

15-Apr-17

GASKET FOR GRP PIPES 24-Dec-17

MS-00035 CA 2-Oct-14 B
BUILDTECH /
EVALUATION COMPLETED
AL JABER
MS-00035 CB 28-Oct-14 A

MS-00492 CA 4-Jul-17 B 4-Sep-17


POLYPROPYLENE ROAD GULLY WITH
14.31 901.7.3 REMOVABLE GRP SAND BASKET EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL
MS-00492 CC 3-Aug-17 A

MS-00061 CA 29-Dec-14 W
EVALUATION COMPLETED QATAR PIPELINE
MS-00061 CE 3-Apr-16 B

PROC REP REV 49 Page 207 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00060 CA 28-Dec-14 W 25-Feb-15

MS-00060 CE 12-Nov-15 A 28-Jul-15


EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL

MA-MAT-PROCU-0870 HDPE PIPES & FITTINGS (ELECTRICAL- 27-Apr-16


14.32 901.8A SDR17)
19-Feb-17

MS-00386 CA 13-Jul-16 W
EVALUATION COMPLETED DOHA REGIONAL
MS-00386 CB 30-Jul-16 W

QATAR NATIONAL
EVALUATION COMPLETED
PLASTIC FACTORY MS-00095 CA 25-Feb-15 B

MS-00179 CA 28-Jun-15 W 16-Jun-15


EVALUATION COMPLETED QATAR PIPELINE
MS-00179 CE 17-Nov-15 A
14.33 MA-MAT-PROCU-0870 901.8A HDPE PIPES & FITTINGS (ITS - SDR 17)
MS-00230 CA 29-Aug-15 B
EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL
MS-00230 CD 17-Nov-15 A

MS-00050 CA 7-Dec-14 W
EVALUATION COMPLETED QATAR PIPELINE
MS-00050 CD 28-Jul-15 A

MS-00058 CA 23-Dec-14 W

PROC REP REV 49 Page 208 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00058 CD 28-Nov-15 A
14.34 MA-MAT-PROCU-0890 901.8 HDPE PIPES & FITTINGS (TSE / D315)
EVALUATION COMPLETED HEPWORTH P.M.E QATAR WLL
MS-00459 CA 1-Apr-17 B 15-Aug-17

MS-00459 CE 10-Aug-17 A 21-Aug-17

ADVANCED PLASTIC FACT./ MS-00529 CA 7-Sep-17 B 25-Oct-17


EVALUATION COMPLETED EUROSTANDARD / TECHNO
GULF
MS-00529 CC 18-Oct-17 A

QATAR PIPELINE MS-00274 CA 3-Nov-15 INV

HDPE PIPES & FITTINGS (COMMUNICATION


14.35 901.8C REGULARITY AUTHORITY) EVALUATION COMPLETED MS-00278 CA 9-Nov-15 W
HEPWORTH P.M.E QATAR WLL
MS-00278 CB 14-Dec-15 INV

14.36 901.8.1 WELDING MACHINE FOR HDPE PIPES


EVALUATION COMPLETED FUSION PAC TECHNOLOGIES

15-Jul-15

4-Nov-15

14.37 901.8.1 HIRING CHARGES OF BUTT FUSIONEVALUATION


MACHINE COMPLETED HEPWORTH P.M.E QATAR WLL 22-Mar-16

13-Apr-16

PROC REP REV 49 Page 209 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
14.37 901.8.1 HIRING CHARGES OF BUTT FUSIONEVALUATION
MACHINE COMPLETED HEPWORTH P.M.E QATAR WLL ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

3-Sep-16

PROC REP REV 49 Page 210 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

15. PIPE WRAPPING, PROTECTION AND MARKING

FINAL SCHEDULE ISSUED FOR


15.01 444 DENSO TAPE QUOTATIONS
UNDER REVIEW

MS-00051 CA 9-Dec-14 W 7-Jun-15

EVALUATION COMPLETED MANAI TRADING MS-00051 CC 19-Feb-15 B


WRAPPING TAPE, PRIMER AND
15.02 445.5 MOULDING PUTTY TAPE DI PIPES FOR PW 25-Feb-17
NETWORK
MS-00134 CA 20-Apr-15 B
AHMAD ALUTHMAN &
EVALUATION COMPLETED
BROS W.L.L.
MS-00134 CD 2-Jul-15 A

MS-00070 CA 18-Jan-15 W 1st Del

MS-00070 CC 27-Aug-15 A 1st Del

2nd Del

3rd Del

3rd Del
CHASE PROTECTIVE
EVALUATION COMPLETED COATING LTD (UK) / MANNAI 4th Del
TRADING

5th Del
WRAPPING TAPE, PRIMER AND
15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE
PROC REP REV 49 Page 211 of 405 File: 382684358.xlsx
NETWORK
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS CHASE PROTECTIVE

APPROVAL
EVALUATION COMPLETED COATING LTD (UK) / MANNAI ORDER

STATUS
SELECTED
TRADING SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
WRAPPING TAPE, PRIMER AND
15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE 6th Del
NETWORK
7th Del

8th Del

9th Del

MS-00082 CA 9-Feb-15 W
AHMAD ALUTHMAN & BROS
EVALUATION COMPLETED
W.L.L.
MS-00082 CE 26-Oct-15 A

MS-00245 CA 22-Sep-15 B
EVALUATION COMPLETED HENKEL POLYBIT / H.POLYBIT
MS-00245 CB 26-Oct-15 A

MS-00074 CA 28-Jan-15 W 11-Mar-15

WARNING TAPE - DETECTABLE


15.04 484 EVALUATION COMPLETED Al SAMIR PLASTIC FACTORY MS-00074 CD 26-Oct-15 A 23-Mar-16

23-Feb-17

SHAOXING SHANGYU
EVALUATION COMPLETED XIETANG HUAAN PLASTIC MS-00569 CA 4-Mar-18 B
FACTORY

DETECTAB LE WARNING TAPE FOR TSE


15.05 484 NETWORKS

PROC REP REV 49 Page 212 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

DETECTAB LE WARNING TAPE FOR TSE


15.05 484 NETWORKS BIMA INTERNATIONAL
MARKETING, CONSULTING,
EVALUATION COMPLETED
MANUFACTURING, INDUSTRY MS-00570 CA 11-Mar-18 B
AND COMMERCE LTD. INC.

MS-00056 CA 4-Dec-14 W 28-Mar-15

MS-00056 CD 8-Apr-15 B 6-Jun-15

WARNING TAPE - NON DETECTABLE QATAR NATIONAL PLASTIC


15.06 484A PW & Electrical Purposes
EVALUATION COMPLETED
FACTORY MS-00056 CF 13-Jun-16 A 28-Jul-15

27-Jun-16

12-Jan-17

MS-00072 CA 21-Jan-15 W 28-Mar-15

MS-00072 CC 8-Apr-15 A 6-Jun-15

28-Jul-15
WARNING TAPE - NON DETECTABLE QATAR NATIONAL PLASTIC
EVALUATION COMPLETED
ITS,TSE AND STREET LIGHT FACTORY
27-Jun-16
15.07 484A
27-Apr-17

4-Oct-17

PROC REP REV 49 Page 213 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

15.07 484A ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

WARNING TAPE - NON DETECTABLE FOR ITS MS-00565 CA 11-Feb-18 W


UNIPLAST CO. WLL
WARNING TAPE - NON DETECTABLE FOR
STREET LIGHT
MS-00566 CA 11-Feb-18 W

MS-00116 CA 30-Mar-15 B 28-Mar-15

QATAR NATIONAL PLASTIC


15.08 484A WARNING TAPE - NON DETECTABLE SSD/MOI COMPLETED
EVALUATION
FACTORY MS-00116 CD 2-Dec-15 A 6-Jun-15

28-Jul-15

MS-00117 CA 30-Mar-15 B 28-Mar-15

MS-00117 CB 19-Apr-15 A 6-Jun-15

QATAR NATIONAL PLASTIC


15.09 484A WARNING TAPE - NON DETECTABLE QAF
EVALUATION COMPLETED
FACTORY
28-Jul-15

16-Jan-16

27-Jun-16

MS-00319 CA 4-Feb-16 W
15.10 485.1 PE CABLE TILE FOR 11KV CABLES EVALUATION COMPLETED UNIPLAST
MS-00319 CB 29-Feb-16 INV

15.11 486 UTILITY MARKERS

15.12 486 MARKER PLATES

PROC REP REV 49 Page 214 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

15.13 486.1 MARKER POSTS

MS-00053 CA 30-Nov-14 W 22-Jan-15

PETRO FOAM for Plastic


15.14 445.8 POLYTHENE SHEET - 1000 GAUGE EVALUATION
(250micro) COMPLETED Production MS-00053 CD 1-Feb-15 B 21-Feb-15

18-Mar-15

MS-00052 CA 21-Dec-14 W 5-May-15

POLYETHELENE SLEEVING FOR DI PIPES QATAR PLASTIC PRODUCTS


15.15 445.7 POTABLE WATER
EVALUATION COMPLETED
Co. WLL MS-00052 CE 18-Jun-15 A 7-Jun-15

29-Oct-15

MS-00071 CA 20-Jan-15 W 8-Nov-15

QATAR NATIONAL PLASTIC


EVALUATION COMPLETED
FACTORY MS-00071 CC 3-Nov-15 A 6-Jan-16

12-Jan-17
POLYETHELENE SLEEVING FOR DI
15.16 445.7A PIPES FOR TSE
EVALUATION COMPLETED INCOP MS-00091 CA 22-Feb-15 INV

MS-00273 CA 3-Nov-15 B
QATAR PLASTIC PRODUCTS
EVALUATION COMPLETED
(QPPC)
MS-00273 CC 21-Dec-15 A

TOKEN TRADING &


15.17 445.6 BLACK SELF ADHESIVE TAPE EVALUATION COMPLETED
CONTRACTING
4-May-15

PROC REP REV 49 Page 215 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

16. CHAMBERS, MANHOLES, MANHOLES COVERS AND FRAMES

MS-00437 CA 30-Jan-17 B 24-Apr-17


D.I. MANHOLE COVERS & FRAMES BOXES
16.01 904.1 FOR PORTABLE WATER
CARNATION / HANSON DOHA
MS-00437 CB 7-Mar-17 A

PQ-00079 CA 5-Jun-16 W
PROMITHEAS INTERNATIONAL
PQ-00079 CD 13-Nov-16 A
CONSTRUCTION OFREINFORCED CONCRETE
16.02 904.1 CHAMBERS - PACK 1,2&3
EVALUATION COMPLETED
PQ-00077 CA 1-Jun-16 W
CYTECO
ENG & CONST WLL
PQ-00077 CB 20-Jun-16 A

MS-00204 CA 20-Aug-15 B 7-May-16


ALUMINIUM ACCESS COVERS AND FRAMES
16.03 904.1A FOR TSE EVALUATION COMPLETED ASMA
MS-00204 CB 17-Sep-15 A

MS-00185 CA 4-Jul-15 W
MIDDLE EAST ENERGY
MS-00185 CB 8-Sep-15 B
D.I. MANHOLE COVERS & FRAMES FOR SSD
16.04 904.2 (NOT IN SCOPE LETTER)
EVALUATION COMPLETED
MS-00187 CA 6-Jul-15 B
GLOBAL INDUSTRIAL
SUPPLIES & SER.
MS-00187 CD 17-Nov-15 A

MS-00233 CA 9-Sep-15 B 1st LOT

PROC REP REV 49 Page 216 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00233 CD 19-Jan-16 A 2nd LOT

MS-00498 CA 22-Jul-17 B 3rd LOT

MS-00498 CC 13-Sep-17 B 4th LOT


16.05 904.3 GRP LADDERS FOR TSE MANHOLES
EVALUATION COMPLETED TEAM ONE COMPOSITES

MS-00498 CD 19-Sep-17 A 5th LOT

6th LOT

7th LOT

8th LOT

TEAM ONE COMPOSITES MS-00439 CA 30-Jan-17 INV

MS-00454 CA 7-Mar-17 B 27-Apr-17


GRP LADDERS FOR POTABLE WATER / VALVE
16.06 904.3 CHAMBER (FOR KAHRAMAA)
EVALUATION COMPLETED
ALMUFTAH FIBERGLASS MS-00454 CC 24-Apr-17 B

MS-00454 CD 16-May-17 B

MS-00162 CA 17-May-15 W 1-Aug-15

16.07 904.4 D.I. MANHOLES FOR QAF EVALUATION COMPLETED AL BAUD MS-00162 CE 17-Nov-15 A 4-Oct-16

18-Jan-17

MS-00242 CA 15-Sep-15 W
SIF / GLOBAL INDUSTRIAL
PROC REP REV 49 Page 217 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
SIF / GLOBAL INDUSTRIAL
MS-00242 CD 23-Jan-16 A
EVALUATION COMPLETED
MS-00254 CA 20-Oct-15 W
RBA FERRO / REMAL
MS-00254 CC 21-Dec-15 INV
MANHOLE COVERS AND ACCESSORIES FOR
16.08 904.5 ITS
MS-00349 CA 11-Apr-16 B 9-May-17
EVALUATION COMPLETED SIF / TAYLOS
MS-00349 CB 31-May-16 A

MS-00261 CA 21-Oct-15 B
EVALUATION COMPLETED HANSON DOHA / CARNATION
MS-00261 CC 1-Feb-16 A

MS-00275 CA 12-Nov-15 W 27-Oct-15


16.09 904.6 D.I. GULLIES FOR BRIDGE DECKS EVALUATION COMPLETED ACO / KARMAH
MS-00275 CD 13-Jul-16 A

MS-00447 CA 13-Feb-17 B 22-Apr-17


16.10 904.7 GRATINGS FOR STORM DRAIN MANHOLES
EVALUATION COMPLETED RBA FERRO / REMAL
MS-00447 CC 10-Apr-17 A

MS-00491 CA 19-Jun-17 B
DUCTILE IRON GRATING AND DUCTILE IRON
16.11 904.8 MANHOLE COVER AND FRAMEEVALUATION
FOR COMPLETED RBA FERRO / REMAL MS-00491 CC 13-Sep-17 A
UNDERPASS
MS-00491 CD 1-Feb-18 B

MS-00488 CA 15-Jun-17 B 14-Sep-17


HANSON DOHA / CARNATION
PROC REP REV 49 Page 218 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
HANSON DOHA / CARNATION
MS-00488 CC 19-Aug-17 A 18-Jan-18

DOUBLE TRAINGULAR DUCTILE IRON ERKAON DOKUM INSAAT, MS-00489 CA 15-Jun-17 B


16.11 904.9 MANHOLE COVER AND FRAME FOREVALUATION
WASH COMPLETED TURKEY / KARMAH TRADING &
OUT SUMP SERVICES
MS-00489 CC 19-Aug-17 A

MS-00490 CA 15-Jun-17 B
GLOBAL CASTINGS PVT.LTD./
MIDDLE EAST ENERGY
MS-00490 CB 27-Jul-17 A

MS-00546 CA 20-Nov-17 W

MS-00546 CB 11-Jan-18 B
GOODWIN QATAR CO WLL
MS-00546 CC 1-Feb-18 B

MS-00546 CD 18-Feb-18 A 27-Feb-18

GRP SEALING PLATE FOR DOUBLE


16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
MS-00559 CA 14-Jan-18 W
COVER AND FRAME FOR WASH OUT SUMP
GULF GLASS FIBRE WLL

MS-00559 CB 1-Feb-18 B

PROC REP REV 49 Page 219 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT -GRP
Rev.SEALING
49 - 20PLATE
February 2018
FOR DOUBLE
16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
COVER AND FRAME FOR WASH OUT SUMP

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00559 CC 7-Feb-18 A

MS-00521 CA 5-Sep-17 B 16-Oct-17


DRAINAGE CHANNEL WITH DI GRATINGS AND
16.13 904.10 ACCESSORIES ACO / KARMAH
MS-00521 CC 11-Oct-17 A

MS-00561 CA 3-Feb-18 B
DUCTILE IRON STEEL GRATING FOR QP LINE KISWOK INDUSTRIES LTD / AL
16.14 904.11 PROTECTION AT SECTION 9 & 13 JABOR TRADING

MS-00561 CB 18-Feb-18 A

MS-00446 CA 12-Feb-17 W 23-Jan-17

MS-00446 CC 21-Mar-17 A 1st LOT

AL MUFTAH FIBER GLASS 2nd LOT


16.15 905.9 TANK FOR WASH OUT SUMP GRPEVALUATION
LINERS COMPLETED PRODUCT

3rd LOT

4th LOT

MS-00444 CA 6-Feb-17 W

A-1 FENCE PRODUCTS MS-00444 CC 16-May-17 B

PROC REP REV 49 Page 220 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED A-1 FENCE PRODUCTS

MS-00444 CD 21-Jun-17 B

MS-00445 CA 6-Feb-17 W
16.16 945 GABION BLANKET OR MATTRESSES
EVALUATION COMPLETED
LINK MIDDLE EAST MS-00445 CB 16-May-17 B

MS-00445 CC 29-May-17 A

MS-00503 CA 7-Aug-17 B 26-Sep-17


ADJUST WIRE PRODUCTS /
ASMA
MS-00503 CB 17-Sep-17 A 29-Nov-17

17. ASPHALT WORKS

RED SAND ASPHALT BLANKET TO TOP


17.01 917 SURFACE OF BRIDGE DECK AND APPROACH
SLABS

PQ-00031 CA 21-Oct-14 B
ALCAT Contracting Company
PQ-00031 CD 24-Nov-14 A

MS-00361 CA 12-May-16 W

17.02 MA-MAT-PROCU-1000 917 ASPHALT WEARING COURSE (PMB)EVALUATION COMPLETED AL JABER & MAKHLOUF W.L.L MS-00361 CB 4-Jul-16 W

MS-00361 CC 13-Jul-17 W

MS-00510 CA 26-Aug-17 B
STRUKTON / ALCAT
PROC REP REV 49 Page 221 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

17.02 MA-MAT-PROCU-1000 917 ASPHALT WEARING COURSE (PMB)EVALUATION COMPLETED

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
STRUKTON / ALCAT
MS-00510 CB 11-Oct-17 B

PQ-00031 CA 21-Oct-14 B 2-Jun-15


ALCAT Contracting Company
PQ-00031 CD 24-Nov-14 A
MA-MAT-PROCU-0990 ASPHALT INTERMEDIATE/ BINDER COURSE
17.03 917 70mm, PMB
EVALUATION COMPLETED
MS-00363 CA 12-May-16 B
AL JABER & MAKHLOUF W.L.L
MS-00363 CB 24-Jun-17 A

PQ-00044 CA 16-Feb-15 B 12-Sep-15


GULF CONSOLIDATED
CONTRACTORS (G.C.C.)W.L.L
PQ-00044 CB 25-Feb-15 A

PQ-00076 CA 14-Apr-16 B
AL JABER & MAKHLOUF W.L.L
PQ-00076 CC 25-May-16 B

17.04 917 ASPHALT ROAD WORKS EVALUATION COMPLETED PQ-00092 CA 28-Nov-16 B


MIDMAC COLAS
PQ-00092 CB 12-Dec-16 A

PQ-00093 CA 28-Nov-16 B

QD-CPC PQ-00093 CB 12-Dec-16 B

PQ-00093 CC 21-Dec-16 A

PROC REP REV 49 Page 222 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00101 CA 9-Mar-15 W

AL-JAZEERA for
G.C.C.
MS-00101 CB 9-Apr-15 B

ASPHALT SURFACING WORKS, BITUMEN MS-00101 CC 23-Apr-15 W


17.05 917 60/70, POLYMER MODIFIED BITUMEN (PG 76- COMPLETED
EVALUATION
10), PRIME COAT, TACK COAT MS-00362 CA 12-May-16 B
AL JABER & MAKHLOUF
W.L.L
MS-00362 CB 30-Jun-16 A

QATAR FUEL-WOQOD for


G.C.C.
MS-00102 CA 7-Mar-15 W

MS-00078 CA 9-Feb-15 B
ALCAT Contracting Company
MS-00078 CI 27-Apr-17 A

MS-00088 CA 22-Feb-15 B
G.C.C.
MS-00088 CE 4-Jul-17 INV

MS-00360 CA 12-May-16 B

AL JABER & MAKHLOUF W.L.L MS-00360 CF 10-Jan-17 B


MA-MAT-PROCU-0980 ASPHALTIC BASE COURSE - BC-1, 180/250mm
17.06 917.3 THK, BITUMEN GRADE 60/70
EVALUATION COMPLETED
MS-00360 CG 12-Jun-17 B

GULF CONSOLIDATED
CONTRACTORS MS-00190 CA 23-Jul-15 W

MS-00428 CA 21-Dec-16 B
QD-CPC - NAF
PROC REP REV 49 Page 223 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
ASPHALTIC BASE COURSE - BC-1, 180/250mm
17.06 MA-MAT-PROCU-0980 917.3 THK, BITUMEN GRADE 60/70 EVALUATION COMPLETED

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
QD-CPC - NAF
MS-00428 CD 12-Jun-17 A

MS-00430 CA 22-Dec-16 W
MIDMAC COLAS
MS-00430 CB 16-Mar-17 W

MS-00431 CA 24-Dec-16 B
MIDMAC COLAS
MS-00431 CD 16-Jul-17 A
17.07 917.3A ASPHALTIC BASE COURSE - BC CLASS A
EVALUATION COMPLETED
ALCAT (ASPHALT PLANT AP
01) MS-00508 CA 23-Aug-17 B

ALCAT (ASPHALT PLANT AP


02) MS-00509 CA 23-Aug-17 B

MS-00449 CA 25-Feb-17 W
QD-CPC - NAF
MS-00449 CD 2-Nov-17 A

MS-00452 CA 27-Feb-17 B

ASPHALTIC CONCRETE BASE COURSE (BC ALCAT Contracting Company MS-00452 CB 27-Apr-17 B
17.08 917.3A CLASS A 60/70) GABBRO ((MARSHALL MIX
EVALUATION COMPLETED
DESIGN) MS-00496 CA 10-Jul-17 B

ALCAT (AP 03) J16 MS-00540 CA 6-Nov-17 B

MS-00462 CA 1-Apr-17 B
AL JABER & MAKHLOUF W.L.L
MS-00463 CA 1-Apr-17 B

PROC REP REV 49 Page 224 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00453 CA 5-Mar-17 B
ALCAT Contracting Company
MS-00453 CB 27-Apr-17 B

MS-00475 CA 18-May-17 B

ALCAT Contracting Company / MS-00475 CB 12-Jun-17 B


Amman AP @ Juction 16
ASPHALTIC CONCRETE BASE COURSE (BC
17.09 917.3A CLASS B) GABBRO (MARSHALL MIXEVALUATION
DESIGN)
COMPLETED
MS-00475 CC 19-Sep-17 B

MS-00467 CA 4-Apr-17 B
MIDMAC COLAS

MS-00467 CB 11-Jul-17 B

AL JABER & MAKHLOUF W.L.L MS-00460 CA 1-Apr-17 B

MIDMAC COLAS MS-00472 CA 29-Apr-17 B


ASPHALTIC CONCRETE WEARING COURSE
17.10 917.3A (GABBRO) PMB PG76-10 (MARSHALL MIX
EVALUATION COMPLETED MS-00534 CA 27-Sep-17 B
DESIGN) ALCAT (AP03 @ J16)
MS-00534 CB 1-Nov-17 B

MS-00081 CA 9-Feb-15 W

ALCAT Contracting Company MS-00081 CD 20-Apr-15 W

MA-MAT-PROCU-1000 ASPHALTIC WEARING COURSE - SC-1 ,


17.11 917.4 BITUMEN GRADE 60/70
EVALUATION COMPLETED MS-00081 CE 15-Jun-15 W

PROC REP REV 49 Page 225 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
ASPHALTIC WEARING COURSE - SC-1 , DATE
17.11 MA-MAT-PROCU-1000 917.4 EVALUATION COMPLETED
EVALUATED
BITUMEN GRADE 60/70

MS-00089 CA 22-Feb-15 W
G.C.C.
MS-00089 CD 4-Jul-17 INV

ASPHALT MIX DESIGN - WEARING COURSE MS-00090 CA 22-Feb-15 W


17.12 917.4A TYPE-2 EVALUATION COMPLETED G.C.C.
MS-00090 CE 4-Jul-17 INV

MS-00464 CA 1-Apr-17 B
AL JABER & MAKHLOUF W.L.L
MS-00465 CA 1-Apr-17 B
ASPHALT MIX DESIGN - WEARING COURSE
17.13 917.4A.1 (MARSHALL MIX DESIGN) EVALUATION COMPLETED
MS-00466 CA 1-Apr-17 B
AL CAT
MS-00466 CB 27-Apr-17 B

