STANDARD
INDUSTRI
PEMBINAAN
(CONSTRUCTION INDUSTRY STANDARD)

CM

CIS 7:2014
MY

CY

CMY

QUALITY ASSESSMENT SYSTEM FOR


BUILDING CONSTRUCTION WORKS

Descriptors: quality of workmanship, structural, architectural, mechanical and electrical, external works, benchmark,
site inspection, field testing, sampling

© Copyright

LEMBAGA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA


Standard Writing Organisation

Lembaga Pembangunan
Industri Pembinaan Malaysia
CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA
Ibu Pejabat CIDB, Tingkat 34, Menara Dato’ Onn, Pusat Dagangan Dunia Putra
No 45, Jalan Tun Ismail, 50480 Kuala Lumpur.
Tel : 603-4047 7000 Fax : 603-4047 7070
http://www.cidb.gov.my
QUALITY ASSESSMENT SYSTEM FOR BUILDING
CONSTRUCTION WORK

STANDARD CIS forward.2014.indd 2 3/27/2014 4:45:39 PM


© Construction Industry Development Board Malaysia 2014

All enquiries regarding this book should be forwarded to:

Chief Executive
Construction Industry Development Board Malaysia
Level 34, Menara Dato’ Onn
Pusat Dagangan Dunia Putra
No 45, Jalan Tun Ismail
50480 Kuala Lumpur
Malaysia

Tel : 603-4047 7000


Fax : 603-4047 7070
Email : qlassic@cidb.gov.my
Website : www.cidb.gov.my

First edition 2006


Second edition 2014

No part of this publication may be reproduced or transmitted in any form or by any means, whether
mechanical or electronic including photocopying and recording without the written consent of
CIDB.

Perpustakaan Negara Malaysia Data Pengkatalogan-dalam-Penerbitan

STANDARD CIS forward.2014.indd 1 3/27/2014 4:45:39 PM


CONTENTS Page

Committee representation iv

Foreword v

SECTION 1: GENERAL

1.1 Introduction 1

1.2 Normative references 1

1.3 Definition 1
1.3.1 Approved standards 1
1.3.2 Competent person 1
1.3.3 Component 1
1.3.4 Elements 1
1.3.5 QLASSIC 1
1.3.6 Qualified person (QP) or principal-submitting-person (PSP) 1
1.3.7 Superintendent Officer (SO) 1

1.4 Objectives of Quality Assessment System for


Building Construction Works 2

1.5 Use of Quality Assessment System for


Building Construction Works 2

1.6 Scope of Quality Assessment System for


Building Construction Works 2

1.7 Assessment approach 2

SECTION 2: QUALITY STANDARD

2.1 Components to be assessed 3

SECTION 3: ASSESSMENT

3.1 Weightage 4

3.2 QLASSIC assessors 5

3.3 Sampling 5

3.4 Structural works assessment 5

3.5 Architectural works assessment 8

3.6 M&E works assessment 11

3.7 External works assessment 13

ii

STANDARD CIS forward.2014.indd 2 3/27/2014 4:45:39 PM


Tables

1 Allocation of weightage for components of building construction works according to


building category 4

2 Weightage for reinforced concrete structure elements 5

3 Sampling guidelines for reinforced concrete structure works 6

4 Weightage for structural steel elements 7

5 Weightage for prestressed concrete elements 7

6 Sampling guidelines for structural steel works 8

7 Weightage for architectural elements 8

8 Sampling guidelines for architectural works 9

9 Weightage for location of architectural works according to building category 10

10 Weightage for M&E elements according to building category 11

11 Sampling guidelines for M&E works 12

Annexes

A Quality Standards For Structural Works 14

B Quality Standards For Architectural Works 25

C Quality Standards For M&E Works 38

D Quality Standards For External Works 52

E Defect Groups For Assessment Of Architectural Works (Internal Finishes) 55

Acknowledgement 56

iii

STANDARD CIS forward.2014.indd 3 3/27/2014 4:45:39 PM


Committee representation

This Construction Industry Standard (CIS) was developed and reviewed by the Construction
Industry Development Board Malaysia with the assistance of the Technical Committee and
working groups on Quality Assessment System for Building Construction Works which comprises
representatives from the following organisations:-

Construction Industry Development Board of Malaysia


Jabatan Kerja Raya Malaysia
Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan
Persatuan Kontraktor Melayu Malaysia
Master Builders Association Malaysia
Association of Consulting Engineers Malaysia
Real Estate and Housing Developers’ Association Malaysia
Pertubuhan Akitek Malaysia
Royal Institution of Surveyors Malaysia
National House Buyers Association of Malaysia
Malaysia Air-Conditioning & Refrigeration Association
The Electrical and Electronic Association of Malaysia
Persatuan Pengilang, Pembekal, Kontraktor, Industrial Elektrik, Elektronik, Mekanikal dan
ICT Melayu dan Bumiputra Malaysia
Guild of Bumiputra Contractors Berhad
Canaan Building Inspection Sdn Bhd
Sime Darby Property Berhad
Sunway Integrated Properties Sdn Bhd
Universiti Sains Malaysia

iv

STANDARD CIS forward.2014.indd 4 3/27/2014 4:45:39 PM


FOREWORD

The Malaysian Construction Industry Standards (CIS), hereby referenced as CIS 7:2014, was
developed as a quality assessment system for building construction works standard by the
Technical Committee on Quality Assessment In Construction with the assistance of Construction
Industry Development Board Malaysia (CIDB), which acted as a moderator and facilitator for the
technical committee throughout the development process of this standard.

While the CIS 7:2014 on quality assessment system for building construction works adopts several
components with reference to CONQUAS – The BCA Construction Quality Assessment System
(Eighth Edition 2012): Building and Construction Authority, Singapore, it is also dependent on new
or updated information and developments concerning this subject area made available through
the Technical Committee and Working Groups.

The use of this CIS 7:2014 is voluntary and compliance with this document does not in itself
confer immunity from legal obligations.

STANDARD CIS forward.2014.indd 5 3/27/2014 4:45:40 PM


vi

STANDARD CIS forward.2014.indd 6 3/27/2014 4:45:40 PM


QUALITY ASSESSMENT SYSTEM FOR
BUILDING CONSTRUCTION WORKS

SECTION 1: GENERAL

1.1 Introduction

Quality Assessment System for Building Construction Works is an independent method to assess and
evaluate primarily on the quality of workmanship of building projects based on this standard.

1.2 Normative references

The following normative reference is indispensable for the application of this construction industry
standard. The latest edition of the normative reference (including any amendments) shall apply.

l Uniform Building By-Laws 1984 (Amendment 2007)

l CIDB Act 520 1994 (Amendment 2011)

1.3 Definition

For the purpose of this Construction Industry Standard, the following definitions apply.

1.3.1 Approved standards

Approved standard shall mean standard specified by the qualified person for the project.

1.3.2 Competent person

A person who possesses a valid certificate from an accredited institution.

1.3.3 Component

General building works are divided into four different components: structural, architectural, mechanical
and electrical (M&E), and external works.

1.3.4 Elements

A subdivision of a component, for example concrete for structural works, tile finishing for architectural
works, drains for external works, performance for M&E works and others.

1.3.5 QLASSIC

An acronym for quality assessment system in construction.

1.3.6 Qualified person (QP) or principal-submitting-person (PSP)

A QP as defined in the Uniform Building By-Laws 1984 (Amendment 2007). Hereon, wherever QP
appears in this document, it also refers to PSP.

1.3.7 Superintendent Officer (SO)

The SO shall be the person appointed to administer the contract during construction.

STANDARD CIS.latest 2014.indd 1 3/27/2014 4:44:49 PM


1.4 Objectives of Quality Assessment System for Building Construction Works

Quality Assessment System for Building Construction Works was designed and developed to enable the
user to achieve any of the following objectives:

a) to benchmark the level of quality of the construction industry in Malaysia

b) to have a standard quality assessment system for quality of workmanship of building projects

c) to assess quality of workmanship of a building project based on the industry’s acceptable standards

d) to evaluate the performance of contractors based on quality of workmanship

e) to compile data for statistical analysis

1.5 Use of Quality Assessment System for Building Construction Works

Quality Assessment System for Building Construction Works is intended to complement the normal
contractual drawings and specifications in a project. It is not intended to be used independently as
working specifications. Unless specified in the building contract, qualified persons should not use
Quality Assessment System for Building Construction Works to decide if the building or parts of the
building project are in accordance with the relevant by-laws. It is still the responsibility of the qualified
person to ensure that the quality of the construction works conforms to approved standards, practices,
specifications and drawings.

1.6 Scope of Quality Assessment System for Building Construction Works

This standard sets out the quality of workmanship for the various aspects of the construction elements
for the general building works. The Quality Assessment System for Building Construction Works covers
four main components: Structural works, Architectural works, M&E works and External works.
Assessments on the workmanship are carried out based on this standard and marks are awarded if
the workmanship complies with the standards. These marks are then summed up to give a total quality
score (%) for the building project.

However, the assessment excludes works such as piling, foundation and substructure works, which are
heavily equipment-based and called under separate contracts or subcontracts.

The building is assessed primarily on workmanship standards achieved through site inspection and field
testing. For structural and M&E works, assessment is carried out throughout the construction process.
For completed building projects, the assessment is done for architectural, M&E fittings and external
works.

Apart from site inspection on finishing works, the assessment also includes field tests, test results on
the material and the functional performance of selected services and installations. These tests help to
ascertain the quality of building workmanship for occupants in relation to safety, comfort and aesthetics.
These defects may surface only after sometime.

1.7 Assessment approach

In line with CIDB Act (Amendment 2011), it is a prerequisite that all projects, which applied for QLASSIC
assessment, shall submit a declaration document by the SO on the compliance to Section 33C of the
said act.

