Professional Documents
Culture Documents
CALCULATION SHEET
DATA
Room Floor Area = 380 m²
Ceiling Height = 3.00 m
Room Volume = 1,140.00 m³
No. of Persons ( Previous data ) = 32 persons
Required Air Flow/person = 25 CMH / person
Pressurization Rate = 1.5 times/hr
Prod. Machine Load ( Total ) = 60 kW (GIVEN-TI)
Area -1 ( assumed) = 30 kW x 0.30 =
Area -2 ( oven 30KW) = 30 kW x 0.50 =
Design Prod. Machine Load = 24.0 kW - - - - - - - 6.82528
Process Exhaust Volume ( OVEN ) = 400 CMH
Equipment Load Factor ( as per observation) = 0.30
Sensible Heat/person = 65 kcal / hr-person
Latent Heat/person = 105 kcal / hr-person
Room Load/area = 40 kcal / hr-m²
Lighting Load = 20 kcal / hr-m²
COMPUTATION
1. ) OA REQUIRED
a.) Required Ventilation for people ( OA Vent )
CMH
OAP = 25 x 32 Persons
person
times
OAPRES = 1,140 m³ x 1.5
hr
IF OAC(MAU) IS REQUIRED
SPECIFY :
1 UNIT - 10 TR ( 30240 KCAL/HR) OAC UNIT ALL FRESH AIR
2110 CMH X 80mmAq
3 phase , 220V, 60 Hz , 2.0 Kw
860 kcal/hr
QE = 24 kW x x 1.00
1 kW
kcal/hr
QP = 65 x 32 Persons
person
kcal/hr
QR = 40 x 380 m²
m²
kcal/hr
QL = 20 x 380 m²
m²
kcal/hr
QLH = 105 x 32 Persons
person
NAME OF COMPANY
CALCULATION SHEET
SHF = 0.93
45,520 kcal/hr
SA =
1.2 kg/m³ ( 0.24 kcal/kg-˚C) ( 9.5
near ok
RA = SA - OA Volume
At 25˚C db (28.8°C wb) & 78% RH Outside Air Condition and 25C+/-2˚C (55%RH)+/-10% Ro
hsA = 10.30 kcal/kg tsA = 16.0
hRM = 12.6 kcal/kg tRM = 25.0
TMIX = 23.87 °C db °F db
1 TR
QC = 46,534 kcal/hr x
3,024 kcal/hr
QC
= 15.4 TR Say, 16 TR
NAME OF COMPANY
CALCULATION SHEET
F R E S H A I R F R E S H A I R
NAME OF COMPANY
CALCULATION SHEET
16,781 CMH
AC =
1,140.0 m³
11.) SUPPLY AIR VOLUME BASED ON RECOMMENDED AIR CHANGE AT NON STD-CLEANROOM
SA = Room Volume x Recommended Air Change
AC = times/hr
SA = m³ x 0 times/hr
SA = 0 CMH
SA
Air Volume / HEPA Unit =
No. of HEPA filter
summary
1 unit AHU-1
Air Handling Unit Chilled Water Type
Horizontal Draw Thru Type w/ Plenum Box & Medium Filter-90%
16 TR ( 48,384
Air Flow: 16,781 CMH
(CFM )
Electrical Supply:
1 unit OAC-
Air Handling Unit Chilled Water Type
Horizontal Draw Thru Type w/ Plenum Box & Medium Filter-90%
10 TR ( 30,637 kcal / hr }
Air Flow: 2,110 CMH X 90 mmAq ESP
Electrical Supply: Kw x V
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
DESIGN CONDITION
Outdoor Temperature: 35.0 ˚C db / 28.8°C wb
Outdoor Relative Humidity: 64 %
Outdoor Enthalpy hOA = 22.4 Kcal / Kg -da
No.:
Date:
Calculated by :
100K
Checked by :
1,710 CMH
12.6
) Kcal/kg-da
s the load required to cool the Outdoor air and to be added on the total
heat load.
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
x Load Factor
No.:
Date:
Calculated by :
100K
Checked by :
This is the SENSIBLE heat load within the prod room required to
maintain room at desired temp.
This is the SENSIBLE heat load from lighting required to maintain the
room at desired temp.
This is the TOTAL ROOM sensible heat load required to maintain the room
at desired temp in additiion to the OA Load & latent heat load.
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
This is the LATENT heat load from PERSON required to maintain the
room at desired temp.
This is the TOTAL (sensible & latent ) heat load required to maintain the
room at desired temp that will be added to the Outdoor Air Heat Load.
ΔT = 25.0 ˚C - 15.5 ˚C
ΔT = 9.5 ˚C
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
˚C)
No.:
Date:
Calculated by :
100K
Checked by :
°C db x 14,671 CMH )
F= 0.93
No.:
Date:
Calculated by :
100K
Checked by :
R CONDITIONING SYSTEM :
F R E S H A I R F R E S H A I R
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
Note (b) :
Chilled water supply should be set at 6.5°C or 7.0°C
to meet the desire Room Temperature of 21°C +/- 3.
Note (c) :
Liebert AHU(60 TR ) should be set Temp at 70°C and
modulating valve at 50% opening.
Note (d) :
100K Room- RH is controlled by Humidistat thru the AHU ( 30 TR ) via
modulating valve . RH ranged from min 44% and max of 56%
LEANROOM
NOT APPLICABLE
0 CMH
= = 0 CMH
2
PANY
ON SHEET
No.:
Date:
Calculated by :
100K
Checked by :
q ESP
3 Ø 60 Hz