Carlisle Connectivity Projects: Overview
Carlisle Connectivity Projects:
Communication Plan
Carlisle Connectivity Projects:
Communication Plan
– Press Releases
• Cost
– $ 4.4 Million (Construction)
• Schedule
– Construction:
• Western Phase: November 2017 to November 2018
• HOP Phase: May 2018 to May 2019
• Traffic Control
– Western Phase: Not on active roadways
– HOP Phase: Possible closure and detour of Carlisle Springs Road
between E Street and N. Hanover Street
Carlisle Connectivity Projects: Borough Project 1
– 5-point Roundabout
• N. Hanover Street
• West and East Penn Streets
• Fairground Avenue
• Schedule
– Pre-Construction: Ongoing thru June 2019
• Design 85% Complete
• Right-of-Way 70% Complete
• Utilities 40% Complete
• Railroad Cord. 75% Complete
• Traffic Control
– North Hanover St & Carlisle Spring Road: Traffic maintained via staged
construction
– Fairground Ave and East/West Penn Streets : Traffic will be detoured
Carlisle Connectivity Projects: Borough TIGER Project
• Schedule
– Pre-Construction: On going thru April 2019
• Design 60% Complete
• Right-of-Way 50% Complete
• Utilities 50% Complete
• Traffic Control
– Traffic will be detoured in phases
Carlisle Urban Storm Water Park
Carlisle Urban Storm Water Park
• Features
– 2.4 Acre Stormwater management and Recreation Facilities along
Fairground Avenue between Norfolk Southern RR and D Street
• Schedule
– Pre-Construction (Design and Permitting): 60% Complete
– Construction: TBD (See Status)
• Status
– Construction on hold until after CAI Development Buildout