MS-00215 CA 27-Aug-15 W
AL JARMAQ / G.C.C.
MS-00215 CB 16-Mar-17 W

MS-00216 CA 27-Aug-15 W

G.C.C. MS-00216 CD 22-Dec-15 W

ASPHALT PLANT SAMPLES FOR BITUMEN


17.14 917.4B GRADE 60/70 EVALUATION COMPLETED MS-00216 CE 16-Jul-17 W

MS-00217 CA 27-Aug-15 W

MS-00217 CD 22-Dec-15 W
AL CAT
PROC REP REV 49 Page 226 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
ASPHALT PLANT SAMPLES FOR BITUMEN
17.14 917.4B GRADE 60/70 EVALUATION COMPLETED

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
AL CAT
MS-00217 CE UR

MS-00217 CF UR

MS-00103 CA 7-Mar-15 B
AL- JARMAQ
for G.C.C.
MS-00103 CE 24-Jun-17 A

WOQOD
( for ALCAT, GCC)
MS-00113 CA 5-Apr-15 W

17.15 MA-MAT-PROCU-0960 917.2 BITUMEN 60/70 EVALUATION COMPLETED MS-00367 CA 12-May-16 B


AL JABER & MAKHLOUF W.L.L
MS-00367 CD 8-Aug-16 A

MS-00118 CA 8-Apr-15 B
WOQOD
( for GCC)
MS-00118 CD 17-Jul-16 A

MS-00120 CA 8-Apr-15 B
QATAR FUEL-WOQOD for
G.C.C.
MS-00120 CB 4-Jul-17 INV
17.16 MA-MAT-PROCU-0950 917.2A POLYMER MODIFIED BITUMEN (PG 76-10)EVALUATION COMPLETED
MS-00126 CA 13-Apr-15 B
AL-JAZEERA for
G.C.C.(BAPCO)
MS-00126 CB 4-Jul-17 INV

14-Oct-15
ALCAT Contracting Company
11-Oct-16

PROC REP REV 49 Page 227 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00114 CA 5-Apr-15 W

QATAR FUEL-WOQOD for


G.C.C. & ALKAT
MS-00114 CC 5-Jul-17 B

MS-00114 CD 18-Jul-17 A

MS-00119 CA 8-Apr-15 B
QATAR FUEL-WOQOD for
G.C.C.
MS-00119 CC 4-Jul-17 INV
17.17 MA-MAT-PROCU-0970 917.1 PRIME COAT EVALUATION COMPLETED

AL-JAZEERA for MS-00124 CA 13-Apr-15 B


G.C.C.(GULF PETROG.
DUBAI) MS-00124 CB 4-Jul-17 INV

MS-00365 CA 12-May-16 B
AL JABER & MAKHLOUF
W.L.L
MS-00365 CD 21-Feb-17 B

MS-00365 CE 11-Jul-17 A

MS-00125 CA 13-Apr-15 W
AL-JAZEERA for
G.C.C.(CHEMIX EM.)
MS-00125 CB 4-Jul-17 INV

14-Oct-15
ALCAT Contracting Company
11-Oct-16

MS-00115 CA 5-Apr-15 W
QATAR FUEL-WOQOD for
G.C.C. & ALKAT
PROC REP REV 49 Page 228 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
QATAR FUEL-WOQOD for
G.C.C. & ALKAT
MS-00115 CD 10-Apr-17 A

MS-00121 CA 8-Apr-15 B
QATAR FUEL-WOQOD for
G.C.C.
MS-00121 CC 4-Jul-17 INV
17.18 MA-MAT-PROCU-0970 917.5 TACK COAT EVALUATION COMPLETED
MS-00122 CA 11-Apr-15 W
AL-JAZEERA for
G.C.C.(CHEMIX EM.)
MS-00122 CE 4-Jul-17 INV

MS-00364 CA 12-May-16 B
AL JABER & MAKHLOUF W.L.L
MS-00364 CC 21-Jul-16 A

MS-00123 CA 11-Apr-15 W
AL-JAZEERA for
G.C.C.(BAHREIN ASPH.)
MS-00123 CB 23-Apr-15 W

MS-00295 CA 3-Jan-16 B
EVALUATION COMPLETED AL-MOHSEN
MS-00295 CL 11-Nov-17 A

MS-00342 CA 13-Mar-16 B

MS-00342 CL 1-Nov-17 A
EVALUATION COMPLETED J&P
MS-00409 CA 9-Oct-16 B

MA-MAT-PROCU-0970 CEMENT STABILIZED MATERIAL


17.19 917.6 (CSM TYPE-1 MIX DESIGN)
MS-00409 CD 1-Nov-17 A

PROC REP REV 49 Page 229 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
CEMENT STABILIZED MATERIAL DATE
17.19 MA-MAT-PROCU-0970 917.6 EVALUATED
(CSM TYPE-1 MIX DESIGN)

MS-00393 CA 22-Aug-16 W
EVALUATION COMPLETED J&P
MS-00393 CG 1-Nov-17 A

MS-00402 CA 27-Sep-16 W

EVALUATION COMPLETED J&P MS-00402 CB 8-Nov-16 B

MS-00402 CC 24-Nov-16 B

17.20 MA-MAT-PROCU-0940 918 AGGREGATE BASE COURSE

MS-00226 CA 29-Aug-15 B
ALCAT
MS-00226 CD 5-Jul-16 A

MS-00366 CA 12-May-16 B
17.21 918.1 ASPHALT AGGREGATES FOR ASPHALT PLANT COMPLETED
EVALUATION AL JABER & MAKHLOUF W.L.L
MS 00366 CC 17-Jul-16 A

MS-00227 CA 29-Aug-15 A
G.C.C.
MS-00227 CB 17-Jul-16 A

18. TRAFFIC SIGNS, TRAFFIC CONTROL AND ROAD MARKINGS

MS-00155 CA 16-May-15 W

STANDARD TRAFFIC SIGNS, BIKE LANE GIFFIN (UAE) /


18.01 931 SIGNS AND GROUND MOUNTED SIGNS
EVALUATION COMPLETED
GREEN ARROW
PROC REP REV 49 Page 230 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

STANDARD TRAFFIC SIGNS, BIKE LANE GIFFIN (UAE) /


18.01 931 SIGNS AND GROUND MOUNTED SIGNS
EVALUATION COMPLETED
GREEN ARROW MS-00155 CB 12-Jul-15 B

MS-00155 CC 2-Dec-15 A

MS-00157 CA 16-May-15 W
ELECTRO INDUSTRIES
MS-00157 CD 1-Feb-16 A

PQ-00107 CA 28-Aug-17 A

PQ-00107 CB 9-Oct-17 A
STANDARD TRAFFIC SIGNS, BIKE LANE
EVALUATION COMPLETED
SIGNS
MS-00528 CA 31-Aug-17 B
SIGMA METAL INDUSTRIES /
GREEN ARROW

MS-00528 CB 23-Sep-17 B
18.02 931

MS-00528 CC 9-Oct-17 A

MS-00528 CA 31-Aug-17 B
SIGMA METAL INDUSTRIES /
GREEN ARROW
MS-00528 CC 9-Oct-17 A
GROUND MOUNTED SIGNS EVALUATION COMPLETED

MS-00156 CA 16-May-15 W
ELECTRO INDUSTRIES

PROC REP REV 49 Page 231 of 405 File: 382684358.xlsx


18.02 931
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. GROUND MOUNTED SIGNS
DESCRIPTION EVALUATION COMPLETED RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
ELECTRO INDUSTRIES
MS-00156 CD 18-Apr-16 INV

PQ-00071 CA 22-Feb-16 A
EVALUATION COMPLETED ELECTRO INDUSTRIES
MS-00335 CA 21-Feb-16 INV

PQ-00067 CA 6-Feb-16 A
MA-MAT-PROCU-1030 OVERHEAD SIGN GANTRIES AND
18.03 931 CANTILEVER STRUCTURES GIFFIN (UAE) /
EVALUATION COMPLETED
GREEN ARROW MS-00323 CA 21-Feb-16 B

MS-00323 CC 11-Apr-16 A

EVALUATION COMPLETED MEMA / GREEN ARROW MS-00538 CA 11-Oct-17 B

INSTALLATION OF DIRECTIONAL SIGNS


18.04 931.1 INCLUDING GANTRIES
EVALUATION COMPLETED TRAGS PQ-00112 CA 14-Oct-17 A

PQ-00110 CA 23-Sep-17 W

PQ-00110 CB 1-Oct-17 W
OVER HEAD TRUSS GANTRY AND
18.05 EVALUATION COMPLETED MEMA / GREEN ARROW
CANTILEVER STRUCTURES
MS-00535 CA 27-Sep-17 W

MS-00535 CB 9-Oct-17 B

OVER HEAD TRUSS GANTRY AND


18.06
931.1 MONOTUBE GANTRY, CANTILEVER SIGMA METAL INDUSTRIES PQ-00114 CA 30-Nov-17 A
STRUCTURES

PROC REP REV 49 Page 232 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
931.1 EVALUATED

MS-00549 CA 28-Nov-17 B
OVER HEAD MONOTUBE GANTRY AND
18.07 SIGMA METAL INDUSTRIES
CANTILEVER STRUCTURES
MS-00549 CB 12-Dec-17 A

MS-00550 CA 28-Nov-17 B
OVER HEAD TRUST GANTRY AND
18.08 SIGMA METAL INDUSTRIES
CANTILEVER STRUCTURES
MS-00550 CB 12-Dec-17 A

PQ-00047 CA 30-May-15 A

EVALUATION COMPLETED BIN OMRAN MS-00145 CA 7-May-15 W

MS-00145 CD 31-May-16 A
18.09 933 PAVEMENT MARKINGS / SURFACE MARKINGS
PQ-00048 CA 2-Jun-15 A

EVALUATION COMPLETED BOOM CONSTRUCTION MS-00147 CA 7-May-15 W

MS-00147 CE 17-Nov-15 A

MS-00482 CA 5-Jun-17 W
KISAN YOL GOSTERICINIZ /
BIN OMRAN TRADING
MS-00482 CE 2-Oct-17 A

18.10 933.1 THERMOPLASTIC ROAD MARKING EVALUATION COMPLETED MS-00500 CA 17-Jul-17 B 17-Jul-17

SALAMA ROAD MARKING


FACTORY MS-00500 CC 5-Sep-17 A 31-Jul-17

PROC REP REV 49 Page 233 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
18.10 933.1 THERMOPLASTIC ROAD MARKING EVALUATION COMPLETED ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
SALAMA ROAD MARKING DATE
EVALUATED FACTORY

PQ-00103 CA 12-Aug-17 A

MS-00108 CA 22-Mar-15 B 27-Mar-15

MS-00108 CG 11-Jan-16 A 3rd Shipmt.

4th Shipmt.

5th Shipmt.

6th Shipmt.

7th Shipmt.

MS-00353 CA 26-Apr-16 B 1st Shipmt.


HIEROS, SPAIN /
18.11 943 GUARD RAILS AND CRUSH CUSHION
EVALUATION COMPLETED
ELECTRO INDUSTRIES
MS-00353 CD 3-Aug-16 A 2nd Shipmt.

MS-00427 CA 14-Dec-16 B 3rd Shipmt.

MS-00427 CC 9-Feb-17 A 4th Shipmt.

5th Shipmt.

1st Shipmt.

2nd Shipmt.

3rd Shipmt.

PROC REP REV 49 Page 234 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00433 CA 10-Jan-17 B LOT 1


X-TENSION GUARDRAIL END TERMINAL - NON LINDSAY / ELECTRO
18.12 943 GATING
EVALUATION COMPLETED
INDUSTRIES
MS-00433 CC 25-Feb-17 A LOT 2

MS-00435 CA 28-Jan-17 W

HIEROS, SPAIN /
18.13 943 FIXED OBJECT ATTACHMENT (FOA)EVALUATION COMPLETED ELECTRO INDUSTRIES MS-00435 CB 11-Oct-17 B

MS-00435 CC 20-Nov-17 B

PQ-00061 CA 31-Dec-15 W
18.14 943 INSTALLATION OF CRASH BARRIERS
EVALUATION COMPLETED MIDWIL TRADING INC., QATAR
PQ-00061 CB 6-Feb-17 A

18.15 943 INSTALLATION OF STEEL GUARDRAILS


EVALUATION COMPLETED ELECTRO INDUSTRIES PQ-00065 CA 23-Jan-16 A

PQ-00098 CA 1-Feb-17 W
INSTALLATION OF STEEL GUARDRAILS, EXCEL METAL INDUSTRIES
18.16 943 CRASH CUSHIONS, TRANSITION & EVALUATION
END COMPLETED PQ-00098 CB 8-Mar-17 A
TERMINAL
DUNES INTERNATIONAL PQ-00104 CA 12-Aug-17 A

18.17 944 CRASH CUSHIONS EVALUATION COMPLETED GREEN ARROW 26-May-15

MS-00149 CA 11-May-15 W 24-May-15


REDA NATIONAL,S.A/
18.18 938 CATS EYES / ROAD STUDS EVALUATION COMPLETED
ELECTRO INDUSTRIES
PROC REP REV 49 Page 235 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
REDA NATIONAL,S.A/
18.18 938 CATS EYES / ROAD STUDS EVALUATION COMPLETED
ELECTRO INDUSTRIES
MS-00149 CD 24-Dec-16 A

18.19 935 BARRIER BOLLARDS

18.20 941 HANDRAIL & ACCESSORIES

19. FENCING AND GATES

19.01 MA-MAT-PROCU-1040 921 CHAIN LINK FENCING & GATES UNDER EVALUATION

19.02 921 PEDESTRIAN FENCE (GALVANIZED)

19.03 921.1 CHAIN LINK RAILING 710mm HEIGHT UNDER EVALUATION

MS-00441 CA 2-Feb-17 W

CLIC QATAR MS-00441 CC 3-Aug-17 A

PQ-00106 CA 23-Aug-17 A
EVALUATION COMPLETED
19.04 921.2 CAMEL FENCE MS-00442 CA 2-Feb-17 B

LINK MIDDLE EAST / ELECTRO


IND. MS-00442 CB 4-Mar-17 B

MS-00442 CC 27-Apr-17 A

LINK MIDDLE EAST / EXCEL


EVALUATION COMPLETED
METAL IND. MS 00473 CA 16-May-17 B

PROC REP REV 49 Page 236 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

19.05 923 DECORATIVE FENCE

19.06 921T TEMPORARY SITE FENCING ENQUIRY ISSUED

19.07 941 ALUMINIUM RAILING

20. BRIDGE BEARINGS AND POST TENSIONING WORKS

PQ-00057 CA 24-Nov-15 B
RUHR UNIVERSITY BOCHUM
GERMANY
PQ-00057 CC 26-Dec-15 A

MS-00005 CA 12-Jul-14 B 1 st Del

MS-00005 CF 17-Nov-15 A 2nd Del

3rd Del

4th Del

5th Del

6th Del

7th Del

8th Del

PROC REP REV 49 Page 237 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

9th Del

10th Del

11th Del

12th Del
EVALUATION COMPLETED
20.01 946 BRIDGE BEARINGS 13th Del
MAURER SOHNE GmbH
(GERMANY)
/ ECO,QATAR 14th Del

15th Del

16th Del

17th Del

18th Del

19th Del

20th Del

21st Del

22nd Del

PROC REP REV 49 Page 238 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

23rd Del

24th Del

25th Del

26th Del
MAGEBA SA
EVALUATION COMPLETED
/ SKS QATAR MS-00191 CA 29-Jul-15 INV

MS-00298 CA 11-Jan-16 B
MAGEBA SA
EVALUATION COMPLETED
/ SKS QATAR
MS-00298 CE 20-Apr-16 A

MS-00294 CA 19-Jan-16 B

MS-00294 CF 31-May-16 A 1st Del

2nd Del
20.02 947 MODULAR EXPANSION JOINT
3rd Del
MAURER SOHNE
EVALUATION COMPLETED
/ ECO,QATAR
4th Del

5th Del

6th Del

7th Del

MS-00413 CA 25-Oct-16 W 23-Oct-16


DEKOTEC / AL DANA TECH.
20.03 947.1 BITUMEN JOINT FILLER IN ASPHALTEVALUATION COMPLETED SERV. & ENG.
PROC REP REV 49 Page 239 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
DEKOTEC / AL DANA TECH.
20.03 947.1 BITUMEN JOINT FILLER IN ASPHALTEVALUATION COMPLETED SERV. & ENG.
MS-00413 CC 3-Dec-16 A 10-Apr-17

PQ-00046 CA 2-Jun-15 W

20.04 949 POST TENSIONING WORKS SUPPLIED BY RIZZANI TENSA MS-00170 CA 28-May-15 W

MS-00170 CH 14-May-16 A

PQ-00052 CA 23-Aug-15 A
BRIDGES DECK CONSTRUCTION AND
20.05 949 ERECTION
RIZZANI DE ECCHER S.P.A.
PQ-00052 CB 23-Aug-15 A

20.06 949.1 GROUT FOR POST TENSIONING

PQ-00097 CA 4-Jan-17 W
SCARIFYING BRIDGE DECK TOP SURFACE
20.07 949.2 CONCRETE
EVALUATION COMPLETED YAMMINE
PQ-00097 CC 18-Mar-17 A

MS-00249 CA 4-Oct-15 B
NATIONAL METAL
20.08 949.2 7 WIRE STEEL STRAND SUPPLIED BY RIZZANI
MANUFACTURING & CASTING
MS-00249 CC 26-Dec-15 A

MS-00201 CA 13-Aug-15 W
20.09 949.3 THREADED ZINC INSERT TSI 38 X 138SUPPLIED BY RIZZANI CONAC
MS-00201 CB 13-Aug-15 W

MS-00220 CA 27-Aug-15 B
PHILIPP GROUP / BRIGHT
STAR
MS-00220 CC 26-Oct-15 A
PHILIPP FIXING GALVANIZED SOCKETS
20.10 949.12 WAVED END SUPPLIED BY RIZZANI
MS-00271 CA 3-Nov-15 B
PHILIPP GROUP / BRIGHT
STAR
PROC REP REV 49 Page 240 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. PHILIPP FIXINGDESCRIPTION
GALVANIZED SOCKETS RELEASE
20.10 949.12 WAVED END SUPPLIED
ISSUED BY RIZZANI /
/ RECEIVED SUPPLIER NUMBER DATE
DATE
EVALUATED
PHILIPP GROUP / BRIGHT
STAR
MS-00271 CB 28-Nov-15 A

MS-00221 CA 27-Aug-15 B
20.11 949.5 FIXING SOCKET WITH WAVED END SUPPLIED BY RIZZANI COSMOPLAST
MS-00221 CC 26-Oct-15 A

20.12 949.6 HDPE R3962 DEVIATION DIABOLO SUPPLIED BY RIZZANI A.D.S. TOOL MS-00223 CA 17-Aug-15 W

MS-00224 CA 27-Aug-15 B
20.13 949.7 6" PRE-SHAPED UPVC PIPE SUPPLIED BY RIZZANI KG PLASTIC
MS-00224 CD 13-Jul-16 A

SEALER INJECTION OF CRACK


20.14 949.8 MASTERINJECT 1320
SUPPLIED BY RIZZANI BASF MS-00234 CA 12-Sep-15 INV

MS-00235 CA 12-Sep-15 B
COSMETIC REPAIR UP TO 10 MM
20.15 949.9 MASTEREMACO N 307
SUPPLIED BY RIZZANI BASF
MS-00235 CB 8-Mar-16 A

MS-00236 CA 12-Sep-15 B
MASTERINJECT 1315 IS INJECTION EPOXY
20.16 949.10 RESIN SUPPLIED BY RIZZANI BASF
MS-00236 CC 20-Apr-16 A

INJECTION INTO CRACKS IN CONCRETE OR MS-00237 CA 15-Sep-15 B


20.17 949.11 MASONRY SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
(FOSROC NITOFILL EPLV) MS-00237 CC 22-Mar-16 A

REPAIR MORTAR FOR STRUCTURAL MS-00238 CA 15-Sep-15 B


20.18 949.21 CONCRETE AND MASONRY REPAIRSSUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
(FOSROC RENDEROC HSXTRA) MS-00238 CC 13-Jun-16 W

REPAIR MORTAR FOR STRUCTURAL MS-00239 CA 15-Sep-15 B


20.19 949.13 CONCRETE AND MASONRY REPAIRSSUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
PROC REP REV 49 (FOSROC RENDEROC FCXTRA) Page 241 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
REPAIR MORTAR FOR STRUCTURAL EVALUATED
20.19 949.13 CONCRETE AND MASONRY REPAIRSSUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
(FOSROC RENDEROC FCXTRA) MS-00239 CB 2-May-16 INV

MS-00240 CA 15-Sep-15 B
CONCRETE REPAIR MATERIAL (FOSROC
20.20 949.14 NITOMORTAR FC) SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
MS-00240 CC 6-Apr-16 A

MS-00241 CA 15-Sep-15 B
POLYMER MODIFIED CEMEMTITIOUS FOR
20.21 949.15 CONCRETE REPAIRS (RENDEROC LAXTRA)
SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
MS-00241 CD 16-Jun-16 A

CONCRETE CURING COMPOUND (CONCURE


20.22 949.16 WB 309) SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR MS-00243 CA 15-Sep-15 INV

MS-00244 CA 17-Sep-15 W
STAHLWERK ANNAHÜTTE MAX
20.23 949.17 POST-TENSIONING BAR, NUT AND PLATE
SUPPLIED BY RIZZANI
AICHER / QADCO
MS-00244 CD 14-Jul-16 A

MS-00248 CA 1-Oct-15 B
SIKADUR - 31 SBA SEGMENTAL BRIDGE SIKA SERVICES AG / SIKA
20.24 949.18 CONSTRUCTION SUPPLIED BY RIZZANI
QATAR L.L.C.
MS-00248 CD 2-Mar-16 A

WATER BASED CONCRETE CURING


20.25 949.19 COMPOUND (MASTERKURE®106) SUPPLIED BY RIZZANI BASF MS-00251 CA 4-Oct-15 B

MS-00218 CA 27-Aug-15 B
20.26 949.20 CONCRETE SPACERS MAX FRANK SUPPLIED BY RIZZANI MAX FRANK / CASTLE
MS-00218 CC 12-Nov-15 A

20.27 949.30 COSMOPLAST PE CORRUGATED CONDUIT


SUPPLIED BY RIZZANI COSMOPLAST MS-00263 CA 26-Oct-15 INV

MS-00266 CA 26-Oct-15 W
HDPE PIPE & CAP FOR EXTERNAL PT
20.28 949.22 ANCHORAGES SUPPLIED BY RIZZANI CENTRALTUBI / FUTURE
MS-00266 CC 24-Dec-15 A

PROC REP REV 49 Page 242 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00219 CA 27-Aug-15 W
SLAB BOLSTER SEMIFIX-SUPER 50 IS MIN REUSS-SEIFERT / MODERN
20.29 949.23 SEGMENT CONCRETE COVER SUPPLIED BY RIZZANI
BUILDERS
MS-00219 CB 10-Jan-15 W

MS-00272 CA 3-Nov-15 W
20.30 949.24 COSMOPLAST - 4" UPVC PIPE SUPPLIED BY RIZZANI COSMOPLAST
MS-00272 CB 2-Dec-15 INV

MS-00277 CA 9-Nov-15 B
HIGH STRENGTH, NON-FLOW, EPOXY
20.31 949.25 BEDDING & REPAIR MORTAR. SUPPLIED BY RIZZANI BASF / CONSTRUCTION
MS-00277 CB 8-Mar-16 A

MS-00280 CA 19-Nov-15 W
HDPE CORRUGATED PLASTIC DUCT FOR REX POLYEXTRUSION /
20.32 949.26 BEARING STUD RECESS SUPPLIED BY RIZZANI
QADCO
MS-00280 CB 1-Feb-16 A

ITALFLEX /
MAS TRADING MS-00283 CA 2-Dec-15 INV
PLASTIC DUCT FOR INSTALLATION OF
20.33 949.27 TEMPORARY TIE-DOWNS SUPPLIED BY RIZZANI INDUSTRIE POLIECO /
PROFESSIONAL TOOLS MS-00304 CA 21-Jan-16 B
TRADING

EPOXY ADHESIVE FOR SEGMENTAL MS-00286 CA 19-Dec-15 B


20.34 949.28 CONSTRUCTION (MASTERBRACE® ADH
SUPPLIED BY RIZZANI BASF
1441) MS-00286 CB 30-Jun-16 B

CONCRETE REPAIR MATERIALS : FOSROC MS-00287 CA 16-Dec-15 B


20.35 949.29 NITOMORTAR S WITH NITOCOTE PRIMER
SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
SEALER MS-00287 CB 3-Apr-16 A

MS-00288 CA 13-Dec-15 B
CEMENTITIOUS GROUT for CASTING OF
20.36 949.30 SPACERS (MASTERFLOW® 928) SUPPLIED BY RIZZANI BASF
MS-00288 CE 24-Jul-16 A

PROC REP REV 49 Page 243 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
CONCRETE CURING COMPOUND
20.37 949.31 (FOSROC CONCURE A) SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR MS-00292 CA 31-Dec-16 INV

