GS Associates

GEO-TECH ENGINEERING DIVISION


To
Mr. HANUMANT DHAWARE,
Patil Construction & Infrastructe Ltd.,
2 & 3rd Floor, PMPML Commercial building No.1,
Opp. Income tax building, Shankarsheth Road, Swarget, Pune - 411042
Cont.No. 020 24479626, 24479978 / 79 / 80

Ref: Through Mobile Conversation to Mr. Madhav Shingare


Sir
Sub: Submission of quotation for following works to be done in EPC Mode Road Project in Maharastra.

COST FOR THE WORK OF FOLLOWING ITEMS COVERED IN EPC MODE PROJECT IN MAHARASTRA

Rates in
Sl.N Probable Description of work Unit in
Amount
o Quantity words
Figures

Reconnaissance Survey, Site


One Kilo
1 100 Km Verifications and Taking Topo Survey 12,600 12,60,000
Metre
using Total station instrument.

Fixing TBM & PBM and Marking centre


One Kilo
2 100 Km line for Existing & Re Alignment 9,700 9,70,000
Metre
Portion

Preparation of Longitudinal Section,


Cross Section. Design Horizontal Curve One Kilo
3 100 Km 15,000 15,00,000
and Vertical Curve as per MORTH Metre
standards

Preparation of Culvert Drawings


Junction Improvements Drawings & Bus One Kilo
4 100 Km 4,900 4,90,000
Lay Bay Drawings as per MORTH Metre
standards

Preparation of GAD for Retaining Wall


5 100 Km & Side Drains Drawings as per MORTH 1,10,000 LS 1,10,000
standards

GS Associates
gsassociatescbe@gmail.com 3/1-B, T.Balan Nagar, Kavundampalayam, Coimbatore- 641 030
Preparation of GAD & Design of Sub
Structure & Super Structure for Minor
Bridges (Bridge Length up to 30m
Length) as per MORTH standards
6 20 Nos 45,000 1 No 9,00,000
(Including Water Way Calculation &
Sub Soil Inestigation for Foundation)
Submision all Stuctural Drawings for
Execution

Preparation of GAD & Design of sub


Structure & Super Structure for Major
Bridges (Bridge Length above 30m) as
7 2 Nos per MORTH standards (Including Water 8,25,000 1 No 16,50,000
Way Calculation & Sub Soil Inestigation
for Foundation) .Submision all Stuctural
Drawings for Execution

Soil Sample collection from Trial Pit


1mx1mx1m and conducting
One Trial
8 200 Trial Pits FDD,Moisture Content, atterberg limits, 5,000 10,00,000
Pit
CBR test and other regular tests for
road work as per MORTH Specification

Preparation of BBD Test Analysis


One
9 100 Location Report for the Overlay design as per 3,000 3,00,000
Location
IRC- 81 [Only Report Preparation]
Preparation of Axle Load Survey Report
10 100 Km 75,000 LS 75,000
[Only Report Preparation]

Drawing works and plotting, printing


11 3 Sets and Binding for L.S.C.S Detailed 20,000 Set 60,000
drawings for Road Works and CD Works

Submission of Soil Test Report in


12 3 Sets Complete shape with MORT & H and all 7,000 Set 21,000
related IRC Codes
Total Amount 83,36,000

Service Tax 15% 12,50,400

Grand Total 95,86,400


Rupees Ninety Five Lakhs Eighty Six Thousand and Four Hundred Only

GS Associates
gsassociatescbe@gmail.com 3/1-B, T.Balan Nagar, Kavundampalayam, Coimbatore- 641 030
Note :
1. Design Approval from concern authority for this work is your scope.
2. Toll Plaza Design not included this rate .
3. Minor Bridges & Major Bridges based on this project only.
4. For BBD and Axle Load Survey Rate is only for Report Preparation.
5. Arrange Accomadation facilities to Field Staff.
Payment Terms :
1. 50 % Advance to be paid along with work order.
2. 30 % after Completion of Site Work.
3. Balance 20 % payment to be paid on the submission of Report.
Time Schedule :
1. Commencement of Work within 15 days from the date of Receipt of Work order.
2. Completion of field work within 45 days from the date of Receipt of Work order.
3. Submission of report within 20 days from the date of completion of field works.
Bank Details
GS Associates
Current A/c No: 33503742787
Bank : State Bank of India
Branch: Saibaba Colony, Coimbatore.
IFS Code: SBIN0004792
For GS Associates
Sd/--------------------------
P.Rajendran
(91) - 9840073732
Project Co ordinator

GS Associates