You are on page 1of 3

RUBY FIELD

DAILY PRODUCTION REPORT

DATE : 05-March-2018

REPORT FOR : 04-March-2018

Safe, Success to Deliver the Promise


1. WEATHER
Weather Condition : Clear
Wind Speed(knots)/Direction (deg) : 12.00 knots / 10.00 deg
Swell (m)/Condition : 0.50 m / N 0.5 mtr at 5 second

2. SAFETY INCIDENTS HIGHLIGHTS/NEAR MISSES


Description TRIR Type Remarks

NTR 0 NTR

3. ENVIRONMENTAL
Quantity
Effluent Stream Unit
Today Yesterday
Gas Flared 0.29 0.43 MMSCF
Produce Water overboard 5.24 0.00 BBLS
Oil In Water 5.46 5.54 PPM

4. POB IN FIELD
No. Location/Field/Vessel POB

1 PQP 27
2 TB Sejati 13
TOTAL 40

5. VESSELS
Fuel ROB Moored To
No. Name/Callsign Activity
Used(Ltr) (Ltr) Buoy (hrs)

1 TB Sejati Stand by 4,048 66,785.00 8

6. PRODUCTION INFORMATION
A. GAS PRODUCTION
RUBY Metering Senipah Metering
Outlet Unit
Today Yesterday Today Yesterday
Ruby Net Production 92.04 5.36 MMSCF
Gas Energy Rate 93.58 4.41 87.90 14.60 BBTU
Gas Export Rate 90.74 4.27 84.07 13.97 MMSCF
Pipeline Pressure Avg 103.30 80.30 43.20 46.03 BARG
YTD Sales Gas Production 5,672.24 5,578.66 6,191.92 6,104.02 BBTU
YTD Sales Gas Production 6,378.66 6,287.92 6,388.29 6,304.22 MMSCF
CUM Sales Gas Production 117,399.94 117,306.36 122,551.74 122,463.83 BBTU
CUM Sales Gas Production 122,252.70 122,161.96 122,254.53 122,170.46 MMSCF

PRODUCTION ISSUES
- Nomination (115 MMscf) not achieved due to linepacking.

05 March 2018 12:06:24PM Page 1 of 3


B. CONDENSATE PRODUCTION
RUBY Meter Senipah Meter
Outlet Unit
Today Yesterday Today Yesterday
Condensate Production 0.00 0.00 28.14 9.56 BBLS
Water Production 5.24 0.00 0.49 0.62 BBLS
YTD Condensate Production 79.02 79.02 3,355.16 3,327.02 BBLS
CUM Condensate Production 13,116.88 13,116.88 92,059.68 92,031.54 BBLS

C. GAS COMPOSITION

Outlet Ruby Senipah Unit

Carbon Dioxide (CO2) 0.75 0.72 % Mol


Nitrogen (N2) 0.25 0.20 % Mol
Methane (C1) 97.57 97.40 % Mol
Ethane (C2) 0.23 0.23 % Mol
Propane (C3) 0.43 0.44 % Mol
Iso Butane (IC4) 0.18 0.19 % Mol
Normal Butane (NC4) 0.21 0.22 % Mol
Iso Pentane (IC5) 0.11 0.13 % Mol
Normal Pentane (NC5) 0.07 0.09 % Mol
Hexanes (C6) 0.20 0.40 % Mol
Total Gas Composition 100.00 100.00 % Mol
GHV 1,031.31 1,045.60 BTU/SCF

7. WELL TEST DATA


Choke THP FLP FLT Total Gas Condensate Water Test
Well No. (x/64) (barg) (barg) (DegC) (MMSCFD) (BOPD) Hours GLR
(BPD) Date

Ruby-01/P 3 272 77.55 64.29 38.75 25.39 0.00 15.31 22 1.66 2/28/18
Ruby-03/P 11 272 75.87 75.67 52.13 26.09 0.00 15.17 22 1.72 2/27/18
Ruby-05/P 5 75 75.10 68.82 51.30 35.15 0.00 8.27 8 4.25 2/16/18
Ruby-06/P 2 144 73.65 72.10 52.00 42.80 0.00 15.21 4 2.81 2/12/18