SLAB BOLSTER (REUSS-SEIFERT GMBH REUSS-SEIFERT / MODERN


20.38 949.32 TELEFIX-SUPER 50) SUPPLIED BY RIZZANI
BUILDERS MS-00297 CA 10-Jan-16 W

GROUT FOR POST-TENSIONED CABLES & MS-00301 CA 19-Jan-16 B


20.39 949.33 FIXING ANCHORS/ BOLTS IN CONCRETE
SUPPLIED BY RIZZANI BASF
(MASTER ROC PLC) MS-00301 CE 30-Jul-16 A

MS-00299 CA 14-Jan-16 W
SUPPLIED BY RIZZANI BASF
MS-00299 CC 6-Apr-16 A
GROUTING OF BEARINGS &SHEAR KEYS IN
20.40 949.34 SEGMENTAL BRIDGES
MS-00334 CA 2-Mar-16 B
SUPPLIED BY RIZZANI SIKA BAHRAIN
MS-00334 CE 24-Jul-16 B

CORRUGATED PLASTIC DUCT FOR BEARING INDUSTRIE POLIECO /


20.41 949.35 GROUTING (50MM DUCT) SUPPLIED BY RIZZANI
PROFESSIONAL MS-00303 CA 21-Jan-16 INV

MS-00305 CA 21-Jan-16 B
EPDM SEALING GASKET PLACED AROUND TEKSPAN S.P.A /
20.42 949.36 THE PT DUCT HOLES SUPPLIED BY RIZZANI
PROFESSIONAL
MS-00305 CB 30-Jul-16 A

MS-00306 CA 24-Jan-16 W

CORROSION INHIBITOR POWDER FOR POST CORTEC CORPORATION (USA)


20.43 949.37 TENSIONED SEGMENTAL BRIDGES (MCI-309)
SUPPLIED BY RIZZANI
/ GREY MATTERS MS-00306 CB 24-Feb-16 B

MS-00306 CC 14-Apr-16 A

MS-00313 CA 28-Jan-16 W
ACRYLIC BONDING AGENT & CURING AID -
20.44 949.38 MASTEREMACO P210 SUPPLIED BY RIZZANI BASF
MS-00313 CB 14-Apr-16 A

PROC REP REV 49 Page 244 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

CONCRETE CURING COMPOUND TO TOP MS-00317 CA 1-Feb-16 B


20.45 949.39 SLAB SURFACE OF THE SEGMENTS SUPPLIED BY RIZZANI BASF
(MASTERKURE® 181). MS-00317 CB 22-Mar-16 A

WATER BASED CHEMICAL RELEASE AGENT -


20.46 949.40 (MASTERFINISH® RL225) SUPPLIED BY RIZZANI BASF MS-00318 CA 6-Feb-16 INV

MS-00322 CA 14-Feb-16 B
CEMENTITIOUS GROUT FOR REMEDIAL
20.47 949.41 WORKS (MF®928) SUPPLIED BY RIZZANI BASF
MS-00322 CD 24-May-16 A

MS-00325 CA 18-Feb-16 B
CEMENTITIOUS GROUT FOR REMEDIAL
20.48 949.41 WORKS (MASTFLOW950) SUPPLIED BY RIZZANI BASF
MS-00325 CC 20-Apr-16 A

20.49 MS-00324 CA 18-Feb-16 B


CEMENTITIOUS MICRO CONCRETE FOR
949.42 REMEDIAL WORKS - MF® 980 SUPPLIED BY RIZZANI BASF
20.50 MS-00324 CD 24-May-16 A

MS-00326 CA 18-Feb-16 W
EPOXY GROUT FOR REPAIRS IN BRIDGE
20.51 949.43 CONSTRUCTION MS® 915 SUPPLIED BY RIZZANI BASF
MS-00326 CC 20-Apr-16 A

MS-00328 CA 25-Feb-16 B
CEMENTITIOUS PINHOLES FILLER SIKAREP®
20.52 949.44 FINE-N SUPPLIED BY RIZZANI SIKA QATAR
MS-00328 CC 12-Apr-16 A

MS-00329 CA 25-Feb-16 B
HIGH STRENGTH FREE FLOW MICRO
20.53 949.45 CONCRETE SIKACRETE®114 SUPPLIED BY RIZZANI SIKA QATAR
MS-00329 CD 16-May-16 A

MS-00330 CA 25-Feb-16 B
NON SHRINK HIGH ST.CEMENTITIOUS GROUT
20.54 949.46 SIKAGROUT®114 SUPPLIED BY RIZZANI SIKA QATAR
PROC REP REV 49 Page 245 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
NON SHRINK HIGH ST.CEMENTITIOUS GROUT
20.54 949.46 SIKAGROUT®114 SUPPLIED BY RIZZANI SIKA QATAR
MS-00330 CE 9-Jun-16 A

MS-00331 CA 25-Feb-16 B
CEMENTITIOUS PATCH REPAIR MORTAR 5MM
20.55 949.47 TO 30MM SIKAREP SUPPLIED BY RIZZANI SIKA QATAR
MS-00331 CC 12-Apr-16 A

MS-00332 CA 25-Feb-16 B
EPOXY CEMENT BASED, BONDING AGENT &
20.56 949.48 REBAR COAT SIKATOP®110 SUPPLIED BY RIZZANI SIKA QATAR
MS-00332 CC 12-Apr-16 A

MS-00340 CA 22-Mar-16 B
INJECTION TO FILL AND SEAL CRACKS IN
20.57 949.49 STRUCTURES (Sikadur52) SUPPLIED BY RIZZANI SIKA QATAR
MS-00340 CB 14-Apr-16 A

MS-00341 CA 29-Mar-16 B
EPOXY BASED BONDING AGENT
20.58 949.50 SIKADUR®32LP SUPPLIED BY RIZZANI SIKA QATAR
MS-00341 CB 12-Apr-16 INV

MS-00344 CA 28-Mar-16 B
EVAPORATION RETARDANT ON TOP DECK
20.59 949.51 SURFACE(MasterKure111 CF) SUPPLIED BY RIZZANI BASF
MS-00344 CD 10-Jul-16 A

MS-00345 CA 28-Mar-16 B
BASED EXPOXY RESIN FOR REPAIR MORTAR
20.60 949.52 SIKADUR - 31CF SLOW SUPPLIED BY RIZZANI SIKA BAHRAIN
MS-00345 CC 14-May-16 A

MS-00346 CA 28-Mar-16 B
STRUCTURAL REPAIR WORKS SIKADUR 42MP
20.61 949.53 SLOW SUPPLIED BY RIZZANI SIKA BAHRAIN
MS-00346 CB 14-Apr-16 A

MS-00347 CA 3-Apr-16 B
CONCRETE BONDING AGENT FOSROC
20.62 949.54 NITOBOND EP SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
PROC REP REV 49 Page 246 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
CONCRETE BONDING AGENT FOSROC
20.62 949.54 NITOBOND EP SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
MS-00347 CC 18-May-16 INV

MS-00350 CA 6-Apr-16 B
EPOXY BONDING AGENT FOR CONCRETE
20.63 949.55 REPAIRS -ADH 1414 SUPPLIED BY RIZZANI BASF
MS-00350 CB 4-Jul-16 INV
HIGH CHEMICAL RESISTANCE, NON TOXIC
20.64 949.56 EPOXY COATING SIKAG®PW SUPPLIED BY RIZZANI SIKA BAHRAIN MS-00375 CA 30-May-16 INV

MS-00376 CA 30-May-16 B
A NON-TOXIC SOLVENT HIGH BUILD
20.65 949.57 PROTECTIVE EPOXY RESIN COATINGSUPPLIED BY RIZZANI BASF
MS-00376 CB 10-Jul-16 A

GROUTING OF BEARINGS &SHEAR KEYS IN


20.66 949.58 SEGMENTAL BRIDGES SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR MS-00377 CA 1-Jun-16 INV

MS-00231 CA 2-Sep-15 B
FORM OIL FOSROC REEBOL WB (WATER
20.67 098A BASED)
SUPPLIED BY RIZZANI AL GURG FOSROC / TADMUR
MS-00231 CB 21-Oct-15 A

21. LANDSCAPING - HARDSCAPING

21.01 965/976 SOFT LANDSCAPING & IRRIGATION

21.02 HARD LANDSCAPING

21.03 MA-MAT-PROCU-0920 IRRIGATION NETWORK

PQ-00105 CA 24-Aug-17 A
21.04 965 LANDSCAPING AND IRRIGATION EVALUATION COMPLETED LARISSA GARDENS W.L.L.
PQ-00105 CB 28-Aug-17 A

PROC REP REV 49 Page 247 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

21.05 965.1 DUST CONTROL APPLICATION MIXTURE

MS-00512 CA 28-Aug-17 B
UNI-SPRAYTM SERIES AND VARIABLE ARC RAIN BIRD / AG MIDDLE EAST /
21.06 965.2 NOZZLES (VANS)
EVALUATION COMPLETED
LARISSA
MS-00512 CB 19-Sep-17 A

MS-00513 CA 28-Aug-17 B

1065 & 1068 FORGED BRASS FULLYWAY GATE PEGLER YORKSHIRE / MEAC
21.07 965.3 VALVES
EVALUATION COMPLETED
WATER SYSTEMS / LARISSA MS-00513 CB 19-Sep-17 B

MS-00513 CC 14-Dec-17 A

MS-00514 CA 28-Aug-17 B

TECNIDRO s.r.l / MEAC WATER


21.08 965.4 MASTER CONTROL VALVE
EVALUATION COMPLETED
SYSTEMS / LARISSA GARDEN MS-00514 CB 19-Sep-17 B

MS-00514 CC 14-Dec-17 A

PQ-00018 CA 3-Jul-15 W 6-Jun-14


21.09 965.5 PLANT REMOVAL EVALUATION COMPLETED GARDEN HOUSE CENTER
PQ-00018 CB 17-Mar-15 A

PQ-00085 CA 6-Nov-16 W
A TO Z
PQ-00085 CB 22-Nov-16 W

PQ-00086 CA 6-Nov-16 W
GARDEN HOUSE CENTER
PROC REP REV 49 Page 248 of 405 File: 382684358.xlsx
RELOCATION OF TREES SECTION 02 QP-MIC
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
GARDEN HOUSE CENTER
PQ-00094 CA 15-Dec-16 W
RELOCATION OF TREES SECTION 02 QP-MIC
21.10 965.5.1 LIMIT EVALUATION COMPLETED
PQ-00087 CA 6-Nov-16 W
QATAR CANADIAN COMPANY
PQ-00087 CB 17-Nov-16 W

PQ-00099 CA 1-Feb-17 B
GOLDEN NAIL
PQ-00099 CC 7-Mar-17 A

MS-00515 CA 28-Aug-17 B
PRESSURE COMPENSATING FULL-CIRCLE RAIN BIRD / AG MIDDLE EAST /
21.11 965.6 BUBBLERS 1400 SERIES
EVALUATION COMPLETED
LARISSA GARDEN
MS-00515 CB 19-Sep-17 A

21.12 965.7 GRAVEL MULCH

MS-00516 CA 28-Aug-17 B
XERI-BUGTM EMITTERS & PRESSURE- RAIN BIRD / AG MIDDLE EAST /
21.13 965.8 COMPENSATING MODULES
EVALUATION COMPLETED
LARISSA GARDEN
MS-00516 CB 21-Sep-17 A

MS-00517 CA 28-Aug-17 B
RAIN BIRD / AG MIDDLE EAST /
21.14 965.9 PVB PROFESSIONAL SERIES VALVEEVALUATION
BOXES COMPLETED LARISSA GARDEN
MS-00517 CB 19-Sep-17 A

MS-00518 CA 28-Aug-17 B
UPVC PRESSURE S/S PIPES CLASS 'E' (15 HEPWORTH / LARISSA
21.15 965.10 BAR) EVALUATION COMPLETED
GARDEN
MS-00518 CB 19-Sep-17 A

PROC REP REV 49 Page 249 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

PEB AND PESB SERIES VALVES (SOLENOID MS-00519 CA 28-Aug-17 B


RAIN BIRD / AG MIDDLE EAST /
21.16 965.11 VALVES) AND PRS-DIAL PRESSUREEVALUATION COMPLETED LARISSA GARDEN
REGULATING MODULE MS-00519 CB 19-Sep-17 A

QUICK-COUPLING VALVES (5-RC), QUICK- MS-00520 CA 28-Aug-17 B


RAIN BIRD / AG MIDDLE EAST /
21.17 965.12 COUPLING KEYS (55-K-1) AND HOSEEVALUATION
SWIVEL COMPLETED LARISSA GARDEN
(SH-1) MS-00520 CB 19-Sep-17 A

MS-00522 CA 13-Sep-17 B
XD (EXTRA DISC) 3" PLASTIC DISC FILTERS, THE TORO COMPANY / GOLF
21.18 965.13 120 MESH (125 MICRON) CODE: IT-ABF7512-
EVALUATION COMPLETED INTERNATIONAL CO. / MS-00522 CB 1-Oct-17 B
3X* LARISSA GARDENS

MS-00522 CC 9-Jan-18 A

MS-00523 CA 13-Sep-17 W
MODERN PLASTIC INDUSTRY
21.19 965.14 UPVC FITTINGS (CLASS-E) EVALUATION COMPLETED (L.L.C) (MPI-ATLAS) / LARISSA MS-00523 CC 19-Oct-17 B
GARDENS

MS-00523 CD 16-Nov-17 A

CONTROL VALVE WIRES FOR 24 VAC PAIGE ELECTRIC COMPANY, MS-00524 CA 13-Sep-17 B
21.20 965.15 (NOMINAL) CIRCUITS (SINGLE CONDUCTORS,
EVALUATION COMPLETED LP / AG MIDDLE EAST /
TYPE UF) LARISSA GARDENS
MS-00524 CB 1-Oct-17 A

MS-00525 CA 13-Sep-17 B
UNIRAIN ARV-2"-KA (2" KINETIC AND UNIRAIN, S.A. / AG MIDDLE
21.21 965.16 AUTOMATIC AIR RELEASE VALVE) EVALUATION COMPLETED EAST / LARISSA GARDENS
MS-00525 CB 1-Oct-17 A

PROC REP REV 49 Page 250 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00526 CA 13-Sep-17 B

THE TORO COMPANY / GOLF MS-00526 CB 1-Oct-17 B


21.22 965.17 TFS (FLOW SENSORS) EVALUATION COMPLETED INTERNATIONAL CO. /
LARISSA GARDENS
MS-00526 CC 14-Dec-17 B

MS-00526 CD 7-Feb-18 A

PROC REP REV 49 Page 251 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00527 CA 13-Sep-17 B
SWING PIPE TUBING AND FITTINGS (SPX- RAIN BIRD / AG MIDDLE EAST /
21.23 965.18 FLEX SERIES - SWING PIPE) EVALUATION COMPLETED
LARISSA GARDEN
MS-00527 CB 1-Oct-17 A

MS-00530 CA 13-Sep-17 B
DBY / DBR WIRE CONNECTOR FOR 3M COMPANY / AG MIDDLE
21.24 965.19 LANDSCAPING AND IRRIGATION EVALUATION COMPLETED EAST / LARISSA GARDENS
MS-00530 CB 1-Oct-17 A

MS-00531 CA 13-Sep-17 B

THE TORO COMPANY / GOLF MS-00531 CB 1-Oct-17 B


SENTINEL CENTRAL CONTROL SYSTEM FOR
21.25 965.20 EVALUATION COMPLETED
LANDSCAPING AND IRRIGATION
INTERNATIONAL CO. /
LARISSA GARDENS
MS-00531 CC 30-Nov-17 B

MS-00531 CD 7-Feb-18 A

QATAR NATIONAL PLASTIC MS-00533 CA 13-Sep-17 B


WARNING TAPE GREEN COLOR, 150 MM
21.26 965.21 WIDTH, THICKNESS 200m EVALUATION COMPLETED FACTORY / LARISSA
GARDENS
MS-00533 CB 5-Oct-17 A

MS-00536 CA 9-Oct-17 W

UNIVERSAL / NURSERY & MS-00536 CB 16-Nov-17 B


21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES) COMPLETED
EVALUATION AGR. ENG / LARISSA
GARDENS

PROC REP REV 49 Page 252 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER
UNIVERSAL / NURSERY & NUMBER DATE
21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES) COMPLETED
EVALUATION AGR. ENG / LARISSA DATE
EVALUATED GARDENS

MS-00536 CC 11-Mar-18 A

MS-00537 CA 9-Oct-17 B
COMER / QATAR PIPELINE /
21.28 965.23 UPVC FITTINGS - UNION EVALUATION COMPLETED
LARISSA GARDENS
MS-00537 CB 18-Oct-17 A

MS-00543 CA 1-Nov-17 B
ELYSEE IRRIGATION /
21.29 965.24 POLYETHYLENE LIGHT WEIGHT FITTINGS
EVALUATION COMPLETED
LARISSA GARDENS
MS-00543 CB 16-Nov-17 B

MS-00544 CA 1-Nov-17 B

SAB SYKER / LARISSA


21.30 965.25 PLANTAFLOR SAB PEAT MOSS
EVALUATION COMPLETED
GARDENS MS-00544 CB 16-Nov-17 B

MS-00544 CC 30-Nov-17 A

NDS Standard Series 13" x 24" Rectangular Valve


National Diversified Sales, Inc.
Boxes- Description - Marking: 13" x 24" x 15" Box,
21.31 965.26 Overloading Bolt-Down Cover-Color: Black
EVALUATION COMPLETED
Box,
(NDS)Woodland Hills, MS-00548 CA 28-Nov-17 INV
CA/LARISSA GARDENS W.L.L.
Green Cover: (Part No. 125BCB)

MS-00556 CA 23-Dec-17 W
CARSON INDUSTRIES L.L.C. /
21.32 965.27 Valve Box Rectangular Super JumboEVALUATION
1324-15 COMPLETED LARISSA GARDENS W.L.L.

MS-00556 CB 9-Jan-18 B

PROC REP REV 49 Page 253 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

21.33 967 LITTER BINS

21.34 950 BIKE SHELTERS

21.35 950.1 BIKE RACKS

21.36 804 STREET/ PARK BENCHES

22. ARTSCAPING

22.01 968 ARTSCAPING ENQUIRY ISSUED

23. INTELIGENT TRANSPORT SYSTEM

(ITS) INTELIGENT TRANSPORT SYSTEM


23.01 930 EVALUATION COMPLETED ALGOSYSTEMS QATAR PQ-00027 CA 4-Sep-14 A
OVER HEIGHT DETECTION SYSTEM

ITS EQUIPMENTS (SUPPLY, INSTALLATION,


23.20 897.1 TESTING AND COMMISSIONING OF EVALUATION
ITS COMPLETED ALGOSYSTEMS QATAR PQ-00111 CA 14-Oct-17 A
WORKS

24. ELECTRICAL MATERIALS

24.01 460 HIGH VOLTAGE TOWER RELOCATION


EVALUATION COMPLETED NATIONAL CONTRACTING PQ-00010 CA 26-May-14 B

PQ-00036 CA 27-Oct-14 W
24.02 460 ELECTRICAL WORKS EVALUATION COMPLETED CONSPEL

PROC REP REV 49 Page 254 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
24.02 460 ELECTRICAL WORKS EVALUATION COMPLETED CONSPEL
PQ-00036 CB 8-Nov-14 A

LV (415 V) & MV (11 KV) POWER


24.03 460 DISTRIBUTION WORKS
EVALUATION COMPLETED DOREX ENGINEERING PQ-00050 CA 23-Aug-15 B

24.04 460 STREET LIGHTING WORKS EVALUATION COMPLETED EMESCO PQ-00051 CA 16-Jul-15 A

PQ-00081 CA 28-Jul-16 W
TESTING AND COMMISS. WORKS FOR KEMCO ELECTRICAL &
24.05 460 INDOOR SUB-STATIONS
EVALUATION COMPLETED
MECHANICAL
PQ-00081 CE 18-Mar-17 A

PQ-00084 CA 18-Oct-16 B

24.06 460 11 KV OHL WORKS EVALUATION COMPLETED KAHROMIKA PQ-00084 CB 21-Nov-16 B

PQ-00084 CC 14-Dec-16 A

MS-00043 CA 20-Oct-14 W 23-Nov-15


MA-MAT-PROCU-1070 MV & LV CABLES AS FEEDERS TO FEEDER
24.07 460 PILLARS AND SUBSTATIONS
EVALUATION COMPLETED DOHA CABLES
MS-00043 CD 3-Jan-16 A

MS-00199 CA 29-Jul-15 W 23-Nov-15


24.08 MA-MAT-PROCU-1070 460 LV CABLES FOR STREET LIGHTING
EVALUATION COMPLETED DOHA CABLES
MS-00199 CE 19-Jan-16 A

MS-00039 CA 20-Oct-14 W
MA-MAT-PROCU-1073 COPPER TERMINAL CABLE LUGS FOR KOMPRESS HOLDINGS
24.09 460 STREET LIGHTING
EVALUATION COMPLETED
LTD / TRADE HOUSE
MS-00039 CC 8-Aug-15 A

MS-00038 CA 20-Oct-14 W 8-Dec-15


MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM
24.10 460 / WALLIS
EVALUATION COMPLETED A. N. WALLIS & Co. LTD

PROC REP REV 49 Page 255 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM
24.10 460 / WALLIS
EVALUATION COMPLETED A. N. WALLIS & Co. LTD
MS-00038 CC 17-Sep-15 A

PVC CONDUITS & ACCESSORIES FOR INTERPLAST / MS-00037 CA 20-Oct-14 W 1-Dec-15


24.11 MA-MAT-PROCU-1072 460 UNDERBRIDGES, UNDER PASSESEVALUATION
& COMPLETED CONSTRUCTION
PEDESTRIAN / BIKEPATHS MATERIAL SERVICES MS-00037 CC 8-Aug-15 A

MS-00041 CA 20-Oct-14 W
MA-MAT-PROCU-1075 G.I. CONDUITS, PVC COATED G.I., FLEXIBLE SYARIKAT LAN-RIC
24.12 460 CONDUIT & ACCESSORIES
EVALUATION COMPLETED
INDUSTRIES / TISSCO
MS-00041 CB 20-Jan-15 B

MS-00040 CA 20-Oct-14 W
CMP PRODUCTS / TRADE
EVALUATION COMPLETED
HOUSE
MS-00040 CE 25-Nov-15 A
24.13 MA-MAT-PROCU-1074 460 CABLE GLANDS
MS-00343 CA 17-Mar-16 W
BRASS COPPER /
EVALUATION COMPLETED
DALLAS TRADING
MS-00343 CD 14-Jan-17 A

INDUSTRIAL CABLE MS-00042 CA 20-Oct-14 W


CABLE TRAY, LADDER, TRUNKING SUPPORT
24.14 460 SYSTEM / ICMS SYSTEMS
EVALUATION COMPLETED MANAGEMENT SYS /
TRADE HOUSE MS-00042 CG 24-Jan-16 A

MS-00044 CA 20-Oct-14 W
24.15 MA-MAT-PROCU-1077
PYROTENAX MICC CABLES FOR INDOOR PYROTENAX, PENTAIR /
460 SUBSTATIONS
EVALUATION COMPLETED
JBK DUCAB
MS-00044 CG 18-May-16 B

MS-00044 CH UR

MS-00415 CA 31-Oct-16 W

LUMINARIES FOR MICC CABLE FOR MICC / GLOBAL ELECTRIC


24.16 460 SUBSTATIONS
EVALUATION COMPLETED
COMPANY
PROC REP REV 49 Page 256 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
LUMINARIES FOR MICC CABLE FOR MICC / GLOBAL ELECTRIC
24.16 460 SUBSTATIONS
EVALUATION COMPLETED
COMPANY
MS-00415 CB 7-Jan-17 B

MS-00415 CC UR

MS-00110 CA 22-Mar-15 B
L/M VOLTAGE CABLE JOINTS & TERMINATION TYCO RAYCHEM
24.17 460 EVALUATION COMPLETED
FOR SUBSTATIONS / MANNAI TRADING
MS-00110 CB 12-Jan-16 A

FEDERAL MS-00206 CA 12-Aug-15 W 31-Dec-16


PACKAGE TYPE SUBSTATION (500kVA,
24.18 460 11/0.433kV)
EVALUATION COMPLETED TRANSFORMERS /
GULF LIGHTS MS-00206 CE 31-Jan-16 A

FEDERAL MS-00228 CA 20-Aug-15 W 4-Jan-16


EVALUATION COMPLETED TRANSFORMERS /
GULF LIGHTS MS-00228 CE 3-Jan-16 A
24.19 460 500 KVA OIL FILLED TRANSFORMERS
EVALUATION COMPLETED SGB MY / QIECO MS-00541 CA 28-Oct-17 W

VOLTAMP / ERTIBAT ENG.


