Professional Documents
Culture Documents
ABSTRACT ESTIMATE
Sub Est. Amt. Rs. 3713626
1 Earth work excavation including removal and satisfactory disposal of all materials
necessary for the construction of roadway in accordance with specification and the
lines grades and cross section shown in the drawings or as directed by the Engineer in
charge(Box Cutting) as per MORT&H - V Clause 111 , 112 , 202 , 301 , 302 , 303 ,
305 & 900.
2 Providing and laying Granuler Sub base (GSB Gr - V) layer of required thickness on
the prepared sub grade with approved material having a minimum CBR value of 30
and grading conforming to Table 400-1 of MOST spreading in uniform layer, watering,
premixing and compacting at optimum moisture content with power rollers of 80-100
KN static weight to not less than 98% of the laboratory dry density as per IS 2720
(para 8) and fine dressing to the required grade and cross slopes as shown in the
drawing or as directed by the Engineer, as per Clause 401 of MORT&H - V revision.
4 Providing and applying of Primer coat using SS - 1 Bituminous Emulsion at the rate of
7.00 Kg per 10 Sqm over the WMM surface including clearing of road surface and
spraying as per Clause 502 of MORT&H - V revision and directed by the Engineer.
8 Earthwork Excavation for making-up berms using available cut earth in accordance
with the specifications and the lines, grades and cross sections shown in the drawings
or as indicated by the Engineer for spreading, sectioning and rolling with power roller
to achieve required compaction and including all other incidental charges etc.,
complete.
1 Earth work excavation including removal and satisfactory disposal of all materials
necessary for the construction of roadway in accordance with specification and the lines
grades and cross section shown in the drawings or as directed by the Engineer in charge
(Box Cutting) as per MORT&H - V Clause 111, 112, 202, 301, 302, 303, 305 & 900.
2 Providing and laying Granuler Sub base (GSB Gr - V) layer of required thickness on the
prepared sub grade with approved material having a minimum CBR value of 30 and
grading conforming to Table 400-1 of MOST spreading in uniform layer, watering, premixing
and compacting at optimum moisture content with power rollers of 80-100 KN static weight
to not less than 98% of the laboratory dry density as per IS 2720 (para 8) and fine dressing
to the required grade and cross slopes as shown in the drawing or as directed by the
Engineer, as per Clause 401 of MORT&H - V revision.
4 Providing and applying of Primer coat using SS - 1 Bituminous Emulsion at the rate of 7.00
Kg per 10 Sqm over the WMM surface including clearing of road surface and spraying as
per Clause 502 of MORT&H - V revision and directed by the Engineer.
5 Providing and applying of Tack coat using RS - 1 Bitumin Emulsion at the rate of 2.50 Kg
per 10 Sqm over the primed surface including clearing of road surface and spraying as per
Clause 503 of MORT&H - V revision and directed by the Engineer.
8 Earthwork Excavation for making-up berms using available cut earth in accordance with the
specifications and the lines, grades and cross sections shown in the drawings or as
indicated by the Engineer for spreading, sectioning and rolling with power roller to achieve
required compaction and including all other incidental charges etc., complete.