You are on page 1of 3

RATIO CONCRETE G40

1:1.7:2.3 = 5 m3

1 cement: 1m3=28 bag

1 bucket = 8 bag cement


28 bag / 8 bag/bucket = 3.50 bucket

2 Pasir

1.7 m3 x 3.50 bucket = 5.95 bucket

3 Batu

2.3 m3 x 3.50 bucket = 8.05 bucket

Ratio untuk campuran 5 m3 untuk grade 40 mengikut bucket = 28bag:6 bucket pasir:8 bucket batu
RATIO CONCRETE G40

1.2:2.04:2.76 = 5 m3 1.2
1 m3 28 bag
1 cement: 1.2 m3 33.6 bag

1 bucket = 8 bag cement


34 bag / 8 bag = 4.13 bucket

2 Pasir

2.04 m3 x 4.13 bucket = 8.43 bucket

3 Batu

2.3 m3 x 4.13 bucket = 9.50 bucket

Ratio untuk campuran 5 m3 untuk grade 40 mengikut bucket = 34bag:9 bucket pasir
2.04 2.76 6

34bag:9 bucket pasir:10bucket batu

You might also like