EVALUATION COMPLETED
CO.
MS-00539 CA 21-Oct-17 W

MS-00232 CA 2-Sep-15 W
A.A. ENGINEERING &
24.20 460 STREET LIGHTING FEEDER PILLARS
EVALUATION COMPLETED MECHANICAL SERVICES MS-00232 CE 21-May-16 B
( AES )
MS-00232 CF 5-Nov-16 A

MS-00246 CA 15-Sep-15 W
AL-BABTAIN / DARWISH
24.21 460 6M STREET LIGHTING COLUMN EVALUATION COMPLETED
TRADING
MS-00246 CH 13-Nov-16 A

PROC REP REV 49 Page 257 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00129 CA 1-Aug-15 W
AL-BABTAIN / DARWISH
24.22 460 20M STREET LIGHTING HIGH MASTS
EVALUATION COMPLETED
TRADING
MS-00129 CF 14-Dec-15 W

MS-00130 CA 1-Aug-15 W 16-Nov-15


AL-BABTAIN / DARWISH
24.23 460 30M STREET LIGHTING HIGH MASTS
EVALUATION COMPLETED
TRADING
MS-00130 CE 3-Nov-15 A

MS-00476 CA 13-May-17 W
30M STREET LIGHTING (8 Lanterns-4 Lanterns AL-BABTAIN POWER
24.24 460 on each Side)
EVALUATION COMPLETED
TELECOMUNICATION
MS-00476 CB 3-Jun-17 B

SCHREDER GULF / MS-00198 CA 3-Aug-15 W 16-Nov-15


LUMINARIES FOR STREET LIGHTING
STONE & MORE
(250, 400 & 600WATTS).
ENTERPRISES MS-00198 CE 23-Nov-15 A
24.25 460 EVALUATION COMPLETED
MS-00411 CA 22-Oct-16 W
LUMINARIES FOR STREET LIGHTING 250
GE LIGHTING / VENICIA
WATTS
MS-00411 CE 8-Aug-17 A

24.26 460 LUMINARIES FOR SUBSTATION EVALUATION COMPLETED ORBIK / UNILED / HUDA MS-00391 CA 20-Aug-16 W

MS-00255 CA 8-Oct-15 B
24.27 460 CABLE TIES FOR STREET LIGHTING
EVALUATION COMPLETED 3M / DALLAS TRADING
MS-00255 CG 22-Jul-17 A

MS-00196 CA 28-Jul-15 W
8 MTR OCTAGONAL LIGHTING COLUMN WITH AL-BABTAIN / DARWISH
24.28 460 EVALUATION COMPLETED
SINGLE OR DOUBLE ARM BRACKET TRADING
MS-00196 CD 10-Nov-15 A

PROC REP REV 49 Page 258 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00197 CA 28-Jul-15 W 16-Nov-15

MS-00197 CE 10-Oct-15 A
12 MTR OCTAGONAL LIGHTING COLUMN AL-BABTAIN / DARWISH
24.29 460 EVALUATION COMPLETED
WITH SINGLE OR DOUBLE ARM BRACKET TRADING
MS-00507 CA 13-Aug-17 B

MS-00507 CB 23-Aug-17 B

MS-00448 CA 19-Feb-17 W
14 MTR OCTAGONAL STREET LIGHTING POLE AL-BABTAIN / DARWISH
24.30 460 EVALUATION COMPLETED
WITH 6 ARM BRACKET (2.0 M OUTREACH) TRADING
MS-00448 CD 20-May-17 A

MS-00477 CA 13-May-17 W

14 M OCTANGONAL STREET LIGHTING POLE AL-BABTAIN POWER


24.31 460 EVALUATION COMPLETED
WITH 4 ARM BRACKETS (2.0 M OUTREACH) TELECOMUNICATION
MS-00477 CB 30-May-17 B

MS-00477 CC 19-Jul-17 A

MS-00152 CA 10-May-15 W
FLEXIBLE HEAT RESISTANT CABLE 3C X
24.32 460 2.5mm² CU/PVC
EVALUATION COMPLETED DOHA CABLES
MS-00152 CF 17-Feb-16 A

MS-00378 CA 28-May-16 W
DUCAB CABLE CO. /
24.33 460 FLEXIBLE HEAT RESISTANT CABLE
EVALUATION COMPLETED
JBK DUCAB
MS-00378 CE 16-May-17 A

MS-00153 CA 10-May-15 W

24.34 460 SINGLE CORE WIRES FOR LV SYSTEM


EVALUATION COMPLETED DOHA CABLES MS-00153 CF 21-Jan-16 B

PROC REP REV 49 Page 259 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
24.34 460 SINGLE CORE WIRES FOR LV SYSTEM
EVALUATION COMPLETED
EVALUATED DOHA CABLES

MS-00153 CG 6-May-17 A

MS-00258 CA 19-Oct-15 W 11-Jan-16


TYCO RAYCHEM
24.35 460 MV/LV CABLE JOINTS & TERMINATION
EVALUATION
KITS COMPLETED
/ MANNAI TRADING
MS-00258 CB 14-Nov-15 W

MS-00259 CA 19-Oct-15 W
SCHREDER GULF /
UNDER BRIDGE & UNDER PASS LIGHTING
24.36 460 LUMINAIRES
EVALUATION COMPLETED STONE & MORE
ENTERPRISES MS-00259 CC 5-Dec-15 B

MS-00264 CA 15-Nov-15 W
24.37 460 LUMINAIRES FOR SUBSTATION EVALUATION COMPLETED GE LIGHTING / VENICIA
MS-00264 CC 22-Mar-16 W

MS-00265 CA 27-Oct-15 W
TAMCO SWITCHGEAR /
24.38 460 11 KV SWITCHGEAR PANELS EVALUATION COMPLETED
GULF LIGHTS
MS-00265 CC 5-Jan-16 B

MS-00354 CA 16-Apr-16 W
AL-AHLEIA /
24.39 460 11KV INDOOR SWITCHGEAR 25KA,
EVALUATION
800A COMPLETED
AALCO TRADING
MS-00354 CD 22-Jul-17 A

FREE STANDING FEEDER PILLAR WITH MAIN LUCY MIDDLE EAST/ MS-00269 CA 29-Oct-15 W
24.40 460 SWITCH OF 800A TP AND 6 NOS OUTGOING
EVALUATION COMPLETED QATAR INTERNATIONAL
FUSED WAYS OF 2500A TP TYPE-J FUSES. ELECTRICAL MS-00269 CC 13-Feb-16 A

FAISAL JASSIM /
EVALUATION COMPLETED
FJ TRADING
MS-00285 CA 30-Nov-15 W 3-Feb-16

MS-00316 CA 1-Feb-16 W
24.41 460 COMMON FEEDER PILLAR A.A. ENGINEERING &
PROC REP REV 49 EVALUATIONPage
COMPLETED
260 of 405 MECHANICAL SERVICES File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
24.41 460 COMMON FEEDER PILLAR A.A. ENGINEERING &
EVALUATION COMPLETED MECHANICAL SERVICES MS-00316 CB 24-Feb-16 W
(AES)
MS-00316 CC UR

MS-00469 CA 20-Apr-17 W
Asiatic/Qatar International
24.42 460 6 Way Free Standing Feeder Pillar EVALUATION COMPLETED Electrical Comapany
MS-00469 CC 13-Jun-17 A

A.B.B /
24.43 460 DISTRIBUTION BOARD FOR MV SUBSTATION
EVALUATION COMPLETED
FAISAL JASSIM (FJ)
MS-00260 CA 3-Nov-15 W

TOFCO CPP LTD./ MS-00276 CA 7-Nov-15 W


24.44 460 CUT-OUT BOX FOR STREET LIGHTING
EVALUATION
POLE COMPLETED QATAR INTERNATIONAL
ELECTRICAL MS-00276 CE 14-Mar-16 A

EXER FRESH EXP./


24.45 460 MARSHALLING BOXES FOR SUBSTATIONS
EVALUATION COMPLETED
VOLTAGE ENG.
MS-00282 CA 19-Nov-15 W

MS-00302 CA 16-Jan-16 W
MK ELECTRIC, UK/
24.46 460 ELECTRICAL WIRING ACCESSORIES
EVALUATION COMPLETED
ELECTRO TRADE
MS-00302 CD 18-May-16 B

MS-00383 CA 28-Jun-16 W

TYCO RAYCHEM
/ MANNAI TRADING
MS-00383 CC 22-Aug-16 B

24.47 460 MULTICORE PILOT CABLE JOINT KIT


EVALUATION COMPLETED MS-00383 CD 5-Oct-16 A

MS-00406 CA 16-Oct-16 W
YAMUNA CABLE/ GLOBAL
ELEC. CO.

PROC REP REV 49 Page 261 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
24.47 460 MULTICORE PILOT CABLE JOINT KIT
EVALUATION COMPLETED SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
YAMUNA CABLE/ GLOBAL
ELEC. CO.
MS-00406 CB 19-Jan-17 W

24.48 460 INDOOR TYPE SUBSTATION ENQUIRY ISSUED 6-May-15

24.49 460 STREET LIGHTING COLUMNS AND BRACKETS AL-BABTAIN 2-Jun-15

24.50 460 CABLE DUCTS AND ACCESSORIES

24.51 MA-MAT-PROCU-1060 460 HV/EHV CABLES

24.52 460 STREET LIGHTING LANTERNS & LUMINAIRS

24.53 MA-MAT-PROCU-1080 460 BRIDGE / UNDERPASS LIGHTING

MS-00389 CA 30-Jul-16 W

24.54 460 14M STREET LIGHTING POLES EVALUATION COMPLETED AL-BABTAIN / DARWISH MS-00389 CB 6-Sep-16 B

MS-00389 CC 6-Nov-16 A

MS-00387 CA 12-Jul-16 W

EVALUATION COMPLETED TAMCO / GULF LIGHTS MS-00387 CC 19-Sep-16 B


24.55 460 11 KV RING MAIN UNIT (RMU)
MS-00387 CD 5-Oct-17 B

SIEMENS AG / SIEMENS
EVALUATION COMPLETED
WLL
MS-00547 CA 20-Nov-17 W

MS-00397 CA 27-Aug-16 B

GE LIGHTING SYSTEM /
24.56 460 LUMINAIRES FOR STREET LIGHTING
EVALUATION COMPLETED
VENICIA
PROC REP REV 49 Page 262 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED
GE LIGHTING SYSTEM /
24.56 460 LUMINAIRES FOR STREET LIGHTING
EVALUATION COMPLETED
VENICIA
MS-00397 CC 1-Dec-16 B

MS-00397 CD 6-May-17 A

MS-00405 CA 13-Oct-16 W

14 M STREET LIGHTING POLE OF DOUBLE


24.57 460 ARM BRACKET ON ONE SIDE
EVALUATION COMPLETED AL-BABTAIN / DARWISH MS-00405 CB 10-Dec-16 B

MS-00405 CC 16-May-17 A

MS-00407 CA 17-Oct-16 W

YAMUNA CABLE/ GLOBAL


24.58 460 11 KV JOINT & TERMINATION KIT EVALUATION COMPLETED
ELEC. CO.
MS-00407 CC 1-Feb-17 B

MS-00407 CD UR

MS-00408 CA 18-Oct-16 W
YAMUNA CABLE/ GLOBAL
24.59 460 LV CABLE & STRAIGHT JOINT KITEVALUATION COMPLETED
ELEC. CO.
MS-00408 CD 24-Apr-17 A

MS-00474 CA 8-May-17 W

Yamuna Power &


24.60 460 CAST RESIN TEE JOINTS EVALUATION COMPLETED
Infrastructure
MS-00474 CB 3-Jun-17 B

MS-00474 CC 8-Jul-17 A

MS-00410 CA 24-Oct-16 W

24.61 460 BARE COPPER CABLE EVALUATION COMPLETED DOHA CABLES MS-00410 CB 21-Nov-16 B

PROC REP REV 49 Page 263 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
24.61 460 BARE COPPER CABLE EVALUATION COMPLETED
EVALUATED DOHA CABLES

MS-00410 CC 12-Dec-16 B

MS-00545 CA 9-Nov-17 W

A.A. ENGINEERING & MS-00545 CB 14-Jan-18 B


24.62 460 KWH METER SERVICE CABINETS
EVALUATION COMPLETED
MECH. SER.

MS-00545 CC 4-Mar-18 A

MS-00542 CA 25-Oct-17 B

STREET LIGHTING COLUMN (6 M, 12 M & 14 VALMONT INDUSTRIES /


24.63 460 EVALUATION COMPLETED
M) & HIGH MAST (30 M) AL CONTRA
MS-00542 CB 11-Dec-17 B

MS-00542 CC 23-Jan-18 B

MS-00532 CA 13-Sep-17 W
STREET LIGHTING COLUMN (6 M, 12 M & 14 MITAS POLES /
24.64 460 M) WITH SINGLE / DOUBLE ARM
EVALUATION COMPLETED
PETROSERV
MS-00532 CB 9-Oct-17 A

24.65 MS-00557 CA 9-Jan-18 B


POWER & LIGHT CENTER
460 Underpass Lighting Luminaire
EVALUATION COMPLETED
(PLCC)
MS-00557 CB UR

PROC REP REV 49 Page 264 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

LUCY ZODION LTD. /


24.66 460 LIGHTING CUT-OUTS -STREET LIGHTING
EVALUATION COMPLETED ALCONTRA TRADING & MS-00563 CA 27-Feb-18 W
CONTRACTING CO.

PQ-00058 CA 25-Nov-15 W
LV (415 V) & MV (11 KV) POWER
25.00 460 PL1 DISTRIBUTION WORKS EVALUATION COMPLETED POWER LINKS QATAR
PQ-00058 CC 9-Apr-16 A

PQ-00091 CA 10-Dec-16 W

CONSTRUCTION OF INDOOR / OUTDOOR AND


25.01 460 PL2 PACKAGE FOR ELECTRICAL SUBSTATIONS
EVALUATION COMPLETED POWER LINKS QATAR
PQ-00091 CB 15-Jan-17 W

PQ-00091 CC 21-Feb-17 A

MS-00351 CA 6-Apr-16 W
AL-SAMIR PLASTIC
25.02 460 PL1 PE CABLE TILE FOR ELECTRICALEVALUATION
CABLES COMPLETED
FACTORY U.A.E
MS-00351 CC 1-May-16 A

MS-00352 CA 6-Apr-16 W
AL-SAMIR PLASTIC
25.03 460 PL2 WARNING TAPE FOR ELECTRICALEVALUATION
CABLES COMPLETED
FACTORY U.A.E
MS-00352 CC 20-Jun-16 A

MS-00355 CA 30-Apr-16 B
HENKEL POLYBIT
SUBSTRUCTURE WATERPROOFING SYSTEM
25.04 460 PL3 FOR POWER SUBSTATION EVALUATION COMPLETED MS-00355 CC 17-Jul-16 B

AL WAFA WP & M PQ-00080 CA 30-Jun-16 A

PROC REP REV 49 Page 265 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00356 CA 4-May-16 B
CONCRETE HOLLOW BLOCKS FOR WALLS OF
25.05 460 PL4 POWER SUBSTATION EVALUATION COMPLETED SIMSIMA FACTORY
MS-00356 CD 23-Jan-17 A

MS-00357 CA 7-May-16 B
READY MIX CONCRETE FOR POWER
25.06 460 PL5 SUBSTATIONS EVALUATION COMPLETED SMEET READY MIX
MS-00357 CB 21-Jun-16 B

MS-00358 CA 8-May-16 B
POLYETHYLENE SHEET(1000 GAUGE -
25.07 460 PL6 250MIC) FOR POWER SUBSTATION)
EVALUATION COMPLETED UNIPLAST
MS-00358 CB 9-Jun-16 A

MS-00369 CA 18-May-16 W

GRACE QATAR TRADING


25.08 460 PL7 GRC WORKS FOR POWER SUBSTATION
EVALUATION COMPLETED
& CONT
MS-00369 CB 13-Jul-16 B

MS-00369 CC 26-Dec-16 B

MS-00370 CA 16-May-16 W
GALVANIZED STEEL DOOR & VENTILATORS TECH STAR ALUMINIUM &
25.09 460 PL8 FOR SUBSTATION EVALUATION COMPLETED
STEEL
MS-00370 CB 23-Jun-16 B

MS-00368 CA 24-May-16 W
WASHED SAND FOR BLOCK WORK & QATAR SAND TREATMENT
25.10 460 PL9 PLASTERING FOR SUBSTATION EVALUATION COMPLETED PLANT
MS-00368 CC 9-Oct-16 A

MS-00371 CA 24-May-16 B
OPC CEMENT FOR BLOCK WORK & QATAR NATIONAL
25.11 460 PL10 PLASTERING FOR SUBSTATION EVALUATION COMPLETED CEMENT CO.
MS-00371 CB 21-Jun-16 B

PROC REP REV 49 Page 266 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00372 CA 30-May-16 B

BITUPLUS MEMBRANE FOR ROOF


25.12 460 PL11 WATERPROOFING FOR SUBSTATION
EVALUATION COMPLETED HENKEL POLYBIT MS-00372 CB 3-Aug-16 B

MS-00372 CC 3-Apr-17 A

MS-00373 CA 30-May-16 B

POLYSTRENE BOARD FOR ROOF QATAR INSULATION


25.13 460 PL12 WATERPROOFING FOR SUBSTATION
EVALUATION COMPLETED
FACTORY
MS-00373 CB 23-Jun-16 B

MS-00373 CC 3-Apr-17 A

MS-00374 CA 30-May-16 W
GEOTEXTILE MEMBRANE FOR ROOF
25.14 460 PL13 WATERPROOFING FOR SUBSTATION
EVALUATION COMPLETED TERRAM / TADMUR
MS-00374 CC 9-Oct-16 A

MS-00379 CA 9-Jun-16 B

AL GURG FOSROC /
TADMUR TRADING
MS-00379 CB 10-Jul-16 B
FLOOR EPOXY PAINT- SUBSTATION (FOSROC
25.15 460 PL14 NITOFLOR FC150 & FC140) EVALUATION COMPLETED
MS-00379 CC 26-Dec-16 B

AL GURG FOSROC /
TADMUR TRADING
MS-00457 CA 16-Mar-17 B

MS-00380 CA 13-Jun-16 W

EXTERNAL & INTERNAL WALL FACE COATING


25.16 460 PL15 SYSTEM FOR SUBSTATION EVALUATION COMPLETED HEMPEL PAINTS QATAR MS-00380 CB 23-Jan-17 W

MS-00380 CC 11-Oct-17 B

PROC REP REV 49 Page 267 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00398 CA 6-Sep-16 B
HIGH YIELD STEEL DEFORMED REBARS QATAR STEEL COMPANY /
25.17 460 PL16 (NORMAL AND EPOXY COATED) EVALUATION COMPLETED TEYSEER
MS-00398 CC 3-Dec-16 A

MS-00399 CA 11-Sep-16 B
BITUMEN FIBER JOINT FILLER BOARD 12 MM JOLLYBOARD LIMITED /
25.18 460 PL17 THICKNESS EVALUATION COMPLETED
TADMUR TRADING
MS-00399 CB 18-Oct-16 A

MS-00401 CA 22-Sep-16 W
BLACK ANNEALED WITH PVC COATED ANPING COUNTY
25.19 460 PL18 BINDING WIRE (1.6 MM THICKNESS)
EVALUATION COMPLETED
HONGDA / MEBCO
MS-00401 CC 30-Jan-17 A

READY MIX CONCRETE FOR POWER


25.20 460 PL19 SUBSTATIONS EVALUATION COMPLETED SMEET READY MIX MS-00403 CA 2-Oct-16 B

MS-00458 CA 16-Mar-17 W
25.21 460 PL20 PLASTERING ACCESSORIES EVALUATION COMPLETED EXPANDED METAL
MS-00458 CB 3-Apr-17 A

25.22 460 PL21 WATERPROOFING SYSTEM EVALUATION COMPLETED BITUMODE QATAR MS-00505 CA 7-Aug-17 B

MS-00551 CA 14-Dec-17 B
HAGER MIDDLE EAST FZE
25.23 460 PL22 DB Box, MCCBs, ELCBEVALUATION COMPLETED / IMPERIAL TRADING AND
CONTRACTING COMPANY
MS-00551 CB 24-Jan-18 A

PHILIPS LIGHTING
MS-00552 CA 17-Dec-17 B
Substation Lighting Features - Philips (France) /
25.24 460 PL23 EVALUATION COMPLETED
Flourescent Light Fittings
(FRANCE) / ART AND
BUILDING SOLUTIONS
PROC REP REV 49 Page 268 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED PHILIPS LIGHTING
Substation Lighting Features - Philips (France) /
25.24 460 PL23 EVALUATION COMPLETED
Flourescent Light Fittings
(FRANCE) / ART AND
BUILDING SOLUTIONS
MS-00552 CB 25-Jan-18 A

Thorn Lighting
MS-00553 CA 17-Dec-17 B
25.25 460 PL24 Weather proof light EVALUATION COMPLETED Company(UK) / ART AND
BUILDING SOLUTIONS
MS-00553 CB 25-Jan-18 A

Emergi-Lite Company / ART


MS-00554 CA 19-Dec-17 B
25.26 460 PL25 Exit Light Fittings for Substation
EVALUATION COMPLETED AND BUILDING
SOLUTIONS
MS-00554 CB 25-Jan-18 A

Hempel Qatar W.L.L. / ART


25.27 460 PL26 Strata Primer SF 25359, Strata Epoxy
EVALUATION
HT 35599 COMPLETED AND BUILDING MS-00555 CA 30-Dec-17 B
SOLUTIONS

PQ-00096 CA 8-Jan-17 W
ASSOCIATED
PQ-00096 CC 5-Mar-17 A
EARTH HOLE DRILLING FOR EARTHING ROD
26.00 461.01 INSTALLATION EVALUATION COMPLETED
PQ-00095 CA 8-Jan-17 W
YAMMINE
PQ-00095 CC 18-Mar-17 A

1222/122 INSTRUMENTATION CONTROL AND


27.00 EVALUATION COMPLETED GULF AUTOMATION PQ-00101 CA 30-Dec-17 A
3/1224 AUTOMATION

PROC REP REV 49 Page 269 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018

ENQUIRY STATUS

APPROVAL
ORDER

STATUS
SELECTED SUBMITTAL RESPONSE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION RELEASE
ISSUED / RECEIVED / SUPPLIER NUMBER DATE
DATE
EVALUATED

MS-00483 CA 8-Jun-17 B

MS-00483 CC 6-Jul-17 B
1222/122 SCADA PROVISION RTU CONTROL PANEL
27.01 EVALUATION COMPLETED GULF AUTOMATION
3/1224 FOR TSE
MS-00483 CD 9-Nov-17 B

MS-00483 CE 6-Feb-18 B

ENDRESS & HAUSER INSTRUMENTS (FLOW MS-00484 CA 6-Jun-17 B


1222/122 METER, PRESSURE TRANISMITTER AND
27.02 EVALUATION COMPLETED GULF AUTOMATION
3/1224 LEVEL SWITCH) AND AUMA ACTUATORS FOR
TSE
MS-00484 CD 17-Oct-17 A

1222/122
27.03 AUMA ACTUATORS FOR TSE EVALUATION COMPLETED GULF AUTOMATION MS-00568 CA 4-Mar-18 B
3/1224

PROC REP REV 49 Page 270 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

1. PRELIMINARY ITEMS AND ENGINEER'S SITE FACILITIES

Y
1.01 PR-GEN-MOBL-0485 06B ENGINEER'S SITE OFFICES
Y

OFFICE PORTA CABIN CONSISTING OF ONE


1.02 PR-GEN-MOBL-0485 06B Y
ROOM, TOILET & KITCHEN

Y
PR-GEN-MOBL-0485 TRUSSES FOR MESS HALL AND CLINIC
1.03 06B PORTA CABIN

1.04 PR-GEN-MOBL-0638 06B SITE PHOTOGRAPHS AND VIDEO

1.05 PR-GEN-MOBL-0485 06B PHOTOCOPIER Y

1.06 PR-GEN-MOBL-0485 06B DIGITAL CAMERA Y

CEILING MOUNTED PROJECTOR & WALL


1.07 PR-GEN-MOBL-0485 06B Y
MOUNTED FOLDING SCREEN

Y
1.08 PR-GEN-MOBL-0485 06B 42" FLAT PLASMA TV & DVD PLAYER
Y
3.00
Y
1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM
PROC REP REV 49 Page 271 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
3.00

1.09 PR-GEN-MOBL-0485 06B TELEPHONE SETS AND PABX SYSTEM


Y

KITCHEN SINK,CUPBOARDS, APPLIANCES ,


1.10 PR-GEN-MOBL-0485 06B CROCKERY & CUTLERY, CUPS, SAUCERS
AND GLASSES

PR-GEN-MOBL-0485 PORTABLE DRY POWDER FIRE


1.11 06B EXTINGUISHER

1.12 PR-GEN-MOBL-0485 06B ELECTRIC STEEL WATER COOLER Y

Y CLIENT AND J&P SITE OFFICE

1.13 PR-GEN-MOBL-0485 06B FIRE DETECTION SYSTEM Y J&P ENG. SITE OFFICE & AECOM SITE OFFICE

Y FOR MAIN SITE CLINIC

Y FOR AECOM NEW OFFICES


1.14 06B IT NETWORK EQUIPMENT
Y

NETWORK SPARES FOR SERVER ROOM AND


1.15 06B Y
DESKTOP CONNECTION

1.16 06B ID CARD PRINTER, USB & ETHERNET Y

PROC REP REV 49 Page 272 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 2 SETS

