Professional Documents
Culture Documents
NOTAS
QUINTA AVENIDA
ORGANIZAR CONTRATOS
ACTIVIDADES PENDIENTES Y ACTIVIDADES PARA ATACAR
ANALISIS DE LA PLANEACION
REQUISICION
PLANO RECOD DISEÑO HIDRAULICO
CAMBIOS PENDIENTES EN DISEÑOS ARQUITECTONICOS Y
ESTRUCTURALES (ESCALERAS Y CUBIERTA)
DISEÑO DE ESCALERAS
COTIZACION DE ALUMINIO PERCIANA EN FACHADA
ORNAMENTACION DE FACHADA
BOSQUES
REVISION DE COSRTE CON SOPORTE A CONTABILIDAD
CONTRATOS DE TODOS LOS CONTRATISTAS
CAMPO REAL
DISEÑO ESTRUCTURAL
DISEÑO HIDRO SANITARIO
CATALEYA (PITALITO)
DISEÑOS ESTRUCTURALES
DISEÑOS HIDROSANITARIOS
4 DE MARZO
VIERNES SABADO
3/4/2017
3/4/2017
2/28/2017 revisada consolidar informacion PENDIENTE CANTDADES HIDRAULICAS Y ELECTRICAS
2/28/2017
2/28/2017
2/28/2017 pendiente aprobar
3/4/2017
3/4/2017
3/4/2017
IDRAULICAS Y ELECTRICAS
9.525
12.7
OMOLOGACION DE MALLA DE 6 MM Y 8 MM
CON SEPARACION A CADA 15
15 6.5 7 7.5 8 8.5
2.21 2.57 2.95 3.35 3.78
6mm 0.2826 1.88 12.7 10.9 9.5 7.4
8mm 0.5024 3.35 22.7 19.5 17 13.2
6.70
muro
m3 p1 17.45 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
p2 11.95 1 malla 8 mm cd 15 + 12 cada 15
m2 p1 17.45 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
m6 p1 17.45 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
m7 p1 17.45 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
p2 8.51 1 malla 8MM cada 15 y 1/2" cada 25 cm vertical
m8 p1 15.30 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
p2 8.51 1 malla 8MM cada 15 y 1/2" cada 25 cm vertical
m12 p1 17.45 2 malla 8MM cada 15 y 1/2" cada 12 cm vertical
p2 8.51 1 malla 8MM cada 15 y 1/2" cada 25 cm vertical
AREA
mm2 cm2 7 8 9 10 11 12 13 14 15 16
1/4" 32 0.32 4.57 4.00 3.56 3.2 2.91 2.67 2.46 2.29 2.13 2.00
3/8" 71 0.71 10.14 8.88 7.89 7.1 6.45 5.92 5.46 5.07 4.73 4.44
mm 1/2" 129 1.29 18.43 16.13 14.33 12.9 11.73 10.75 9.92 9.21 8.60 8.06
cm/m2 5/8" 199 1.99 28.43 24.88 22.11 19.9 18.09 16.58 15.31 14.21 13.27 12.44
cm 3/4" 284 2.84 40.57 35.50 31.56 28.4 25.82 23.67 21.85 20.29 18.93 17.75
cm 7/8" 387 3.87 55.29 48.38 43.00 38.7 35.18 32.25 29.77 27.64 25.80 24.19
1" 510 5.1 72.86 63.75 56.67 51 46.36 42.50 39.23 36.43 34.00 31.88
17 18 19 20 25
1.88 1.78 1.68 1.60 1.28
4.18 3.94 3.74 3.55 2.84
7.59 7.17 6.79 6.45 5.16
11.71 11.06 10.47 9.95 7.96
16.71 15.78 14.95 14.20 11.36
22.76 21.50 20.37 19.35 15.48
30.00 28.33 26.84 25.50 20.40
UBICACIÓN PROYECTO NOMBRE PROYECTO
CATALEYA
PARQUE INDUSTRIAL ESTRELLA DEL SUR
LOTE SILVIO GOMEZ
CONTAINERS JUMBO
CENTRO EMPRESARIAL LASA
LOTE ÑAÑEZ
VALVERDE
NEIVA VIMIANZO
RESERVA DEL PRADO TORRE A
HOTEL ESTACION
VALLEGRANDE
CAMPO BERDEZ
CALLE 44
DISEÑO ARQUITECTONICO ESTUDIO DE SUELOS DISEÑO ESTRUCTURALES
PENDIENTE OK OK
OK OK OK
CANCHAS
ESPECIFICACIONES TECNICAS DISEÑOS HIDROSANITARIOS DISEÑOS ELECTRICOS
DE COSNTRUCCION
4/15/2017 4/15/2017
OK
OK
OK OK OK
OK OK OK
OK OK OK
OK OK OK
EN PROCESO PENDIENTE OK
PENDIENTE PENDIENTE
DE CANCHAS
MULTIPLES
PLANOS DE REGLAMENTO
PRESUPUESTO PROGRAMACION DE OBRA DE PROPIEDAD HORIZONTAL
4/30/2017
PENDIENTE
OK OK 6/1/2017
OK OK 30/06/217
OK OK 6/30/2017
OK OK
OK PENDIENTE 3/18/2017
OK PENDIENTE PENDIENTE
RECORDAD A MONICA
RECORDAR A JUAN
CAMILO ROJAS
TOTAL
TIPO CANTIDAD UNIDAD HABITANTES CANT. VIVIENDA
VIVIENDA
192
casas edificios
valvula de paso (mariposa) valvula de paso
contador contador
cheque cheque
valvula dreaser
VOLUMEN
VOLUMEN DEL
DEL TANQUE TANQUE
(L) (M3)
224,000 224