Kemang Residence DAILY REPORT

Project Number : Reff. Number 087


Client : PT. Indika Inti Property Issued Date 7/11/2017
CM Consultant : PT. TeamworX Indonesia Day Nr. 102 day(s)
Contractor : PT. Japa Melindo Pratama Remain. Day 626 day(s)
No. Work Description Weather Condition
07.00 - 08.00
Pasang pipa tegak kamar room 1 lt dasar 08.00 - 09.00
marking titik stop kontak 09.00 - 10.00
bobok titik stop kontak lt dasar 10.00 - 11.00
sparingan pipa air hujan 11.00 - 12.00
12.00 - 13.00
13.00 - 14.00
14.00 - 15.00
15.00 - 16.00
16.00 - 17.00
17.00 - 18.00
18.00 - 19.00
19.00 - 20.00
20.00 - 21.00
21.00 - 22.00
22.00 - 23.00
23.00 - 24.00
MANPOWER MATERIAL
Working Hour(s)
No. Description No. Description Qty Unit
08.00 - 18.00 > 18.00
1 Project Manager 1
2 Site Manager meteran
3 Project Engineer pipa clipsal
4 General Affair sock
5 Secretary 1 pipa pvc
6 Account/Finance sock pvc
7 Safety Officer klaem clipsal
8 QA/QC kapur warna
9 Proc./Logistic
10 Electric/Mechanic
11 Supervisor
12 Surveyor EQUIPMENT
13 Drafter
Foreman 1 No. Type Qty Unit
14
15 Lead hand
16 Rebar pompa sumpit
17 Carpenter bioteg
18 Masonry pipa pvc
19 Steel Structure pipa clipsal
20 Welder/Fitter sock
21 M/E Skill klem
22 Helper
23 Operator SAFETY CONDITION
24 Driver Total Manhour(s) 6896 hour(s)
25 Security Lost of Injury Time 0 hour(s)
26 Other Total Accident 0 case(s)
3 Total Incident 0 case(s)
Approved by. ISSUED BY
PT. TeamworX Indonesia PT. Japa Melindo Pratama
0000FFTeamworX
Armudin Suhardi
QF-CM-129 Rev.00 *Note : S = sunny day, C = cloudy, R = rainy