DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

MINISTRY OF HIGHER EDUCATION & HIGHWAYS

EXTENSION OF SOUTHERN ESPRESSWAY PROJECT


SECTION-3
FROM WETIYA TO ANDARAWEWA

Method Statement of Greeny Works

CONSULTANT
CHINA RAILWAY FIRST SURVEY &
DESIGN INSTITUTE GROUP CO., LTD. (FSDI)

CONTRACTOR
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD.

Submittal Number:S3-CSC-EW-CS1-3038-00
Project Code From XXX Section Project Type Professional Document Revision
Document No
No Phase Type Typee #

E S E P ━ C S C ━ S 3 ━ W D ━ T E C ━ E W ━ C S 1 ━ 3 0 3 8 0 0
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

CONTENTS

Page

Section

1.0 Introduction and General Information 1

2.0 Equipment & Tools 1

3.0 Materials 1-2


2017.11.1
00 Tie Weiwei Ji Jianhui Cai Lei First Submission
5
4.0 Construction Method and Procedures 2-4
Audited
Revision Validation
Date prepared by Quality Description
# 5.0 Safety Management Chief
and Control Engineer 4
Manager

6.0 Environmental Protection 4-5

7.0 Quality Control 5

8.0 Appendix A 6-7

Appendix B 8-9

Appendix C 10-11
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

1.0 Introduction and General Information

This method statement provides the detail of the


materials, equipment, procedures and relevant
documentations related to tree and shrub planting &
planting vines according to contract documents,
design drawings, technical specification, ICTAD and
any other necessary documents. Also included here
are the quality control verifications, safety &
environmental precautions to be implemented during
the work and measurement verifications.

1.1 Location of Work


The location for tree and shrub planting will be all centre median of the expressway
except super elevated section.Planting vines will be carried out at the slope of rock
blasting area.

1.2 Specifications and Drawings


Tree and shrub planting will be carried out in accordance with TS Section 654 as reflected
in project specifications, Top soil will be carried out as mentioned in TS 651. Vines
planting will comply with TS Section 653. Drawings prepared by the Contractor and
approved by the Engineer shall be applicable for the centre median as necessary.

2.0 Equipment & Tools

The major equipment used for planting tree and shrub & planting vines includes, but are not
limited to the following.

 Construction Tools & Accessories


 Gardening Tools
 Water Truck
 Dump Truck
 Excavator
 Other minor tools

3.0 Materials

The major materials to be used for planting tree and shrub & planting vines include, but are
not limited to the following:
 Top Soil

1
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

 Water
 Trees and Shrubs
 Vines
4.0 Construction Method and Procedures

The method & procedure for tree and shrub planting


& planting vines follow the steps below. A flowchart
is also provided in Appendix A & B.

4.1 Top Soil Placing

4.1.1 Top soil materials shall be hauled to the


construction area which is approved by Engineers. Laying of top soil shall be commenced
when the centre median is reasonably close to the lines shown on the drawings or
instructed by the Engineer.

4.1.2 Top soil shall be carefully spread to cover the areas ensuring the depth requirement
of technical specification and design drawings.

4.1.3 After spreading the soil, all deleterious materials (large lumps or clods, litters, or
other foreign materials and stones exceeding 75 mm in any dimension) shall be raked up
and removed from site.

4.2 Tree and Shrub Planting

4.2.1 Trees and shrubs shall conform to the requirements of 715.35. The trees and shrubs
shall be true to the type and size indicated on the Drawings." Duranta Erecta Sheena ' s
Gold (Golden Duranta)" shall be used as the Center- Median shrubs.Shrubs planting shall
be in the space of 3 meter.

2
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

4.2.2 Notify the Engineer in advance of digging or shipping of plants from the nursery or
collecting source. All plants will be subject to inspection where growing in the nurseries
or collecting areas.

4.2.3 All plants shall be dug carefully, retaining essential roots and avoiding mechanical
damage to root systems. All plants shall arrive with their roots in a moist and healthy
condition.

4.2.4 All such plants shall be so dug and transported as to provide and retain a firm ball of
earth. All balled and all bare-root material shall be adequately protected.

4.2.5 The depth of the hole shall extend 200mm below the depth of the rootball. When
holes present a hazard along the highway, they should be dug immediately prior to
planting.

4.2.6 Planting holes for container grown plants shall be dug to the size required for the
equivalent balled and burlapped plants.

4.2.7 All backfill for planting shall use topsoil.

4.2.8 All balled plants shall be planted so the top of the ball is slightly above the natural
ground level to allow for normal settlement unless otherwise specified on the Drawings.
When planting beds, the individual plants shall be selected and arranged according to
spread and height to present a uniform appearance.