Y 1 SET

Y 4 x 2 SETS

5 SETS of SOKKIA TOTAL STATION CX102,


1.17 PR-GEN-MOBL-0485 046 SURVEYING INSTRUMENTS Y AUTOLEVEL B40, MINI PRISM

24 x 2 SETS

Y FULL SET - GeoMax RTK Rover Receiver

Y 1 SET

Y AUTO LEVEL STAFF 10NRS

Y 5 SETS

Y 1 NR

Y 2 NRS

1.18 046A LASER ROTATOR INSTRUMENT 2 NRS

2 NRS

1 NRS

PROC REP REV 49 Page 273 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

1.19 046 SURVEYING EQUIPMENT CALIBRATION

1.20 045 GROUND WATER MONITORING Y

1.21 045 THERMO COUPLES

Y 3 NRS

CONCRETE REINFORCEMENT COVER METER


1.22 045 Y 3 NRS
/ DETECTOR

Y 1 NR

ELCOMETER 900 CONCRETE CRACK


1.23 045 Y
MICROSCOPE

Y
1.24 PR-GEN-MOBL-0485 030 COMPUTERS & PRINTERS
Y

26.00 Y

Y
1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture
PROC REP REV 49 Page 274 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
26.00
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

1.25 PR-GEN-MOBL-0485 833.1 J&P - Site Office Furniture


Y

13.00 Y

1.26 PR-GEN-MOBL-0485 833.2 Client Site Office Furniture Y

1.27 833.3 GARAGE OFFICES - SITE FACILITIES Y

Y
1.28 833.4 MATERIAL STORE - SITE FACILITIES
Y

1.29 820 KITCHEN EQUIPMENTS Y

Y For Client office

AIRCONDITIONING UNITS, SPLIT TYPE


1.30 PR-GEN-MOBL-0485 451 Y For J&P office
HEAT /COOL 1.5 TON & 2 TON CAPACITY

PROC REP REV 49 Page 275 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
PR-GEN-MOBL-0485 AIRCONDITIONING UNITS, SPLIT TYPE
1.30 451 HEAT /COOL 1.5 TON & 2 TON CAPACITY

Y For Site Clinic

Y
1.31 PR-GEN-MOBL-0485 06C PROJECT SIGN BOARD

1.32 PR-GEN-MOBL-0520 06D SITE HOARDING 3480.00

Y G.I. SHEET

SUPPLY OF PVC FLEX TARPAULIN PRINTED


1.33 922 BANNER

1.34 PR-GEN-MOBL-0520 06E TEMPORARY TRAFFIC SIGNS Y

Y
TEMPORARY TRAFFIC SIGNS FOR
1.35 06E J17 &J18 AND FLASHING ARROW
Y

PROC REP REV 49 Page 276 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

TEMPORARY TRAFFIC SIGNS FOR


1.36 06E Y
J17 & J18 ROUNDABOUT (R/A)
253.00

1.37 06E FLAG SIGNS WITH POST


Y

1.38 06E SOLAR ELECTRONIC ARROW Y

TEMPORARY TRAFFIC SIGNS for Site Access


1.39 06E Y
Road

Y
1.40 06E SOLAR MESSAGE BOARD
Y

Y
1.41 06E REFLECTIVE STICKER
Y

1.42 06E TEMPORARY TRAFFIC SIGNS for J15 Y

PROC REP REV 49 Page 277 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

PR-GEN-MOBL-0520 WEBCAMS - FOR SITE MONITORING AND


1.43 06F TIME LAPSE

1.44 06F VIDEOGRAPHY AND PHOTOGRAPHY Y

Y APPROVED BY MOI / TRAFFIC DEPARTMENT

Y 1 NOS
1.45 PR-GEN-MOBL-0520 06G TRAFFIC CONTROL SYSTEM

Y 2 NOS

1.46 06R RADAR SPEED SIGNS

1.47 PR-GEN-MOBL-0520 097 ACCESS TOWERS FOR WEBCAMS Y MATERIAL ORDER

SUPPY, INSTALLATION OPERATION AND


1.48 573 Y
TESTING FOR CCTV CAMERA

1.49 790 LOCATION SIGNS Y

2. SITE INVESTIGATION, SURVEYING AND TESTING

Y QUOTATION / BOQ NO.GL/Q/SI/5380


PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL
2.01 041 INVESTIGATION & PILE TESTING
PROC REP REV 49 Page 278 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

PR-GEN-MOBL-0610 GEOPHYSICAL SURVEY & SOIL


2.01 041 INVESTIGATION & PILE TESTING
Y QUOTATION. REF: GL/Q/SI/5699

Y QUOTATION. REF: GL/Q/SI/5713R

Y QUOTATION. REF: PT15002313

Y QUOTATION. REF.MTC-10921A
2.02 PR-GEN-MOBL-0610 041A TOPOGRAPHICAL SURVEY
Y QUOTATION. REF.MTC-13102

Letter of Intent EXW-P023-0001-SC5-FUGRO-002,


Dt.10.Mar.2016
PR-GEN-MOBL-0610 GEOTECHNICAL, SURVEY & LABORATORY
2.03 041C SERVICES

Y
2.04 PR-GEN-MOBL-0610 045 LABORATORY EQUIPMENT
Y

Micro Oven-1 NR, Pyrex Heat Reis- 12NRS

NON NUCLEAR ASPHALT DENSITY GAUGE


2.05 045.5 Y 1 UNIT
(MODELPQI-380)

PROC REP REV 49 Page 279 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

2.06 PR-GEN-MOBL-0625 047 GIS FOR WATER, DRAINAGE, POWER

All
requir
ed Y
2.07
testin Y
gAll
being
requir Y
048 INDEPENDENT LABORATORY TESTING perfo
ed Y
rmed
testin
g
being
perfo
rmed

2.08 048 CONCRETE MIX DESIGN TRIALS Y

2.09 048 GROUND WATER TESTING Y

Y
ADDITIONAL SITE INVESTIGATION -
2.10 048 BOREHOLES
Y QUOTATION. GL/Q/SI/5725 DT.03.12.2015

PROC REP REV 49 Page 280 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

2.11 048 SITE TEST/PIEZOCONE PENETRATION Y

2.12 049 INTERNATIONAL ROUGHNESS INDEX (IRI)

3. CEMENT & CONCRETE

3.01 MA-MAT-PROCU-0700 61 PILING WORKS

3.02 61.1 CROSS HOLE SONIC LOGGING Y

PILING WORK FOR CANTILEVER


3.03 061.2 STRUCTURES

Y GLENIUM 195

PROC REP REV 49 Page 281 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y GLENIUM 195
3.04 101 BATCHING PLANT REQUIREMENT
Y MASTERGLENIUM SKY 504

Y EPSILONE HW 390

Y
3.05 MA-MAT-PROCU-0700 101 OPC BULK CEMENT
Y

3.06 101.1 MICROSILICA Y

3.07 101.2 SRC BULK CEMENT

3.08 101.3 GGBFS Y

CONDITIONAL APPROVAL VIA LETTER (LT-01229)

PROC REP REV 49 Page 282 of 405 File: 382684358.xlsx


64,408.00 Cu.m Foundations & 57,902.00
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONDITIONAL APPROVAL VIA LETTER (LT-01231)

64,408.00 Cu.m Foundations & 57,902.00 Company Profile Received & Reviewed
MA-MAT-PROCU-0700 SUPPLY OF READY MIX CONCRETE - Cu.m Walls, Coloumns, Pier Heads,
3.09 102 VENDOR PREQUALIFICATION Barriers & Approch Slabs (Total Redymix
Concrete Delivered Qty 324,516.00 Cu.m)

PROC REP REV 49 Page 283 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

INVALID ( see email Mr. Nikitas to Edan 20/07/2017)

INVALID ( see email Mr. Nikitas to Edan 20/07/2017)

PROC REP REV 49 Page 284 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE MIX INGREDIENTS


3.10 MA-MAT-PROCU-0700 102 Aggregates, Sand, Portland cement,
Water, GGBS, Siilica Fume

Transmittal Advise No. EXW-P023-0001-MQ-AEC-TN-


60444 dt 20/11/2017

PROC REP REV 49 Page 285 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 503 M3

Y 3000 M3

Y 2500 M3

PROC REP REV 49 Page 286 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 400 M3

READY-MIX CLASS C20/20 [SRC] -


3.11 MA-MAT-PROCU-0701 102.1 10,651.00 Cu.m
Backfilling Concrete

Y 1000 M3

Y 500 M3

Y 7000 M3

Y 3000 M3

Y 2000 M3

Y 2000 M3

Y 2500 M3

Y 5000 M3

Y 4000 M3

Y 195 M3

PROC REP REV 49 Page 287 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 1500 M3
MAT-MAT-PROCU READY-MIX CLASS C30/20 [SRC] -
3.12 702 102.2 16,759.00 Cu.m
Blinding Concrete

Y 5000 M3

Y 2500 M3

Y 20000 M3

Y 2500 M3

PROC REP REV 49 Page 288 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

READY-MIX CLASS C40/20 [OP+GGBS+SF] -


3.13 MA-MAT-PROCU-0705 102.3 6,326.00 Cu.m
Structural Concrete for Pile Foundations
Y 1000 M3

Y 50000 M3

Y 30000 M3

MA-MAT-PROCU-0705 READY-MIX CLASS C40/20 (SRC+GGBS+SF)


3.14 102.3A Structural Concrete

Y 400 M3

PROC REP REV 49 Page 289 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MA-MAT-PROCU-0706 READY-MIX CLASS C50/20 [OP+GGBS+SF] -


3.15 102.4 Precast Elements

3.16 102.4A READY-MIX CLASS C50/10 FOR SPACER

Y 3500 M3

PROC REP REV 49 Page 290 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MA-MAT-PROCU-0708 READY-MIX CLASS C50/20 OPC(POST


3.17 102.5 TENSIONED CONCRETE)

3.18 102.6 READY MIX 30/10 SRC SCREED

Y 1000 M3

3.19 102.6A READY MIX 30/10 OPC SCREED


PROC REP REV 49 Page 291 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

3.19 102.6A READY MIX 30/10 OPC SCREED

Y 355 M3

3.20 102.7 READY MIX OPC/SAND 1/20

READY MIX OPC C 55/20 (PRECAST BRIDGE


3.21 102.8 SECTIONS)
Y

PROC REP REV 49 Page 292 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00
READY MIX OPC C 55/20 (PRECAST BRIDGE
3.21 102.8

Material On Site
SECTIONS)
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

READY MIX OPC C 55/10 (PRECAST BRIDGE


3.22 102.9 SECTIONS)

QTY 50 M3
READY MIX OPC C 55/10 (SF PIPE
3.23 102.9A SURROUND)

3.24 102.10 GROUT MIX DESIGN C40/06MM

4. AGGREGATES, SANDS & SOILS

4.01 111.2 ASPHALT RED SAND

Y 40000 TONS

PROC REP REV 49 Page 293 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 600000 TONS

Y 500000 TONS

4.02 113 SUBBASE & ROAD BASE MATERIAL 197838.72 Tons

Action by K. Efstathiou

Y 300000 TONS

Y 2000 TONS

PROC REP REV 49 Page 294 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
4.02 113 SUBBASE & ROAD BASE MATERIAL 197838.72 Tons
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 2000 TONS

Y 100000 TONS

Y 100000 TONS

Y 27000 TONS

Y 500000 TONS

Y 1000000 TONS

Y 100000 TONS

Y 100000 TONS

Y 100000 TONS

Y 500866 TONS

Y 500000 TONS

Y 500000 TONS

Y 200000 TONS

Y 500000 TONS

Y 300000 TONS

PROC REP REV 49


4.03 114 FILL MATERIAL Page 295 of 405 14186905.595 Tons File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 300000 TONS
4.03 114 FILL MATERIAL 14186905.595 Tons
Y 50000 TONS

Y 40000 TONS

Y 100000 TONS

Y 200000 TONS

Y 200000 TONS

Y 300000 TONS

Y 500000 TONS

Y 500000 TONS

Y 250000 TONS

Y 100000 TONS

4.04 115 ROCKFILL TYPE 1 ,2&3 153347.505 Tons Y 50000 TONS

Y 500,000 TONS
4.05 115 SUPPLY AND DELIVERY FILL MATERIALS

4.06 MA-MAT-PROCU-0740 113.1 GRANULAR BEDDING 3/8" 184939.353 Tons

PROC REP REV 49 Page 296 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

BLENDING PLANT FOR ROAD BASE MATERIAL


4.07 113.2 PRODUCTION

4.08 113.3 MIX DESIGNING FOR ROAD BASE

PLANT TRAIL FOR SUB BASE MATERIAL AT


4.09 113.4 J&P BLENDPLANT J16

Y 0-5 mm : 100 Tons


4.10 111C STEEL SLAG FOR BLENDING PLANT
0-5 mm : 75 Tons

Y 73,114 TONS

Y 100,000 TONS

PROC REP REV 49 Page 297 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 300,000 TONS

DUNE SAND for BEDDING & BACKFILLING TO


4.11 MA-MAT-PROCU-0750 111 910760.38 Tons
TRENCHES

Y 40000 TONS

Y 100,000 TONS

Y 300,000 TONS

Y 200,000 TONS

Y 50000 TONS

Y 10000 TONS

Y 300,000 TONS

4.12 111 WHITE SAND 205108.2 Tons

PROC REP REV 49 Page 298 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
4.12 111 WHITE SAND 205108.2 Tons

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


4.13 111 SCALPING POWDER FOR ITS CI-AEC-TN-65236 recvd 08/02/2018

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


4.14 111 SCALPING POWDER FOR MV, LV NETWORKS CI-AEC-TN-65375 recvd 11/02/2018

750242.5 Tons

MA-MAT-SUBM-0730 EARTHWORKS MATERIALS - BACKFILL


4.15 119 MATERIAL

PROC REP REV 49 Page 299 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

4.16 119.1 EXCAVATION WORKS

4.17 10B MICROTUNNELING WORKS

HORIZONTAL DIRECTIONAL DRILLING


4.18 10C WORKS

5. CONCRETE ADMIXTURES, ADDITIVES AND CURING

Y 5 DRUMS

5.01 MA-MAT-PROCU-0700 121 CURING COMPOUND 10.00 Y 10 DRUMS

PROC REP REV 49 Page 300 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
5.01 MA-MAT-PROCU-0700 121 CURING COMPOUND 10.00

5.02 MA-MAT-PROCU-0700 121.1 EVAPORATION RETARDER

MA-MAT-PROCU-0700 CONCRETE ADDITIVES


5.03 122 (CEMENTETIOUS ADDITIONS)
BY CONCRETE SUPPLIER

Y 5 DRUMS

FORMWORK RELEASE AGENT


5.04 MA-MAT-PROCU-0700 098A 13.00 Y 13 DRUMS
(Water Based)

Y 12 DRUMS

Y 10 DRUMS

MA-MAT-PROCU-0700 FORMWORK RELEASE AGENT


5.05 098B (Solvent Based)
8 DRUMS

6 DRUMS

6. FORMWORK & SCAFFOLDING

6.01 90 SCAFFOLDING-ACCESSORIES

6.02 MA-MAT-PROCU-0700 94.1 FORM LINERS 980.00 Y

6.03 94.1 RMD - DESIGN SERVICES

PROC REP REV 49 Page 301 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

SCAFFOLDING ACCESSORIES FOR


6.04 94.1 Y
UNDERPASS

Y G.I. PIPES: 250 LTH


6.05 94.1 SCAFFOLDING ACCESSORIES FOR BRIDGES
DOUBLE COUPLER: 1000 NRS
Y SWIVEL COUPLER: 1000 NRS

6.06 94.1 ACCESS SCAFFOLD AND ACCESSORIES Y

Y
6.07 MA-MAT-PROCU-0760 96 FORMWORK-SCAFFOLDING
Y

6.08 96 RMD FORMWORK ACCESSORIES Y

6.09 96 TOOLS FOR FORMWORK Y

6.10 96.1 FORMWORK-SCAFFOLDING Y

6.11 96.2 FORMWORK-ABUTMENT WALLS Y LOT 1

7. WATERPROOFING MEMBRANES & PROTECTIVE TREATMENTS

PROC REP REV 49 Page 302 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

WATERPROOFING MEMBRANE (General


MA-MAT-PROCU-0760 LETTER OF INTENT INTERTECTRA QATAR-001,
7.01 124 Protection to Buried Concrete) & (Underpass & 18.01.2015
other Burried structures & elements)

WATERPROOFING MEMBRANE General


7.02 MA-MAT-PROCU-0760 124 Protection to Buried Concrete, Underpass & other Burried
structures

MA-MAT-PROCU-0760 WATERPROOFING MEMBRANE (Underpass &


7.03 124 other Burried structures & elements)

ADESOBIT 1600X (15mX11m/R) - 10 ROLLS


Concrete Protection - Waterproof Membrane for Y LAMA PRIMER (15LTR/Pail) 5 PAILS
7.04 124 general protection to buried concrete, DWI
ADESOBIT 1600X Membrane with LAMA primer

Concrete Protection - Waterproof Membrane for Y ARMOPROOF (2m/Sh) - 50 SHEETS


7.05 124 general protection to buried concrete,
ARMOPROOF - PROTECTION BOARD

Concrete Protection - General protection to buried


Approved via letter ref. EXW-P023-0001-CI-AEC-LT-
7.06 124 concrete for Kahramaa PW Manhole chambers 37965 dt. 26/10/2016
(ARMOPROOF - PROTECTION BOARD)

IN
TE
Concrete Protection - Waterproof Membrane for
general protection to buried concrete DWI RT
124
7.07
ADESOBIT1600X & ARMORPROOF Protection EC
Board
TR
A
PROC REP REV 49
S/
Page 303 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
IN 0.00

TE

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION
RT Delivery Qty REMARKS / STATUS
EC
TR
Concrete Protection - Waterproof Membrane for
general protection to buried concrete, BITUMODE
A
7.08 124 - PROTECTION BOARD 6 MM and BITUSELF S/
1.6 MM XL C
Waterproofing System for QP Line and TSE
Works
7.09 124 BITUMODE - PROTECTION BOARD 6 MM and
BITUSELF 1.6 MM XL & BITUMODE PRIMER
S.B. INCLUDED WITH BITUMODE PRIMER S.B.

Protection Nord Board 6 MM and Solar Self


7.10 124 Adhesive 1.6 MM with Premier Primer SB

STRUCTURAL ADHESIVE - EUROSEAL


7.11 124.1 Y
DILATION TAPE

96 DRUMS
BONDED SYSTEM: SPRAY APPLIED
7.12 124.1 Y
MEMBRANE - INTEGRITANK

Concrete Protection (Waterproofing System -


7.13 124.1 Underpass and other buried structures) - Euroseal
PVC T- LOCK Membrane
IN Y
TE
RT
EC
TR
PROC REP REV 49
A
Page 304 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
IN
TE
Crack Inducer - HDPE Flat Sheet Membrane, flat RT
7.14 124.1
sheet extruded along its length to mechanically
join itself
EC Y
into poured concrete. TR
Euroseal HDPE T-Lock Sheet Membrane A
7.15 124.1 waterproofing (Thickness 2.5mm) for Bridge S/
Foundations
C
Concrete Protection (Waterproofing System -
7.16 124.1 Underpass and other buried structures)- GSE
STUDLINER

Concrete Protection (Waterproofing System -


7.17 124.1 Underpass & other buried structures) -
Submerged Tunnel

MA-MAT-PROCU-0960 UNBONDED WATERPROOFING SYSTEM


7.18 124.1 (FOSROC PRODUCTS)

WATERPROOFING SYSTEM FOR


7.19 124.1 SUBMERGED TUNNEL, UNDERPASSES AND
BRIDGE SUBSTRUCTURES

7.20 MA-MAT-PROCU-0760 124.2 WATERPROOFING MEMBRANE ANNULUS

SPRAY APPLIED WATERPROOFING


7.21 124.5 MEMBRANE TO BRIDGE DECKS

ELIMINATOR BRIDGE DECK AND TOP OF


7.22 124.5 BASE SLAB WATERPROOFING

IN
TE
PROC REP REV 49 PageRT
305 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
IN
TE
RT
7.23 124.6
MASTIC FILLET (FORSOC NITOFEAL EC
PRODUCT)
TR
A
S/
C
SUBSTRUCTURE WATERPROOFING SYSTEM
7.24 124.7 FOR TSE

CONCRETE PROTECTION AND


7.25 127 WATERPROOFING

7.26 128
BRIDGE DECK SPRAY APPLIED - IN
PITCHMASTIC PmB (International)
TE
RT
EC Letter of Intent EXW-P023-0001-Tadmur Pools-001,
Dt.01.Mar.2016
TR
A Y QTY 3 Drums

S/
Y
C QTY 10 Drums

PROTECTIVE TREATMENTS TO CONCRETE


PROC REP REV 49 128 (ANTICARBONATION COATING) Page 306 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

PROTECTIVE TREATMENTS TO CONCRETE


128 (ANTICARBONATION COATING)
7.27

IN
PROTECTIVE TREATMENTS TO CONCRETE TE
128A (ANTICARBONATION COATING) RT
EC
TR
EPOXY COATING (ABOVE GROUND LEVEL) i.e. A
7.28
INSIDE MANHOLES, CHAMBERS ETC S/
C
128.1
BITUMINOUS EMULSION COATING (MSE
7.29
WALLS) WEBER.DRY SSP 50

PROC REP REV 49 Page 307 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

128.1

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

AECOM TRANS ADVICE NO. EXW-P023-0001-CI-AEC-


TN-64417 received 23/01/18
7.30 MASTERPROTECT 1812
AECOM TRANS ADVICE NO. EXW-P023-0001-CI-AEC-
TN-66087 recvd 27/02/18

Waterproof Paint Based on Cementitious Material


7.31 128.2 for Portable Water / Valve Chambers (For 109,800.00 Sq.Ft
KAHRAAMA)

7.32 MA-MAT-PROCU-0960 254 BITUMINOUS PAINT (MSE WALLS)

Y 60 000m²(100 ROLLS)

Y 120 000m²(200 ROLLS)

GEOTEXTILE FABRIC FOR DRAINAGE &


7.33 133 Y 240000m²(400 ROLLS)
EARTHWORKS

Y 138,000.00 M2

PROC REP REV 49 Page 308 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
GEOTEXTILE FABRIC FOR DRAINAGE &
7.33 133 EARTHWORKS
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

GEOTEXTILE FOR ABUTMENT WALLS SAME


7.34 133.1 AS MSE WALLS
SPECIAL PAINTS: ANTICORROSION COATING
7.35 788 (MasterEmaco®8100AP)

8. JOINTS

BITUMEN IMPREGNATED FIBER BOARD (35%


8.01 141 695.00 Y
Bitumen Impregnated)

8.02 BARRIER EXPANSION JOINT

Y
8.03 141.1 EXPANDED POLYSTYRENE 25mm
Y

JOINT SEALANT
8.04 142 POLYSULPHIDE

PROC REP REV 49 Page 309 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
JOINT SEALANT
8.04 142 POLYSULPHIDE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

JOINT SEALANT
8.05 142 POLYURETHANE
STOPPED - REJECTED

Y
JOINTS - WATERPROOFING - WATER
8.06 143 SWELLING GASKETS (Superswell 47B)

Y 250 ROLLS

WATER SWELLING GASKETS (WATERSTOP)


8.07 143 FOR TSE CHAMBER
Y

PROC REP REV 49 Page 310 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. WATER SWELLING GASKETS (WATERSTOP)
8.07 143NO. FOR TSE CHAMBER
DESCRIPTION Delivery Qty REMARKS / STATUS

SURE-STOP PVC WATER STOPS (INTERNAL -


8.08 143.1 Y
EXTERNAL)

JOINTS - WATERPROOFING -REINJECTABLE


8.09 143.2 HOSES SYSTEM IN
TE Y
RT
EC
9. REINFORCEMENT AND ANCILIARIES , MESH TR
A
S/
C Y

PROC REP REV 49 Page 311 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y AGAINST LPO 24259

Y
9.01 MA-MAT-PROCU-0780 151 REINFORCEMENT STEEL 41422.005 Tons
Y

PROC REP REV 49 Page 312 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

9.01 MA-MAT-PROCU-0780 151 REINFORCEMENT STEEL 41422.005 Tons

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

A
l
r
PROC REP REV 49
e
Page 313 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION
A Delivery Qty REMARKS / STATUS

l
r
e
a
d
STAINLESS STEEL DOWEL BARS IN y Y
9.02 MA-MAT-PROCU-0780 151.2 600.00
UNDERPASS EXPANSION JOINTS
o
r Y 25 MM X 300 MM
(FOR 20 MM S.S. DOWEL BARS)
d
9.03 151.2 PVC SLEEVE FOR DOWEL BARS e Y 32 MM X 300 MM
(FOR 25 MM S.S. DOWEL BARS)
r 32 MM X 300 MM
e (FOR 25 MM S.S. DOWEL BARS)

d Y
9.04 MA-MAT-PROCU-0780 151.3 STAINLESS STEEL REINFORCEMENT BARS
f
r
o Y 25MM X 6 MTR

m
MA-MAT-PROCU-0780 STAINLESS STEEL ROUND BAR FOR BRIDGE
9.05 151.4 BARRIERS
a Y 25MM X 6 MTR
b
o
v
9.06 MA-MAT-PROCU-0780 152 GALVANIZED WOVEN WIRE MESH
e
PROC REP REV 49 Page 314 of 405 File: 382684358.xlsx
f
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTEr (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 o
Completion Date: 21 Jan 2017 m
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
a 0.00

Material On Site
o
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
v
e
Y
s
u
p
p Y
l
9.07 MA-MAT-PROCU-0780 154.1 MECHANICAL SPLICERS FOR REBARS i
e Y
r
s

Y 5 TONS

y 5 TONS

20 TONS

10 TONS

Y 5 TONS

y 5 TONS

PROC REP REV 49 Page 315 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 20 TONS

10 TONS

9.08 MA-MAT-PROCU-0780 154 BINDING WIRE 1,500.00 Roll

Y 10 TONS

Y 10 TONS

Y 10 TONS

Y 20 TONS

AECOM REF (TQ-04456), DT.01.08.15


Y 3000 NRS
MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS
9.09 155 CHAIRS & SUPPORTS

PROC REP REV 49 Page 316 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MA-MAT-PROCU-0780 REINFORCEMENT PVC WHEEL SPACERS


9.09 155 CHAIRS & SUPPORTS
2000 NRS

10. SUNDRY METALWORK

10.01 182 CANOPY OVER UNDERPASS

PROC REP REV 49 Page 317 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

10.02 182.1 HANDRAIL OVER UNDERPASS

10.03 182.1 GALVANIZED CHEQUERED PLATE

11. PRECAST CONCRETE ITEMS

AECOM TRANSMITTAL ADVISE NO. EXW-P023-0001-


CI-AEC-TN-63912 dated 11-01-18

AECOM TRANSMITTAL ADVISE NO. EXW-P023-0001-


11.00 221 PRECAST CONCRETE SOAKAWAY RINGS CI-AEC-TN-64839 dated 01-02-18

Memo No. 03189 / 20-02-2018; Size: 1200mm ID x


600mm Height x 150mm Thickness: Qty: 32 Nos.

