QA & INSPECTION CIRCLE, JABALPUR

A/T SCHEDULE FOR


GPON EQUIPMENTS, ACCESSORIES AND EMS FOR BHARATNET/
NOFN PROJECT
Document No.: INSP/CFA/TS-NOFN/2017-18/40
No of Pages : 6
Issue No : II
Issued By : QA &Inspection Circle, Jabalpur
Approved By : CGM QA &Inspection Circle, Jabalpur
Date of Approval: 21.07.2017
Amendment No. (If Any):
Document No.:
No of Pages :
Issued by :
Approved By :
Date of Issue :

Restricted use by BSNL Employees only

“FIX IT RIGHT AT THE FIRST INSTANCE”


QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

A/T SCHEDULE FOR GPON EQUIPMENTS, ACCESSORIES AND EMS FOR


BHARATNET/ NOFN PROJECT

PART A - OLT Node Tests

1. OLT Equipment Details


SL. No ITEM DESCRIPTION DETAILS
1 OLT Location
2 Block & Dist. Name
3 OLT Location ID/IP address
4 OLT Model No.
5 OLT Sl. No.
6 OLT Capacity (4/8/16/24 Port)
7 QA Reference No.

2. Infrastructure verification of BSNL premises for OLT:


SL. No TEST DESCRIPTION PROCEDURE/REFERENCE RESULT/ REMARK
1 Layout drawing As per engineering drawing OK / Not OK
document (EDD)
2 Check of Earthing (in Ohms) Measured Value: If earthing is available then earth
measurement is to be done. If not
feasible, a certificate from the
concerned BSNL official indicating the
last reading to be obtained.
3 Check of Air conditioning Available / Not available
( if available at OLT location)
4 Check of Documentation Available / Not available Technical manuals in CD to be supplied
5 Check of Power plant/Battery Available / Not available
including inverter.
6 Check for connectivity with Data Done / Not Done DCN connectivity from OLT to EMS for
Comm. Network (DCN) management purpose
7 Engine Alternator Available in working
condition / Non- working
Condition / Not available
8 Check of Firefighting Equipment Available / Not available
/Fire Detection
9 Sign. Writing on the equipment Done/Pending
10 Network diagram in the form of Available / Not available
OLT port diagram. ( To be
arranged by BBNL PMUs)
11 Verification of Earth Connectivity Check for Physical
connectivity of Earth from
Earth distribution Box to the
OLT.

No. INSP/CFA/TS-NOFN/2017-18/40 Page 1 of 6 Issue -II


Dated 21.07.2017
QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

3. Physical Verification of Hardware


SL. No TEST DESCRIPTION PROCEDURE

1 Physical Verification of the system Check the supply of OLT as per BOM. Physical Check for the
at OLT. provision of No. of ports to be verified.
a) No. of PON cards :
b) No. of PON ports:
c) No. of Control / uplink cards :
d) No. & Type of SNI ports
2 LCT hardware version as per TSEC, if applicable
3 LCT Software version as per TSEC, if applicable

4. Services Configuration Details


SL. No ITEM CONFIGURATION
1 OLT Management IP (Out of Band)
2 LCT/EMS Server Gateway
3 OLT MGMT VLAN
4 High Speed Internet VLAN/s
5 VoIP VLAN

5. OLT Tests

SL. No TEST DESCRIPTION PROCEDURE

1 Check for the S/W Verify the S/W version of the OLT as per the TSEC certificate.
conformity
2 Verification of Power supply Check that the OLT gets powered ON after the -48V DC is through.
requirement of OLT.
3 Verification of Power supply a. Check for two -48VDC feeds are through two independent MCBs
redundancy at OLT. b. Put on both the power supply. Check for all lamps.
c. Disconnect the power supply A.
d. Check for correct function of the OLT by browsing some sites from
a nearby ONT
e. Restore supply A.
f. Disconnect the power supply B after 5-6 minutes.
g. Check for correct function of the OLT by browsing some sites from
a nearby ONT
h. Restore Supply B.
5 Verification of hot swapping Remove one PON card from any slot and the OLT should work normally
Functionality of OLT. without any change in configuration.

