You are on page 1of 60

数量Quantities 时间Time Feb

总量 已完量 剩余量 单位
描述Description
total finished remaining unit 天/day 15 16 17 18 19 20 21 22 23 24 25 26
amount quantities quantities
QTY Drawing 5246 5246 m3 350 350 350 350 350 350 350 350 350 350 350 350
挖土方
挖机 excavator 2 台/unit 15
soil excavation
运土车 dump truck 5 台/unit
QTY Drawing 14 m2 3
模板 管理人员 9 个/person 4 9
formwor Management staff
工人workers 8 个/person 8
垫层 74 m3
lean QTY Drawing
concrete 管理人员 9 个/person
混凝土
concrete Management staff 2
工人workers 10 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 73 t
钢筋 管理人员 9 个/person 22
rebar Management staff
工人workers 30 个/person
QTY Drawing 136 m2
模板 管理人员 9 个/person 9
formwor Management staff
Baseplate
工人workers 10 个/person
QTY Drawing 601 m3

混凝土 管理人员 9 个/person


concrete Management staff 2
工人workers 20 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 127 t
钢筋 管理人员 9 个/person 29
rebar Management staff
工人workers 40 个/person
QTY Drawing 2726 m2
模板 管理人员 9 个/person 40
formwor Management staff
Wall
工人workers 40 个/person
QTY Drawing 696 m3
混凝土 管理人员 9 个/person
concrete Management staff 3
C35 工人workers 30 个/person
罐车 mixer 5 台/unit
泵车 pump 1 台/unit
QTY Drawing 478 m3

Concrete 混凝土 管理人员 9 个/person


Baseplate concrete Management staff 2
C20 工人workers 20 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 2 t
钢筋 管理人员 9 个/person 3
rebar Management staff
工人workers 8 个/person
QTY Drawing 165 m2
模板 管理人员 9 个/person 6
formwor Management staff
Beam
工人workers 20 个/person
QTY Drawing 17 m3

混凝土 管理人员 9 个/person


concrete Management staff 1
工人workers 10 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 8 t
钢筋 管理人员 9 个/person 7
rebar Management staff
工人workers 10 个/person
QTY Drawing 287 m2
模板 管理人员 9 个/person 13
formwor Management staff
Slab
工人workers 15 个/person
QTY Drawing 95 m3

混凝土 管理人员 9 个/person


Management staff 1
concrete
工人workers 15 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 1 t
钢筋 1
rebar
钢筋 管理人员 9 个/person 1
rebar Management staff
工人workers 10 个/person
QTY Drawing 52 m2
模板 管理人员 9 个/person 3
formwor Management staff
Hoist
工人workers 10 个/person
QTY Drawing 7 m3

混凝土 管理人员 9 个/person


Management staff 1
concrete
工人workers 15 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 2 t
钢筋 管理人员 9 个/person 2
rebar Management staff
工人workers 10 个/person
QTY Drawing 53 m2
模板 管理人员 9 个/person 7
formwor Management staff
Electric Sin
工人workers 5 个/person
QTY Drawing 19 m3

混凝土 管理人员 9 个/person


Management staff 1
concrete
工人workers 15 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 1 m3
Stone
Block 管理人员 9 个/person 2
Course Management staff
工人workers 10 个/person
Graded QTY Drawing 1 m3
Crushed 管理人员 9 个/person 2
Stones Management staff
Course 工人workers 10 个/person
QTY Drawing 1 t
钢筋 管理人员 9 个/person 1
rebar Management staff
Outdoor Repa 工人workers 5 个/person
QTY Drawing 15 m2
模板 管理人员 9 个/person 2
formwor Management staff
工人workers 5 个/person
QTY Drawing 4 m3

混凝土 管理人员 9 个/person


Management staff 1
concrete
工人workers 15 个/person
罐车 mixer 3 台/unit
泵车 pump 1 台/unit
QTY Drawing 1259 m2
Epoxy Asphalt 管理人员 9 个/person 13
Management staff
工人workers 20 个/person
QTY Drawing 2662 m2
Waterproofing 管理人员 9 个/person 27
Management staff
工人workers 20 个/person
QTY Drawing 472 m3
挖机 excavator 2 台/unit
回填
Conpector 1 台/unit 2
backfilling
Stamper 1 台/unit
运土车 dump truck 2 台/unit

Note No include steel Work, Because Drawing not complate


Quantity no finaly waiting review by Hepsec
Cooling Tower Pump House plan progress schedule
Maret

27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

350 350 350

3 3 3
9 9 9
8 8 8
46 28
9 9
10 10
3 3
1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
15 15 15 15 15 15 15 15 15
9 9 9 9 9 9 9 9 9
10 10 10 10 10 10 10 10 10
361 241
9 9
20 20
3 3
1 1
4 4 4 4 4 4 4 4 4 4 4 4 4 4
9 9 9 9 9 9 9 9 9 9 9 9 9 9
40 40 40 40 40 40 40 40 40 40 40 40 40 40
68 68 68 68 68 68 68 68 68
9 9 9 9 9 9 9 9 9
40 40 40 40 40 40 40 40 40
schedule
April

26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
275 275
9 9
30 30
5 5
1 1
232
9
20
3
1
Mei

25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

68
9
40
147
9
20
3
1
232 14.7
9 9
20 20
3 3
1 1
1 1 1
9 9 9
8 8 8
28 28 28 28 28 28
9 9 9 9 9 9
20 20 20 20 20 20
17
9
10
3
1
1 1 1 1 1 1 1
9 9 9 9 9 9 9
10 10 10 10 10 10 10
23 23 23 23 23 23 23 23 23 23 23 23 23
9 9 9 9 9 9 9 9 9 9 9 9 9
15 15 15 15 15 15 15 15 15 15 15 15 15
Juni

