BILL NO. 1: GENERAL PROVISIONS
1.29 16.02 Overhaul on material hauled in excess of 10km (ordinary overhaul) m3-km 4,320.00 -
-
Construct speed humps for the safety of road users as instructed by
16.03 m3 0.80 -
the Engineer
-
1.30 17.01 Clearing and grubbing ha 0.80 -
-
Page 2 of 10
BILL No. 2: DRAINAGE
Access Road to ECZ Warehouse along Great East Road
ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT
NO REFERS (ZMK)
2100 DRAINS
21.01 Excavation for open drains
(a) Excavating soft material situated within the following depth ranges below the
surface level:
2.1 (i) 0 m up to 1,5 m (Provisional) cu.m 288.00 -
-
-
-
B2200 PREFABRICATED CULVERTS -
-
Provide and lay new pipe culverts with concrete bedding and surround and build
B22.01 -
headwalls complete with inlet and outlet structures as shown on the drawings for:
2.7 a 600 No 12.00 -
23.08 Cast insitu concrete lining (class 25 type of concrete) cu.m 144.00 -
-
-
-
-
Page 3 of 10
BILL NO. 3: EARTHWORKS AND PAVEMENT LAYERS OF GRAVEL OR CRUSHED STONE
Page 4 of 10
BILL No. 4: ASPHALT PAVEMENTS AND SEALS
Extra over item 41.01 for applying the prime coat in areas
4.2 41.03 litre Rate only -
accessible only to hand held equipment
Page 5 of 10
BILL NO. 5: ANCILLARY ROADWORKS
Page 6 of 10
BILL NO. 7: TESTING AND QUALITY CONTROL
Page 7 of 10
BILL.8: DAYWORKS
8100 LABOUR
61,687.50
8.9 81.09 Sub - total of dayworks bill for labour
8.10 81.10 Allow for contractor's overhead and profit for item 8. % 10 6,168.75
8200 MATERIALS
650,212.50
8.25 82.15 Sub - total of dayworks bill for materials
8.26 82.16 Allow for contractor's overhead and profit for item 8 % 10 65,021.25
Page 8 of 10
BILL.8: PAYMENT DAYWORKS
REFERS
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
ZMK ZMK
8.27 83.01 D12 Dozer or equivalent with ripper and scrapper. hr 60 630.00 37,800.00
8.28 83.02 CAT 14 motor grader or equivalent (compl. W/ scarifihr 75 630.00 47,250.00
8.30 83.04 Wheel or crawler loader 2.70 cu.m capacity hr 45 420.00 18,900.00
8.53 83.25 Water pump with 100mm dia delivery pipe. hr 45 157.50 7,087.50
8.55 83.27 Sub - total of dayworks bill for plant & equipment 336,656.25
8.56 83.28 Allow for contractor's overhead and profit for item 8. % 10 33,665.63
Page 9 of 10
BILL.8: DAYWORKS
Page 10 of 10