In general, the assessor determines the samples (elements or locations) to be assessed prior to each
assessment. The samples are selected from floor plans and site plans. The selected samples shall be

STANDARD CIS.latest 2014.indd 2 3/27/2014 4:44:49 PM


distributed as uniformly as possible throughout the project and construction stages. All locations are to
be prepared for the assessment.

The scoring will be done on the works that are inspected for the first time. Rectification and correction
carried out after the assessment will not be rescored. The objective of this practice is to encourage
contractors towards “doings things right the first time and every time”.

When an assessed item does not comply with the corresponding quality standards, it is considered
to have failed and an “X” will be noted in the assessment form. Likewise a “√” is given for an item
meeting the given standards. A “NA” will be given to indicate that the item is not applicable. The score
is computed based on the number of “√” over the total number of items assessed.

SECTION 2: QUALITY STANDARD

2.1 Components to be assessed

The quality standards for building construction work are divided into four main components:-

a) Structural works

The structural integrity of the building is of paramount importance as the cost of failure and repairs are
very significant. The assessment of structural works comprises:

i) Site inspection of casted concrete, prefabricated, precast elements, etc., during


construction

ii) Test result of compressive strength of concrete and tensile strength of steel reinforcement

iii) Non-destructive testing of the uniformity and the cover of hardened concrete

The quality standards for structural works are given in Annex A.

b) Architectural works

Architectural works deal mainly with the finishes. This is when the quality and standards of workmanship
are most visible.

Architectural works encompass floors, internal walls, ceilings, doors, windows, fixtures, external walls,
aprons, perimeter drains, structure car parks and car porches.

The quality standards for architectural works are given in Annex B.

c) M&E works

The quality of M&E works is important in view of its increasingly high-cost proportion and its impact on
the performance of a building. The assessment covers electrical works, air-conditioning and mechanical
ventilation works (ACMV), fire protection works, sanitary and plumbing works, and other basic M&E fittings.

The quality standards for M&E works are given in Annex C.

d) External works

External works cover the general external work elements in building construction such as the link-
ways/shelters, drains, road works, footpaths, turfings, playgrounds, gates and fences, swimming pools,
hardscapes and electrical substation, guard house and bin centre.

The quality standards for external works are given in Annex D.

STANDARD CIS.latest 2014.indd 3 3/27/2014 4:44:49 PM


SECTION 3: ASSESSMENT

The assessment for building construction work is carried out through a sampling and statistical approach.

3.1 Weightage

The weightage for structural, architectural, M&E and external works are allocated in accordance to four
categories of buildings (see Table 1).

Table 1. Allocation of weightage for components of building construction works


according to building category


Component Residential Building Non-Residential Building

Category A Category B Category C Category D


Landed housing Stratified housing Public/ Public/
(%) (%) Commercial/ Commercial/
Industrial building Industrial building
(%) (%)
Structural works 15 20 20 20
Architectural works 70 60 55 50
M&E works 5 10 15 20
External works 10 10 10 10
Total score 100 100 100 100

Note:
Category C is without centralised cooling system, Category D is with centralised cooling system.

The weightage system is aimed at making the score quantitative and represent the quality of workmanship
of a building project. It has taken into consideration the distribution between the cost proportions of the
four components in the various buildings and their aesthetic considerations.

The total quality score of a building project is the sum of marks awarded to the four components in each
category of a building.

Each category of a building comprises as following:

i) Category A (Landed housing) – Detached, semi-detached, terrace and cluster houses

ii) Category B (Stratified housing) – Flats, apartments, condominiums, service apartments, small
office home office (SOHO) and town houses

iii) Category C (Public/commercial/industrial buildings without centralised cooling system) – Office


buildings, schools, factories, warehouses, workshops, hangers, small office flexible office (SOFO),
small office virtual office (SOVO), religious buildings, stadiums, community halls, hospitals, airports,
religious buildings, universities, colleges, police stations, etc

iv) Category D (Public/commercial/industrial buildings with centralised cooling system) – Office


buildings, schools, factories, warehouses, workshops, hangers, small office flexible office (SOFO),
small office virtual office (SOVO), religious buildings, stadiums, community halls, hospitals, airports,
religious buildings, universities, colleges, police stations, etc

STANDARD CIS.latest 2014.indd 4 3/27/2014 4:44:49 PM


3.2 QLASSIC assessors

The QLASSIC assessors are accredited and regulated by CIDB. They are updated with the latest relevant
information on a regular basis to ensure consistency and effective implementation of the assessment.

3.3 Sampling

As it is impractical to assess all elements in a building project, the assessment is carried out through a
sampling approach. The sampling, which is based on the gross floor area (GFA) of the building and 10 m
length section or per location for external works is to ensure that the assessment adequately represents
the entire building project.

3.4 Structural works assessment

Assessment of structural works is carried out during construction of the building project. The assessment
covers performance testing.

Table 2. Weightage for reinforced concrete structure elements


Reinforced Concrete Structure Weightage Cast In-situ Weightage Precast
Elements (%) (%)
Formwork 20 0
Rebar 15 5
Finished concrete 25 35
Concrete quality 5 0
Steel reinforcement quality 5 0
Precast specific requirement - 20
NDT– UPV test for concrete uniformity 15 20
NDT – Electro-covermeter test for 15 20
concrete cover
Total 100 100

Note:
If total precast concrete volume exceeds 20% of total structural concrete volume, assessment will be carried out for precast
concrete construction. The marks will be distributed proportionately between cast in-situ assessment and precast concrete
assessment based on the respective concrete volume percentage. The qualified person (check with the current UBBL) is
required to declare the concrete volume for reinforced concrete and precast concrete construction.

For a typical reinforced concrete structure, selection of samples for assessment is based on Table 3.
Each sample represents a beam, column, slab or reinforced concrete wall.

STANDARD CIS.latest 2014.indd 5 3/27/2014 4:44:49 PM


Table 3. Sampling guidelines for reinforced concrete structure works

Item Category A Category B Category C Category D Remark


Landed Housing Stratified Public/ Public/
Housing Commercial/ Commercial/
Industrial Industrial
Building Building

1. Structural
elements
GFA/1,500 m2 GFA/500 m2
-
(Min 30 samples; max 50 samples) (Min 30 samples; max 50 samples)

50% weightage
provided for
100% testing declaration by
QP
2. Concrete
compressive
strength 50% weightage
provided for
(Min 30 samples; max 50 on-site (Min 30 samples; max 150 on-site
100% on-site
verification of test records) verification of test records)
verification of
test records

50% weightage
provided for
Every bar size and welded steel fabric per supplier per project declaration by
QP
3. Steel
reinforcement
tensile strength 50% weightage
(Min 30; max 150 on-site provided for
verification of mill certificates) 100% on-site
verification of
test records

4. NDT - UPV
GFA/5,000 m2
test for concrete -
(Min 2 sets; max 20 sets)
uniformity

5. NDT - Electro-
GFA/5,000 m2
Covermeter test -
(Min 2 sets; max 20 sets)
for concrete cover

Note:
1. The computed number of elements to be checked must be evenly distributed throughout the entire block and cover
at least 50% of the floors in a block. It should also, as far as possible, cover the different types of structural elements.
2. Concrete compressive and steel reinforcement tensile strength - self testing with declaration by qualified person. On-
site verification by assessor.

STANDARD CIS.latest 2014.indd 6 3/27/2014 4:44:50 PM


The resulting scores for precast and finished concrete will be the sum of the number of checks that meet
the standards.

There is no assessment of precast components at the precast yard. The assessment is applicable for all
types of precast components at site.

The assessment of the non-destructive tests, i.e., on concrete uniformity and cover for steel reinforcement,
is to minimise the risk of carbonation and steel corrosion, which affect the durability of the concrete
structures.

If the structural works consist of structural steelworks which, constitute more than 20% of the structural
cost, assessment will be required for the latter and the marks will be distributed proportionately. This
applies to prestressing works as well. In any case, the distribution should follow the cost composition for
these three types of structural works in the projects.

The weightage for structural steelwork and prestressed concrete are allocated as per Table 4. If the
structural steel in all structural works is to be casted, the assessment shall be performed prior to the
covered works.

Table 4. Weightage for structural steel elements

Structural steel work Weightage (%)

Main member/Partially-assembled components 40


Metal decking 20
Erection tolerance 10
Corrosion and fire protection 10
Welding test report 20
Total 100
Note:
Assessment for structural steel roof truss is compulsory, regardless of the 20% costing criteria.

Table 5. Weightage for prestressed concrete elements



Prestressed concrete work Weightage (%)

Tendon and anchorage 25


Sheathing 25
Stressing and grouting 25
Debonding 25
Total 100

The selection of sample for structural steel works assessment is based on the following guidelines:

STANDARD CIS.latest 2014.indd 7 3/27/2014 4:44:50 PM


Table 6. Sampling guidelines for structural steel works

Item Steel tonnage per sample Min sample


Structural elements
• Main member/partially-
assembled components 250 5
• Metal decking 250 5
• Erection tolerances 500 5
• Corrosion and fire protection 500 5
Material and functional test
• Welding test report All critical welding joints All critical welding joints
Note:
Samples will be taken before and after installation. All critical welding joints need to be determined by a structural engineer.

3.5 Architectural works assessment

Assessment of architectural works is carried out upon completion of the building project and before the
handover of the project.

The weightage for architectural elements are allocated as per Table 7.