25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

1
9
10

95
9
15
3
1
1
9
10
17 17 17
9 9 9
10 10 10
7
9
15
3
1
1 1
9 9
10 10
8 8 8 8 8 8 8
9 9 9 9 9 9 9
5 5 5 5 5 5 5
19
9
15
3
1
1 1
9 9
10 10
1 1
9 9
10 10
1
9
5
7 7
9 9
5 5
4
9
15
3
1
100 100 100 100 100 100 100 100 100 100 100 100 100
9 9 9 9 9 9 9 9 9 9 9 9 9
20 20 20 20 20 20 20 20 20 20 20 20 20
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume

1 Excavation
a Excavation m³ 5246.10

2 Base Plate
a Fromwork Lean Concrete m² 13.76
b Lean Concrete m³ 73.95
c Fromwork Base Plate m² 135.90
d Rebar ton 72.86
e Concrete Base plate m³ 1065.10
f Cement Mortar m² 689.38
g Epoxy for outer surface m² 171.48
h Grouting m³ 0.65

3 Wall
a Rebar ton 125.63
b Fromwork m² 2726.08
c Waterstop m 85.00
d Embedded rigid waterproof sleeve DN 1400 pcs 8.00
e Instal Pipe DN 1400 pcs 8.00
f Embedded rigid waterproof sleeve DN 100 pcs 4.00
g Instal Pipe DN 100 pcs 4.00
h Instal Embedded SC150 (600)D , Steel Gate Chamber Fou kg 0.75
i Instal Embedded SC150 (200)D , Steel Gate Chamber Fou kg 0.06
j Instal Embedded SC150 (600)D , Steel Gate Drainge Ditch kg 0.45
k Instal Embedded SC150 (200)D , Steel Gate Drainge Ditch kg 0.06
l Instal Embedded SC100 (580)D , Embedded of Plat Scree kg 0.17
m Concrete m³ 710.84
n Cement mortar inner surface m² 1638.13
o Epoxy for outer surface m² 1087.95
p Painting For Embedded m² 1507.68

4 Beam
a Fromwork m² 165.30
b Rebar ton 2.33
c Concrete m³ 17.18
d Cement mortar inner surface m² 79.57

5 Roof
a Rebar ton 6.68
b Fromwork m² 287.30
c Embedded rigid waterproof sleeve DN 150 pcs 4.00
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume

d Instal Pipe DN 150 pcs 4.00


e Concrete m³ 95.08
f Cement mortar inner surface m² 255.08
g Instal Embedded SA 2020 B kg 0.05
h Painting For Embedded kg 0.05
i Caver Plate GB - 1 kg 0.30
j Painting For Plate kg 0.30
k Caver Plate GB - 2 kg 0.47
l Painting For Plate kg 467.86
m Grouting m³ 5.33

6 Expansion Jo
a Sealing Cement m 54.30
b Mastic Asphalt m 54.30
c Asphalt linen sean filling or asphalt wood silk plate m 54.30
d Waterstop m 54.30

7 Chain Hoist Frame


a Fromwork Foundation LC m² 0.88
b Lean Concrete Foundation m³ 0.24
c Fromwork Foundation m² 3.20
d Rebar ton 0.93
e Concrete Foundation m³ 0.80
f Fromwork Column m² 26.32
g Concrete Column m³ 2.96
h Fromwork Beam m² 22.92
i Concrete Beam m³ 2.58
j Lifting Weight DIE6 kg 0.06
k Shearing Bolt pcs 4.00
l Tension Bolt pcs 8.00
m Lifting Weight ZIE6 kg 0.12
n Shearing Bolt pcs 8.00
o Tension Bolt pcs 16.00

8 5T Electric
a Fromwork Beam m² 31.20
b Rebar ton 2.32
c Concrete Beam m³ 6.55
d Fromwork LC m² 1.81
e Lean Concrete m³ 1.75
f Fromwork Foundation m² 6.92
g Concrete Foundation m³ 7.00
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume

h Fromwork Wall m² 14.63


i Concrete wall m³ 4.13

9 Outdoor Repa
a Stone Block Course (Lay By Hand) m³ 1.32
b Graded Crushed Stones Course m³ 1.32
c Concrete C 25 m³ 1.82
d Fromwork Lean Concrete Drainage Ditch m² 1.42
e Lean Concrete Drainage Ditch m³ 0.50
f Fromwork Base Plate Drainage Ditch m² 1.38
g Rebar ton 0.82
h Concrete Base Plate Drainage Ditch m³ 0.38
i Fromwork Wall Drainage Ditch m² 11.87
j Concrete Wall Drainage Ditch m³ 0.87
k Fill Asphalt Mastic t= 5mm Divded Line m 17.00
L Besmear asphalt m 17.00
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume Remarks

1 Excavation
a Excavation m³ 5246.10

2 Base Plate
a Fromwork Lean Concrete m² 13.76
b Lean Concrete m³ 73.95
c Fromwork Base Plate m² 135.90
d Rebar ton 72.86
e Concrete Base plate m³ 1065.10
f Cement Mortar m² 689.38
g Epoxy for outer surface m² 171.48
h Grouting m³ 0.65