No. INSP/CFA/TS-NOFN/2017-18/40 Page 2 of 6 Issue -II


Dated 21.07.2017
QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

6 Verification of Optical Connect a power meter to the UP Link ports with patch card.
Power Measurement of Measure the optical power for various windows. The Limits should be
Uplink Ports. as given below:
1. For 850 nm:1000 Base SX (500M)/1G
a. RX Power: -17 to 0 dBm
b. TX Power: -9.5 to 0 dBm
2. For 1310 nm: 1000 Base LX (10KM)/1G
a. RX Power: -19.5 to -3dBm
b. TX Power: -9.0 to -3 dBm
3. For 1550 nm: 1000 Base LX (40KM)/1G
a. RX Power: -23 to -3dBm
b. TX Power: -3 to +3 dBm
4. For 1550 nm: 1000 Base ZX (80KM)/1G
a. RX Power: -24 to -1dBm
b. TX Power: 0 to +5 dBm
7 Verification of Optical Connect a power meter to the GPON port with patch card.
Power Measurement of Measure the optical power. The Limits should be as given below:
GPON Ports. a. RX Power : -8 to -28 dBm
b. TX Power : +1.5 to +5 dBm
8 Verification of Service a) The OLT is powered ON with all configurations. Check for the correct
restoration on OLT reboot functioning of the lamps and working of the OLT by browsing of
Internet from ONT.
b) Shutdown the OLT by disconnecting both the power supply.
c) Power ON the OLT after few minutes.
d) Check the system is restored within 15 minutes.
9 Verification of Loss of a. Ensure that the OLT is in working condition.
Signal on Fiber Cut b. Check for Green indication in OLT.
between OLT and Splitter c. Remove the fiber between OLT & the splitter.
d. Check the Red indication.
e. Restore the fiber.
f. Check for Green indication.
g. Check the alarm status in LCT/EMS
10 Verification of Switch Card a. Ensure that the OLT is powered ON with all configuration. Both the
/Uplink Redundancy control cards are working with uplinks.
b. Remove the Fiber from the Active Control Card.
c. Check for the correct functioning of the lamps and working of the OLT
by browsing from a nearby ONT.
d. Restore the Fiber to Active Control Card.
e. Repeat the same with the Passive control Card to ensure the port
redundancy.
f. Again remove the control card itself from the slot.
g. Check for the correct functioning of the lamps and working of the OLT
by browsing from a nearby ONT.
h. Insert the active control card.
i. Wait till the system becomes normal.
j. Repeat the same with the other control card to ensure the control
card redundancy.
k. Check the switchover status in LCT / EMS and working running
services
(if the uplink port redundancy is provided in separate card conduct
the test separately for Control card redundancy and uplink port
redundancy )
No. INSP/CFA/TS-NOFN/2017-18/40 Page 3 of 6 Issue -II
Dated 21.07.2017
QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

PART B- ONT Node Tests with OLT


1. ONT EQUIPMENT DETAILS
SL No ITEM DESCRIPTION DETAILS
1 ONT Location
2 Block & Distt. Name
3 Parent OLT Location
4 OLT Location ID/IP address
5 ONT Model No
6 ONT Sl. No.

2. ONT Tests
OLT Name/Location: …….. ONT Location: ……………

SL. No TEST DESCRIPTION PROCEDURE


1 Physical Verification of the Check the supply of ONT as per BOM. Physical Check for the
system at ONT. provision of No. of ports to be verified.
2 Verification of Power supply Check that the ONT gets powered on after the DC is extended. Check
requirement of ONT. for correct working of all lamps.
3 Verification of Signal on ONT a. Ensure that the ONT is in working condition.
Fiber b. Check for Green indication.
c. Remove the fiber between ONT & the splitter.
d. Check the Red indication.
e. Restore the fiber.
i. Check for Green indication.

4 Verification of High Speed a. Power ON the ONT. & ensure ONT is working.
Internet Service & Wi-Fi. b. Establish a Wi-Fi connection between the ONT and Android
Mobile or Laptop PC.
c. Browse for internet access, down loading of files etc., Make O/G
& I/C video calls using social media apps like WhatsApp/Skype.
5 Verification of service a. The ONT is powered on with all configurations. Check for the
restoration on ONT reboot. correct functioning of the lamps and working of the ONT by
browsing of internet.
b. Shutdown the ONT by disconnecting the power supply.
c. Power ON the ONT after few minutes.
Check the system is restored within 15 minutes.
6 Verification of earthing and its a. Verify that the earthing has been provided.
connectivity with CCU and SPV b. Check the Earth connectivity from the earth point to SPV & CCU by
at ONT sites. using a multi meter.