Table 7. Weightage for architectural elements

Architectural elements Weightage (%)


Total Breakdown
Internal Finishes 68
Floor 18
Internal wall 18
Ceiling 8
Door 8
Window 8
Fixtures (Internal) 8
Roof 10
External wall 10
Apron and perimeter drain 3
Car park/Car porch 3
Material and functional 6
tests
Skim coat or Prepacked plaster 3
Wet area water-tightness test -
architect declaration and report 3
Total 100

Note:
A weightage of 3% is automatically awarded to projects, where skim coat or prepacked plaster is used. This is to encourage
the use of these products in the industry.

STANDARD CIS.latest 2014.indd 8 3/27/2014 4:44:50 PM


The assessment is based on the sampling guidelines, as outlined in Table 8.

Table 8. Sampling guidelines for architectural works

No. Items GFA per Min Max Remark


sample sample sample

1a Internal finishes 70 m2 30 700 For landed housing


1b Internal finishes 70 m2 30 600 For stratified housing
1c Internal finishes 500 m2 30 150 For public/commercial/
industrial building
1d Internal finishes 500 m2 30 100 For public/commercial/
industrial building
2 Roof - 50% - 50% of the blocks/units
3 External wall - 50% - 50% of the blocks/units
4 Apron and perimeter - 2 - 10 m length section per
drain sample
5 Car park/Car porch - 2 - 10 m length section per
car park floor
6 Skim coat and Declaration by
prepacked plaster - - - qualified person
7 Wet area water- Declaration by qualified
tightness test - - - person
Note:
1. GFA means Gross Floor Area.
2. This sampling guideline is not applicable to mock-up unit/sample unit. It requires a full assessment to be carried out.

A location for Internal Finishes assessment is a functional space of a building such as a room, hall, toilet,
kitchen, corridor or lobby. Locations are further categorised into three types:

- Principal locations are major functional places such as halls and rooms

- Circulation locations include lift lobbies, corridors and staircases

- Service locations are utility areas such as toilets, kitchens, balconies and yards

The total number of locations will be distributed according to “Principal”, “Circulation” and “Service”
based on the percentage set out in the four categories of buildings in Table 9.

Scoring of internal finishes is based on the defects groups shown in Annex E ‘Defects Group for
Assessment of Architectural Works (Internal Finishes)’. In general, any item which is not available in
a project will not be considered for scoring. For such cases, the architectural score will be prorated
accordingly.

STANDARD CIS.latest 2014.indd 9 3/27/2014 4:44:50 PM


Table 9. Weightage for location of architectural works according to building category

Locations Category A Category B Category C Category D


Landed Stratified Public/ Public/
Housing Housing Commercial/ Commercial/
(%) (%) Industrial building Industrial building
(%) (%)

Principal 40 40 60 60
Service 40 40 15 15
Circulation 20 20 25 25

Note:
For other types of building, the distribution of percentage shall be in accordance to Category C.

An item under assessment will be considered to have failed if it does not meet the standards. In addition,
any item found to be defective functionally such as evidence of water seepage in the window, slab,
ceiling or roof, is considered to have failed the assessment. Likewise for a particular defect that is found
excessive in an item (for instance, excessive cracks on a wall).

For the assessment of external wall, a minimum 50% of the total number of building will be assessed.
For a building, the external wall will be divided into four walls for assessment.

The use of skim coat or prepacked plaster for all plastering works and wet area water tightness test
(WTT) are based on the declaration by the project QP. Further site evidences of WTT need to be
provided.

10

STANDARD CIS.latest 2014.indd 10 3/27/2014 4:44:50 PM


3.6 M&E works assessment

Assessment of M&E works is carried out upon completion of the building project and before the handover
of the project. The assessment covers basic M&E fittings and performance testing.

The assessment covers the following area, with their weightages allocated in accordance with the four
categories of projects (see Table 10).

Table 10. Weightage for M&E elements according to building category

M&E element Category A Category B Category C Category D


Landed Stratified Public/ Public/
Housing Housing Commercial/ Commercial/
Industrial building Industrial building

M&E Works Assessment (%)

Electrical works 15 15 20 20
ACMV works 10 10 20 25
Fire protection works NA 10 10 10
Plumbing & sanitary
works 25 25 25 20
Basic M&E fittings 50 40 25 25
Subtotal 100 100 100 100
Weightage A 60 60 50 50

M&E Works Performance Test Assessment (%)

Verification records 50 50 50 50

Functional/
performance test 50 50 50 50

Subtotal 100 100 100 100


Weightage B 40 40 50 50
Total
(Weightage A+B) 100 100 100 100

Note:

1. “NA“ means that no assessment on M&E element is required.


2. Performance testing will be done for electric power supply, water supply and sanitary flushing system.
3. The sampling for basic M&E fittings will be based on internal finishes guideline for architectural works. Refer to Table 8
and Table 9.

11

STANDARD CIS.latest 2014.indd 11 3/27/2014 4:44:50 PM


Just as architectural works, sampling for M&E works in progress will be determined based on the four
categories of building as per the guidelines in Table 11.

Table 11. Sampling guidelines for M&E works

Category A Category B Category C Category D


Landed Stratified Public/ Public/
Housing Housing Commercial/ Commercial/
Industrial building lndustrial building
(GFA/3,500 m2) (GFA/3,500 m2) (GFA/1,000 m2) (GFA/1,000 m2)

Electrical
1. Main cables 1 1
2. Surface conduits 1+ 1+ 1+ 1+
3. Concealed conduit
system 1+ 1+ 1+ 1+
4. Cable tray, ladder
and trunking 1+ 1+ 1+
5. Distribution board 2+ 2+ 2+
6. Wiring system 1+ 1+ 1+ 1+
ACMV
1. Air handling unit 1+
2. Pump 1
3. Cooling tower 1
4. Chiller 1
5. Pipework 1
6. Split unit/ Window
air conditioner 3+ 3+ 2+ 2+
7. Air conditioner comfort 2+ 2+ 1+ 1+
8. Ductwork 3+ 3+
9. Fire-rated duct 1 1
10. Dampers 1+ 1+
11. Fire Dampers 1 1
Fire protection
1. Wet/Dry riser 1+ 1+ 1+
2. Sprinkler 1+ 1+
3. Fire alarm 1 1
4. Hose reel 1+ 1+ 1+
Plumbing and sanitary
1. Concealed pipes 2+ 3+ 1 1+
2. Exposed pipes 2+ 4+ 4+ 4+
3. Water tank 1 1 1 1
4. Pump and motor 1 1+ 1+
Minimum Sample 15 20 27 32
Maximum Sample 22 35 40 47
Note:
1. Remarks: means to be repeated for additional samples required.

12

STANDARD CIS.latest 2014.indd 12 3/27/2014 4:44:50 PM


3.7 External works assessment

Assessment of external works is carried out upon completion of the building and before the handover
of the project.

The assessment consists of the following locations:

a) Link-ways/shelters - 10 m length section per sample and minimum 2 samples

b) External drains - 10 m length section per sample and minimum 2 samples

c) Roadwork and parking bay - 10 m length section per sample and minimum 2 samples
on the ground

d) Footpaths and turfing - 10 m length section per sample and minimum 2 samples

e) Playground - 1 location

f) Court - 1 location

g) Fence and gate - 10 m length section per sample and minimum 1 sample

h) Swimming pool - 10 m length section per sample and minimum 1 sample

j) Electrical substation - 1 location

k) Guard house - 1 location

l) Bin centre - 1 location

Each item in the external works will be assessed separately and all the listed locations must be assessed,
where applicable. The total QLASSIC score for external works shall be the marks achieved divided by
the total achievable marks.

13

STANDARD CIS.latest 2014.indd 13 3/27/2014 4:44:50 PM


ANNEX A
(Informative)

QUALITY STANDARDS FOR STRUCTURAL WORKS

PART 1: REINFORCED CONCRETE STRUCTURES

Item Element Standard Tolerance Assessment


Method
I. FORMWORK

1. Formwork i. Tolerance for cross-sectional +10 mm/ Steel measuring


dimensions and dimensions of cast in-situ and -5 mm tape
openings for precast elements
services
ii. Tolerance for penetration/ +10 mm for Steel measuring
opening for services size and tape
±25 mm for
location

iii Tolerances for length of


precast members (major
dimensions of unit)

• Up to 3 m ±6 mm

• 3 m to 4.5 m ±9 mm Steel measuring


tape
• 4.5 m to 6 m ±12 mm

• Additional deviation for every ±6 mm
subsequent 6 m

2. Alignment, plumb i. Tolerance for departure of any ±10 mm Steel measuring


and level mark from its position tape

ii. Tolerance for plumb ≤3 mm per Steel measuring


1 m, maximum tape and plumb
20 mm bob

iii. Maximum deviation of mean ±5 mm Steel measuring


level of staircase tread to tape
temporary bench mark

iv. For cast in-situ elements, the ±10 mm Precise levels


deviation of level of any mark
from the intended level

14

STANDARD CIS.latest 2014.indd 14 3/27/2014 4:44:50 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS

PART 1: REINFORCED CONCRETE STRUCTURES

Assessment
Item Element Standard Tolerance Method
3. Condition of i. Formwork must be free from Visual
formwork, props and defects
bracing
ii. Before concreting, the interior Visual
must be free from debris

iii. All formwork joints must not Visual


have gaps to prevent leakage

iv. There must be adequate Visual


support, bracing and tie-back
for the formwork to prevent
bulging or displacement of
structural elements