3 Wall
a Rebar ton 125.63
b Fromwork m² 2726.08
c Waterstop m 85.00
d Embedded rigid waterproof sleeve DN 1400 pcs 8.00
e Instal Pipe DN 1400 pcs 8.00
f Embedded rigid waterproof sleeve DN 100 pcs 4.00
g Instal Pipe DN 100 pcs 4.00
h Instal Embedded SC150 (600)D , Steel Gate Chamber Fou kg 0.75
i Instal Embedded SC150 (200)D , Steel Gate Chamber Fou kg 0.06
j Instal Embedded SC150 (600)D , Steel Gate Drainge Ditch kg 0.45
k Instal Embedded SC150 (200)D , Steel Gate Drainge Ditch kg 0.06
l Instal Embedded SC100 (580)D , Embedded of Plat Scree kg 0.17
m Concrete m³ 710.84
n Cement mortar inner surface m² 1638.13
o Epoxy for outer surface m² 1087.95
p Painting For Embedded m² 1507.68

4 Beam
a Fromwork m² 165.30
b Rebar ton 2.33
c Concrete m³ 17.18
d Cement mortar inner surface m² 79.57

5 Roof
a Rebar ton 6.68
b Fromwork m² 287.30
c Embedded rigid waterproof sleeve DN 150 pcs 4.00
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume Remarks

d Instal Pipe DN 150 pcs 4.00


e Concrete m³ 95.08
f Cement mortar inner surface m² 255.08
g Instal Embedded SA 2020 B kg 0.05
h Painting For Embedded kg 0.05
i Caver Plate GB - 1 kg 0.30
j Painting For Plate kg 0.30
k Caver Plate GB - 2 kg 0.47
l Painting For Plate kg 467.86
m Grouting m³ 5.33

6 Expansion Jo
a Sealing Cement m 54.30
b Mastic Asphalt m 54.30
c Asphalt linen sean filling or asphalt wood silk plate m 54.30
d Waterstop m 54.30

7 Chain Hoist Frame


a Fromwork Foundation LC m² 0.88
b Lean Concrete Foundation m³ 0.24
c Fromwork Foundation m² 3.20
d Rebar ton 0.93
e Concrete Foundation m³ 0.80
f Fromwork Column m² 26.32
g Concrete Column m³ 2.96
h Fromwork Beam m² 22.92
i Concrete Beam m³ 2.58
j Lifting Weight DIE6 kg 0.06
k Shearing Bolt pcs 4.00
l Tension Bolt pcs 8.00
m Lifting Weight ZIE6 kg 0.12
n Shearing Bolt pcs 8.00
o Tension Bolt pcs 16.00

8 5T Electric
a Fromwork Beam m² 31.20
b Rebar ton 2.32
c Concrete Beam m³ 6.55
d Fromwork LC m² 1.81
e Lean Concrete m³ 1.75
f Fromwork Foundation m² 6.92
g Concrete Foundation m³ 7.00
Summary Calculation Sheet Of Item Work

Project Name : KALTENG 1 2x100 MW CFSPP


Location : KALIMANTAN TENGAH
Owner : HEPSEC
Contractor : PT. Cemerlang Samudra Kontrindo
Building Name : Clarified Water Pond

No Item Unit Volume Remarks

h Fromwork Wall m² 14.63


i Concrete wall m³ 4.13

9 Outdoor Repa
a Stone Block Course (Lay By Hand) m³ 1.32
b Graded Crushed Stones Course m³ 1.32
c Concrete C 25 m³ 1.82
d Fromwork Lean Concrete Drainage Ditch m² 1.42
e Lean Concrete Drainage Ditch m³ 0.50
f Fromwork Base Plate Drainage Ditch m² 1.38
g Rebar ton 0.82
h Concrete Base Plate Drainage Ditch m³ 0.38
i Fromwork Wall Drainage Ditch m² 11.87
j Concrete Wall Drainage Ditch m³ 0.87
k Fill Asphalt Mastic t= 5mm Divded Line m 17.00
L Besmear asphalt m 17.00
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

1. Excavation Excavation L(m) W1 (m) W2 (m) H1 (m) H2 (m)


(L x W1 x H1) x Nos 24.65 20.90 0.00 7.400 0.000 1.00 ###
(W1 + W2)/2) x (H1 + H2)/2) x L x Nos 16.15 20.90 8.56 7.400 4.100 1.00 ###
(W1 + W2)/2) x H1 x L x Nos 2.00 8.56 7.48 4.100 0.000 1.00 65.77
Total ###

2. Base Plate Fromwork LC L(m) W1 (m) W2 (m) H(m)


((L x 2) + W 1) x H x nos 23.75 19.90 0.00 0.100 1.00 6.74
((L x 2) + W1 + W2) x H x nos 20.73 21.11 7.68 0.100 1.00 7.02
Total 13.76

Lean Concrete L(m) W1 (m) W2 (m) H(m)


(L x W1 x H) x Nos 22.75 20.10 0.00 0.100 1.00 45.73
(W1 + w2)/2 x L x H x Nos 19.61 21.11 7.68 0.100 1.00 28.23
Total 73.95

Fromwork Base Plate L(m) W1 (m) W2 (m) H(m)


((L x 2) + W 1) x H x nos 22.65 19.90 0.00 0.800 1.00 52.16
((L x 2) + W 1) x H x nos 1.02 19.90 0.00 0.800 1.00 17.55
((L x 2) + W1 + W2) x H x nos 17.29 20.91 7.68 0.800 1.00 50.54
(L + W1 + W2) x H x Nos 2.00 4.75 7.48 1.100 1.00 15.66
Total 135.90

Concrete L(m) W1 (m) W2 (m) H(m)


(L x W1 x H) x Nos 22.65 19.90 0.00 0.800 1.00 360.59
(L x W1 x H) x Nos 1.02 19.90 0.00 0.800 1.00 16.21
C 35
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