MSE WALL MATERIALS :


A). FRICTION TIES FOR MSE WALLS
B). PVC DOWELS FOR MSE WALLS
C). GEOTEXTILE FABRIC FOR MSE
11.01 221.1 WALLS
D). BEARING PADS FOR MSE WALLS
E). JOINT FILLER ( For use with
Concrete Face Panels)
PROC REP REV 49 Page 318 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00
MSE WALL MATERIALS :
A). FRICTION TIES FOR MSE WALLS

Material On Site
B). PVC DOWELS FOR MSE WALLS
S. No. ACTIVITY ID SCH. NO. C). GEOTEXTILEDESCRIPTION
FABRIC FOR MSE Delivery Qty REMARKS / STATUS
11.01 221.1 WALLS
D). BEARING PADS FOR MSE WALLS
E). JOINT FILLER ( For use with
Concrete Face Panels) S
u
221.2
11.02 PRECAST MANHOLES
p
pl
11.03 224.2 NEOPRENE PAD FOR TSE CHAMBERS y
b
y
11.03 485 CONCRETE CABLE COVERING TILES V
S Y
LP
PRECAST CONCRETE SOAKAWAY RINGS in
O Y
11.04 904 st
W
al
E Y
la
R Transmittal Advice No. EXW-P023-0001-SR-AEC-TN-
ti
LI 65628 dated 18-02-2018

o
N QTY 4,350 LM
QTY Received 537.
n
K QTY Received 360.

b
S
yS/
JC
&
11.05 MA-MAT-PROCU-0790 913 PRECAST CONCRETE KERB
P
Read
PROC REP REV 49 y319toof 405
Page File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No.
11.05 ACTIVITY ID
MA-MAT-PROCU-0790 SCH.
913NO. PRECAST CONCRETE
DESCRIPTION
KERB Delivery Qty REMARKS / STATUS

Read
y to
plac
e
orde
rRead
y to
plac
11.06 MA-MAT-PROCU-0800 913.1 PRECAST CONCRETE BARRIERS e 8,078.00 Nos
orde
rMat
erial Y
sub
mit
al
appr
oval y
und
er
2,798.00 Nos
11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS prog Y OREGON BARRIER - 800 NRS
ress
Y OREGON BARRIER - 800 NRS

Y OREGON BARRIER - 800 NRS

PROC REP REV 49 Page 320 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
11.07 PR-GEN-TRDV-0157 913.1.T TEMPORARY TRAFFIC BARRIERS 2,798.00 Nos
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y 1000 NRS

Y 1000 NRS

11.08 MA-MAT-PROCU-0810 912 INTERLOCKING TILES

Transmittal Advise No. EXW-P023-0001-CE-AEC-TN-


60873

12. RESINS, MORTARS, GROUTS AND CONCRETE REPAIR MATERIALS

12.01 226 NON-SHRINK GROUT

12.02 227 FLOW GROUT F0R POST TENSIONING DUCTS

12.03 237 BEDDING MORTAR FOR THE BEARINGS

12.04 237.1 EPOXY BONDING AGENT

PROC REP REV 49 Page 321 of 405 File: 382684358.xlsx


EPOXY GROUT FOR
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

EPOXY GROUT FOR


12.05 237.2 BRIDGE BEARING RIZZ
ANI
S/C

Y
FLO-GROUT 2 (NON-SHRINK CEMENTITIOUS
12.06 237.3 GROUT)

Y 30 KITS

12.07 237.4 EPOXY ADHESIVE Y 5 KITS

Y 50 KITS

CONCRETE REPAIR MATERIAL: Cancel see e-mail of 14/4/2015


12.08 126 a) Pactorep -PQ-Q (Large areas)
b) Pactorep HB 70 (Small areas)

CONCRETE REPAIR MATERIAL:


12.09 126 a) MasterEmaco S 466 (Large areas)
PROC REP REV 49 b) MasterEmaco S 488 (Small areas) Page 322 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE REPAIR MATERIAL:


12.09 126 a) MasterEmaco S 466 (Large areas)
b) MasterEmaco S 488 (Small areas)

CONCRETE REPAIR MATERIAL: Y


a) Weber.tec 311 MC (Large areas)
12.10 126 b) Weber.rep.331 TX (Small areas)
c) Weber.rep.332 FR (Small areas)

170.00 Y

CONCRETE REPAIR MATERIAL:


12.11 126 Weber.rep 360 FFR (Pre-mixed cementitious paste
for face repair)

CONCRETE REPAIR MATERIAL:


12.12 126 Injectable mortar HIT-HY 200-R 500/2/EE

Y QTY 15 NOS

PROC REP REV 49 Page 323 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

13. DOORS AND WINDOWS

13.01 303 METAL DOORS FOR ELECT. SUB-STATIONS

13.02 317.2 ALUMINIUM LOUVRES FOR SUBSTATIONS


P
O Y
13.03 565.1 BRIDGE ACCESS DOORS AND FRAMES
W
E
R
LI y QTY 48 NOS
N
13.04 565.1 ABUTMENT DOORS K
S
S/
C
Y QTY 72 NOS

BRIDGE TOP ABUTMENT DOORS (800 MM X


13.05 565.1 1500 MM)

PROC REP REV 49 Page 324 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

BRIDGE TOP ABUTMENT DOORS (800 MM X

Material On Site
13.05 565.1 1500 MM)
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Alrea
13.06
ANCHOR ROD FOR BRIDGE TOP ABUTMENT
565.1.2 DOOR
dy Y
orde
14. PIPES & FITTINGS FOR VARIOUS NETWORKS (SUPPLY & DRAINAGE)
red
from
Rem
al

14.01 901 EXISTING QP LINE PROTECTION WORKS

14.02 901 TSE AND WATER WORKS

900MM DIA - 115 LM


Y 1000MM DIA - 2180 LM

900MM DIA CUTTING

Y 900MM DIA - 111 LM

PROC REP REV 49 Page 325 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y (51 LM)

900MM DIA=73 LM
Y 1000MM DIA=1577 LM

375.00 L.m (900mm) & 2,394.00 (93 LM)


14.03 901.1 RC PIPES Y
L.m(1000mm) RC Jacking Pipe Sleeve

900MM DIA - 153 LM


Y 1000MM DIA - 306 LM

(30 LM)
Y RC Jacking Pipe Sleeve

QTY 30 NOS

Already ordered from


Doha Precast Factory
14.04 901.3 TSE LINE DUCTILE IRON PIPE INSTALLATIONS

A
l
W MS-00048 CD Status 'A' now Status 'W', AECOM Ref LT-
11578, 18.Jun.15,
a for Pipe DIA larger than 600MM

k
h
e
PROC REP REV 49
e
Page 326 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017 A
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 l
W 0.00

Material On Site
k
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
h
e
e Rejected "W", AECOM Ref. LT-07815, 29.Mar.15, for Pipe

l DIA larger than 600MM

S
/
Alre
C
ady
ord
ere
d
fro
m
PA Y
B/L No.007, SAMOS MAJESTY (Sea)
(OPO: 7200000278)
M Y B/L No.008, SAMOS MAJESTY (Sea)

Y B/L No.710729541, MAERSK SARAT(Sea)


14.04 901.3 DI PIPES & FITTINGS FOR TSE
Y Air B.No.172-12489120, CARGOLUX (Air)

Y B/L No. 006 , YANNIS (Sea)

Y B/L No. 007,008 , TUJU ARROW (Sea)

Y B/L No.012/013, SAMOS MAJESTY (Sea)

Air B.No. 172-12489676 CARGOLUX (Air)


Y
LPO 7200000414 dt. 19.06.2016

PROC REP REV 49 Page 327 of 405 File: 382684358.xlsx


PROJECT
14.04 : CONSTRUCTION 901.3
OF NEWDI ORBITAL HIGHWAY
PIPES & FITTINGS & TRUCK ROUTE (P 023)
FOR TSE
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y B/L No.020/021, SALTA (Sea)

Y B/L No.017, SAMOS (Sea)

Y B/L No. , SALTA (Sea)

B/L No. HBL030215B/215A EBBA MAERSK (Sea)


Y
LPO 7200000429 dt. 04/07/2016

DN 1400 X 2100 MM DI ROCKER PIPE


Y
LPO 7200000630

OPO 7200000312, DT.02.01.2016


Y LPO 22377, DT. 26-03-2015

PROC REP REV 49 Page 328 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y HBA0141066,1.2.16 (Containers - 3)
Vessel: HUMBOLOT

Y MSCURV480398 (Containers - 5)
Vessel: MSC RAPALLO FL609E

Y MSCURV519120 (Containers - 6)
Vessel: EMMA MAERSK 612E
MSCUKG366921 (Containers - 6)
14.05 901.3 D.I. FITTINGS FOR TSE Y
Vessel: MSC LAUREN FL616E

Y MSCURV673190 (Containers - 7)
Vessel: MSC ALTAIR FL618E

Y MSCURV811261 (sea) (Containers - 4)


Vessel: HANSA OFFENBURG

Y MSCUKG612332 (sea) (Containers - 2)


Vessel: MAERSK EFFINGHAM

Y MSCUKG636422(sea) (Containers - 3)
Vessel: MAERSK EVORA

Y MSCURK052216 (sea) (Containers - 4)


Vessel: MSC HAMBURG

Y MSCURK119734 (sea) (Containers - 1)


Vessel: MSC GAIA

Y B/L: MSCURK219153 (Containers - 1)


Vessel: MSC ISTANBUL

Y LPO 7200000510 dated. 20/09/2016


Vessel: ULSAN EXPRESS

B/L: MSCURU207297 (Containers - 2)


Y Vessel: MSC RUBY
LPO 7200000597 dt. 14/11/2016
LPO 7200000639 dt. 19/12/2016

PROC REP REV 49 Page 329 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Memo 2801 dated 23/08/2017


LPO 7200000901 dated 05/09/2017
Memo 2915 dated 12/10/2017
LPO 7200000878 dated 14/08/2017

Y EPDM Gasket: QTY 2 Nos

Y B/L No: 569196125, (Sea) (4 Containrs)


Ves: UNI FORTUNA 1604 (LPO-26019)

Y B/L No: 768724297(Sea) (2 Containrs)


Ves: MAERSK INVERNESS 1606

Y B/L No:
Ves:

Y B/L No:
Ves:

Y B/L No:
Ves:

Y LPO 7100051177 dated 22/09/2016


Additional items

Y
Dismantling Joint, Ranger Couplings, Ranger
Flange Adaptors, Dedicated Flange Adaptor, Y
14.06 901.3B Dedicated Couplings & Restrained Couplings
(DI FITTINGS FOR TSE)
Y

Y Memo 2309 dated 19/02/2017


LPO 7100059653 dated 28/02/2017

PROC REP REV 49 Page 330 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
Dismantling Joint, Ranger Couplings, Ranger
Flange Adaptors, Dedicated Flange Adaptor, 0.00
14.06 901.3B Dedicated Couplings & Restrained Couplings

Material On Site
(DI FITTINGS FOR TSE)
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y TIE RODS QTY 50 NOS (MATERIAL FROM OSECC)

Memo 2802 dated 23/08/2017


LPO 7100068516 dated 10/09/2017

STOPPED

Alr
ea
dy
or
der Y Memo 2389 dated 13/03/2017
LPO 7100060921 dated 22/03/2017
14.07
DEDICATED STEPPED COUPLINGS PN 16 FOR
901.3B.1 TSE WASH OUT CHAMBER ed
fro Memo 2802 dated 23/08/2017
LPO 7100068516 dated 10/09/2017
m B/L No. MSCURX755789 (7 Conatainers)
Y
KL Vessel : Georg Maersk 608E

A Y (3 Containers)

MF (OLD LPO 25894) (NEW LPO 39309)

LE Y (3 Containers)

X
Y (1 Containers)

Memo 1941 dated 19/09/2017


Y LPO 7200000588 dated 08/11/2017

PROC REP REV 49 Page 331 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Memo 2308 dated 18/02/2017


Y LPO 7200000713 dated 02/03/2017

Memo 2803 dated 24/8/2017


LPO 7100069112 dated 27/09/2017

Y PACKAGES 1,2 & 3


14.08 MA-MAT-PROCU-0910 902.2 VALVES FOR TSE

Alre
ady
ord
ered
fro
m
MIV Y OLD LPO 26404 (NEW LPO 39346)

PROC REP REV 49 Page 332 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

14.09 902.3A BOLTS, NUTS & WASHERS Y

Y LPO 42720 DT.02.04.2016

14.10 902.4 EPDM GASKETS Y

PROC REP REV 49 Page 333 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
14.10 902.4 EPDM GASKETS
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y ORDER: ORB/901.3C/165, 04.05.2015

Y TEE 1200 X 900 mm

ORDER: ORB/901.3D/456, 27.10.2016


Y 8812026882, 8812127504,8812028667
DI PIPES & FITTINGS FOR POTABLE WATER
14.11 901.3E (PW) ORDER: ORB/901.3E/124, 30.06.2016
Y LPO: 7200000428 Dt. 02.07.2016
270.00 L.m (600mm) 675.00 L.m ORDER CONFIRMATION: 19205853
(1200mm) & 86 Nos Fittings

Y D.I. PIPE DN 1200 X 9 M LONG = 25NRS

14.12 901.4 DI PIPES FOR POTABLE WATER D.I. PIPE DN 1200 X 9 M LONG = 15NRS
Y LPO: 7200000430 Dt. 09.07.2016
Vessel: T SYMPHONY
APPROVED BY KAHRAMAA, AECOM REF: (LT-12344)
DT. 07.07.2015
14.13 902.4 EPDM GASKETS Y T-Type RubberGasket 1200 MM (15 Pcs)
Vessel: MONTE ALEGRE
DISMANT. JOINTS, FL. ADAPTORS,
APPROVED BY KAHRAMAA, AECOM REF.(LT-10623)
14.14 901.3B COUPLINGS,FLANGED SOCKET, DT. 30.05.2015
FLEXIBLE JOINTS for P.W.

14.15 MA-MAT-PROCU-0900 902.2 VALVES - for P. WATER

PROC REP REV 49 Page 334 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

14.16 903 FIRE HYDRANTS


16
14.17 MA-MAT-PROCU-0850 901.2 VITRIFIED CLAY PIPES Nos
requ
14.18 901.11 STAINLESS STEEL PIPES & FIITS ired
on Y Revised LPO. 7100039277

14.19 901.5B 2 X 7 MICRONET DUCTS


TSE QTY: 25000 Lm

Line Y QTY: 11000 Lm


(Req
14.20 901.5B PVC PERFORATED PIPES uire
d PRODUCES BY OOREDOO ONLY via AECOM REF (LT-
14.21 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS
V.O.) 20116) DT.05.12.2015

AECOM TO ASHGHAL LETTER


REF. (LT-25646), DT.20.03.2016

(NOT IN SCOPE KBR LETTER)


14.22 MA-MAT-PROCU-0870 901.5A UPVC DUCT 54D PIPES FOR QNBN Su
ppl (NOT IN SCOPE KBR LETTER)
y
by (NOT IN SCOPE KBR LETTER)

14.23 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS J&


P
inst Y
all
Y
by
S/C
PROC REP REV 49 &335 of 405
Page File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTESu
(P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 ppl
Completion Date: 21 Jan 2017 y
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 by
J& 0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION
inst Delivery Qty REMARKS / STATUS
all
by
S/C Y QTY: 3000 M
&
J& Y
MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS
14.24
P Y

Y D=160mm,t=3.6mm
Q=6000M

Y LV/MV QTY: 2500 Nrs

END CAP
14.25 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS

PROC REP REV 49 Page 336 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

APPROVED (SSD/MOI) , AECOM


Y REF.(LT-15037) DT. 03/09/2015.

Y (4,000LM)

Y (3,000 LM)

Y Street Light QTY: 2500 Nrs

110 mm 150,487.50 LM , 160 mm Y (25,000 LM)


113,014 LM & 200mm 87LM
Y (60,000 LM) (APPROVED ITS/SCADA)

Y (120,000 LM) PARTIAL

(300,300 LM)

14.26 MA-MAT-PROCU-0870 901.5A UPVC DUCT PIPES & FITTINGS (15,000 M-BLACK) (3000 M-ORANGE)

PROC REP REV 49 Page 337 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT
14.26 MA-MAT-PROCU-0870 REPORT
901.5A UPVC- Rev.
DUCT 49 - 20
PIPES February 2018
& FITTINGS
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

REJECTED SSD/MOI WORKS AECOM REF(LT-12347)


Y DT. 07.07.2015)

APPROVED STREET LIGHTING WORK ONLY AECOM


Y REF(LT-09871) Dt.14.5.15
REJECTED ASHGHAL ITS/SCADA , AECOM REF (LT-
23155) DT.01.02.2016

REJECTED ASHGHAL Street Lighting, AECOM REF (LT-


25641) DT.19.03.2016

REJECTED ASHGHAL ITS/SCADA , AECOM REF (LT-


23157) DT.01.02.2016

Y
UPVC LONG RADIUS BEND PIPES
14.27 901.5 ( 90⁰, OD 110 mm, Thickness : 3.2 mm, Y
Color : Dark Grey)
Y

UPVC PRESSURE PIPES AND FITTINGS FOR


14.28 901.5 TSE WASH OUT SUMP
UPVC changed to HDPE (see MAR
MS-00459 CD "A")
PROC REP REV 49 Page 338 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
UPVC PRESSURE PIPES AND FITTINGS FOR
14.28
S. No. ACTIVITY ID 901.5
SCH. NO. TSE WASH OUTDESCRIPTION
SUMP Delivery Qty REMARKS / STATUS
UPVC changed to HDPE (see MAR
MS-00459 CD "A")

UPVC DUCT PIPES FOR STORM DRAINS


14.29 901.5.2 SYSTEM
Y FOR TSE SLEEVES

Y FOR TSE SLEEVES

Y
AECOM to visit factory for Testing
Y Date. 29.09.2015 Ref.LT-15711,Dt.15.09.2015

PROC REP REV 49 Page 339 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Y AGAINST LPO 26120

Y AGAINST LPO 26584

DN 600: 60 Nos (COMPLETED)


Y DN 800: 30 Nos
LPO 7100048280 dated 24/07/2016
GRP PIPES & FITTINGS GRP Rocker Pipes
MEMO 1857
GRP Spools
7,055.00 L.m (400mm), 37,678.00 L.m Y MEMO 1961
14.30 MA-MAT-PROCU-0880 901.7 (600mm), 19,283.00 L.m (800mm) & LPO 7100048280 dated 24/07/2016
1,791.00 Nos Fittings GRP Spools
Y MEMO 2046
LPO 7100048280 dated 24/07/2016

GRP Rocker Pipe


Y MEMO 2051
LPO 7100061437 dated 30/03/2017

GRP Spools
Y MEMO 2157
LPO 7100048280 dated 24/07/2016

PROC REP REV 49 Page 340 of 405 File: 382684358.xlsx


GRP PIPES & FITTINGS
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 7,055.00 L.m (400mm), 37,678.00 L.m
14.30 MA-MAT-PROCU-0880 901.7 Completion Date: 21 Jan 2017 (600mm), 19,283.00 L.m (800mm) &
1,791.00 Nos Fittings
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

GRP Spools
Y MEMO 2228
LPO 7100048280 dated 24/07/2016
GRP Spools
Y MEMO 2358
LPO 7100048280 dated 24/07/2016

PROC REP REV 49 Page 341 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

GRP Spools
Y MEMO 2485
LPO 7100048280 dated 24/07/2016

Y GRP Couplers

GRP Short pipe DN 600


Y GRP Bend 600 MM X 25

Y GRP Special Pipes

Y GRP Short Pipes (Qty 15 Nos, 05 Nos)

Y Gasket (Qty 250 Nos)

Y Gasket (Qty 400 Nos)

GASKET FOR GRP PIPES Socket Spigot Gasket (Qty 200 Nos)

A
l Y
POLYPROPYLENE ROAD GULLY WITH
14.31 901.7.3 REMOVABLE GRP SAND BASKET r
e
a
d
y AECOM TO KAHRAMAA
REF (LT-14980) DT.03.09.2015

o
PROC REP REV 49
r
Page 342 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
A
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
l
r 0.00
e
a

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION d Delivery Qty REMARKS / STATUS
y

o Y D110MM: 13,908LM, D250MM: 27,708LM

r Y D110MM - 8,000 LM, D250MM - 11,000 LM


d
14.32 MA-MAT-PROCU-0870 HDPE PIPES & FITTINGS (ELECTRICAL-
901.8A SDR17)
e Y D110MM: 5000 MTR
r
Y
e
d

f Rejected by KAHRAMAA letter ref. EXW-P023-0001-EE-

r AEC-LT-34082 dt. 16.08.2016

o
m
Y
A
S
MA-MAT-PROCU-0870 901.8A HDPE PIPES & FITTINGS (ITS - SDR 17)
14.33
M
A41,142.00 L.m (110mm), 1,200.00 L.m
(160mm) & 47,100.00 L.m (250mm)

PROC REP REV 49 Page 343 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 41,142.00 L.m (110mm), 1,200.00 L.m
Completion Date: 21 Jan 2017 (160mm) & 47,100.00 L.m (250mm)
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

14.34 MA-MAT-PROCU-0890 901.8 HDPE PIPES & FITTINGS (TSE / D315)


ELBOW & HDPE Pipes
Y PARTIAL RECEIVING (DIA 160 & 200)

Y ELBOW, TEE & HDPE Pipes

ELBOW, TEE & HDPE Pipes

See stopped CRA Ref Letter. CRA/TA/ICON/T161/


25102015

HDPE PIPES & FITTINGS (COMMUNICATION See stopped CRA Ref Letter. CRA/TA/ICON/T161/
14.35 901.8C REGULARITY AUTHORITY) 25102015

Y
14.36 901.8.1 WELDING MACHINE FOR HDPE PIPES
Y ELECTRO FUSION COUPLERS (lot-1)

Y 15 DAYS

Y 30 DAYS

14.37 901.8.1 HIRING CHARGES OF BUTT FUSION MACHINE Y 33 DAYS

Y 20 DAYS

PROC REP REV 49 Page 344 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
14.37 901.8.1 HIRING CHARGES OF BUTT FUSION MACHINE
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

10 Working Days

PROC REP REV 49 Page 345 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

15. PIPE WRAPPING, PROTECTION AND MARKING

15.01 444 DENSO TAPE

WRAPPING TAPE, PRIMER AND


15.02 445.5 MOULDING PUTTY TAPE DI PIPES FOR PW CANCELLED
NETWORK

PRIMER /25 LTR -


Y LPO 26899, LPO 39403, LPO 46623

Y MOULDING COMPOUND /25 KG

B/L No.E8747/1, Ves: VASCO DE GAMA


Y WRAPPING TAPE 225MM X 60MTR(2C)