II. REINFORCEMENT (CAST IN-SITU AND±10


PRECAST)
mm

1. Mains and secondary i. According to structural drawing Visual and caliper


rebars (numbers/sizes)

ii. Spacing of bars not more than Steel measuring


specified tape

2. Anchorages and lap Required leg length and not Steel measuring
lengths less than that specified ±5 mm tape

3. Cover provision According to specification Measurement
tape

4. Links, stirrups and i. According to structural ±10 mm Visual


trimming bars drawings (numbers/sizes)

ii. Spacing of links not more than Measurement


specified tape

5. Rebar condition i. Rebars must be securely and Visual


properly tied in place

ii. Rebars must be free from Visual


concrete dropping, corrosion,
etc

15

STANDARD CIS.latest 2014.indd 15 3/27/2014 4:44:50 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 1: REINFORCED CONCRETE STRUCTURES

Item Element Standard Tolerance Assessment


Method
Iii. FINISHED CONCRETE (CAST IN-SITU & PRECAST)

1. Dimension for i. Tolerance for cross- +10 mm/ Steel


elements/opening for sectional dimension of cast -5 mm measuring
services in-situ and precast elements tape

ii. Tolerance for opening +10 mm for Steel


size and measuring
± 25 mm for tape
location

iii. Tolerance for length of


precast members (major
dimension of unit):

• Up to 3 m ±6 mm
Steel
• 3 m to 4.5 m ±9 mm measuring
tape
• 4.5 m to 6 m ±12 mm

• Additional deviation for ±6 mm


every subsequent 6 m

iv. Straightness or bow


(deviation from intended
line) of precast member:

• Up to 3 m ±6 mm Steel
measuring tape,
• 3 m to 6 m ±9 mm spirit level
and L-square
• 4.5 m to 6 m ±12 mm

• Additional deviation for ±6 mm


every subsequent 6 m

16

STANDARD CIS.latest 2014.indd 16 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 1: REINFORCED CONCRETE STRUCTURES

Assessment
Item Element Standard Tolerance Method

v. Squareness of precast
member - difference between
the greatest and shortest
dimensions should not exceed
the following:

Length of shorter sides

• Up to and including 1.2 m ±6 mm Steel


measuring
• Over 1.2 m but less than 1.8 m ±9 mm tape

• 1.8 m and over ±12 mm

vi. Twist of precast member-


corners should not be more
than the deviation stated from
the plane containing the other
3 corners:

• Up to 600 mm wide and 6 m in ±6 mm Steel wedge,


length L-square and
spirit level
• Over 600 mm wide and for any ±12 mm
length

vii. Flatness ≤6 mm per Steel wedge and


1.2 m spirit level

2. Alignment, plumb i. Tolerance for departure of any ±10 mm Steel measuring


and level mark from its position tape

ii. Tolerance for plumb: maximum 3 mm/1 m Plum bob and


20 mm for floor to floor height steel measuring
and 40 mm for the entire tape
building height

iii. Maximum deviation of mean ±10 mm Precise levels


level

iv. For cast in-situ elements, the ±10 mm Steel measuring


maximum deviation of levels tape
within the elements

iv. Chamber at mid-span: Steel measuring


according to specifications tape and L-square

17

STANDARD CIS.latest 2014.indd 17 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 1: REINFORCED CONCRETE STRUCTURES

Assessment
Item Element Standard Tolerance Method

3. Exposed surface i. Should not have visual exposure Visual


of groups of coarse aggregates
resulting from grout leakage

ii. Cold joints and formwork joints must Visual


be smooth

iii. No bulging of structural element Visual


iv. All formwork, nails, zinc strips, etc,
Visual
must be removed

v. No cracks or damages Visual

vi. No exposed rebar Visual


IV. PRECAST SPECIFIC REQUIREMENTS
1. Lifting marks/ i. Tolerance for position ±20 mm from Steel measuring tape
inserts centre line
location in
drawing

ii. Lifting devices and inserts free from Visual


damage

2. Sleeve system/ i. Tolerance for position ±6 mm from Steel measuring tape


connections centre line
location in
drawings

ii. Bar protrusion length according to Visual


requirements. No bending, cranking
or damage to bars

iii. Bars free from concrete droppings or Visual


corrosion

iv. Sleeves, grout holes, grout tubes not Visual


congested with debris

3. Interface/joint i. Joint taper:


requirement • Over 3 m length ±6 mm
Steel measuring tape
• Maximum for entire length: ±9 mm

ii. Alignment of horizontal and vertical ±6 mm Steel measuring tape


joint

iii. Jog in alignment of matching edges: ±6 mm Steel measuring tape

18

STANDARD CIS.latest 2014.indd 18 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 1: REINFORCED CONCRETE STRUCTURES

Item Element Standard Tolerance Assessment


Method
iv. Sitting of element According to Visual
specifications

v. Installation of sealant and According to Visual


waterproofing specifications

4. Cast-in steel i. Tolerance for position of cast-in steel ±6 mm from Steel measuring
items/welded and items centre line tape
bolted connection location in
drawings

ii. Tolerance for position of openings ±3 mm from Steel measuring


for bolt connections centre line tape
location in
drawings
V. STRUCTURE – CONCRETE QUALITY
1. Concrete Cube i. For every pour of concrete, test Test records
Test cubes results at 28 days must
satisfy the passing criteria as
specified in the design specification.
The summary of test records must
be endorsed by the QP

All testing shall be carried out at QP-


approved accredited laboratory.

VI. STRUCTURE – STEEL REINFORCEMENT QUALITY

1. Reinforcement i. To pass the tensile strength test for Test records


(Rebar) all the reinforcement bars used
as according to the contract
specifications. The summary of test
records must be endorsed by
the QP

ii. All welded steel fabric used are to Test records


comply with the design specifications.
The summary of test records
must be endorsed by the project’s
structural QP

iii. No non-conforming reinforcement


Test records
detected through test records has
been installed in the structure

All testing shall be carried out at QP-


approved accredited laboratory

19

STANDARD CIS.latest 2014.indd 19 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 1: REINFORCED CONCRETE STRUCTURES

Assessment
Item Element Standard Tolerance Method

VII. NON-DESTRUCTIVE TESTING (NDT)


1. Ultrasonic pulse i. To conduct nondestructive testing
velocity (UPV) (NDT) using UPV to check the
test for concrete degree of uniformity of hardened
uniformity concrete

ii. 5 columns/walls per set and 2


readings per column/wall UPV meter

iii. Assessment is based on the


difference between 2 UPV readings
within a column/wall not exceeding
0.05 km/s

iv. Method as per approved standard

2. Electro- i. To check hardened concrete cover Minimum


covermeter for reinforcement bars after casting according to
test for concrete specification
cover
ii. 5 structural members per set
including:

a) 3 for slab soffit @ 4 readings each

b) 1 for column @ 2 readings each on


both axis of the column
Cover meter
c) 1 for beam @ 2 readings each on
the soffit and one side of the beam

iii. For each reading, full marks for ±5


mm and half marks for >±5 mm to ±8
mm. For each location, no mark will
be awarded if any of the 4 readings
exceeds ±12 mm

iv. Method as per approved standard

20

STANDARD CIS.latest 2014.indd 20 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 2: STRUCTURAL STEEL WORKS

Item Element Standard Tolerance Assessment


Method
I.
I. MAIN MEMBER/PARTIAL ASSEMBLED COMPONENT
1. Physical i. Cross sectional tolerance should Steel measuring
dimensions meet approved structural steel tape
specification or approved plan

ii. Tolerance for length of structural ±3 mm Steel measuring


steel member tape

iii. Tolerance for bolt hole size:- Caliper


• Diameter <24 mm ≤2 mm
• Diameter ≥ 24 mm ≤3 mm
Steel measuring
iv. Tolerance for bolt hole position ±2 mm tape

2. Type and i. According to the structural steel Visual


condition specifications

ii. Surface preparation shall meet the Visual


surface roughness specifications

iii. Material used must be traceable to Visual


its original mill certificates

3. Welding i. Welding size, length and profile Steel measuring


shall meet the structural steel tape and visual
specification and drawings

ii. Visual inspection shall meet the Visual


structural steel specifications

iii. All welding works shall be carried out Competent welder’s


by qualified welders certificate

21

STANDARD CIS.latest 2014.indd 21 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 2: STRUCTURAL STEEL WORKS

Item Element Standard Tolerance Assessment


Method

4. Bolting i. Bolts and washers, type, size and Visual


number shall be according to the
structural steel specifications

ii. Drilled holes shall be free from burrs Visual

iii. The condition of bolted parts Visual


adjacent to the bolt heads, nuts,
flat washers, connection gussets
and splice plates shall be free from
oil, paint, and loose mill scales or
otherwise specified by the structural
steel specifications
Steel measuring
iv. Gap between adjacent parts <2 mm
tape
v. Threaded bolts protruding at least Visual
one thread length with washers

II. METAL DECKING

1. Type and i. Correct type and thickness of metal Visual


condition decking used

ii. All decking joints must not have Visual


gaps

iii. All metal decking must be properly Physical and visual


secured in place

iv. Metal decking must be free from Visual


defect and visible damages

v. Before concreting, the decking must Visual


be free from grease, oil, paint and all
other foreign materials

vi. All accessories such as pour stop, Visual


and end closures and cover plates
must be in place before concreting

2. Shear studs i. Correct numbers and type of shear Visual


studs used

ii. Spacing and position according to Steel measuring


approved plan tape

iii. Strength of shear stud welds not less Test record


than specified

22

STANDARD CIS.latest 2014.indd 22 3/27/2014 4:44:51 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Continued)

PART 2: STRUCTURAL STEEL WORKS

Item Element Standard Tolerance Assessment


Method

iv. All welds should show a full 360° Visual


weld fillet. All welds are free from
visible damages

3. Lapping and i. According to structural steel Steel measuring


deck openings specifications or approved plan tape

III. ERECTION TOLERANCES

1. Column i. Tolerance for verticality (±H/600 mm Plum bob and steel


verticality or 5 mm, maximum ±25 mm; where measuring tape
H is the floor to floor height in mm)