C 35 ((W1 + W2)/2 x L x H x Nos 16.15 20.91 7.68 0.800 1.00 184.69


((W1 + W2)/2 x L x H x Nos 2.00 4.75 7.48 1.100 1.00 13.46
-(L x W1 x H) x Nos 0.80 4.75 0.00 0.300 1.00 (1.14)
(L x W1 x H) x Nos 2.18 2.10 0.00 0.500 4.00 9.14
(L x W1 x H) x Nos 0.40 2.10 0.00 3.800 4.00 12.77
(L x W1 x H) x Nos 0.70 1.80 0.00 1.150 4.00 5.80
(L x W1 x H) x Nos 9.08 17.40 0.00 0.500 1.00 78.95
(L x W1 x H) x Nos 1.30 17.40 0.00 0.500 1.00 11.31
(L x W1 x H) x Nos 2.55 17.40 0.00 0.500 1.00 22.19
C 20 (L x W1 x H) x Nos 1.10 17.40 0.00 0.500 1.00 9.57
(L x W1 x H) x Nos 16.15 17.40 5.00 0.500 1.00 140.51
(L x W1 x H) x Nos 4.70 17.40 0.00 2.500 1.00 204.45
-(L x W1 x H) x Nos 1.50 1.50 0.00 1.500 1.00 (3.38)
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Total ###

Cement Mortar Painting L(m) W1 (m) W2 (m) H(m)


((L x 2) + W 1) x H x nos 21.45 17.40 0.00 0.000 1.00 373.23
((L x 2) + W 1) x H x nos 1.02 17.40 0.00 0.000 1.00 17.71
((L x 2) + W1 + W2) x H x nos 17.29 16.71 5.00 0.000 1.00 288.93
(L + W1 + W2) x H x Nos 2.00 4.75 7.48 0.000 1.00 9.50
Total 689.38

Epoxy Asphalt L(m) W(m) H(m)


((2 x L) + W ) x H x Nos 23.65 19.90 0.800 1.00 53.76
(L x W) x Nos 23.65 0.70 0.000 1.00 16.56
-(L x W) x Nos 1.10 0.70 0.000 1.00 (0.77)
-(L x W) x Nos 1.00 0.70 0.000 2.00 (1.40)
(L x W) x Nos 23.65 0.60 0.000 1.00 14.19
-(L x W) x Nos 1.10 0.20 0.000 1.00 (0.22)
-(L x W) x Nos 1.00 0.20 0.000 2.00 (0.40)
(L x W) x Nos 19.90 0.60 0.000 1.00 11.94
-(L x W) x Nos 1.10 0.30 0.000 2.00 (0.66)
-(L x W) x Nos 1.00 0.40 0.000 2.00 (0.80)
((L x 2) x H x nos 17.29 0.00 0.000 0.80 27.67
((L x 2) + w) x H x nos 2.00 7.48 0.000 0.80 9.18
(L x W) x 2 x Nos 1.10 17.29 0.000 0.00 38.04
(L x W) x 2 x Nos 1.10 2.00 0.000 0.00 4.40
Total 171.48

Grouting L(m) W(m) H(m)


CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

2 x (L x W x H) x Nos 0.50 0.20 0.500 4.00 0.40


(L x W) x H x Nos 0.70 1.80 0.050 4.00 0.25
Total 0.65

3. Wall Fromwork a (out) L(m) W(m) H1 (m) H2 (m)


( W x H1 ) x nos 0.00 3.50 6.200 0.000 2.00 43.40
(L + W) x H1 x Nos 1.10 1.00 6.200 0.000 2.00 26.04
(L x H x Nos) 0.20 0.00 6.200 0.000 2.00 2.48
(L x 2) + W x H1 x Nos 0.40 1.00 6.200 0.000 2.00 22.32
( W x H1 ) x nos 0.00 8.00 6.200 0.000 2.00 99.20
(L x H1) x Nos 5.00 0.00 6.200 0.000 4.00 248.00
(L x H1) x Nos 9.25 0.00 6.200 0.000 2.00 229.40
( W x H1 ) x nos 0.00 0.70 6.200 0.000 1.00 4.34
(W x 2) + L x H x Nos 1.00 0.70 6.200 0.000 2.00 29.76
( W x H1 ) x nos 0.00 0.20 6.200 0.000 1.00 1.24
(W x 2) + L x H x Nos 1.00 0.20 6.200 0.000 2.00 17.36
(L x (H1 + H2)/2) x Nos 1.10 0.00 6.200 6.500 2.00 27.94
(L x (H1 + H2)/2) x Nos 7.44 0.00 4.95 6.250 2.00 166.61
(L x (H1 + H2)/2) x Nos 9.72 0.00 3.20 4.950 2.00 158.50
(L x 2) + W x H1 x Nos 2.00 0.65 3.20 0.000 2.00 8.16
(W x H1) x Nos 0.00 1.00 3.20 0.000 1.00 3.20
Total ###
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Fromwork b (in) L(m) W(m) H1 (m) H2 (m)


(W x H1) x Nos 0.00 17.20 6.50 0.000 2.00 223.60
(L x H1) x Nos 4.70 0.00 6.50 0.000 2.00 61.10
(W x H1) x Nos 0.00 3.90 5.60 0.000 4.00 87.36
((L x 2) + (3.14 x W)) x H x Nos 2.25 0.60 6.50 0.000 8.00 41.50
(W x 2) + L x H1 x Nos 1.50 0.95 6.50 0.000 8.00 176.80
- (L x W x H1) x Nos 0.80 0.35 6.50 0.000 8.00 (14.56)
(L x H1) x Nos 0.98 0.00 6.50 0.000 8.00 50.70
2 x (L + (W x 2)) x H1 x Nos 0.30 0.30 6.50 0.000 8.00 93.60
2xLxWxH 0.65 0.00 6.50 0.000 8.00 8.45
(W x 2) + L x H1 x Nos 0.35 0.35 6.50 0.000 8.00 54.60
(L x H1) x Nos 8.83 0.00 6.50 0.000 8.00 458.90
(L x (H1 + H2)/2) x Nos 1.10 0.00 6.20 6.500 2.00 27.94
(L x (H1 + H2)/2) x Nos 17.20 0.00 6.50 3.200 2.00 333.58
(L x H1) x Nos 0.80 0.00 3.20 0.000 4.00 10.24
(L x H1) x Nos 0.40 0.00 3.20 0.000 4.00 5.12
(L x H1) x Nos 0.80 0.00 3.20 0.000 4.00 10.24
(W x 2) x H1 x Nos 0.00 0.35 3.20 0.000 4.00 8.96
Total ###

