DESIGN CALCULATION
INDEX
3.0.0 ASSUMPTIONS 4
8.0.0 6
CHECKING OF VOLTAGE DROP DURING TRANSIENT CONDITION
9.0.0 6
CHECKING OF VOLTAGE DROP DURING TRANSIENT CONDITION
10.0.0 RESULT 7
LARSEN & TOUBRO LIMITED
ECC Division - EDRC
DOCUMENT NO DATE
PROJECT STANDARDIZATION OF DESIGN CALCULATION
O12020-E-TP-GE-DC-3058 29/8/2012
DM Design Margin
f Supply Frequency Hz
XS DG reactance Ω
3.0.0 ASSUMPTIONS
The DG set is having Automatic Voltage regulator which compensates the voltage drop due to source during steady state condition.
LARSEN & TOUBRO LIMITED
ECC Division - EDRC
DOCUMENT NO DATE
PROJECT STANDARDIZATION OF DESIGN CALCULATION
O12020-E-TP-GE-DC-3058 29/8/2012
4.1.2 Frequency f : 50 Hz
4.1.4 Total maximum demand for emergency load TCL : 2183 kVA 2
4.1.8.3 Full load power factor CosØ : 0.8 (Refer Motor data sheet)
4.1.8.5 Starting power factor Cosqs : 0.2 1 (Refer Motor data sheet)
Sinqs : 0.98
: 1404 kVA
: 1404 * 1000
√3 * 415
: 1953.31 A
: 55 * 1000
√3*415*0.8 * 0.93
: 102.85 A
: 740.52 A
: √3*415*740.52
1000
: 532.28 kVA
: 532.28 + 1404
: 1936 kVA
DG set required for this starting requirement : 1291 kVA ---- (2)
From Equation (1) and (2) above, the DG rating required : Maximum of (1) and (2)
: 1646
Vph
IX
IR CosQ IX Sin (90-Q) Neglecting phase angle difference between Vm and Vph
Q Vm
IR IX Cos (90-Q)
I
: Vm + IR CosQ + IX SinQ
: 3.1583
: 1.32 %
: 0.01500 Ohm
(Im2-Im1) Xs 2.53 V
Is Xs 9.65 V
Vb
Is Xm 8.22 V
Vm IS Rm
203.97 V
Vm Sinqs
Vm Cosqs IS
41.62589 204
LARSEN & TOUBRO LIMITED
ECC Division - EDRC
DOCUMENT NO DATE
PROJECT STANDARDIZATION OF DESIGN CALCULATION
O12020-E-TP-GE-DC-3058 29/8/2012
Also, bus voltage Vb 2 : (Vm cos qs+ IS Rm)2 + (Vm sin qs +IS Xm)2 ----------(c)
1
Putting the Equations (a), (b) & (c) in Equation (I) we get)
2 2
Vph2 = Vm Cosqs + Ist Rm Vm + Vm Sinqs + Ist Vm (Xm+ XS) + XS Im1 (Vph-Vb 2)
Vph Vph Vb
Vm : 208.13 V
: 86.87 %
Vb : 220.55 V
: 92.05 %
Im2 : 1953.31*239.61
220.55
: 2122.12 A
IS : 643.23 A
10.0.0 RESULT
As all the conditions are satisfied, the selected DG set size of 1.75 MVA is Safe
415V ESSENTIAL SWITCHGEAR UNIT - 1
2 220 V DC STATION BATTERY CHARGER-1 415 ACTRIN P 90.00 kVA 125.2 0.80 1.00 C X 0.50 45.00 0.40 0.00 ASSUMED & UNVERIFIED
F 3 UNIT-1 UPS CHARGER A 415 ACTRIN P 160.00 kVA 222.6 0.80 1.00 C X 0.50 80.00 0.40 0.00 BASED ON DEC LATEST INPUT
F 4 PLANT COMMUNICATION EPABX CHARGER 415 ACTRIN P 3.00 kVA 4.2 0.80 1.00 C X 0.50 1.50 0.40 0.00 BASED ON C&I LOADLIST
F 5 TO ESSENTIAL HVAC DB 415 ACTRIN P 50.00 kVA 69.6 0.80 1.00 C X 0.80 40.00 0.40 0.00 INPUT FROM MECHANICAL
OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL FROM DEC Electrical Load list Dtd
415 ACTRI M 2.20 kW 5.9 0.80 0.65 C X 0.80 3.38 0.40 0.00
STATION (PAF-1)-1 25/06/11