2. Column position i. The position in plan of steel column Steel measuring


at the base shall not deviate from tape
the specified position by more than
10mm along either of the principal
setting out axes

3. Beam level i. Maximum deviation of level at each ±5 mm Steel measuring


end of the same beam tape

ii. The level of the top of the steelwork Precise levels


at any storey shall be within ± 10
mm of the specified level

4. Beam position i. Beams shall not deviate from their Steel measuring
specified positions relative to the tape
column to which they are connected
by more than 5 mm

IV. CORROSION AND FIRE PROTECTION

1. Thickness of i. Average thickness of the coating or Steel measuring


coating the protective layer must not be less tape
than specified

2. Condition i. No visible damages Visual

ii. No spalling of coating or protective Visual


layer from structural steel members

3. Welding test i. Reports for all critical welding Test records


report joints from the specified contract
requirements shall be submitted to
the QP

ii. Test records shall comply with the Test records


acceptable criteria and to be
endorsed by the QP
23

STANDARD CIS.latest 2014.indd 23 3/27/2014 4:44:52 PM


QUALITY STANDARDS FOR STRUCTURAL WORKS (Concluded)

PART 3: PRESTRESSED CONCRETE

Item Element Standard Tolerance Assessment


Method

1. Condition of i. All pre-stressing strands and wires Steel measuring


tendons and should comply with the specified tape
anchorages standards and requirements and be
free from loose rust, oil, tar, paint
and any foreign objects

ii. All tendon anchorage are to comply Visual


with the specified standards and
protected from corrosion
Thread parts to be greased wrapped
and tapped holes protected until use

2. Installation of i. Sheathing properly secured and Visual


sheathing protected and free from damage or
puncture

ii. Sheathing profile according to ±5 mm Steel measuring


drawings throughout the length with tape
position tolerance

iii. Splice to sheathing shall be mortar Visual


tight

iv. Air vents grout tubes provided Visual


according to the drawing

3. Stressing and i. Tendon ducts clean and free from Visual


grouting process foreign objects and tendon free
moving in the duct

ii. All grouting operations of the Visual


tendons must be smooth and
achieved without need to flush out in
the first grouting

4. Debonding i. Open ends of debond tubes over the Visual


debond length of strands sealed

ii. Debond lengths according to the Steel measuring


drawings tape

iii. Debonding materials not punctured Visual


or damaged

24

STANDARD CIS.latest 2014.indd 24 3/27/2014 4:44:52 PM


ANNEX B
(Informative)

QUALITY STANDARDS FOR ARCHITECTURAL WORKS

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
I. FLOORS

1. General i. Finishing
requirements • No stain marks Visual

• Consistent colour tone Visual



ii. Alignment and Evenness ≤ 3 mm per Spirit level 1.2m and
• Evenness of surface 1.2 m steel wedge

• Falls in wet areas should be in right Spirit level 1.2m


direction

• For staircases, the variance in Steel measuring
lengths of treads and risers must tape or steel wedge
not exceed 5 mm from dimensions
specified in the approved drawings

iii. Cracks and Damages Visual
• No visible damages/defects

iv. Hollowness/Delamination
• No hollow sound when tapped Tapping rod

• No sign of delamination Physical



v. Jointing Visual
• Consistent skirting thickness and
no visible gaps between wall and
skirting

• Edge to be straight and aligned ≤ 3 mm per Spirit level 1.2m and


1.2 m steel wedge

2. Screed finishes • Surface should not be unduly rough Visual
or patchy

• No permanent foreign material Visual
visually detected

25

STANDARD CIS.latest 2014.indd 25 3/27/2014 4:44:52 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method

3. Tiled floor • Joints are aligned with skirting tiles Visual


or wall tiles

• Joints are aligned between tiles and Visual


consistent in size

• Consistent and neat marking Visual

• Lippage between two tiles ≤ 1 mm L- square (200 mm


x 300 mm) and steel
wedge

4. Timber floor • No warpage Visual

• Timber strips to rest firmly on joists Visual


or screeds

• No visible gaps between timber Visual


strips

• Edges of the floor are properly Visual
sealed

5. Carpet • Surface should be stretched firm ≤ 3 mm per Spirit level and steel
and even 1.2 m wedge

• Joints should not be visible Visual



• All edges should be properly Visual
anchored

6. Special floor • Finished texture and colour to be Visual


finish uniformed

• Follow general requirement where Visual


applicable

7. Raised floor • No loose floor panels or rocking Visual

• No protrusion/potential of tripping Visual


over floor panels

26

STANDARD CIS.latest 2014.indd 26 3/27/2014 4:44:52 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
II. INTERNAL WALLS

1. General i. Finishing Visual


requirements • No stain marks

• Consistent colour tone and good Visual


paintwork

• No rough/patchy surface Visual



ii. Cracks and Damages
• No visible damages/defects Visual

iii. Hollowness/Delamination
• No hollow sound when tapped Tapping rod

• No sign of delamination Physical



iv. Alignment and Evenness ≤3 mm per Spirit level 1.2 m
• Evenness of surface 1.2 m and steel wedge

• Verticality of wall ≤3 mm per Spirit level and steel


1.2 m wedge

• Walls meet at right angle ≤4 mm over L-square (200 mm x


300 mm 300 mm) and steel
wedge

v. Jointing
• Edges to be straight, aligned and Visual
consistent

2. Plaster finishes • No visual cracks Visual

3. Tiled finishes • Joints are aligned between tiles and Visual
consistent size

• Consistent and neat marking Visual

• Lippage between 2 tiles should not L-square (200 mm x


be more than 1 mm 300 mm) and steel
wedge

27

STANDARD CIS.latest 2014.indd 27 3/27/2014 4:44:52 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method

4. Painting • Surfaces are evenly painted Visual



• Good opacity, no patchiness Visual
resulted from touch-up work

• Surface should be free from peeling, Visual and physical


blister, chalkiness (no discolouration
and fading)

• No brush marks to be seen Visual

5. Wall paper • Wall paper should be stretched and ≤3 mm per Visual and spirit
even surface 1.2 m level
• Joints should not be visible Visual
• Edges should be neatly laid and Visual
finished
• Proper anchoring at all edges Visual

6. Wood/timber • Timber panels should rest firmly on Visual and physical


panels joists or screed
• No gaps can be detected between
panels Visual

• Edges should be properly aligned Visual


and sealed
• Surface should be smoothly finished Visual
• Cracks and warpage should not be Visual
detected

7. Cladding • Proper anchorage for panels Visual


• Joints aligned and with consistent Visual
joint size
• Sealant material compatible with Visual
cladding
• Consistent spacing and within Visual
allowable tolerance
• No sign of corrosion Visual

8. Glass blocks/ • Consistent and neat marking Visual


glass panels • Joints should be even Visual
• Glass blocks/panels should be Visual
properly aligned
9. Architectural • Finished texture and colour to be Visual
coating uniform

28

STANDARD CIS.latest 2014.indd 28 3/27/2014 4:44:52 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
Item
III. Element CEILING

1. General i. Finishing
requirements • No stain marks Visual

• Consistent colour tone Visual

• Paintwork with good opacity and with Visual


no brush marks

• No patchy surface Visual



ii. Alignment and Evenness
• Surface should be smooth, even, not Visual
wavy and not sagging

• Straight and aligned ceiling edges Visual

iii. Cracks and Damages


• No visible damages, e.g., spalling, Visual
leaks, cracks, etc

iv. Roughness
• No rough surface Visual

v. Jointing
• Consistent, aligned and neat Visual

2. Plaster/skim coat • No pin holes and with no trowel Visual
ceiling marks

• Formwork joints are grounded Visual


smooth

• No gap between wall and ceiling Visual

3. False ceiling/grid • Alignment of rails should be visually Visual


system straight

• Chipped/cracked surfaces or corners Visual


should not be detected

• Gap between ceiling and wall should Visual


not be detected

• Panels should not warp and laid Visual


neatly into grids

• No sign of corrosion Visual

• Access opening joints should be Visual


neat and have consistent width

29

STANDARD CIS.latest 2014.indd 29 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
IV.
Item DOOR

1. General i. Joints and Gaps


requirements • Consistent gap between bottom of ≤5 mm Steel wedge
door leaf and finished floor
• No visible gaps between door Visual
frame and wall
• Neat joints Visual
• Consistent gap between door leaf Steel gauge
≤5 mm
and frame
• Consistent and no visible gaps for Visual
joints at door leaf and frame

ii. Alignment and Evenness
• Aligned and level with walls Visual
• Double leaf doors to flush with Visual
each other
• Door frame and leaf to flush Visual
• Door leaf and frame corners L-square
maintained at right angles (200 mm x 300 mm)
• No rattling sound when the door is Auditory (hearing)
closed

iii. Materials and Damages
• No stain marks and any visible Visual
damages
• No sags, warps on door leaf Visual
• Door joints and nail holes filled Visual
up, properly sanded with good
paintwork
• Glazing clean and evenly sealed Visual
with gasket
• No sign of corrosion Visual
• Good paintwork (including top and Visual
bottom of door leaf)
• Consistent colour tone Visual

iv. Functionality
• Ease in opening, closing and Physical
locking
• No squeaky sound during opening Tested minimum Auditory (hearing)
and closing of the door one time
• Lockset should be functional Tested minimum Physical
one time
30

STANDARD CIS.latest 2014.indd 30 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method

v. Accessories Defects
• Accessories with good fit and no Visual
stains
• No sign of corrosion Visual
• No missing or defective accessories Visual
• Screws levelled and flushed. No Visual
over-tightened screws
• For timber frame, no additional
timber strip added for site adjustment Visual
should be detected