Waterstop L(m) W(m) H(m)


(2 x L) + W x Nos 22.75 18.30 0.000 1.00 63.80
(2 x L) x Nos 17.20 0.00 0.000 1.00 17.20
(2 x L) x Nos 2.00 0.00 0.000 1.00 4.00
Total 85.00
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Embedded rigid waterproof


sleeve DN 1400
8.00 8.00
Total 8.00

Instal Pipe DN 1400


8.00 8.00
Total 8.00

Embedded rigid waterproof


sleeve DN 100
4.00 4.00
Total 4.00

Instal Pipe DN 100


4.00 4.00
Total 4.00

Instal Embedded SC150 (600)D , Steel Gate Chamber Foundation Plan


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 80.8889 0.15 6 10 8 582.400
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 1.04138 0.25 82 13 8 170.786
Total 753.186
Painting For Embedded (Weight. Plate + Weight Anchor Bar) 753.186
Total 753.186
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Instal Embedded SC150 (200)D , Steel Gate Chamber Foundation Plan


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 80.8889 0.15 2 10 2 48.533
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 1.04138 0.25 30 13 2 15.621
Total 64.154
Painting For Embedded (Weight. Plate + Weight Anchor Bar) 64.154
Total 64.154

Instal Embedded SC150 (600)D , Steel Gate Drainge Ditch Foundation


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 80.8889 0.15 2.9 10 8 281.493
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 1.04138 0.25 82 13 8 170.786
Total 452.279
Painting For Embedded (Weight. Plate + Weight Anchor Bar) 452.279
Total 452.279

Instal Embedded SC150 (200)D , Steel Gate Drainge Ditch Foundation


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 80.8889 0.15 2 10 2 48.533
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 1.04138 0.25 30 13 2 15.621
Total 64.154
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Painting For Embedded (Weight. Plate + Weight Anchor Bar) 64.154


Total 64.154
Instal Embedded SC100 (580)D , Embedded of Plat Screen
Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 80.8889 0.1 2.8 10 4 90.596
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 1.04138 0.25 80 13 4 83.310
Total 173.906
Painting For Embedded (Weight. Plate + Weight Anchor Bar) 173.906
Total 173.906

Concrete a (wall) L(m) W(m) H1 (m) H2 (m)


(L x W x H1) x Nos 0.60 3.50 6.50 0.000 2.00 27.30
(L x W x H1) x Nos 0.60 8.00 6.50 0.000 1.00 31.20
(L x W x H1) x Nos 1.10 1.00 6.50 0.000 2.00 14.30
(L x W x H1) x Nos 1.00 1.00 6.50 0.000 2.00 13.00
(L x W x H1) x Nos 5.00 0.60 6.50 0.000 2.00 39.00
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

(L x W x H1) x Nos 9.75 0.60 6.50 0.000 1.00 38.03


(L x W x H1) x Nos 1.00 1.30 6.50 0.000 2.00 16.90
(L x W x H1) x Nos 1.50 0.95 6.50 0.000 8.00 74.10
- (L x W x H1) x Nos 0.80 0.35 6.50 0.000 8.00 (14.56)
(L x W x H1) x 2 x Nos 0.30 0.30 6.50 0.000 8.00 9.36
(L x W x H1) x Nos 0.35 0.30 6.50 0.000 8.00 5.46
(L x W x H1) x Nos 15.15 0.60 6.50 0.000 3.00 177.26
(L x W x H1) x Nos 1.00 1.00 6.50 0.000 3.00 19.50
(L x W x H1) x Nos 20.25 0.60 6.50 0.000 1.00 78.98
(L x W x H1) x Nos 1.00 1.00 6.50 0.000 3.00 19.50
(L x W x (H1 + H2)/2)) x Nos 1.00 0.80 6.20 6.500 2.00 10.16
(L x W x H1) x Nos 17.20 0.80 6.20 3.200 2.00 129.31
(L x W x H1) x Nos 2.00 0.65 3.200 0.000 2.00 4.16
(L x W x H1) x Nos 2.00 1.00 3.200 0.000 1.00 3.20
(L x W x H1) x Nos 3.50 0.35 2.600 0.000 2.00 3.19
C 20 (L x W x H1) x Nos 0.70 3.20 2.600 0.000 1.00 2.91
(L x W x H1) x Nos 2.80 1.60 0.480 0.000 8.00 8.60
Total 710.84

Cement Mortar L(m) W(m) H1 (m) H2 (m)


(W x H1) x Nos 0.00 17.20 6.50 0.000 2.00 223.60
(L x H1) x Nos 4.70 0.00 6.50 0.000 2.00 61.10
(W x H1) x Nos 0.00 3.90 5.60 0.000 4.00 87.36
((L x 2) + (3.14 x W)) x H x Nos 2.25 0.60 6.50 0.000 8.00 41.50
(W x 2) + L x H1 x Nos 1.50 0.95 6.50 0.000 8.00 176.80
- (L x W x H1) x Nos 0.80 0.35 6.50 0.000 8.00 (14.56)
(L x H1) x Nos 0.98 0.00 6.50 0.000 8.00 50.70
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