No. INSP/CFA/TS-NOFN/2017-18/40 Page 4 of 6 Issue -II


Dated 21.07.2017
QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

PART C- Acceptance Test Cases for Solar Photo Voltaic (SPV) Power
Supply (including CCU, Solar Panel and Battery)
OLT Name/Location _______________ ONT Location _________________

1. Make & Model No.of SPV System


i. CCU :
ii. SPV Panel :
iii. Battery:
2. Sl. No. of the CCU unit with Battery :
3. Sl. No. of Solar Panel :

SL. No TEST DESCRIPTION PROCEDURE

1 Physical verification of SPV, i. Physical check for the proper installation as per the layout diagram
CCU. and all the elements (i.e. Cable, structure & SPV panel) should be
available.
ii. Voltage at the I/P of the CCU from the SPV panels= 16V to 22Volts.
Verify the availability of the proper sign board.
2 Verification of battery charging Turn ON Only Mains I/P
from A.C Mains. i. Mains ON indication- GREEN LED
ii. Mains Charge indication – AMBER LED

3 Verification of battery charging Turn ON only solar power I/P.


from solar panel. Solar charge indication-Yellow LED.

4 Verification of AC mains & Turn OFF Both Solar I/P & Mains I/P.
SOLAR power FAIL. Check the load is taken by the Battery.
5 Test for checking the Health of Record the Battery Terminal Voltage;
the Battery. The Measured voltage should be 12+/- 1.5 V
Check for the Battery level indications on the CCU.
6 Verification of Fuses. Physically check for the provision of I/P fuse of 3.15 A

PART D- Testing of passive (OPTICAL SPLITTERS) components


OLT Name/Location _______________ ONT Location _________________
Sl. No. of the Splitter________________

Make & Model No.of Splitter as per TSEC:

SL No TEST DESCRIPTION PROCEDURE/REFERENCE RESULT/ REMARK


1 Physical verification of the Note the type of splitter
splitter at ONT site. installed (1:4, 1:8 etc.)

No. INSP/CFA/TS-NOFN/2017-18/40 Page 5 of 6 Issue -II


Dated 21.07.2017
QA & INSPECTION CIRCLE GPON Equip., Accessories and EMS
JABALPUR Acceptance Test (A/T) Schedule

PART E- Testing of EMS

SL. No TEST DESCRIPTION PROCEDURE

1 Physical Verification of the Check the supply of EMS as per BOM for both DC & DR sites.
system at EMS. (Along with accessories like LCT etc.)
2 Check for the S/W conformity Verify the S/W version of the LCT & EMS as per the TSEC certificate.
3 Check of Redundancy Check the following redundancy;
i. Power
ii. Control card/Server (Ensure only single point of failure does not
affect the functioning of the system)
4 Back up Restoration of the i. Take the backup of the EMS data.
Data ii. Modify the EMS by adding or deleting some ONT /Alarm etc.,
iii. Restore EMS with the backed up data.
iv. Verify that the modified data is not available.
5 Configuration Management Sample Check:
Perform Addition/deletion & Editing of OLT.
Perform Addition /deletion & Editing of ONT.
Activation and de-activation of any service of ONT.
6 Fault Management Sample Check:
Verify the alarms of the OLT & ONT – GREEN for Healthy, Red for
Fault and yellow for de-graded mode.
Verify the power failure of any OLT & ONT.
Verify Loss of signal of any OLT & ONT
7 Service Creation & Deletion of different Service profiles from EMS .
8 Security Management Sample Check:
Create/modify/Delete a user.
Check for different level of pass word.
9 Calendar Management Sample Check:
Create a task for Back up with time and date. Check the same is
executed properly.
10 Performance Management Sample Check:
Check for customized reports
11 Verification of Log Sample Check:
Verify the following Log:
Alarm Log.
User log.
12 Verification of Messaging Verify an e-mail sent to the maintenance officer on generation of alarm.
13 Verification of CCU Verify CCU and Battery status in EMS.
Parameters

Signature of Testing Official Signature of offering officer

(With Date, Name, and Designation) (With Date, Name and Designation)

*** END of the Document***