B/L No.ME1600439, Ves: CORTEREAL


Y WRAPPING TAPE 225MM X 60MTR(3C)

B/L No.ME1600439, Ves: CORTEREAL


Y MOULDING COMPOUND /25 KG (1C)

B/L No.ME1600540 Ves: G.FORSTER


Y WRAPPING TAPE 225MM X 60MTR(2C)

B/L No.ME1600661 , Ves: CMA B.VILLE


Y WRAPPING TAPE 225MM X 60MTR(2C)
WRAPPING TAPE, PRIMER AND
15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE
PROC REP REV 49 Page 346 of 405 File: 382684358.xlsx
NETWORK
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

WRAPPING TAPE, PRIMER AND


B/L No.ME1600973, Ves:C.C.MAGELAN
15.03 445.5A MOULDING PUTTY TAPE DI PIPES FOR TSE Y MOULDING COMPOUND /25 KG(2C)
NETWORK
B/L: ME1601008,1601050, Ves:C.C.TITAN
Y WRAPPING TAPE 225MM X 60MTR(4C)

Y LPO 71000046623 dated 16/06/2016

Y 40 ROLLS (MEMO 375)

WARNING TAPE - DETECTABLE


15.04 484 Y 212 ROLLS (MEMO 1342)

40 ROLLS

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


CI-AEC-TN-66370 recvd 04-03-2018

DETECTAB LE WARNING TAPE FOR TSE


15.05 484 NETWORKS

PROC REP REV 49 Page 347 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

DETECTAB LE WARNING TAPE FOR TSE


15.05 484 NETWORKS

APPROVED LV CABLE BY KAHRAMA, AECOM REF (LT-


Y 22589) DT.23.01.2016

APPROVED MAINWATER PIPELINE BY KAHRAMAA,


Y REF(LT-29331), 18.05.2016

WARNING TAPE - NON DETECTABLE


15.06 484A Y
PW & Electrical Purposes

Y 34 ROLLS

53 ROLLS

APPROVED FOR ITS WORKS


Y AECOM REF: (LT-09872) DT. 14.05.2015

APPROVED FOR STREET LIGHTING AECOM REF: (LT-


Y 13786) DT. 06.08.2015

Y
WARNING TAPE - NON DETECTABLE
ITS,TSE AND STREET LIGHT

15.07 484A

PROC REP REV 49 Page 348 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

15.07 484A

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

AECOM TRANS. ADVICE NO. EXW-P023-0001-CI-AEC-


WARNING TAPE - NON DETECTABLE FOR ITS TN-65322 recvd 11/02/2018

WARNING TAPE - NON DETECTABLE FOR AECOM TRANS. ADVICE NO. EXW-P023-0001-CI-AEC-
STREET LIGHT TN-65323 recvd 11/02/2018

APPROVED BY SSD/MOI
15.08 484A WARNING TAPE - NON DETECTABLE SSD/MOI Y AECOM Ref (LT-09784), Dt.12.05.2015

APPROVED BY QAF, AECOM


Y REF(LT-11767) DT.23.06.2015

15.09 484A WARNING TAPE - NON DETECTABLE QAF Y

15.10 485.1 PE CABLE TILE FOR 11KV CABLES


STOPPED

15.11 486 UTILITY MARKERS

15.12 486 MARKER PLATES

PROC REP REV 49 Page 349 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

15.13 486.1 MARKER POSTS

15.14 445.8 POLYTHENE SHEET - 1000 GAUGE (250micro) Y

POLYETHELENE SLEEVING FOR DI PIPES


15.15 445.7 Y
POTABLE WATER

Y 110 ROLLS

Y 25 ROLLS (AGAINST 26269)

Y 30 ROLLS
POLYETHELENE SLEEVING FOR DI
15.16 445.7A PIPES FOR TSE

15.17 445.6 BLACK SELF ADHESIVE TAPE Y

PROC REP REV 49 Page 350 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

16. CHAMBERS, MANHOLES, MANHOLES COVERS AND FRAMES

Y
D.I. MANHOLE COVERS & FRAMES BOXES
16.01 904.1 FOR PORTABLE WATER

CONSTRUCTION OFREINFORCED CONCRETE


16.02 904.1 CHAMBERS - PACK 1,2&3
AGREEMENT MEMO 1781, 13.06.2016

Y PARTIAL RECEIVED
ALUMINIUM ACCESS COVERS AND FRAMES
16.03 904.1A FOR TSE

(NOT IN SCOPE, REF. KBR LETTER)

D.I. MANHOLE COVERS & FRAMES FOR SSD


16.04 904.2 (NOT IN SCOPE LETTER)
(NOT IN SCOPE, REF. KBR LETTER)

LPO 7200000451 dated 25/07/2016


Y MEMO 1859
E-mail dated 22/09/2016

PROC REP REV 49 Page 351 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MEMO 2050
Y E-mail dated 31/10/2016

MEMO 2061 for PW


Y E-mail dated 31/10/2016

Y E-mail date 12/12/2016


16.05 904.3 GRP LADDERS FOR TSE MANHOLES
E-mail date 21/01/2017

E-mail date 23/09/2017

E-mail date 23/09/2017

E-mail date 01/11/2017

Y
GRP LADDERS FOR POTABLE WATER / VALVE
16.06 904.3 CHAMBER (FOR KAHRAMAA)

Y 2 x 26 SETS

16.07 904.4 D.I. MANHOLES FOR QAF Y

PROC REP REV 49 Page 352 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

REJECTED BY ASHGHAL (O&M)


MANHOLE COVERS AND ACCESSORIES FOR AECOM REF.(LT-21372) DT.27.12.2015
16.08 904.5 ITS
Y PARTIAL

Y
16.09 904.6 D.I. GULLIES FOR BRIDGE DECKS

Y PARTIAL
16.10 904.7 GRATINGS FOR STORM DRAIN MANHOLES

DUCTILE IRON GRATING AND DUCTILE IRON


16.11 904.8 MANHOLE COVER AND FRAME FOR
UNDERPASS
Re-submit for Change of Sizes: 600x300x40mm - D.I.
Grating (only)

PROC REP REV 49 Page 353 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Covers Two (2) Memos: 2489 & 2471

DOUBLE TRAINGULAR DUCTILE IRON


16.11 904.9 MANHOLE COVER AND FRAME FOR WASH
OUT SUMP
A
l
r
e
a AECOM Trans. Advice No. EXW-P023-0001-CI-AEC-TN-
d 60448 received 20-11-17

o
r AECOM Trans. Advice No. EXW-P023-0001-CI-AEC-TN-
d 65654 dated 18-02-18

GRP SEALING PLATE FOR DOUBLE e


16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
COVER AND FRAME FOR WASH OUT SUMP
r
e
d

f
r
o
m
PROC REP REV 49 Page 354 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
o
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 r
Completion Date: 21 Jan 2017 d
MATERIALS PROCUREMENT REPORT -GRP
Rev.SEALING
49 - 20PLATE
February 2018
FOR DOUBLE e
16.12 904.9.1 TRAINGULAR DUCTILE IRON MANHOLE
COVER AND FRAME FOR WASH OUT SUMP
r 0.00
e
d

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

f
r
o AECOM Trans. Advice No. EXW-P023-0001-CI-AEC-TN-

m 65214 received 07-02-18

DRAINAGE CHANNEL WITH DI GRATINGS AND a


16.13 904.10 ACCESSORIES
b
o
v
e
DUCTILE IRON STEEL GRATING FOR QP LINE
16.14 904.11 PROTECTION AT SECTION 9 & 13
s
u
p
Y
p
l Y Memo 2399 dated 21/03/2017
LPO 7100061308 dated 29/03/2017
i Memo 2489 dated 19/04/2017
16.15 905.9 TANK FOR WASH OUT SUMP GRP LINERS e Y LPO 7100062537 dated 22/04/2017
r Memo 2741 dated 26/07/2017
LPO 7100067305 dated 06/08/2017

Memo 3043 dated 02/12/2017


LPO 7100067305 dated 06/08/2017

PROC REP REV 49 Page 355 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

A
l
16.16 945 GABION BLANKET OR MATTRESSES
r
e
a
d
y Memo 2612 dated 08/06/2017
LPO 7100069061 dated 26/09/2017

o Memo 3025 dated 29/11/2017


REVISED LPO 7100069061 dated 29/11/2017
r
17. ASPHALT WORKS
d
RED SAND ASPHALT BLANKET TO TOP e
17.01 917 SURFACE OF BRIDGE DECK AND APPROACH
SLABS
r
e
d

f
Tr
ho
17.02 MA-MAT-PROCU-1000 917 ASPHALT WEARING COURSE (PMB) rm
o
ub
ge
hl
PROC REP REV 49 Pageo356 of 405 File: 382684358.xlsx
d
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
f
Completion Date: 21 Jan 2017
Tr
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
ho
17.02 MA-MAT-PROCU-1000 917 ASPHALT WEARING COURSE (PMB) rm 0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION ub Delivery Qty REMARKS / STATUS
ge
hl
o
sw
u
ps
17.03 MA-MAT-PROCU-0990 917
ASPHALT INTERMEDIATE/ BINDER COURSE pu
70mm, PMB
lp
ip
el
ri LETTER OF INTEND
e 29-JANUARY-2015

&r
l
a
i
17.04 917 ASPHALT ROAD WORKS
d

b
y

S
/
C
PROC REP REV 49 a
Page 357 of 405 File: 382684358.xlsx
i
d(P 023)
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
b
y
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION / Delivery Qty REMARKS / STATUS
C

a
n
d
ASPHALT SURFACING WORKS, BITUMEN
17.05 917 60/70, POLYMER MODIFIED BITUMEN (PG 76- J
10), PRIME COAT, TACK COAT
&
P

MA-MAT-PROCU-0980 ASPHALTIC BASE COURSE - BC-1, 180/250mm


17.06 917.3 THK, BITUMEN GRADE 60/70

PROC REP REV 49 Page 358 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
ASPHALTIC BASE COURSE - BC-1, 180/250mm
17.06 MA-MAT-PROCU-0980 917.3 THK, BITUMEN GRADE 60/70 0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

17.07 917.3A ASPHALTIC BASE COURSE - BC CLASS A

ASPHALTIC CONCRETE BASE COURSE (BC


17.08 917.3A CLASS A 60/70) GABBRO ((MARSHALL MIX
DESIGN)

PROC REP REV 49 Page 359 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

ASPHALTIC CONCRETE BASE COURSE (BC


17.09 917.3A CLASS B) GABBRO (MARSHALL MIX DESIGN)

ASPHALTIC CONCRETE WEARING COURSE


17.10 917.3A (GABBRO) PMB PG76-10 (MARSHALL MIX
DESIGN)

MA-MAT-PROCU-1000 ASPHALTIC WEARING COURSE - SC-1 ,


17.11 917.4 BITUMEN GRADE 60/70

PROC REP REV 49 Page 360 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
MA-MAT-PROCU-1000 ASPHALTIC WEARING COURSE - SC-1 ,
17.11 917.4 BITUMEN GRADE 60/70

ASPHALT MIX DESIGN - WEARING COURSE


17.12 917.4A TYPE-2

ASPHALT MIX DESIGN - WEARING COURSE


17.13 917.4A.1 (MARSHALL MIX DESIGN)

ASPHALT PLANT SAMPLES FOR BITUMEN


17.14 917.4B GRADE 60/70

PROC REP REV 49 Page 361 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
ASPHALT PLANT SAMPLES FOR BITUMEN 0.00
17.14 917.4B GRADE 60/70

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

17.15 MA-MAT-PROCU-0960 917.2 BITUMEN 60/70

17.16 MA-MAT-PROCU-0950 917.2A POLYMER MODIFIED BITUMEN (PG 76-10)

88428 M2- BITUMINOUS SPRAY

500 TON

PROC REP REV 49 Page 362 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

17.17 MA-MAT-PROCU-0970 917.1 PRIME COAT

109150 M2- BITUMINOUS SPRAY

160 TON

PROC REP REV 49 Page 363 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

17.18 MA-MAT-PROCU-0970 917.5 TACK COAT

MA-MAT-PROCU-0970 CEMENT STABILIZED MATERIAL


17.19 917.6 (CSM TYPE-1 MIX DESIGN)

PROC REP REV 49 Page 364 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
MA-MAT-PROCU-0970 CEMENT STABILIZED MATERIAL
17.19 917.6 (CSM TYPE-1 MIX DESIGN)

CSM (With White Sand)

CSM (with Washed Sand)

17.20 MA-MAT-PROCU-0940 918 AGGREGATE BASE COURSE

17.21 918.1 ASPHALT AGGREGATES FOR ASPHALT PLANT

18. TRAFFIC SIGNS, TRAFFIC CONTROL AND ROAD MARKINGS

LETTER OF INTENT TO GREEN ARROW, DT.


19.June.2016

STANDARD TRAFFIC SIGNS, BIKE LANE


18.01 931 SIGNS AND GROUND MOUNTED SIGNS
PROC REP REV 49 Page 365 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

STANDARD TRAFFIC SIGNS, BIKE LANE


18.01 931 SIGNS AND GROUND MOUNTED SIGNS

STANDARD TRAFFIC SIGNS, BIKE LANE


SIGNS
AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-
IC-AEC-TN-55502 recvd 31-08-2017

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


IC-AEC-TN-56612 recvd 23-09-2017
18.02 931

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


IC-AEC-TN-57519 recvd 09-10-2017

GROUND MOUNTED SIGNS


AECOM TO ASHGHAL
REF.(LT-20016), DT.03.12.2015

PROC REP REV 49 Page 366 of 405 File: 382684358.xlsx


18.02 931
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. GROUND MOUNTED SIGNS
DESCRIPTION Delivery Qty REMARKS / STATUS

LETTER OF INTENT TO GREEN ARROW, DT.


19.June.2016
MA-MAT-PROCU-1030 OVERHEAD SIGN GANTRIES AND
18.03 931 CANTILEVER STRUCTURES

G
r
e
e
18.04 931.1
INSTALLATION OF DIRECTIONAL SIGNS
INCLUDING GANTRIES
n
A
Grr
ro
18.05
OVER HEAD TRUSS GANTRY AND ew
CANTILEVER STRUCTURES
e
nS
A/
OVER HEAD TRUSS GANTRY AND C
rr
18.06
931.1 MONOTUBE GANTRY, CANTILEVER o
STRUCTURES
w
S
PROC REP REV 49 / 367 of 405
Page File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
G
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
r
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
e
e 0.00
n
A

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION rr Delivery Qty REMARKS / STATUS
931.1 o
w
OVER HEAD MONOTUBE GANTRY AND
S
18.07
CANTILEVER STRUCTURES /
C

OVER HEAD TRUST GANTRY AND


18.08
CANTILEVER STRUCTURES

LETTER OF INTENT TO BIN OMRAN, DT. 17/05/2015

18.09 933 PAVEMENT MARKINGS / SURFACE MARKINGS

A
ll
r
e
a
18.10 933.1 THERMOPLASTIC ROAD MARKING d Y
y
o Y PARTIAL

r
PROC REP REV 49
d
Page 368 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 A
Completion Date: 21 Jan 2017 ll
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 r
e 0.00
a

Material On Site
18.10 933.1 THERMOPLASTIC ROAD MARKING d
S. No. ACTIVITY ID SCH. NO. DESCRIPTION y Delivery Qty REMARKS / STATUS

o
r
d
e Y Milestone 7 (Sections: 1)
r B/L: MSCUJ4771497, 17.05.16
Y
e Vessels: MAGNUS F, MSC BERYL

d Y B/L:MSCUJ4771505,Vessels: MAGNUS F, MSC BERYL,


fr Milest. 8 (Sec: 3,4,5,8) (OPO: 7200000250)

o Y B/L: MSCUJ4772495, 24.05.16

m Vessels: MAGNUS F, MSC TRIESTE


B/L: MSCUJ4774665, 31.05.16
Y Vessel: SIMA PRIDE

S Y B/L: MSCUJ4780415, 21.05.16


Ves: MAGNUS F, M.BERYL
a
l Y
LPO 7200000660 dated 14/01/2017
MEMO 2159 dated 15/12/2016

18.11 943 GUARD RAILS AND CRUSH CUSHION a MEMO 2188 dated 21/012/2016

m Y
a Y

Y
MEMO 2475 dated 13/04/2017
Y LPO 7200000791 dated 10/05/2017

PROC REP REV 49 Page 369 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MEMO 2650 dt. 22/06/2017


LPO 7200000839 dt. 28/06/2017 (820 Lm)

MEMO 2298 dt. 13/02/2017


Y LPO 7100059349 dt. 23/02/2017
X-TENSION GUARDRAIL END TERMINAL - NON
18.12 943 GATING
Y

MEMO 2650 dt. 22/06/2017


LPO 7200000839 dt. 28/06/2017

18.13 943 FIXED OBJECT ATTACHMENT (FOA)

AECOM Trans. Advice No. EXW-P023-0001-MQ-AEC-TN-


60446 dt 20/11/2017

18.14 943 INSTALLATION OF CRASH BARRIERS

Letter of Intent EXW-P023-0001-Electro Industries-001,


18.15 943 INSTALLATION OF STEEL GUARDRAILS
EXC Dt.19.Dec.2015

EL /
INSTALLATION OF STEEL GUARDRAILS, DU
18.16 943 CRASH CUSHIONS, TRANSITION & END
TERMINAL
NES
S/C

18.17 944 CRASH CUSHIONS Y

Y
18.18 938 CATS EYES / ROAD STUDS
PROC REP REV 49 Page 370 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

18.18 938 CATS EYES / ROAD STUDS

18.19 935 BARRIER BOLLARDS

18.20 941 HANDRAIL & ACCESSORIES

19. FENCING AND GATES

19.01 MA-MAT-PROCU-1040 921 CHAIN LINK FENCING & GATES

19.02 921 PEDESTRIAN FENCE (GALVANIZED)

19.03 921.1 CHAIN LINK RAILING 710mm HEIGHT

19.04 921.2 CAMEL FENCE

PROC REP REV 49 Page 371 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

19.05 923 DECORATIVE FENCE

19.06 921T TEMPORARY SITE FENCING

19.07 941 ALUMINIUM RAILING

20. BRIDGE BEARINGS AND POST TENSIONING WORKS

Air WayBill.No: 074-3347 4416 (Air Freight)


Y MAURER . 685342/01 (OPO: 7200000335)

Air WayBill.Nos: ESG-54824 (Air Freight)


Y MAURER Ref. 685342/02

Air WayBill.Nos: ESG-54864 (Air Freight)


Y MAURER Ref. 685342/03

Air WayBill.Nos: ESG-54865 (Air Freight)


Y MAURER Ref: 685342/04

Air WayBill.Nos: ESG (Air Freight)


Y MAURER Ref: 685342/05, 685342/06

Air WayBill.No: ESG-00054913(Air Freight)


Y MAURER Ref: 685342/08, 685342/09

Air WayBill.No: (Air Freight)


Y MAU Ref: 685342/10

By Air Freight
Y MAURER Ref: 685342/13

PROC REP REV 49 Page 372 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

B/L No: 404406160008 (Sea Freight)


Y MAURER Ref: 685342/07

BY Sea Freight
Y MAURER Ref: 685342/11 & 685342/12

BY Sea Freight
Y MAURER Ref: 685342/14

By Air Freight
Y MAURER Ref: 685342/15

By Air Freight
20.01 946 BRIDGE BEARINGS Y MAURER Ref: 685342/18-01-AF

By Sea Freight
Y MAURER Ref: 685342/16-SF

By Sea Freight
Y MAURER Ref: 685342/17-SF

By Sea Freight
Y MAURER Ref: 685342/18-02-SF

By Sea Freight
Y MAURER Ref: 675342/01 SF

By Air Freight
Y MAURER Ref: 675342/03-01 AF

By Sea Freight
Y MAURER Ref: 675342/02 SF

By Air Freight
Y MAURER Ref: 675342/03-03 AF

By Sea Freight
Y MAURER Ref: 675342/03-02 SF

By Air Freight
Y MAURER Ref: 675342/04-02 AF / 675342/05-01 AF

PROC REP REV 49 Page 373 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

By Air Freight
Y MAURER Ref: 675342/03-04 SF
By Sea Freight
Y MAURER Ref: 675342/04-01 SF, MAURER Ref:
675342/05-02 SF
By Air Freight
Y MAURER Ref: 675342/06-02 AF
By Air Freight
Y MAURER Ref: 675342/06-03 AF

LETTER OF INTENT ECO-05 , DT.12.05.2016


PURCHASE ORDER 7200000422, 23.06.2016

By Sea Freight
Y MAURER Ref: 560541/01 & 02 SF
By Sea Freight
Y MAURER Ref: 560541/03 SF
20.02 947 MODULAR EXPANSION JOINT
By Sea Freight
Y MAURER Ref: 560541/06-SF
By Sea Freight
Y MAURER Ref: 560541/05-01-SF
By Sea Freight
Y MAURER Ref: 560541/04-SF
By Sea Freight
Y MAURER Ref: 560541/05-02 & 08 - SF
By Sea Freight
Y MAURER Ref: 560541/07-09 - SF

Y
20.03 947.1 BITUMEN JOINT FILLER IN ASPHALT
PROC REP REV 49 Page 374 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

20.03 947.1 BITUMEN JOINT FILLER IN ASPHALT


Y

RIZZ
20.04 949 POST TENSIONING WORKS
ANI
S/C

BRIDGES DECK CONSTRUCTION AND


20.05 949 ERECTION

Y
20.06 949.1 GROUT FOR POST TENSIONING
A
SCARIFYING BRIDGE DECK TOP SURFACE
M
20.07 949.2 CONCRETE M
I
N
20.08 949.2 7 WIRE STEEL STRAND E

S
20.09 949.3 THREADED ZINC INSERT TSI 38 X 138 /
C

PHILIPP FIXING GALVANIZED SOCKETS


20.10 949.12 WAVED END

PROC REP REV 49 Page 375 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. PHILIPP FIXINGDESCRIPTION
GALVANIZED SOCKETS Delivery Qty REMARKS / STATUS
20.10 949.12 WAVED END

20.11 949.5 FIXING SOCKET WITH WAVED END

20.12 949.6 HDPE R3962 DEVIATION DIABOLO

20.13 949.7 6" PRE-SHAPED UPVC PIPE

SEALER INJECTION OF CRACK


20.14 949.8 MASTERINJECT 1320

COSMETIC REPAIR UP TO 10 MM
20.15 949.9 MASTEREMACO N 307

MASTERINJECT 1315 IS INJECTION EPOXY


20.16 949.10 RESIN

INJECTION INTO CRACKS IN CONCRETE OR


20.17 949.11 MASONRY RIZZ
(FOSROC NITOFILL EPLV) ANI
REPAIR MORTAR FOR STRUCTURAL
S/C
20.18 949.21 CONCRETE AND MASONRY REPAIRS
(FOSROC RENDEROC HSXTRA)

REPAIR MORTAR FOR STRUCTURAL


20.19 949.13 CONCRETE AND MASONRY REPAIRS
PROC REP REV 49 (FOSROC RENDEROC FCXTRA) Page 376 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

REPAIR MORTAR FOR STRUCTURAL


20.19 949.13 CONCRETE AND MASONRY REPAIRS
(FOSROC RENDEROC FCXTRA)

CONCRETE REPAIR MATERIAL (FOSROC


20.20 949.14 NITOMORTAR FC)

POLYMER MODIFIED CEMEMTITIOUS FOR


20.21 949.15 CONCRETE REPAIRS (RENDEROC LAXTRA)

CONCRETE CURING COMPOUND (CONCURE


20.22 949.16 WB 309)

20.23 949.17 POST-TENSIONING BAR, NUT AND PLATE

SIKADUR - 31 SBA SEGMENTAL BRIDGE


20.24 949.18 CONSTRUCTION

WATER BASED CONCRETE CURING


20.25 949.19 COMPOUND (MASTERKURE®106)

20.26 949.20 CONCRETE SPACERS MAX FRANK

20.27 949.30 COSMOPLAST PE CORRUGATED CONDUIT

HDPE PIPE & CAP FOR EXTERNAL PT


20.28 949.22 ANCHORAGES

PROC REP REV 49 Page 377 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

SLAB BOLSTER SEMIFIX-SUPER 50 IS MIN


20.29 949.23 SEGMENT CONCRETE COVER

20.30 949.24 COSMOPLAST - 4" UPVC PIPE

HIGH STRENGTH, NON-FLOW, EPOXY


20.31 949.25 BEDDING & REPAIR MORTAR.