2 x (L + (W x 2)) x H1 x Nos 0.30 0.30 6.50 0.000 8.00 93.60


2xLxWxH 0.65 0.00 6.50 0.000 8.00 8.45
(W x 2) + L x H1 x Nos 0.35 0.35 6.50 0.000 8.00 54.60
(L x H1) x Nos 8.83 0.00 6.50 0.000 8.00 458.90
(L x (H1 + H2)/2) x Nos 1.10 0.00 6.20 6.500 2.00 27.94
(L x (H1 + H2)/2) x Nos 17.20 0.00 6.50 3.200 2.00 333.58
(L x H1) x Nos 0.80 0.00 3.20 0.000 4.00 10.24
(L x H1) x Nos 0.40 0.00 3.20 0.000 4.00 5.12
(L x H1) x Nos 0.80 0.00 3.20 0.000 4.00 10.24
(W x 2) x H1 x Nos 0.00 0.35 3.20 0.000 4.00 8.96
Total ###

Epoxy asphalt L(m) W(m) H(m)


( W x H1 ) x nos 0.00 3.50 6.200 0.000 2.00 43.40
(L + W) x H1 x Nos 1.10 1.00 6.200 0.000 2.00 26.04
(L + W) x H1 x Nos 0.20 0.00 6.200 0.000 2.00 2.48
(L + W) x H1 x Nos 0.40 1.00 6.200 0.000 2.00 22.32
(L + W) x H1 x Nos 0.00 8.00 6.200 0.000 2.00 99.20
(L + W) x H1 x Nos 5.00 0.00 6.200 0.000 4.00 248.00
(L + W) x H1 x Nos 9.25 0.00 6.200 0.000 2.00 229.40
(L + W) x H1 x Nos 0.00 0.70 6.200 0.000 1.00 4.34
(L + W) x H1 x Nos 1.00 0.70 6.200 0.000 2.00 29.76
(L + W) x H1 x Nos 0.00 0.20 6.200 0.000 1.00 1.24
(L + W) x H1 x Nos 1.00 0.20 6.200 0.000 2.00 17.36
(L + W) x H1 x Nos 1.10 0.00 6.200 6.500 2.00 27.94
(L + W) x H1 x Nos 7.44 0.00 4.95 6.250 2.00 166.61
(L + W) x H1 x Nos 9.72 0.00 3.20 4.950 2.00 158.50
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

(L + W) x H1 x Nos 2.00 0.65 3.20 0.000 2.00 8.16


(W x H1) x Nos 0.00 1.00 3.20 0.000 1.00 3.20
Total ###

4. Beam Fromwork L(m) W(m) H(m)


L1 ((L+W) x 2) x H x Nos 0.20 0.50 3.900 4.00 21.84
L2 ((L+W) x 2) x H x Nos 0.20 0.50 3.900 4.00 21.84
L3 ((L+W) x 2) x H x Nos 0.28 0.50 3.900 4.00 24.18
L4 ((L+W) x 2) x H x Nos 0.40 0.50 3.900 4.00 28.08
L5 ((L+W) x 2) x H x Nos 0.60 0.70 3.900 4.00 40.56
L6 ((L+W) x 2) x H x Nos 0.20 0.70 2.000 8.00 28.80
Total 165.30

Concrete a L(m) W(m) H(m)


L1 (L x W x H) x Nos 0.20 0.50 3.900 4.00 1.56
L2 (L x W x H) x Nos 0.20 0.50 3.900 4.00 1.56
L3 (L x W x H) x Nos 0.28 0.50 3.900 4.00 2.15
L4 (L x W x H) x Nos 0.40 0.50 3.900 4.00 3.12
L5 (L x W x H) x Nos 0.60 0.70 3.900 4.00 6.55
L6 (L x W x H) x Nos 0.20 0.70 2.000 8.00 2.24
Total 17.18

Cement Mortar L(m) W(m) H(m)


L1 ((W x 2) + L) x H x Nos 0.20 0.20 3.900 4.00 9.36
L2 ((W x 2) + L) x H x Nos 0.20 0.20 3.900 4.00 9.36
L3 ((W x 2) + L) x H x Nos 0.28 0.20 3.900 4.00 10.53
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

L4 ((W x 2) + L) x H x Nos 0.40 0.20 3.900 4.00 12.48


L5 ((W x 2) + L) x H x Nos 0.60 0.40 3.900 4.00 21.84
L6 ((W x 2) + L) x H x Nos 0.20 0.40 2.000 8.00 16.00
Total 79.57

5. Roof Fromwork L (m) W(m) H(m)


(L x W) x Nos 6.18 17.40 0.000 1.00 107.45
(L + W) x 2 x H x Nos 6.18 17.40 0.300 1.00 7.07
(L x W) x Nos 1.70 17.40 0.000 1.00 29.58
(L + W) x 2 x H x Nos 1.70 17.40 0.300 1.00 5.73
(L x W) x Nos 2.55 17.40 0.000 1.00 44.37
(L + W) x 2 x H x Nos 2.55 17.40 0.300 1.00 5.99
(L x W) x Nos 0.30 17.40 0.300 1.00 10.44
(L x W) x Nos 0.60 5.00 0.300 1.00 3.00
(L + w) x H x 2 x Nos 1.00 0.60 3.400 4.00 43.52
(L + w) x H x Nos 0.90 0.60 2.900 4.00 17.40
(L + w) x H x Nos 0.50 0.60 2.900 4.00 12.76
Total 287.30
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Embedded rigid waterproof


sleeve DN 150
4.00 4.00
Total 4.00

Instal Pipe DN 150


4.00 4.00
Total 4.00

Concrete L (m) W(m) H(m)


