(1) The document identifies hazards, assesses risks, and determines controls for aluminum glazing and glass works. Hazards include being struck by moving vehicles, improper lifting, slips/falls, falls from heights above 2 meters, and contact with sharp objects.
(2) For each hazard, the document rates the probability and severity of potential risks, then determines the risk level. It also lists current and recommended control measures, and assigns responsibilities to project managers, site managers, and other roles.
(3) Control measures include traffic control, proper lifting techniques, supervised material storage, safety catch nets, toe boards, training, and personal protective equipment for all involved workers. Responsibilities are delegated to ensure
(1) The document identifies hazards, assesses risks, and determines controls for aluminum glazing and glass works. Hazards include being struck by moving vehicles, improper lifting, slips/falls, falls from heights above 2 meters, and contact with sharp objects.
(2) For each hazard, the document rates the probability and severity of potential risks, then determines the risk level. It also lists current and recommended control measures, and assigns responsibilities to project managers, site managers, and other roles.
(3) Control measures include traffic control, proper lifting techniques, supervised material storage, safety catch nets, toe boards, training, and personal protective equipment for all involved workers. Responsibilities are delegated to ensure
(1) The document identifies hazards, assesses risks, and determines controls for aluminum glazing and glass works. Hazards include being struck by moving vehicles, improper lifting, slips/falls, falls from heights above 2 meters, and contact with sharp objects.
(2) For each hazard, the document rates the probability and severity of potential risks, then determines the risk level. It also lists current and recommended control measures, and assigns responsibilities to project managers, site managers, and other roles.
(3) Control measures include traffic control, proper lifting techniques, supervised material storage, safety catch nets, toe boards, training, and personal protective equipment for all involved workers. Responsibilities are delegated to ensure
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.
Rev. No.:________ Project / Location: Name of Job: Prepared By: Reviewed By: R4 / BBR111, Bandar Bukit Raja 2, 18. Aluminum Glazing & Glass Works Klang, Selangor. Date: Date:
18. Aluminum Glazing & Glass Works
HAZARD IDENTIFICATION RISK ASSESSMENT Current Control Measures / Responsibility No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation
Mechanical (4) To control lorries speeding at site. (max.15km/h)
-Minor injury (5) Workers stay away from moving vehicle / lorry. Struck by moving part of 2 3 6 -Damage to property - Traffic controlled by designated person. Delivery of Material vehicle. (lorry) (6) To provide appropriate PPE. Project Manager 1 Loading and Site Manager unloading material Physical ( Ergonomic ) (5) Manual handling / lifting should be carry out with Spine injury - Improper method -Negligible injury 2 3 6 correct method. Site Agent of handling (6) To provide appropriate PPE. Site Engineer Site Supervisor Physical (5) Supervised by designated person during stacking of material. SHO / SSS Stacking / Storing Slip / fall / collapse of material 2 -Serious injury 2 4 8 - To ensure material not obstruct any access / walkway. EO Material at site / store due to poor material - Proper storage of material. arrangement. (6) To provide appropriate PPE. Scaffolder Work Leader (4) Proper working platform for workers. Machinery opr/ Physical -Serious injury 2 4 8 (5) Scaffolding erecting by experience workers. Workers slip and fall. (6) To provide appropriate PPE. Driver Signalman Installation & (4) Erection of barricade. Physical - Installation of safety catch net. Banksman cleaning works more 3 Fall of object from upper -Serious injury 2 4 8 - Erect safe access with overhead protection. Rigger than 2 meter from - Installation of toe board / debris net at scaffolds. level. ground / slab (6) To provide appropriate PPE. Welder Workers Physical (5) Training for workers use PPE. Body contact with sharp -Serious injury 2 4 8 (6) To provide appropriate PPE. edges / object.