V. WINDOW

1. General i. Joints and Gaps


requirements • Consistent gap between window leaf Visual
and frame (for timber window only)
• No visible gaps between window Visual
frame and wall
• Neat joints between window frame Visual
and wall, internally and externally
• Consistent and no visible gaps for Visual
joints at window leaf and at frame

ii. Alignment and Evenness
• Alignment/level with wall openings Visual
• Window leaf and frame corner ≤4 mm per 300 L-square (200 mm x
maintained at right angle mm 300 mm) and steel
wedge
iii. Materials and Damages
• No stain marks and visible damages/ Visual
defects
• Louvered window with glass panels Visual
of correct length.
• Glazing clean and evenly sealed Visual
with putty or gasket for aluminum
windows
• No sign of corrosion Visual
• Good paintwork Visual

31

STANDARD CIS.latest 2014.indd 31 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
iv. Functionality
• Ease of opening, closing and Physical
locking
• No squeaky sound during opening Tested minimum Auditory (hearing)
and closing of the window one time
• No sign of rainwater leakage Visual
v. Accessories Defects
• Lock sets with good fit and aligned Visual
• No sign of corrosion Visual
• No missing or defective Visual
accessories
• Screws levelled and flushed. No Visual
over-tightened screws
VI. FIXTURES

1. General • Internal fixtures such as wardrobe,


requirements kitchen cabinet, vanity top, mirror,
bathtub, water closet, shower
screen, sink and basin
• External fixtures such as signage,
railing, unit number plate, letter
box, metal gate, etc
i. Joints and Gaps
• Consistent joint width and neat Visual
• No visible gaps Visual
• Welding joints grounded or flushed Visual
ii. Alignment and Evenness
• Level and in alignment Visual
iii. Materials and Damages
• No stain marks Visual
• No visible damages/defects Visual
• Consistent in colour tone Visual
iv. Functionality
• Function, secured and safe Visual and physical

32

STANDARD CIS.latest 2014.indd 32 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method

v. Accessories Defects
• No missing accessories Visual
• No sign of corrosion Visual
• No damages/defects Visual
VII. ROOF

1. General i. Finishing
requirements • No stain marks Visual
• Good paint work Visual

ii. Rough/Uneven/Falls
• Smooth and with no tool marks Visual
• Even and level, especially with no Visual
potential of stripping
• Falls in right direction Visual

iii. Cracks and Damages


• No visible damages/defects, e.g., Visual
cracks, chippings and etc

iv. Joint/Sealant/Alignment
• Consistent joint width, neat and Visual
aligned

v. Chockage/Ponding
• No sign of chockage and ponding Visual

vi. Construction
• No sign of leaking Visual
• Proper dressing for any protrusion Visual
• Neat and secured installation of Visual
fixtures
• Water ponding < 3 mm Spirit level and steel
2. Flat roof
wedge
• Surface to level to avoid tripping Visual
• Proper dressing for any protrusion Visual
• Openings to be sealed to prevent Visual
pest invasion
• Clean and no stain marks Visual

33

STANDARD CIS.latest 2014.indd 33 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

PART 1: INTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method
3. Pitched roof • No leaking Visual
• No rust or stains Visual
• Good painting to roof structural Visual
members
• Roof tiles in alignment Visual
• Openings to be sealed to prevent Visual
pest invasion
• Consistent colour tone Visual
• Proper dressing for any protrusion Visual

4. Waterproofing • Evenly installed, no sharp Visual


(exposed) protrusion
• Complete adhesion to base Visual
• Good laps at joints and proper Visual
vertical abutment details
• No leaking and signs of damage to Visual
membrane/coating
• Clean and no mortar stains Visual
• No paint defects Visual

5. Gutters and rain • No ponding and chockage Visual
water down pipes • No cracks, chips and any other Visual
(RWDP) visible damages/defects
• RWDP inlet to be lower than the Visual
surrounding gutter invert level
• Gutter and RWDP inlet to be Visual
covered to prevent chockage,
where practical
• Clean and no cement stains Visual

34

STANDARD CIS.latest 2014.indd 34 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

EXTERNAL FINISHES

Item Element Standard Tolerance Assessment


Method

VIII.
Ite.m Standard EXTERNAL WALLSTolerance Assessment Tool

1. General i. Finishing
requirements • No stain marks Visual
• Consistent colour tone and good Visual
paintwork
• No rough/patchy surface Visual
ii. Cracks and Damages
• No visible damages/ defects Visual
iii. Alignment and Evenness
• Walls should be aligned and not Visual
wavy
• Edges to be straight and aligned Visual
iv. Jointing
• Consistent and neat marking Visual

2. Plaster finishes • As per General Requirements


above

3. Tiled finish • Joints are aligned between tiles, Visual


and consistent in size
• Consistent and neat marking Visual
• No lippage between tiles Visual

4. Cladding/curtain • Gaps around openings to be Visual


walls properly sealed
• Joint of regular widths as specified Visual
• Evenness of surface, no dent or Visual
scratches
• Sealant material compatible with Visual
cladding
• No sign of corrosion Visual

5. Facing brickwork • Weep holes are provided as Visual


specified
• No efflorescence Visual
• No mortar droppings Visual

35

STANDARD CIS.latest 2014.indd 35 3/27/2014 4:44:53 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

Assessment
Item Element Standard Tolerance Method

6. Architectural • Finished texture and colour to be Visual


coating uniformed
• No paint drips and other stains Visual

7. Painting • Surfaces are evenly painted; no Visual
patchiness due to touch-up work
• Good opacity, no discolouration Visual
and fading
• Surface should be free from Visual and physical
peeling, blisters and chalkiness
IX. APRONS AND PERIMETER DRAINS Visual

1. General i. Finishing
requirements • No stain marks Visual
• No patchiness and brush marks Visual
ii. Cracks and Damages
• No visible cracks and damages Visual
iii. Alignment and Evenness
• Finishes must be even, level, Visual
aligned and consistent
iv. Fall/Gradient
• Free flowing and no water ponding Visual
v. Joints and Gaps
• Consistent joints width and neat Visual

2. Drain cover/ • Level and do not warp or rock Visual and physical
inspection • Gap between drain covers Steel measuring tape
chamber • Gap between sides of drain Measuring tape
• No sign of corrosion on the drain 5–10 mm wide Visual
grating 5–10 mm wide
• Fixtures installed must be safe, Visual and
secured and functional physical

36

STANDARD CIS.latest 2014.indd 36 3/27/2014 4:44:54 PM


QUALITY STANDARDS FOR ARCHITECTURAL WORKS (Continued)

Assessment
Item Element Standard Tolerance Method

X. CAR PARK/CAR PORCH

1. General i. Floor as per internal finishes -


requirements floor
ii. Columm as per internal finishes -
wall
iii. Ceiling as per internal finishes -
ceiling
iv. Fixtures as per internal finishes -
fixtures
v. M&E fitting as per Basic M&E
fitting

37

STANDARD CIS.latest 2014.indd 37 3/27/2014 4:44:54 PM


ANNEX C
(Informative)
QUALITY STANDARDS FOR M&E WORKS

Item Element Standard Tolerance Assessment


Method

I. Standard ELECTRICAL Assessment Tool

1. Main cables
Support • Cables adequately supported and Visual
properly fastened on cable tray/ladder

Fire barrier • Fire barrier properly installed Visual



Spacing of cable • Adequate spacing between cables Visual
of different circuit
Adequate spacing to be provided for
overlapping cables

All elements • No visible damages Visual

2. Surface conduits
Installation • Conduit ends properly connected Visual
• Metallic conduits properly earthed Visual
• Conduits properly bent without Visual
distortion and damage
• Termination of conduit to distribution Visual
board/outlet boxes effectively
connected to brass
Support • Support/brackets at appropriate Visual and physical
interval rigidly fitted

Screw used properly fastened Visual and physical
Fire barrier • Fire barrier properly installed Visual
• Conduits and accessories properly Visual
painted
All elements • No visible damages Visual

3. Concealed
conduit
Installation • Conduit system properly protected Visual
from damages and blockages
• Metalic conduit earthed properly Visual
• Termination of conduit to distribution Visual
board/outlet boxes effectively
connected with brass bushes
• Conduit properly bent without Visual
distortion and free from damages
• Coupling joints fastened Visual

38

STANDARD CIS.latest 2014.indd 38 3/27/2014 4:44:54 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Assessment


Method
Support • Conduits properly secured Visual
• Coupling joints fastened Visual

All elements • No visible damages Visual

Cable tray,
4. ladder and
trunking
Installation • All parts are protected against Visual
corrosion
• Metallic trunking properly earthed Visual
• No sharp bending Visual
• Basic colours for identification of Visual
electrical trunking provided (either
by painting over the whole length/
use coloured identification board)

Support • Support/brackets at appropriate Visual and physical
interval rigidly fitted
• Screw used properly fastened Visual and physical
Fire barrier • Fire barrier properly done Visual

Distribution
5. board
Circuit diagram • Circuit diagram provided Visual
• Proper labeling for panel Visual

Cable • Internal cables neatly arranged Visual


management and tied with cable tie
• Live, neutral and earth cable Visual
properly labeled
Cable termination/ • All live parts to be non-accessible Visual
earthing • All exposed metal parts effectively Visual
earthed
• Neutral and earth connection for Visual
each circuit individually connected
to their respective terminal
• Cable properly terminated using Visual
cable lug and coloured cable
sleeve

39

STANDARD CIS.latest 2014.indd 39 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
Installation • Rubber grommet properly fitted at Visual
cable entry opening
• Mounted on wall using bracket Visual
All elements • No visible damages Visual

