Case History

Automated Vertical Drilling System Drilled


227% Faster Than Average Offset
Baker Hughes VertiTrak and Quantec PDC bit

In this part of Goliad County, Texas, „ improved penetration rates along with
the operator has previously experienced automatic adjustment to correct any
vertical wellbore deviation of up to deviation from vertical. These capabilities
Benefits 4° in inclination. To avoid parameter helped the operator avoid additional trip
„„ Delivered a quality vertical hole changes that would result in a reduction time and days lost on correction runs. This
without compromising critical „
in performance or a costly correction combination resulted in 7,766 ft drilled in
drilling parameters
run, Baker Hughes recommended a 74 hours, with an average of 104.9 ft/hr,
„„ Saved rig time through high ROP „ bit application and drilling system to while consistently keeping the hole under
and elimination of correction runs
overcome this challenge. Baker Hughes 2° of inclination.
„„ Reduced drill string wear VertiTrak system and Q605X completed
„„ Saved operator $135,000 all of the operators objectives for this
particular hole section and performed Q605X provides
Well background and challenges above expectations. best in class cutter
technology, superior
„„ Deviation of up to 4° inclination
stability, and
„„ Reduce inclination without „ A VertiTrak 6¾-in. system was used in hydraulic efficiency.
sacrificing performance conjunction with an 8¾-in. Baker Hughes
Quantec Q605X PDC bit to drill Bethke „
Baker Hughes solution No. 2. The VertiTrak system is the industry’s VertiTrak’s Ultra X-treme
and results first automated vertical drilling system power section combined
„„ Baker Hughes VertiTrak™ automated to incorporate rib steering technology, with digital downhole
vertical drilling system electronics ensure
downhole closed-loop system and two- improved penetration
„„ Quantec™ Q605X PDC bit way communication. VertiTrak system’s rates along with
automatic adjustment
„„ 7,766 ft drilled at average ROP „ Ultra X-treme™ power section combined to correct any deviation
of 104.9 ft/hr, 227% faster than with digital downhole electronics ensures from vertical.
average offset
„„ Drilled vertical section in one run
Offset Drilling Time Comparison
„„ Maintained hole inclination under 2°
Drilling Hours
0 50 100 150 200 250 300
0

VertiTrak Run
2,000 Offset Well 1
Offset Well 2
Measured Depth (ft)

4,000 Offset Well 3

6,000

8,000

10,000

www.bakerhughes.com