You are on page 1of 3

PR1MA @ SITIAWAN

INSPECTION CHECKLIST FOR CEILING WORKS

Project :

Location :
No Items To Be Checked Status * Remarks
1 Hanger Suspension Support System
a) Setting out is correct
b) Material used is correct
c) Material is free from damage and defects
d) Hanger Spacing
e) Hanger fixture secured
f) Installation is correct as per approved drawings

3 Installation of Ceiling Boards


a) Type of board is correct
a) Thickness of board is correct
b) Installation is proper as per approved drawings
c) Installed ceiling is firm and secure
g) Surface to receive paint (where required) is acceptable
h) General appearance is acceptable Remarks

5 Mechanical Items
 Provisions have been made for the correct locations and openings for Mechanical Items
(as per Approved For Construction Drawings)
If there are any mechanical, electri
6 Electrical Items plumbing items, additional inspecti
 Provisions have been made for the correct locations and openings for Electrical Items (as “Inspection Checklist for Ceiling W
per Approved For Construction Drawings) Mechanical & Electrical Openings
Items”) is necessary. Attach this.
7 Plumbing Items
 Provisions have been made for the correct locations and openings for Mechanical Items
(as per Approved For Construction Drawings)

Submitted By Inspected By Approved By


CONTRACTOR CONSULTANT CONSULTANT

Signature

Name
Position
Company
Date
REF No:

Remarks

If there are any mechanical, electrical and/or


plumbing items, additional inspection using the
“Inspection Checklist for Ceiling Works (For
Mechanical & Electrical Openings / Sleeves / Cast-In
Items”) is necessary. Attach this.

Approved By
CONSULTANT
* Status Of Inspection:  Acceptable ,   ot Acceptable, -  ot Applicable ^ Where required