4.2.9 Bare-rooted plants shall be placed in the planting holes with the roots spread out in a
natural position while the specified backfill is placed. Non-plantable containers shall be
carefully removed from all container grown or potted plants immediately prior to
planting.
3
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

4.2.10 Sufficient amounts of water, without


puddling, shall be used in the process of planting
to settle the backfill material around the roots or
ball. Additional backfill material shall be placed
and further compaction accomplished by
tamping.

4.2.11 After the planting has been completed, all


planting sites shall be cleaned up. Subsoil, rock,
excess topsoil, and other waste material shall be
removed and disposed of as directed.

4.2.12 All holes dug and not used, or areas disturbed in attempting to find a suitable
planting site, shall be refilled, and the area shall be restored to its original condition and
reseeded.

4.2.13 Maintain the plants in a healthy, living condition during the life of the Contract,
which includes any warranty period indicated in the Contract, and shall maintain an
adequate supply of moisture in the root zone at all times.

4.2.14 When moisture in the root zone is deficient, watering shall be started within 48
hours with sufficient labour and equipment to completely water all the plants within a
two-week period unless otherwise directed by the Engineer.

4.2.15 All maintenance shall be completed according to the program for final acceptance
of the Contract.

4.3 Planting of Vines

4.3.1 The method of planting vine will be determined to a great extent by the site
conditions, namely soil, slope, and type of cover.Methods of planting shall be done as
shown on the Drawings. The nominal number of plants per square metre shall be fifty .

4.3.2 Row Planting--On areas covered with grass or weed mass, the equivalent of a
square 300mm on a side of sod including roots shall be removed and replaced on the
lower side of the plant hole to help retain moisture runoff.

4.3.3 Plant backfill for vines shall be topsoil. For plants in containers or pots 75mm size
or less, the backfill shall be applied at the rate of one half litre per plant. For plants in
larger containers, the planting specifications will be as shown on the Drawings.

4
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

4.3.4 The Contractor shall maintain the plants in


a healthy, living condition during the life of the
contract, and shall maintain an adequate supply
of moisture in the root zone at all times.

5.0 Safety Management and Control

Though this operation does not involve a complex


work, extreme safety measures have to be adapted as
well to protect the workers and resources prior to the
commencement of work
 A tool box talk meeting will be conducted
prior to any work commencing to advise all
workers of the correct and safety procedures that must be observed and undertaken
whilst carrying out the operation.

 The physical conditions of the working crews, especially those who will spread top
soil should also be physically fit, healthy and alert.

 Suitable personal protective equipment (PPE) shall be worn by workers at all times
when working, such as safety shoes, hardhat, gloves, safety belt, etc. as required.

 All embankment will be checked and assured stable prior to allowing workers to
proceed with the work.

 Regular maintenance and cleaning of the pilot road will be undertaken to ensure it is
kept free of top soil spill over from trucks.

6.0 Environmental Protection

To ensure proper care of the environment in general and the community in particular, the
following shall be observed at all times during construction:
 Reasonable precautions shall be taken to avoid injury to existing plant growth,
structures and roadway surface.

 No trees, shrubs or plants outside of the road limit shall be cut, damage or uprooted
during top soil loading and transporting, top soil placing, tree and shrub plants laying
and growth maintenance.

 Water shall be properly diverted to natural drains and prevent them from flowing to
rice paddies and other plantations.

 Gathered large lumps or clods, branches, litters, or other foreign materials and stones
shall be properly disposed to approved permanent disposal areas.
5
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

 No oil, lubricants and other petroleum


products shall be allowed to drip or flow
outside the right of way into streams, creeks
and other natural drains of the environment
by sitting them inside a binding box or
similar protective equipment.

7.0 Quality Control

Finished product protection measures will be carried


out by pavement subcontractor, most of the centre
median works will be finished before the asphalt
works. When place the top soil on the pavement necessary measures will be applied by
pavement subcontractor.
A standard set of formats for all required records will be used and the list of these formats is a
ttached here for reference as " Appendix C ".

Appendix A: 6
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

Flow chart for


trees and
shrubs

7
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

Appendix
B:
Flow chart for vines
planting

8
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

Appendix C:
Inspection
check form

12
CHINA STATE CONSTRUCTION ENGINEERING
CORPORATION LTD. Extension of Southern Expressway
from Wetiya to Andarawewa

Appendix D:
Check list for
greeny works

12