You are on page 1of 3

Attachment # 7 FILED

2018 Feb-21 PM 05:09


*Construction Projects/Professional Services (November 28, 2017) U.S. DISTRICT COURT
N.D. OF ALABAMA

Project Name Description of Project Architect Phase Geo-Tech Surveying


(New Schools)

Eastern Area School (670)  Re-zone Grayson Valley Turner- 1 Bhate Sain Associates
students to new school Batson
1. 19,300,000  Re-zone 400 current Chalkville
2. 550,000 Land Elem students to new school
Greenwood Elementary  Replace school on different site CWA 1 Bhate Gonzalez-
(700)  Rezoning parts of MES zone for Strength
1. 20,500,000 new school. (Rezone 400
2. 475,824 Land students)
North Highland Elementary  Replace school on different site Davis 2 Bhate Sain Associates
(650)  Possible K-2 school
1. 20,000,000  Rezone 2 schools into same
2. (Old HHS Site) zone
Hueytown Elementary School  Replace school on different site Lathan 2 Bhate Sain Associates
(650)  Possible 3-5 school
1. 19,000,000  Rezone 2 schools into same
2. (Current HES Site) zone
Fultondale High School  New 7-12 high school McKee 3 Terracon Sain Associates
600
1. 30,500,000
2. Land -----?
3. Athletic Package--6 million
4. Field House—2 million
38,500,000
New Minor area Elementary  Combine Crumly Chapel and Davis 1 Terracon Gonzalez-
(650) Hillview elementary schools Strength
1. 20,000,000 onto one site.
2. 275,000
New Warrior Elementary  Rezone 200 students from Bryan Studio 2H 1A Terracon Gonzalez-
(650) Elementary to new warrior sch. Design Strength
1. 20,000,000
2. 649,000
Proposed School Additions & Scope of Work Architect Phase Geo-Tech Surveying
Renovations
Irondale Community School  10 classroom addition Turner-Batson 1 Terracon NA
4,000,000

New MS—IB School  Demo of buildings McKee 3 NA NA


(Old Fultondale High School)  Remodel building
4,000,000

Erwin Middle School  Demo of buildings Lathan 1 Bhate Gonzalez-


 Remodel buildings Strength
15,000,000  New Gym
 Athletic Fields
Pinson Valley HS  Softball Field Lathan 2 Bhate NA
2,000,000  Turf football field
 Additional parking spaces
Rudd Middle School  Building Renovations Khafra 2 NA NA
10,000,000  Classroom additions

Shades Valley HS  Career Tech Addition Studio 2H 2 Terracon NA


4,000,000 Design

Hueytown Middle School  Building Renovations GMC 2 Bhate NA


10,000,000  Classroom additions

Grantswood Elementary  10 classroom addition Turner-Batson 1 Terracon Sain Associates


School  New Lunchroom
 HVAC upgrade
10,000,000  Playground addition
 Renovations within old building
Snow Rogers Elementary  10 classroom addition Davis 3 Bhate Sain Associates
 Renovate lunchroom space
4,000,000
Erwin Intermediate  4 classroom addition Lathan 2 Bhate Gonzalez-
 New Gym Strength
4,000,000

You might also like