6. Wiring system
Installation • Installed neatly and systematically Visual
• Conform to space factor Visual
requirement (30% for duct, 40%
for conduit, 45% for trunking)
Cable termination • No reduction of the number of Visual
cable strands at all terminals
• No wiring joints for final subcircuit Visual
All elements • No visible damages Visual

40

STANDARD CIS.latest 2014.indd 40 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
II. ACMV WORKS Tolerance
1. Air handling unit
Location and • Unit location and pipe layout Visual
installation installed as per approved building
drawings
• Inspection access door for fan, Visual
coil, motor and filter
• All metal parts properly earthed Visual
• Smoke detector installed at the Visual
return air stream
• Name place installed with Visual
manufacturer’s name, serial
number and model number
Support • Pipe/duct from AHU must be Visual
supported
All elements • No visible damage Visual

2. Pump
Location and • Location and pipe layout installed Visual
installation as per approved building
drawings
• Pump and motor assembled Visual
properly installed on inertia block
and spring isolator
• Guard provided to exposed shafts, Visual
coupling and moving parts
• Name plate installed with Visual
manufacturer’s name, serial
number and model number
Electrical • No bad electrical termination Visual
termination
All elements • No visible damage Visual

3. Cooling tower
Self-earthing • Cooling tower completed with self- Visual
system earthing system for connection
to building lightning protection
system

41

STANDARD CIS.latest 2014.indd 41 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
Location and • Name plate installed with Visual
installation manufacturer’s name, serial
number and model number
• Location and pipe layout installed as Visual
per approved building drawings
• Clear of all debris Visual
All elements • No visible damage Visual

4. Chiller
Location and • Location and pipe layout installed Visual
installation as per approved building
drawing
• Chiller to be levelled when placed Visual
on plinth or vibration isolators
• Chiller fixed securely in position Visual
• Correct model, make and Visual
capacity
Pipe support and • Pipes supported properly by Visual
label hangers or brackets
• Pipe connections follow specified Visual
flow direction
No leakage • No sign of leakage Visual
All elements • No visible damage Visual

5. Pipework • Pipe works installed as per Visual


Including chilled approved building drawing and
water, hot water, specifications
steam, condenser
water, condenser
drain, cold water
make-up, water
treatment and
refgrigerant

Paints and • Pipe works provided with drains at Visual


support each low point and automatic air
vents with manual isolating valve at
each high point

42

STANDARD CIS.latest 2014.indd 42 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
Fire stop • Fire stop for passage of pipes at Visual
opening for fire resistant walls and
floor
• Properly painted and supported Visual
All elements • No visible damage Visual

6. Split unit/window
air conditioner
Installation • Units are levelled when placed on Visual
plinth
• Drainage provided/units slightly Visual
tilted for condensation
• Drain hose connected to the drain Visual
pipe
• Cool air is not blocked by beam, Visual
shelving or other built-in furniture
in the room
Seal penetration • Proper sealant of wall or roof Visual
opening after pipes are installed
Leakage • No sign of leakage from pipe Visual
All elements • No visible damages Visual

7. Air conditioner • Room temperature between Temperature meter


comfort 23°C–25°C or according to
Temperature specification
Relative humidity • Room relative humidity not Humidity meter
more than 60% or according to
specification

8. Ductwork
Paints • Exposed ductwork and hanger Visual
properly painted to approved
colour code
Support • Ductwork properly supported Visual
All elements • No visible damages Visual


43

STANDARD CIS.latest 2014.indd 43 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
9. Fire-rated ducts
Installation • No hanging of other services Visual
Access panel • Fire-resistant sealed access panel Visual
provided with fire-rated enclosure of
equipment for maintenance
All elements • No visible damages Visual

10. Dampers
Access door • Damper/splitter damper can be Physical
adjusted freely between the open
and close position
• Access door provided to all Visual
dampers

All elements • No visible damages Visual

11. Fire dampers


Installation • Dampers in open position and held Visual
in position by fusible link
Access door • Access doors provided to all Visual
dampers according to relevant code
of practice
All elements • No visible damages Visual

44

STANDARD CIS.latest 2014.indd 44 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
III.
Item FIRE
• Landing valve PROTECTION
must be accessibleWORKS

1. Wet/dry riser
Landing valve • Landing valve must be accessible Visual
• Landing valve strapped and
padlocked Visual
• Labeling for riser door Visual
• Landing valve painted red for wet Visual
riser/yellow for dry riser
• Automatic air release valve Visual
provided at the highest mark of
rising main

Pipe and pipe • Riser pipes properly supported Visual
support • Labeling and painting for riser pipe Visual
• Bonding to earth provided for Visual
rising main

Wall/floor • Proper wall/floor penetration Visual
penetration

All elements • No visible damages Visual

2. Sprinkler • No obstruction and painting to Visual
Installation sprinkler heads
• Correct sprinkler heads used in Visual
correct locations

Pipe support • Pipework properly supported Visual

Wall/floor • Proper wall/floor penetration Visual
penetration

All elements • No visible damages Visual

45

STANDARD CIS.latest 2014.indd 45 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method

3. Fire Alarm
Installation • Fire alarm wiring in GI conduit Visual

Paints • Good condition and finishing Visual
paintwork for panel and conduit

Fire alarm zoning • Fire alarm zoning diagram Visual
diagram provided near panels/subpanels

All elements • No visible damages Visual

4. Hose reel
Installation • Hose reel cabinet properly labeled Visual
• Hose reel pipe properly fixed with Visual
hanger and bracket
• Hose reel operation instruction Visual
fixed on hose reel drum or door

Paints • Good condition and finishing Visual
paintwork

All elements • No visible damages Visual

46

STANDARD CIS.latest 2014.indd 46 3/27/2014 4:44:55 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
IV.
Item PLUMBING AND SANITARY WORKS
Tolerance Assessment Tool

1. Concealed pipes • Pipes properly supported, bent Visual


location and without distortion, kinks and
installation damages

• Pipe and fitting ends properly Visual
capped
• Proper joints Visual
Alignment • Vertically and horizontally aligned Visual

All elements • No visible damages Visual

2. Exposed pipes
Installation • Pipes properly supported, bent Visual
without distortion, kink and
damage
• Joints are watertight Visual
• Pipe ends properly capped Visual
• No cold water pipes below Visual
sewerage pipes

Alignment • Horizontally, vertically and parallel Visual
aligned to building surface
• Inclined pipes laid to proper Visual
gradients
• Tolerance for plumb ≤3 mm per 1 m Plumb bob and
height steel measuring tape
Clearance • Do not cause obstruction/pose Visual
safety hazard at public areas
• Sufficient clearance between Visual
installed pipes/ceiling and pipes/
wall for accessibility
• Service pipe duct accessible Visual

All elements • No visible damages Visual

3. Water tank
Installation • All openings properly covered Visual
• Joints and pipe connections are Visual
watertight
• Not located below sewerage pipes Visual

47

STANDARD CIS.latest 2014.indd 47 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
• Corrosion-resistant external cat Visual
ladders provided for large water
tank

• Overflow pipe to be discharged at Visual
proper location

• Well supported on plinth or Visual


bearers

Netting • Netting properly fitted for overflow/ Visual


warning/ vent pipes

Clearance • Accessible for maintenance Visual
Minimum clearance of 600 m all
rounded the water tank

All elements • No visible damages/defects Visual
• Clean and free from debris Visual

4. Pump and motor
Installation • No noticeable abnormal vibration Visual
and noise from pump/ motor

• Test certificate for alignment Visual


if pump and motor from
manufacturer

Electrical • No bad/loose electrical Visual
termination terminations

All elements • No visible damages Visual

48

STANDARD CIS.latest 2014.indd 48 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
V. BASIC M&E FITTINGS
Item Tolerance

1. General i. Joints and Gaps


requirements • No visible gap Visual
• Consistent joint width and neat Visual

ii. Alignment and Evenness
• Aligned, levelled and straight Spirit level

iii. Materials and Damages
• No visible damages/defects Visual
• No stain marks Visual
• Consistent colour tone Visual

iv. Functionality and Safety
• No operational defects Physical and visual
• Securely fixed Physical

v. Accessories Defects
• No missing accessories Visual
• No visible damages/defects Visual

2. Plumbing and
sanitary fittings
Gully and floor • No damages and chokings Visual
trap • Must be securely fixed Visual
• Traps top lower than the Visual
surrounding floor level

49

STANDARD CIS.latest 2014.indd 49 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
Pipes • Tolerance for plumb <10 mm/storey Plumb bob and steel
height measuring tape

• Brackets firmly secured and joints Visual


properly sealed and marked
• If painted, no drippings and with Visual
good opacity
• Pipes properly supported, bent Visual
without distortion, kinks and
damages
• Sufficient clearance between Visual
installed pipes and building
surface for accessibility

Fittings • Firmly secured and joints properly Physical and visual
sealed and marked
• No leakage at joints Visual
• No chipping or cracks Visual
• No paint drops or mortar droppings Visual
• Fittings in working condition Physical and visual
• Accessible for maintenance Visual
• All sensors covers properly sealed Visual
against water seepage

3. M&E Fittings • These include power mark,


telephone mark, air-con diffuser,
fan coil unit, lighting, smoke alarm,
sprinkler heads, CATV/CCTV
camera, speakers, alarm system,
etc

Installation • Fittings must be aligned Visual


• No stains Visual

50

STANDARD CIS.latest 2014.indd 50 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR M&E WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
• Neat patch-up for marking/ Visual
penetration
• Heights of switch and marks Visual
should be consistent
• Switch can properly function Tested minimum Physical
one time

• No visible gap between switches Visual


and walls

51

STANDARD CIS.latest 2014.indd 51 3/27/2014 4:44:56 PM


ANNEX D
(Informative)