(L x W x H) x Nos 6.18 17.40 0.300 1.00 32.23
(L x W x H) x Nos 1.70 17.40 0.300 1.00 8.87
(L x W x H) x Nos 2.55 17.40 0.300 1.00 13.31
(L x W x H) x Nos 0.30 17.40 0.300 1.00 1.57
2 x (L x W x H) x Nos 1.00 3.40 0.900 4.00 24.48
(L x W x H) x Nos 0.90 2.90 0.90 4.00 9.40
(L x W x H) x Nos 0.50 2.90 0.90 4.00 5.22
Total 95.08

Cement Mortar L (m) W(m) H(m)


(L x W) x Nos 6.18 17.40 0.000 1.00 107.45
(L x W) x Nos 1.70 17.40 0.000 1.00 29.58
(L x W) x Nos 2.55 17.40 0.000 1.00 44.37
(L + w) x H x 2 x Nos 1.00 0.60 3.400 4.00 43.52
(L + w) x H x Nos 0.90 0.60 2.900 4.00 17.40
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

(L + w) x H x Nos 0.50 0.60 2.900 4.00 12.76


Total 255.08

Instal Embedded SA 2020 B


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x Kg/m² x Nos 64.7111 0.2 0.2 8 16 41.415
Anchor Bar kg/m L (m) qua. (pcs) Ø (mm)
(L x qua x kg/m) x Nos 0.39437 0.16 4 8 16 4.038
Total 45.453
Painting For Embedded (Weight. Plate + Weight Anchor Bar) 45.453
Total 45.453

GB - 1 kg/m2 L (m) W(m) H(mm)


(L x W) x kg/m² x Nos 48.53 0.35 0.80 6.000 4.00 54.36
(1-SGB III 350 x 800)
(L x W) x kg/m² x Nos 40.44 2.30 0.01 5.000 4.00 7.44
(L x W) x kg/m² x Nos 48.53 0.55 1.13 6.000 4.00 120.12
(2-SGB III 550 x1125)
(L x W) x kg/m² x Nos 40.44 3.35 0.01 5.000 4.00 10.84
(L x W) x kg/m² x Nos 48.53 0.45 1.13 6.000 4.00 98.28
(2-SGB III 450 x1125)
(L x W) x kg/m² x Nos 40.44 3.15 0.01 5.000 4.00 10.19
Total 301.23
Painting For Plat Weight Plate 301.23
Total 301.23
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

GB - 2 kg/m2 L (m) W(m) H(mm)


(L x W) x kg/m² x Nos 48.53 0.45 0.80 6.000 24.00 419.33
(6-SGB III 450 x 800)
(L x W) x kg/m² x Nos 40.44 2.50 0.01 5.000 24.00 48.53
Total 467.86
Painting For Plat Weight Plate 467.86
Total 467.86

Grouting L (m) W(m) H(m)


(L x W x H) x Nos 0.50 0.50 0.200 72.00 3.60
(L x W x H) x Nos 0.20 0.20 0.600 72.00 1.73
Total 5.33

6. Expansion Joint Sealing Cement L (m) W(m) H(m)


(L x Nos) 0 18.6 0 1 18.60
(2 x H) x Nos 0 0 6.5 1 13.00
(L + H) x 2 x Nos 2.475 0 3.2 2 22.70
Total 54.30

Mastic Asphalt L (m) W(m) H(m)


(L x Nos) 0 18.6 0 1 18.60
(2 x H) x Nos 0 0 6.5 1 13.00
(L + H) x 2 x Nos 2.475 0 3.2 2 22.70
Total 54.30

Asphalt linen sean filling or asphalt wood silk plate L (m) W(m) H(m)
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

(L x Nos) 0 18.6 0 1 18.60


(2 x H) x Nos 0 0 6.5 1 13.00
(L + H) x 2 x Nos 2.475 0 3.2 2 22.70
Total 54.30

Waterstop L (m) W(m) H(m)


(L x Nos) 0 18.6 0 1 18.60
(2 x H) x Nos 0 0 6.5 1 13.00
(L + H) x 2 x Nos 2.475 0 3.2 2 22.70
Total 54.30

7. Chain Hoist FrameFromwork Foundation LC L (m) W(m) H(m)


1.10 1.10 0.100 2.00 0.88
Total 0.88

Lean Concrete Foundation L (m) W(m) H(m)


(L x W x H) x Nos 1.10 1.10 0.100 2.00 0.24
Total 0.24
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Fromwork Foundation L (m) W(m) H(m)


(W x H) x Nos 1.00 1.00 0.400 2.00 3.20
Total 3.20

Concrete Foundation L (m) W(m) H(m)


1.00 1.00 0.400 2.00 0.80
Total 0.80

Fromwork Column L (m) W(m) H(m)


0.45 0.45 7.310 2.00 26.32
Total 26.32

Concrete Column L (m) W(m) H(m)


0.45 0.45 7.310 2.00 2.96
Total 2.96

Fromwork Beam L (m) W(m) H(m)


0.30 0.90 9.550 1.00 22.92
Total 22.92

Concrete Beam L (m) W(m) H(m)


0.30 0.90 9.550 1.00 2.58
Total 2.58

Lifting Weight DIE6


CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Plate kg/m2 L (m) W(m) H(mm)


