Professional Documents
Culture Documents
OpsData Services
Engine Failure Departure Procedure
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 07L BASED ON CLIMBING ON RUNWAY
07L HEADING. INTERCEPT AND TRACK OUTBOUND ON THE LKC VOR R-104. (DO NOT
STD START TURN BEFORE D7.1/R-108 LKC VOR/DME) AT D9.5 LKC DME TURN RIGHT
TO A MAG COURSE OF 185 DEGREES.
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 07R BASED ON A 15 DEGREE BANKED
07R CLIMBING -LEFT- TURN, COMMENCED AT D3.0 SMT VOR/DME (R-237)(D2.1 ISR
STD DME) TO A MAG COURSE OF 050 DEGREES. INTERCEPT AND TRACK OUTBOUND
ON THE LKC VOR R-104. AT D9.5 LKC DME TURN RIGHT TO A MAG COURSE OF
185 DEGREES.
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 25L BASED ON CLIMBING STRAIGHT
25L ON RWY HEADING. AT D5.5 IFL ILS/DME TURN LEFT TO INTERCEPT AND TRACK
STD OUTBOUND ON THE LKC VOR R-210. (IF LKC VOR OTS, TURN TO A MAG COURSE
OF 210 DEGREES)
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 25R BASED ON CLIMBING STRAIGHT
25R ON RWY HEADING. AT D6.0 I-TFR ILS/DME TURN LEFT TO INTERCEPT AND TRACK
STD OUTBOUND ON THE LKC VOR R-210. (IF LKC VOR OTS, TURN TO A MAG COURSE
OF 210 DEGREES)
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.
XIANYANG 12/21/2017
XI'AN, CHN XIY/ZLXY
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 23L BASED ON A 15 DEGREE BANKED
23L CLIMBING -RIGHT- TURN, COMMENCED AT D18.0 LCZ VOR TO A MAG COURSE OF
STD 280 DEGREES.
RWY ALLOWABLE TAKEOFF WEIGHTS FOR RWY 23R BASED ON A 15 DEGREE BANKED
23R CLIMBING -RIGHT- TURN, COMMENCED AT D18.0 LCZ VOR TO A MAG COURSE OF
STD 280 DEGREES.
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.
XIAOSHAN 12/21/2017
HANGZHOU, CHN HGH/ZSHC
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.
LISHE 12/21/2017
NINGBO, CHN NGB/ZSNB
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.
TUNXI 12/21/2017
HUANGSHAN, CHN TXN/ZSTX
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.
LONGDONGBAO 12/21/2017
GUIYANG, CHN KWE/ZUGY
NOTICE
The obstacles considered in the accompanying analysis are based on the departure procedures
indicated above. These procedures are intended to define the engine failure departure track that must
be followed to satisfy obstacle clearance requirements. The operator must review and approve these
procedures before use. Where navaids are used to aid in the definition of these procedures, the
operator must monitor future changes to such facilities, as this service is not provided with the analysis.