OIL PUMP MOTOR OF PAF HYDRAULIC LUBE OIL FROM DEC Electrical Load list Dtd
415 ACTRI M 2.20 kW 5.9 0.80 0.65 S 0.80 0.00 0.40 0.00
STATION (PAF-2)-1 25/06/11
POWER FOR HYDRAULIC OIL STATION MOTOR OF FROM DEC Electrical Load list Dtd
415 ACTRI M 2.20 kW 5.9 0.80 0.65 C X 0.80 3.38 0.40 0.00
FDF (FDF-1)-1 25/06/11
POWER FOR HYDRAULIC OIL STATION MOTOR OF FROM DEC Electrical Load list Dtd
415 ACTRI M 2.20 kW 5.9 0.80 0.65 C X 0.80 3.38 0.40 0.00
FDF (FDF-2)-1 25/06/11
POWER FOR LUBE OIL STATION MOTOR OF IDF (IDF- FROM DEC Electrical Load list Dtd
415 ACTRI M 1.10 kW 2.9 0.80 0.65 S 0.80 0.00 0.40 0.00
1)-1 25/06/11
POWER FOR LUBE OIL STATION MOTOR OF IDF (IDF- FROM DEC Electrical Load list Dtd
415 ACTRI M 1.10 kW 2.9 0.80 0.65 C X 0.80 1.69 0.40 0.00
2)-1 25/06/11
LOCALE CONTROL CABINET FOR LUBRICATION OIL-
FROM DEC Electrical Load list Dtd
F 1 POWER FOR LUBE OIL STATION MOTOR OF MILL- 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
1
24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 S 0.80 0.00 0.40 0.00
2 POWER FOR LUBE OIL STATION MOTOR OF MILL-2 24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
3 POWER FOR LUBE OIL STATION MOTOR OF MILL-3 24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 S 0.80 0.00 0.40 0.00
4 POWER FOR LUBE OIL STATION MOTOR OF MILL-4 24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION
FROM DEC Electrical Load list Dtd
F OIL-5 POWER FOR LUBE OIL STATION MOTOR 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
24/02/11, REV.F
OF MILL-5
LOCALE CONTROL CABINET FOR LUBRICATION
FROM DEC Electrical Load list Dtd
F OIL-6 POWER FOR LUBE OIL STATION MOTOR 415 ACTRI M 11.00 kW 22.5 0.80 0.85 S 0.80 0.00 0.40 0.00
24/02/11, REV.F
OF MILL-6
LOCALE CONTROL CABINET FOR LUBRICATION
FROM DEC Electrical Load list Dtd
F OIL-7 POWER FOR LUBE OIL STATION MOTOR 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
24/02/11, REV.F
OF MILL-7
415V ESSENTIAL SWITCHGEAR UNIT - 1
STEAM TURBINE JACKING OIL PUMP AC FROM DEC Electrical Load list Dtd
415 ACTRI M 55.00 kW 102.8 0.80 0.93 C X 0.80 59.14 0.40 0.00
MOTOR(NORMAL) 25/06/11
10 SPARE 415 ACTRI M kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
11 SPARE 415 ACTRIN P kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
12 RESERVED 415 ACTRIN P 5.00 kW 10.2 0.80 0.85 c X 0.80 5.88 0.40 0.00
1 220 V DC UNIT-1 BATTERY CHARGER-2 415 ACTRIN P 325.00 kVA 452.2 1.00 1.00 c X 0.50 162.50 0.40 0.00 ASSUMED & UNVERIFIED
F 2 UNIT-1 UPS BYPASS TRANSFOMER 415 ACTRIN P 160.00 kVA 222.6 1.00 1.00 S 0.50 0.00 0.40 0.00 BASED ON DEC LATEST INPUT
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
2 POWER FOR LUBE OIL STATION MOTOR OF MILL-2 24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 S 0.80 0.00 0.40 0.00
3 POWER FOR LUBE OIL STATION MOTOR OF MILL-3 24/02/11, REV.F