WELL STATUS DATA

Choke THP FLP FLT Annulus A Online Remarks


Well ID
(x/64) (barg) (barg) (Deg C) (barg) Hours
Ruby-01/P 3 272/64 76.07 75.92 53.06 5.51 24 NTR
Ruby-03/P 11 272/64 75.94 75.92 51.85 5.84 24 NTR
Ruby-05/P 5 272/64 76.14 75.93 53.49 7.80 24 NTR
Ruby-06/P 2 272/64 76.20 75.96 54.03 2.39 24 NTR

8. UTILITY / COMPRESSION PERFORMANCE SUMMARY


Quantity
Equipment Unit
Today Yesterday
Fuel Gas Consumption 1.01 0.66 MMSCF
Potable Water Produced 3,815 0 Liters
Potable Water Consumption 10,409 11,848 Liters
Potable Water Storage Tank A 42,982.05 50,292.38 Liters
Potable Water Storage Tank B 11,750.50 9,878.93 Liters
Total Fresh Water Av. 54,732.55 60,171.30 Liters

05 March 2018 12:06:24PM Page 2 of 3


9. MAJOR EQUIPMENT RUNNING STATUS
Utility
Description Status Remarks
Equipment
213-MY-01 Gas Turbine Compressor 01 Stop Last run 30-11-17
213-MY-02 Gas Turbine Compressor 02 Standby Last run 01-03-17
215-P-01A Condensate Export Pump A Standby Last run 26-02-18
215-P-01B Condensate Export Pump B Standby Last run 17-02-18
220-C-01A Air Compressor A Lead Auto run
220-C-01B Air Compressor B Lag Auto run
227-P-01A Fire Water Pump A Standby Last run 25-02-18
227-P-01B Fire Water Pump B Standby Last run 25-02-18
235-MY-01A Gas Turbine Generator A Standby Last run 25-02-18
235-MY-01B Gas Turbine Generator B Run NTR
236-MY-01 Emg Diesel Generator Standby Last run 27-02-18

10. CHEMICAL STOCK


Usage Stock Day Tank Remaining
Chemical Remarks
(Liter) (Liter) Days
Corrosion Inhibitor 43 1,055 81 NTR
Diesel Storage 0 16,816 0 NTR
Water Clarifier 0 1,298 0 NTR

11. DAILY HIGHLIGHT


Ruby outlet pressure : 103.3 barg
RTI inlet pressure : 43.2 barg
RTI outlet pressure : 19.18 barg

- STOP card of the day: Found a contractor personnel not attending yet PTW training when he will-
propose permit to work. Stop him and inform to HSSE for giving the PTW training.
- Conducted PTW training for two personnel from contractor (PT. Jololu Utara) before their strating-
activity.
- Conducted table top ER drill with topic man over board with all Ruby ER team.
- Syslab reps. completed to collect air emission at GTG B and water for environment sample.
- Luas Birus reps. completed to collect produce water sample for SRB and DO analysis.
- Jololulu Utara reps. Checked and rectify AC cabin crane PQP (under monitoring)
- At 08.30 GTC 2 running after troubleshoot on Dry Seal Vent issue and export gas with flow rate-
115 mmscfd.
- Ran test potable water maker HP pump after alignment. Found pump still high vibration more than-
4 mm/s. Continue next day to re-alignment.
- Completed PM: Choke valve external visual inspection and lubrication at WHP(WO 98040).
- Completed PM: Inspection and functional test of flame detector at PQP Area (WO. 91048). Flame-
detectors at subcellar are functioning properly
- Completed to check OPGD 230GRX077 at PQP main deck. Found F12 fault code
- CM: Check & rectify condenser unit B of HVAC EER 242-UC-02-B1 due to low pressure indication.-
Preparation for brazing tool (disconnect control cable & junction box)
- Completed PM: Earthing bonding visual inspection for unit 216/221/226/229 (WO 90982/97983/84/87).-
Found unit in good condition

Highlight issue at 00.00-06.00 a.m: none.

ISSUE CONCERN
1. Online GC at Senipah has been offline since 30-Nov-16. Gas composition data taken from Handil Lab
analysis. Repaired by Emerson Engineer was done in 7 November 2017, but still unsuccess. Waiting for
spare part to solve the problem.
2. Ruby Online GC is on manual keypad, due to waiting for spare part (membrane kit).

05 March 2018 12:06:24PM Page 3 of 3