HDPE CORRUGATED PLASTIC DUCT FOR


20.32 949.26 BEARING STUD RECESS

PLASTIC DUCT FOR INSTALLATION OF


20.33 949.27 TEMPORARY TIE-DOWNS

EPOXY ADHESIVE FOR SEGMENTAL


20.34 949.28 CONSTRUCTION (MASTERBRACE® ADH
1441)

CONCRETE REPAIR MATERIALS : FOSROC


20.35 949.29 NITOMORTAR S WITH NITOCOTE PRIMER
SEALER

CEMENTITIOUS GROUT for CASTING OF


20.36 949.30 SPACERS (MASTERFLOW® 928)

PROC REP REV 49 Page 378 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE CURING COMPOUND


20.37 949.31 (FOSROC CONCURE A)
SLAB BOLSTER (REUSS-SEIFERT GMBH
20.38 949.32 TELEFIX-SUPER 50)

GROUT FOR POST-TENSIONED CABLES &


20.39 949.33 FIXING ANCHORS/ BOLTS IN CONCRETE
(MASTER ROC PLC)

GROUTING OF BEARINGS &SHEAR KEYS IN


20.40 949.34 SEGMENTAL BRIDGES

20.41
CORRUGATED PLASTIC DUCT FOR BEARING
949.35 GROUTING (50MM DUCT)
RIZZ
ANI
EPDM SEALING GASKET PLACED AROUND S/C
20.42 949.36 THE PT DUCT HOLES

CORROSION INHIBITOR POWDER FOR POST


20.43 949.37 TENSIONED SEGMENTAL BRIDGES (MCI-309)

ACRYLIC BONDING AGENT & CURING AID -


20.44 949.38 MASTEREMACO P210

PROC REP REV 49 Page 379 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE CURING COMPOUND TO TOP


20.45 949.39 SLAB SURFACE OF THE SEGMENTS
(MASTERKURE® 181).

WATER BASED CHEMICAL RELEASE AGENT -


20.46 949.40 (MASTERFINISH® RL225)

CEMENTITIOUS GROUT FOR REMEDIAL


20.47 949.41 WORKS (MF®928)

CEMENTITIOUS GROUT FOR REMEDIAL


20.48 949.41 WORKS (MASTFLOW950)

20.49
CEMENTITIOUS MICRO CONCRETE FOR
949.42 REMEDIAL WORKS - MF® 980
20.50

EPOXY GROUT FOR REPAIRS IN BRIDGE


20.51 949.43 CONSTRUCTION MS® 915

CEMENTITIOUS PINHOLES FILLER SIKAREP®


20.52 949.44 FINE-N

HIGH STRENGTH FREE FLOW MICRO


20.53 949.45 CONCRETE SIKACRETE®114

NON SHRINK HIGH ST.CEMENTITIOUS GROUT


20.54 949.46 SIKAGROUT®114
PROC REP REV 49 Page 380 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

NON SHRINK HIGH ST.CEMENTITIOUS GROUT


20.54 949.46 SIKAGROUT®114

CEMENTITIOUS PATCH REPAIR MORTAR 5MM


20.55 949.47 TO 30MM SIKAREP

EPOXY CEMENT BASED, BONDING AGENT &


20.56 949.48 REBAR COAT SIKATOP®110

INJECTION TO FILL AND SEAL CRACKS IN


20.57 949.49 STRUCTURES (Sikadur52)

EPOXY BASED BONDING AGENT


20.58 949.50 SIKADUR®32LP

EVAPORATION RETARDANT ON TOP DECK


20.59 949.51 SURFACE(MasterKure111 CF)

BASED EXPOXY RESIN FOR REPAIR MORTAR


20.60 949.52 SIKADUR - 31CF SLOW RIZZ
ANI
S/C
STRUCTURAL REPAIR WORKS SIKADUR 42MP
20.61 949.53 SLOW

CONCRETE BONDING AGENT FOSROC


20.62 949.54 NITOBOND EP
PROC REP REV 49 Page 381 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE BONDING AGENT FOSROC


20.62 949.54 NITOBOND EP

EPOXY BONDING AGENT FOR CONCRETE


20.63 949.55 REPAIRS -ADH 1414

HIGH CHEMICAL RESISTANCE, NON TOXIC


20.64 949.56 EPOXY COATING SIKAG®PW

A NON-TOXIC SOLVENT HIGH BUILD


20.65 949.57 PROTECTIVE EPOXY RESIN COATING

GROUTING OF BEARINGS &SHEAR KEYS IN


20.66 949.58 SEGMENTAL BRIDGES

FORM OIL FOSROC REEBOL WB (WATER


20.67 098A BASED)

21. LANDSCAPING - HARDSCAPING

21.01 965/976 SOFT LANDSCAPING & IRRIGATION

21.02 HARD LANDSCAPING

21.03 MA-MAT-PROCU-0920 IRRIGATION NETWORK

21.04 965 LANDSCAPING AND IRRIGATION

PROC REP REV 49 Page 382 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

21.05 965.1 DUST CONTROL APPLICATION MIXTURE

UNI-SPRAYTM SERIES AND VARIABLE ARC


21.06 965.2 NOZZLES (VANS)

1065 & 1068 FORGED BRASS FULLYWAY GATE


21.07 965.3 VALVES

21.08 965.4 MASTER CONTROL VALVE

Rem
ains Y LETTER OF INTENT (6 Jun 2014)
21.09 965.5 PLANT REMOVAL
in
Secti
on 2
awai
ting AECOM letter ref. EXW-P023-0001-CM-AEC-LT-42409
dated 11/01/2017
QP-
MIC CANCELLED

PROC REP REV 49


appr
Page 383 of 405 File: 382684358.xlsx
RELOCATION OF TREES SECTION 02 QP-MIC
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTERem
(P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014 ains
Completion Date: 21 Jan 2017 in
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018 Secti
on 2 0.00
awai

Material On Site
ting
S. No. ACTIVITY ID SCH. NO. DESCRIPTION
QP- Delivery Qty REMARKS / STATUS

MIC
appr AECOM letter ref. EXW-P023-0001-CM-AEC-LT-42409

21.10
RELOCATION OF TREES SECTION 02 QP-MIC
965.5.1 LIMIT oval dated 11/01/2017

AECOM letter ref. EXW-P023-0001-CM-AEC-LT-42409


dated 11/01/2017

PRESSURE COMPENSATING FULL-CIRCLE


21.11 965.6 BUBBLERS 1400 SERIES

21.12 965.7 GRAVEL MULCH

XERI-BUGTM EMITTERS & PRESSURE-


21.13 965.8 COMPENSATING MODULES

21.14 965.9 PVB PROFESSIONAL SERIES VALVE BOXES

UPVC PRESSURE S/S PIPES CLASS 'E' (15


21.15 965.10 BAR)

PROC REP REV 49 Page 384 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

PEB AND PESB SERIES VALVES (SOLENOID


21.16 965.11 VALVES) AND PRS-DIAL PRESSURE
REGULATING MODULE

QUICK-COUPLING VALVES (5-RC), QUICK-


21.17 965.12 COUPLING KEYS (55-K-1) AND HOSE SWIVEL
(SH-1)

XD (EXTRA DISC) 3" PLASTIC DISC FILTERS,


21.18 965.13 120 MESH (125 MICRON) CODE: IT-ABF7512-
3X*

21.19 965.14 UPVC FITTINGS (CLASS-E)

CONTROL VALVE WIRES FOR 24 VAC


21.20 965.15 (NOMINAL) CIRCUITS (SINGLE CONDUCTORS,
TYPE UF)

UNIRAIN ARV-2"-KA (2" KINETIC AND


21.21 965.16 AUTOMATIC AIR RELEASE VALVE)

PROC REP REV 49 Page 385 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

21.22 965.17 TFS (FLOW SENSORS)

PROC REP REV 49 Page 386 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

SWING PIPE TUBING AND FITTINGS (SPX-


21.23 965.18 FLEX SERIES - SWING PIPE)

DBY / DBR WIRE CONNECTOR FOR


21.24 965.19 LANDSCAPING AND IRRIGATION

SENTINEL CENTRAL CONTROL SYSTEM FOR


21.25 965.20 LANDSCAPING AND IRRIGATION

WARNING TAPE GREEN COLOR, 150 MM


21.26 965.21 WIDTH, THICKNESS 200m

Recvd AECOM Letter Ref. EXW-P023-0001-AL-AEC-LT-


62724 dated 16/12/2017 with attached PPD approval Ref.
21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES) 2017-317799 dated 10/12/2017

PROC REP REV 49 Page 387 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
21.27 965.22 POLYETHYLENE PIPES (UNIPIPE LDPE PIPES)

21.28 965.23 UPVC FITTINGS - UNION

21.29 965.24 POLYETHYLENE LIGHT WEIGHT FITTINGS


CRS Point 6: Test Result for Carbon Black submitted to
ASHGHAL O&M by AECOM & waiting for Reply.

CRS Point 1: EXW-P023-0001-MQ-JPL-IR-01702 CA -


21.30 965.25 PLANTAFLOR SAB PEAT MOSS UNDER REVIEW BY AECOM

AECOM TRANS. ADVICE NO. EXW-P023-0001-AL-AEC-


TN-61387 dt 29/11/2017

NDS Standard Series 13" x 24" Rectangular Valve


Boxes- Description - Marking: 13" x 24" x 15" Box, INVALID as per Email of MUKESH (LARISSA) dated
21.31 965.26 Overloading Bolt-Down Cover-Color: Black Box, 11/12/2017 @ 8:22am
Green Cover: (Part No. 125BCB)

21.32 965.27 Valve Box Rectangular Super Jumbo 1324-15


AECOM TRANSMITTAL ADVISE NO. EXW-P023-0001-
AL-AEC-TN-63720 dt 09/01/18

PROC REP REV 49 Page 388 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

21.33 967 LITTER BINS

21.34 950 BIKE SHELTERS

21.35 950.1 BIKE RACKS

21.36 804 STREET/ PARK BENCHES

22. ARTSCAPING

22.01 968 ARTSCAPING

23. INTELIGENT TRANSPORT SYSTEM

(ITS) INTELIGENT TRANSPORT SYSTEM


23.01 930 A
OVER HEIGHT DETECTION SYSTEM l
ITS EQUIPMENTS (SUPPLY, INSTALLATION,
g
23.20 897.1 TESTING AND COMMISSIONING OF ITS o
WORKS
s
24. ELECTRICAL MATERIALS y
s
24.01 460 HIGH VOLTAGE TOWER RELOCATION t
e
24.02 460 ELECTRICAL WORKS m
PROC REP REV 49 S
Page 389 of 405 File: 382684358.xlsx
A
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTEl (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
g
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
o
s
y 0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION t Delivery Qty REMARKS / STATUS
e
24.02 460 ELECTRICAL WORKS m

24.03 460
LV (415 V) & MV (11 KV) POWER S AECOM REF.(LT-14433) DT.16.05.2015
DISTRIBUTION WORKS / UNDERTAKE LV(415V) & MV(11KV)

24.04 460 STREET LIGHTING WORKS C

TESTING AND COMMISS. WORKS FOR


24.05 460 INDOOR SUB-STATIONS

24.06 460 11 KV OHL WORKS

Partially delivered on site. Remaining released for


Y manufacturing
MA-MAT-PROCU-1070 MV & LV CABLES AS FEEDERS TO FEEDER
24.07 460 PILLARS AND SUBSTATIONS Material Inspection of Electric Tables J&P LT-00868,
Dt.08.12.15

24.08 MA-MAT-PROCU-1070 460 LV CABLES FOR STREET LIGHTING

MA-MAT-PROCU-1073 COPPER TERMINAL CABLE LUGS FOR


24.09 460 STREET LIGHTING

Ready ex-works
MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM
24.10 460 / WALLIS
PROC REP REV 49 Page 390 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

MA-MAT-PROCU-1071 EARTHING & LIGHTING PROTECTION SYSTEM


24.10 460 / WALLIS

PVC CONDUITS & ACCESSORIES FOR Y


24.11 MA-MAT-PROCU-1072 460 UNDERBRIDGES, UNDER PASSES &
PEDESTRIAN / BIKEPATHS

MA-MAT-PROCU-1075 G.I. CONDUITS, PVC COATED G.I., FLEXIBLE


24.12 460 CONDUIT & ACCESSORIES AECOM TO ASHGHAL
REF (LT-08211) (23257)DT.08.04.2015

24.13 MA-MAT-PROCU-1074 460 CABLE GLANDS

Approved via letter ref. EXW-P023-0001-EL-AEC-LT-


37930 dt. 26/10/2016

CABLE TRAY, LADDER, TRUNKING SUPPORT


24.14 460 SYSTEM / ICMS SYSTEMS

24.15 MA-MAT-PROCU-1077
PYROTENAX MICC CABLES FOR INDOOR
460 SUBSTATIONS

LUMINARIES FOR MICC CABLE FOR


24.16 460 SUBSTATIONS
PROC REP REV 49 Page 391 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

LUMINARIES FOR MICC CABLE FOR Transmittal Advice No. EXW-P023-0001-EE-AEC-LT-


24.16 460 SUBSTATIONS 42164 dt. 07/01/2017

L/M VOLTAGE CABLE JOINTS & TERMINATION


24.17 460
FOR SUBSTATIONS

Y
PACKAGE TYPE SUBSTATION (500kVA,
24.18 460 11/0.433kV)

24.19 460 500 KVA OIL FILLED TRANSFORMERS

Approved by letter ref. EXW-P023-0001-EL-AEC-LT-


24.20 460 STREET LIGHTING FEEDER PILLARS 37950 dt. 26/10/2016

24.21 460 6M STREET LIGHTING COLUMN


Approved via letter ref. EXW-P023-0001-EL-AEC-LT-
38852 dt. 10/11/2016

PROC REP REV 49 Page 392 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

24.22 460 20M STREET LIGHTING HIGH MASTS


MATERIAL NOT ACCEPTABLE
AECOM REF (LT-20516) DT.10.12.2015

24.23 460 30M STREET LIGHTING HIGH MASTS

30M STREET LIGHTING (8 Lanterns-4 Lanterns


24.24 460 on each Side)

LUMINARIES FOR STREET LIGHTING


(250, 400 & 600WATTS).

24.25 460
LUMINARIES FOR STREET LIGHTING 250
WATTS

24.26 460 LUMINARIES FOR SUBSTATION

24.27 460 CABLE TIES FOR STREET LIGHTING


AECOM TO ASHGHAL LETTER
SENT (LT-16748) (23257) DT.08.10.2015

8 MTR OCTAGONAL LIGHTING COLUMN WITH


24.28 460 SINGLE OR DOUBLE ARM BRACKET

PROC REP REV 49 Page 393 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

12 MTR OCTAGONAL LIGHTING COLUMN


24.29 460 WITH SINGLE OR DOUBLE ARM BRACKET

14 MTR OCTAGONAL STREET LIGHTING POLE


24.30 460 WITH 6 ARM BRACKET (2.0 M OUTREACH)

14 M OCTANGONAL STREET LIGHTING POLE


24.31 460 WITH 4 ARM BRACKETS (2.0 M OUTREACH)

FLEXIBLE HEAT RESISTANT CABLE 3C X


24.32 460 2.5mm² CU/PVC

24.33 460 FLEXIBLE HEAT RESISTANT CABLE

24.34 460 SINGLE CORE WIRES FOR LV SYSTEM

PROC REP REV 49 Page 394 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
24.34 460 SINGLE CORE WIRES FOR LV SYSTEM

AECOM TO ASHGHAL LETTER


Ref. (LT-18390) (23257) , Dt.04.11.2015

Y
24.35 460 MV/LV CABLE JOINTS & TERMINATION KITS

UNDER BRIDGE & UNDER PASS LIGHTING


24.36 460 LUMINAIRES AECOM to ASHGHAL for final approval letter ref. EXW-
P023-0001-EL-AEC-LT-39369 dated 20/11/2016

24.37 460 LUMINAIRES FOR SUBSTATION

24.38 460 11 KV SWITCHGEAR PANELS

LOI ISSUE. MATERIALS UNDER APPROVAL


24.39 460 11KV INDOOR SWITCHGEAR 25KA, 800A

FREE STANDING FEEDER PILLAR WITH MAIN


24.40 460 SWITCH OF 800A TP AND 6 NOS OUTGOING
FUSED WAYS OF 2500A TP TYPE-J FUSES.

24.41 460 COMMON FEEDER PILLAR


PROC REP REV 49 Page 395 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

24.41 460 COMMON FEEDER PILLAR

24.42 460 6 Way Free Standing Feeder Pillar

24.43 460 DISTRIBUTION BOARD FOR MV SUBSTATION

24.44 460 CUT-OUT BOX FOR STREET LIGHTING POLE

24.45 460 MARSHALLING BOXES FOR SUBSTATIONS

24.46 460 ELECTRICAL WIRING ACCESSORIES

24.47 460 MULTICORE PILOT CABLE JOINT KIT

PROC REP REV 49 Page 396 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
24.47 460 MULTICORE PILOT CABLE JOINT KIT
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

24.48 460 INDOOR TYPE SUBSTATION

24.49 460 STREET LIGHTING COLUMNS AND BRACKETS For 12 mtr poles

24.50 460 CABLE DUCTS AND ACCESSORIES

24.51 MA-MAT-PROCU-1060 460 HV/EHV CABLES

24.52 460 STREET LIGHTING LANTERNS & LUMINAIRS

24.53 MA-MAT-PROCU-1080 460 BRIDGE / UNDERPASS LIGHTING

Approved via letter ref. EXW-P023-0001-EL-AEC-LT-


24.54 460 14M STREET LIGHTING POLES 37954 dt. 26/10/2016

24.55 460 11 KV RING MAIN UNIT (RMU)

AECOM Trans. Advice No. EXW-P023-0001-EE-AEC-TN-


60505 recvd 20/11/17

24.56 460 LUMINAIRES FOR STREET LIGHTING


PROC REP REV 49 Page 397 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

24.56 460 LUMINAIRES FOR STREET LIGHTING

14 M STREET LIGHTING POLE OF DOUBLE


24.57 460 ARM BRACKET ON ONE SIDE

24.58 460 11 KV JOINT & TERMINATION KIT

24.59 460 LV CABLE & STRAIGHT JOINT KIT

24.60 460 CAST RESIN TEE JOINTS

24.61 460 BARE COPPER CABLE

PROC REP REV 49 Page 398 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS
24.61 460 BARE COPPER CABLE

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


EE-AEC-TN-59716 recvd 09-11-2017

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


24.62 460 KWH METER SERVICE CABINETS EE-AEC-TN-63962 recvd 14-01-2018

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


EE-AEC-TN-666369 recvd 04-03-2018

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


EL-AEC-TN-58559 dated 25-10-2017

STREET LIGHTING COLUMN (6 M, 12 M & 14 AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


24.63 460 M) & HIGH MAST (30 M) EL-AEC-TN-62263 dated 11-12-2017

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


EL-AEC-TN-64453 dated 23-01-2018

STREET LIGHTING COLUMN (6 M, 12 M & 14


24.64 460 M) WITH SINGLE / DOUBLE ARM

24.65
460 Underpass Lighting Luminaire

PROC REP REV 49 Page 399 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


24.66 460 LIGHTING CUT-OUTS -STREET LIGHTING EL-AEC-TN-66089 recvd dated 27-10-2018

LV (415 V) & MV (11 KV) POWER


25.00 460 PL1 DISTRIBUTION WORKS

CONSTRUCTION OF INDOOR / OUTDOOR AND


25.01 460 PL2 PACKAGE FOR ELECTRICAL SUBSTATIONS

25.02 460 PL1 PE CABLE TILE FOR ELECTRICAL CABLES

25.03 460 PL2 WARNING TAPE FOR ELECTRICAL CABLES

SUBSTRUCTURE WATERPROOFING SYSTEM


25.04 460 PL3 FOR POWER SUBSTATION

PROC REP REV 49 Page 400 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

CONCRETE HOLLOW BLOCKS FOR WALLS OF


25.05 460 PL4 POWER SUBSTATION

READY MIX CONCRETE FOR POWER


25.06 460 PL5 SUBSTATIONS

POLYETHYLENE SHEET(1000 GAUGE -


25.07 460 PL6 250MIC) FOR POWER SUBSTATION)

25.08 460 PL7 GRC WORKS FOR POWER SUBSTATION

GALVANIZED STEEL DOOR & VENTILATORS


25.09 460 PL8 FOR SUBSTATION

WASHED SAND FOR BLOCK WORK &


25.10 460 PL9 PLASTERING FOR SUBSTATION

OPC CEMENT FOR BLOCK WORK &


PO
25.11 460 PL10 PLASTERING FOR SUBSTATION WE
R
PROC REP REV 49 PageLIN
401 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION
PO Delivery Qty REMARKS / STATUS
WE
R
LIN
BITUPLUS MEMBRANE FOR ROOF
KS
25.12 460 PL11 WATERPROOFING FOR SUBSTATION S/
C

POLYSTRENE BOARD FOR ROOF


25.13 460 PL12 WATERPROOFING FOR SUBSTATION

GEOTEXTILE MEMBRANE FOR ROOF


25.14 460 PL13 WATERPROOFING FOR SUBSTATION

FLOOR EPOXY PAINT- SUBSTATION (FOSROC


25.15 460 PL14 NITOFLOR FC150 & FC140)

EXTERNAL & INTERNAL WALL FACE COATING


25.16 460 PL15 SYSTEM FOR SUBSTATION

PROC REP REV 49 Page 402 of 405 File: 382684358.xlsx


PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

HIGH YIELD STEEL DEFORMED REBARS


25.17 460 PL16 (NORMAL AND EPOXY COATED)

BITUMEN FIBER JOINT FILLER BOARD 12 MM


25.18 460 PL17 THICKNESS

BLACK ANNEALED WITH PVC COATED


25.19 460 PL18 BINDING WIRE (1.6 MM THICKNESS)

READY MIX CONCRETE FOR POWER


25.20 460 PL19 SUBSTATIONS

25.21 460 PL20 PLASTERING ACCESSORIES

25.22 460 PL21 WATERPROOFING SYSTEM

AECOM TRANSMITTAL ADVICE NO. TD-EXW-P023-EE-


AEC-TN-62570 dated 14/12/2017

25.23 460 PL22 DB Box, MCCBs, ELCB


AECOM TRANSMITTAL ADVICE NO. TD-EXW-P023-EE-
AEC-TN-64466 dated 24/01/2018

AECOM TRANSMITTAL ADVICE NO. TD-EXW-P023-EL-


AEC-TN-62714 dated 17/12/2017
Substation Lighting Features - Philips (France) /
25.24 460 PL23 Flourescent Light Fittings
PROC REP REV 49 Page 403 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
0.00

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION Delivery Qty REMARKS / STATUS

Substation Lighting Features - Philips (France) /


25.24 460 PL23 Flourescent Light Fittings
AECOM TRANSMITTAL ADVICE NO. TD-EXW-P023-EE-
AEC-TN-64499 dated 25/01/2018

25.25 460 PL24 Weather proof light

AECOM TRANSMITTAL ADVICE NO. TD-EXW-P023-EE-


AEC-TN-64500 dated 25/01/2018

AECOM TRANSMITTAL ADVISE NO. TD-EXW-P023-EE-


AEC-TN-62822 dated 19/12/2017
25.26 460 PL25 Exit Light Fittings for Substation
AECOM TRANSMITTAL ADVISE NO. TD-EXW-P023-EE-
AEC-TN-64536 dated 25/01/2018

25.27 460 PL26 Strata Primer SF 25359, Strata Epoxy HT 35599

AS
EARTH HOLE DRILLING FOR EARTHING ROD SO
26.00 461.01 INSTALLATION
CIA
YA
TE
M
S/
MI
C
27.00
1222/122 INSTRUMENTATION CONTROL AND NE Refer to AECOM Letter Ref. No.: EXW-P023-0001-CI-
AEC-LT-58911 dated 30/12/2017 with the attached
3/1224 AUTOMATION S/ ASHGHAL Email Approval (last page)

C
PROC REP REV 49 Page 404 of 405 File: 382684358.xlsx
PROJECT : CONSTRUCTION OF NEW ORBITAL HIGHWAY & TRUCK ROUTE (P 023)
CONTRACT PERIOD : Commencement Date: 23 Jan 2014
Completion Date: 21 Jan 2017
MATERIALS PROCUREMENT REPORT - Rev. 49 - 20 February 2018
YA 0.00
M
MI

Material On Site
S. No. ACTIVITY ID SCH. NO. DESCRIPTION NE Delivery Qty REMARKS / STATUS
S/
C

27.01
1222/122
3/1224
SCADA PROVISION RTU CONTROL PANEL
FOR TSE
PQ and Material submital subject to
approval from ASHGHAL

ENDRESS & HAUSER INSTRUMENTS (FLOW


1222/122 METER, PRESSURE TRANISMITTER AND
27.02
3/1224 LEVEL SWITCH) AND AUMA ACTUATORS FOR
TSE

1222/122 AECOM TRANSMITTAL ADVICE NO. EXW-P023-0001-


27.03 AUMA ACTUATORS FOR TSE CI-AEC-TN-66371 recvd 04-03-2018
3/1224

PROC REP REV 49 Page 405 of 405 File: 382684358.xlsx