LOCALE CONTROL CABINET FOR LUBRICATION OIL- FROM DEC Electrical Load list Dtd
F 415 ACTRI M 11.00 kW 22.5 0.80 0.85 C X 0.80 12.94 0.40 0.00
4 POWER FOR LUBE OIL STATION MOTOR OF MILL-4 24/02/11, REV.F
12 AVIATION OBSTRUCTION LIGHTING FEEDER 415 ACTRI P 10.00 kW 17.4 0.80 1.00 0.80 0.00 0.40 0.00 Assumed & unverified
13 ESSENTIAL LIGHTING DB-2 415 ACTRI P 100.00 kVA 139.1 1.00 1.00 0.80 0.00 0.40 0.00 Assumed & unverified
Added as per ACPL/EIPL Comments
14 Chimney emergency load 415 ACTRI P 50.00 kVA 69.6 1.00 1.00 C X 0.80 40.00 0.40 0.00
dated 17.7.2012
Added as per ACPL/EIPL Comments
15 switchyard emergency load 415 ACTRI P 15.00 kVA 20.9 1.00 1.00 C X 0.80 12.00 0.40 0.00
dated 17.7.2012
16 SPARE 415 ACTRI M kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
17 SPARE 415 ACTRIN P kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
18 RESERVED 415 ACTRIN P 5.00 kW 10.2 0.80 0.85 c X 0.80 5.88 0.40 0.00
1 220 V DC UNIT-2 BATTERY CHARGER-1 415 ACTRIN P 325.00 kVA 452.2 0.80 1.00 C X 0.50 162.50 0.40 0.00 ASSUMED & UNVERIFIED
2 220 V DC STATION BATTERY CHARGER-2 415 ACTRIN P 105.00 kVA 146.1 0.80 1.00 C X 0.50 52.50 0.40 0.00 ASSUMED & UNVERIFIED
F 3 UNIT-2 UPS CHARGER A 415 ACTRIN P 160.00 kVA 222.6 0.80 1.00 C X 0.50 80.00 0.40 0.00 BASED ON DEC LATEST INPUT
10 SPARE 415 ACTRI M kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
415V ESSENTIAL SWITCHGEAR UNIT - 2
11 SPARE 415 ACTRIN P kW 0.0 0.80 0.65 S 0.80 0.00 0.40 0.00
12 RESERVED 415 ACTRIN P 5.00 kW 10.2 0.80 0.85 c X 0.80 5.88 0.40 0.00
1 220 V DC UNIT-2 BATTERY CHARGER-2 415 ACTRIN P 325.00 kVA 452.2 1.00 1.00 c X 0.50 162.50 0.40 0.00 ASSUMED & UNVERIFIED
F 2 UNIT-2 UPS BYPASS TRANSFOMER 415 ACTRIN P 160.00 kVA 222.6 1.00 1.00 S 0.50 0.00 0.40 0.00 BASED ON DEC LATEST INPUT
FLAME SCANNING COOLING FAN AC MOTOR FROM DEC Electrical Load list Dtd
10 415 ACTRI P 15.00 kW 26.09 0.80 1.00 C X 0.80 15.00 0.40 0.00
LOCAL CONTROL CABINET 25/06/11
11 COMMUNICATION PANEL 415 ACTRI P 6.00 kW 10.43 0.80 1.00 C X 0.80 6.00 0.40 0.00 Assumed & unverified
12 AVIATION OBSTRUCTION LIGHTING FEEDER 415 ACTRI P 10.00 kW 17.39 0.80 1.00 C X 0.80 10.00 0.40 0.00 Assumed & unverified
13 ESSENTIAL LIGHTING DB-2 415 ACTRI P 100.00 kVA 139.12 1.00 1.00 C X 0.80 80.00 0.40 0.00 Assumed & unverified
Added as per ACPL/EIPL Comments
14 Chimney emergency load 415 ACTRI P 50.00 kVA 69.6 1.00 1.00 C X 0.80 40.00 0.40 0.00
dated 17.7.2012
Added as per ACPL/EIPL Comments
15 switchyard emergency load 415 ACTRI P 15.00 kVA 20.9 1.00 1.00 C X 0.80 12.00 0.40 0.00
dated 17.7.2012
16 SPARE 415 ACTRI M kW 0.00 0.80 0.65 S 0.80 0.00 0.40 0.00
17 SPARE 415 ACTRIN P kW 0.00 0.80 0.65 S 0.80 0.00 0.40 0.00
18 RESERVED 415 ACTRIN P 5.00 kW 10.23 0.80 0.85 c X 0.80 5.88 0.40 0.00