1 Hanger Suspension Support System
a) Setting out is correct
b) Material used is correct
c) Material is free from damage and defects
d) Hanger Spacing
e) Hanger fixture secured
f) Installation is correct as per approved drawings
5 Mechanical Items
Provisions have been made for the correct locations and openings for Mechanical Items
(as per Approved For Construction Drawings)
If there are any mechanical, electri
6 Electrical Items plumbing items, additional inspecti
Provisions have been made for the correct locations and openings for Electrical Items (as “Inspection Checklist for Ceiling W
per Approved For Construction Drawings) Mechanical & Electrical Openings
Items”) is necessary. Attach this.
7 Plumbing Items
Provisions have been made for the correct locations and openings for Mechanical Items
(as per Approved For Construction Drawings)
Signature
Name
Position
Company