QUALITY STANDARDS FOR EXTERNAL WORKS

Item Element Standard Tolerance Assessment


Method

I.
Item i. EXTERNAL WORKS

1. General i. Finishing
requirements • No stain marks Visual
• Consistent colour tone and good Visual
paintwork
• No rough/patchy surface Visual

ii. Alignment and Evenness


• Evenness of surface Visual
• Edge to be straight and aligned Visual

iii. Materials and Damages
• No visible damages/defects Visual
• No missing or defective Visual
accessories
• No sign of corrosion Visual

iv. Functionality
• Securely fixed, functional and safe Visual and physical

v. Joints and Gaps


• Consistent joints width and neat Visual and physical
• No visible gaps for M&E fittings Visual

2. Link-way/shelter Floor, column, ceiling, fixtures and Refer to item 1


M&E fittings (General
Requirements)
3. External drains Drain, drain cover and inspection
chamber
i. Drain
• Free flowing and no ponding of Visual
water, no siltation

ii. Drain Cover


• Level and do not warp or rock Visual and physical
• Gap between drain covers. 5–10 mm wide Steel measuring
tape
• Gap between sides of drain 5–10 mm wide Steel measuring
tape
• Drain grating properly painted Visual

52

STANDARD CIS.latest 2014.indd 52 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR EXTERNAL WORKS (Continued)

Item Element Standard Tolerance Assessment


Method
iii. Inspection Chamber
• Inspection chambers are level with Visual and steel
surroundings without depression measuring tape
and with tolerance of 20 mm for
protrusion
• Covers to be level with frames Visual

4. Roadwork Road surface, road marking,
and car park on kerbs, road signs and road lightings
the ground i. Road surface
• No water ponding Visual

5. Footpaths and Footpath, turfing, lighting, other
turfing fixtures
i. Turfing
• No depression or bald patches Visual
• Turfing done evenly, no dead Visual
grass or weeds

6. Playground Floor, playground equipment,


lightings, side drain, fixtures (eg.,
fencing, fixed benches, signages)
i. Floor
• No water ponding Visual
ii. Side drain
• Free flowing of water Visual
• No water ponding Visual
• No siltation Visual

7. Court Floor,signage, M&E fittings,
permanent fixtures
i. Floor
• No water ponding Visual

53

STANDARD CIS.latest 2014.indd 53 3/27/2014 4:44:56 PM


QUALITY STANDARDS FOR EXTERNAL WORKS (Concluded)

Item Element Standard Tolerance Assessment


Method
8. Fence and gate Fence, gate, M&E fittings, fixtures

i. Gate
• Piers and gate to be vertical, Visual
perpendicular and straight.
Gate to be parallel and aligned

9. Swimming pool Overflow drain, pool deck, ladder


and railing, fixtures, M&E fittings

i. Overflow drain
• No chockage Visual

ii. Pool deck


• No sign of delamination Physical and visual

10. Electrical External wall, doors and windows, Visual


substation fence and gate, apron and drain,

11. Guard house External wall, apron and drain, Visual


barrier, door and windows, roof

12. Bin centre External wall, floor, apron and


drain, door and window, roof

i. Floor
• Fall in the right direction Visual
• No water ponding Visual
• No sign of delamination Physical and visual

54

STANDARD CIS.latest 2014.indd 54 3/27/2014 4:44:57 PM


ANNEX E
(Informative)

DEFECT GROUPS FOR ASSESSMENT OF ARCHITECTURAL WORKS (INTERNAL FINISHES)


COMPONENTDEFECT GROUPING DESCRIPTION OFsDEFECT Tolerance

Floors and Finishing Stain marks -


internal/ Colour tone and paintwork -
external walls Patchy and rough surface (for internal walls only) -
Alignment and Evenness of surface ≤3 mm/1.2 m
evenness Falls in wet areas -
Variance in lengths of treads and risers for staircases ≤5 mm
Verticality of wall ≤3 mm/1.2 m
Walls meet at right angles ≤4 mm/ 300 mm
Edges of walls to be straight and aligned ≤3 mm/1.2 m
Cracks and Damages/ defects -
damages
Hollowness/ No hollow sound when tapped -
delamination Inadequate bedding/bonding -
Jointing Skirting thickness -
Gap between wall and skirting -
Edges of floors to be straight and aligned ≤3 mm/1.2 m
Ceiling Finishing Stain marks -
Colour tone -
Patchy surfaces -
Alignment and Surface smooth, even and not wavy -
evenness Straightness of corners -
Cracks and damages Spalling and leaks, no visible cracks -
Roughness Rough surface -
Jointing Consistent and neat -
Door and Joints and gaps Gaps between bottom of door leaf and finished floor -
window Gaps between window/door frame and wall -
Neat joints between frame and wall internally and externally ≤5 mm
Gap between window/door leaf and frame -
Alignment and Parallel with wall opening -
evenness Window/door frame to be plumb and square -
Window/door leaf and frame corners at right angles -
Double leaf doors to flush with each other -
Door frame and leaf to flush -
Materials and Stain marks (corrosion) and defects -
damages Louvered window with glass panels of correct length -
Glazing clean, evenly sealed with putty or gasket -
Sags/warps on door leaf -
Nail holes and joints proper for door -
Good paintwork (including top and bottom of door leaf) -
Functionality Ease in opening and closing -
No squeaky sound during opening and closing Minimum 1 time
Lockset for door Minimum 1 time
Accessories Lock sets are aligned with good fit and no stains (corrosion) -
defects Missing/defective accessories -
No additional timber strip added for timber frame -

55

STANDARD CIS.latest 2014.indd 55 3/27/2014 4:44:57 PM


ACKNOWLEDGEMENT

The committee which developed the Malaysian Construction Industry Standard consists of the
following representatives:

Technical Committee

Dato’ Ir. K Laxana Naidu (Chairman) Master Builders Association Malaysia

Ir. Mukhtar Che Ali (Vice Chairman) Construction Industry Development Board
Malaysia

Mr. Chuang Kuang Hong (Secretary) Construction Industry Development Board


Malaysia

Ir. Noraini Bahri Construction Industry Development Board


Mr. Ibrahim Mohd Yusoff Malaysia
Ms. Heryanti Hilmi
Mr. Md Zahari Abdul Rahman

Ir. Abu Harith Shamsuddin Jabatan Kerja Raya Malaysia


Tuan Haji Azme Hassan

Mr. Tan Lai Seng Kementerian Kesejahteraan Bandar,


Haji Ahmad Redza Ghulam Rasool Perumahan dan Kerajaan Tempatan

Ir. Kamarudin Mohd Salleh Persatuan Kontraktor Melayu Malaysia


Ir. Jamaludin Non

The late Ir. Kor Chan Wah Master Builders Association Malaysia

Ir. Ng Hong Poo Association of Consulting Engineers Malaysia

Ar. Chan Seong Aun Pertubuhan Akitek Malaysia


Ar. Steven Thong Boon Ann

Dato’ Soam Heng Choon Real Estate and Housing Developer


Mr. Amirrudin Ismail Association Malaysia

Brid. Gen. Sr. Haji Mohd Amin Mohd Din Royal Institution of Surveyors Malaysia
Sr. Joshua Kang Wee Leng

Ar. Dr. S C Vadiveloo National House Buyers Association of Malaysia
Mr. Chang Kim Loong

Dato’ Ir. Haji Md Nasir Ibrahim Guild of Bumiputra Contractors Berhad


Allahyarham Mohd Shah Mohd Ali
Mr. Haris Azman Abd Aziz

Prof. Madya Sr. Dr. Ilias Said Universiti Sains Malaysia


Dr. Radzi Ismail

56

STANDARD CIS.latest 2014.indd 56 3/27/2014 4:44:57 PM


Working Group 1 (General)

Sr. Joshua Kang Wee Leng (Chairman) Canaan Building Inspection Sdn Bhd

Mr. Chuang Kuang Hong (Secretary) Construction Industry Development Board


Malaysia

Ir. Mukhtar Che Ali Construction Industry Development Board


Mr. Ibrahim Mohd Yusoff Malaysia
Ms. Heryanti Hilmi
Mr. Rahlan Ali
Mr. Anuar Mat Daud
Mr. Azam Syah A. Kadir
Mr. Md Zahari Abdul Rahman

Dato’ Ir. K Laxana Naidu Master Builders Association Malaysia

Mr. Jeganathan Sime Darby Property Berhad

Mr. Teh Tik Guan Sunway Integrated Properties Sdn Bhd

Haji Rastam Hamzah Senior QLASSIC Assessor

Working Group 2 (M&E Work)

Ir. Looi Hip Peu Association of Consulting Engineers Malaysia

Mr. Chuang Kuang Hong (Secretary) Construction Industry Development Board


Malaysia

Ir. Mukhtar Che Ali Construction Industry Development Board


Mr. Md Zahari Abdul Rahman Malaysia

Ir. Sharinah Hamid Jabatan Kerja Raya Malaysia

Sr. Joshua Kang Wee Leng Canaan Building Inspection Sdn Bhd

Mr. Perumal Vengadasalam The Electrical and Electronic Association of


Mr. How Chee Seng Malaysia

Mr. Peter Tan Malaysia Air-Conditioning & Refrigeration


Association

Ms. Nor Sakinah Sallehuddin Persatuan Pengilang, Pembekal, Kontraktor,


Mr. Sukri Wahad Industrial Elektrik, Elektronik, Mekanikal dan
ICT Melayu dan Bumiputra Malaysia

57

STANDARD CIS.latest 2014.indd 57 3/27/2014 4:44:57 PM


58

STANDARD CIS.latest 2014.indd 58 3/27/2014 4:44:57 PM

You might also like