Appendix A

FLOW CHART FOR TREES & SHRUBS

Start

Get approval of planting material from


engineer

Notify the engineer in advance of digging or shipping


of plants from nursery or collecting source

Transport plants as to provide and


retain a firm ball of earth

Dig planting holes which shall extend


200mm below the depth of rootball

Backfill for planting and


present a uniform appearance

Joint inspection with engineers to


check the quality of planting

Supply enough water

Clean up planting sites

Maintenance