(L x W) x kg/m x 2 x Nos 80.89 0.26 0.35 10.000 2.00 29.02
(L x W) x kg/m x Nos 161.78 0.30 0.26 20.000 2.00 25.24
(L x W) x kg/m x Nos 161.78 0.30 0.04 20.000 2.00 3.88
Total 58.14
Shearing Bolt unit
M 27 Unit x Nos 2.000 2.00 4.00
Total 4.00
Tension Bolt unit
M 18 Unit x Nos 4.000 2.00 8.00
Total 8.00

Lifting Weight ZIE6


Plate kg/m2 L (m) W(m) H(mm)
(L x W) x kg/m x 2 x Nos 80.89 0.26 0.35 10.000 4.00 58.05
(L x W) x kg/m x Nos 161.78 0.30 0.26 20.000 4.00 50.47
(L x W) x kg/m x Nos 161.78 0.30 0.04 20.000 4.00 7.77
Total 116.29
Shearing Bolt unit
M 27 Unit x Nos 2.000 4.00 8.00
Total 8.00
Tension Bolt unit
M 18 Unit x Nos 4.000 4.00 16.00
Total 16.00

8. 5T Electric Single Cantry Crane Foundation Plan


CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Fromwork Beam L (m) W(m) H(mm)


((W x 2) + L) x H x Nos 0.60 0.70 15.600 1.00 31.20
Total 31.20

Concrete Beam L (m) W(m) H(mm)


((W x 2) + L) x H x Nos 0.60 0.70 15.600 1.00 6.55
Total 6.55

Fromwork LC L (m) W(m) H(mm)


(L + W) x 2 x H Nos 2.80 6.25 0.100 1.00 1.81
Total 1.81

Lean Concrete L (m) W(m) H(mm)


(L x W x H) x Nos 2.80 6.25 0.100 1.00 1.75
Total 1.75

Fromwork Foundation L (m) W(m) H(mm)


(L + W) x 2 x H Nos 2.60 6.05 0.400 1.00 6.92
Total 6.92

Concrete Foundation L (m) W(m) H(mm)


(L x W x H) x Nos 2.80 6.25 0.400 1.00 7.00
Total 7.00

Fromwork Wall L (m) W(m) H(mm)


CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

(L + W) x 2 x H Nos 0.60 6.05 1.100 1.00 14.63


Total 14.63

Concrete Wall L (m) W(m) H(mm)


(L x W x H) x Nos 0.60 6.25 1.100 1.00 4.13
Total 4.13

9. Outdoor Repairing Site


Stone Block Course (Lay By Hand) L (m) W(m) H(mm)
(L x W x H) x Nos 1.10 6.00 0.200 1.00 1.32
Total 1.32

Graded Crushed Stones Course L (m) W(m) H(mm)


(L x W x H) x Nos 1.10 6.00 0.200 1.00 1.32
Total 1.32

C 25 Concrete Surface L (m) W(m) H(mm)


(L x W x H) x Nos 1.1 6 0.25 1 1.65
(L x W x H) x Nos 1.4 0.3 0.3 1 0.03
(L x W x H) x Nos 6.3 0.3 0.3 1 0.14
Total 1.82

Drainagge Ditch
Fromwork Lean Concrete L (m) W(m) H(mm)
(L + W) x 2 x H Nos 0.80 6.30 0.100 1.00 1.42
Total 1.42
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Lean Concrete L (m) W(m) H(mm)


(L x W x H) x Nos 0.80 6.30 0.100 1.00 0.50
Total 0.50

Fromwork Base Plate L (m) W(m) H(mm)


(L + W) x 2 x H Nos 0.60 6.30 0.100 1.00 1.38
Total 1.38

Concrete Base Plate L (m) W(m) H(mm)


(L x H x W x Nos) 0.60 6.30 0.100 1.00 0.38
Total 0.38

Fromwork Wall L (m) W(m) H(mm)


(L + W) x 2 x H Nos x 2 0.15 6.30 0.460 1.00 11.87
Total 11.87

Concrete Wall L (m) W(m) H(mm)


(L x H x W x Nos) 0.15 6.30 0.460 1.00 0.87
Total 0.87

Devded Line
Fill Asphalt Mastic t= 5mm L (m) W(m) H(mm)
(L + W) x Nos 5.50 3.00 0.000 2.00 17.00
Total 17.00
CALCULATION SHEET
Project Name KALTENG 1 2x100 MW CFSPP Building name
Location Desa Tumbang Kajuei, kec. Rungan, Kab. Gunung mas, Prov. Kalimantan tengah Referensi Draw
Owner HEPSEC
Contractor PT. Cemerlang Samudra Kontrindo
MC 0 (based on
Drawing
Item Description Calculation
NoS Qty

Besmear asphalt L (m) W(m) H(mm)


(L + W) x Nos 5.50 3.00 0.000 2.00 17.00
Total 17.00
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks














Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks














Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks




















Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks




















Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks


















m
m
m
m
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

pcs
pcs

pcs
pcs

pcs
pcs

pcs
pcs

kg

kg
kg
kg
kg
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

kg

kg
kg
kg
kg

kg

kg
kg
kg
kg

kg

kg
kg
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

kg
kg

kg

kg
kg
kg
kg






Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

























Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

























Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks


















Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks
















Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

pcs
pcs

pcs
pcs













Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks


kg

kg
kg
kg
kg

kg
kg
kg
kg
kg
kg
kg
kg
kg
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

kg
kg
kg
kg
kg



m
m
m
m

m
m
m
m
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

m
m
m
m

m
m
m
m




Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks








Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

kg
kg
kg
kg

pcs
pcs

pcs
pcs

kg
kg
kg
kg

pcs
pcs

pcs
pcs
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks








Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks










Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks






m
m
Building name : Underground Part Structure Drawing of CW Pump House
Referensi Drawing: FA02111S-S5302

Unit Remarks

m
m