You are on page 1of 179

Water Supply Flow Diagram

of Urban Local Bodies


(Based on Year 2008-09)

1
Ahmedabad - Water Supply Flow Diagram (Municipal Corporation)
Narmada Canal

Kotarpur WTP Jaspur WTP


5 no. of French wells French well
6500 2750
LL/Day
Western Main Eastern Main LL/Day
Central Main

No. of WDS-21 No. of WDS-62


800 No. of WDS-33
LL/Day
Dudheshwa WTP
West zone North zone
19 East zone South zone North zone
2 20 26 16

No. of WDS-6

WATER LOSS
Water Production at Source: 9254.21 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 6388.00 Lac Litres/Day
Estimated Total Loss: 2866.21 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
2 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhavnagar - Water Supply Flow Diagram (Municipal Corporation)
Shetrunji
Mahi Pipe (Narmada Water)
Dam

Gaurishankar
Khodiyar Lake
Lake

400 150 180


LL/Day LL/Day LL/Day
Neelambaug Chitra
Thaktheswar

Dilbhar WDS
Thaktheswar WDS Neelambaug WDS Chitra WDS
22 LL Sump+ESR
319 LL Sump+ESR 40 LL Sump+ESR 36 LL Sump+ESR

WATER LOSS
Water Production at Source: 875.00 Lac Litres/Day
Average daily quantity of water supplied: 859 .00 Lac Litres/Day
Direct Pumping (5 Lac Liters water drawn from ground) Water Estimated consumption quantity: 514.80 Lac Litres/Day
Estimated Total Loss: 360.20 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
3 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhuj - Water Supply Flow Diagram (Class-B)
WATER LOSS
Narmada Canal 8 No.of Tubewell Water Production at Source: 181.50 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 154.00 Lac Litres/Day
280 Estimated Total Loss: 27.50 Lac Litres/Day
75
LL/Day 75
Bhujia Sump
GWSSB
Bhujia HGLR-1 WDS

30

23 No.of Tubewell 9
Madhapar Sump WDS 30

20
7.5
Bhujia HGLR-2 WDS
Patwadi Sump WDS
70
8
Bhujia HGLR-3 WDS
10
10 12

10

Shivkrupa HGLR WDS


Rawalwadi HGLR WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
4 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chanasma - Water Supply Flow Diagram (Class-D)
Narmada Canal

Narmada Sump

GWSSB
Goga WDS
Civil Bore

Civil WDS

Bhadariya WDS
Kotawadiya Bore
Mochi Kuva Bore

Kotawadiya WDS Indiranagar WDS

Mochi Kuva WDS


WATER LOSS
Water Production at Source: 37.70 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 22.60 Lac Litres/Day
Estimated Total Loss: 15.10 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
5 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Deesa - Water Supply Flow Diagram (Class-B)
Gawadi Bore
Regiment Bore
WDS

2.5
Indira Nagar Bore
Nehru Nagar Bore WDS
15 LL Indira Nagar Sump +ESR
12.5 LL Sump +ESR

Rishala Bore
Rajpur Bore WDS

Dantiwala colony Bore


10
5 Garden Tank Bore
Railway Station Bore WDS
12.5 LL Sump +ESR
10.63
SCW High School Bore WDS

Direct Pumping at 3 WDS: Garden Tank ESR


Shiv Nagar Bore, Sadar Bazar Bore,
, Kailash Nagar Bore

WATER LOSS Kachhi Colony Bore WDS


Water Production at Source: 112.30 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 85.30 Lac Litres/Day
Estimated Total Loss: 27.00 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
6 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dhandhuka - Water Supply Diagram (Class-C)
Narmada Canal

GWSSB

Maltan Kuva
3
2
3 5

Punit Baug well


Tower Chowk WDS

Punit Baug WDS

WATER LOSS
Water Production at Source: 339.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 265.00 Lac Litres/Day
Estimated Total Loss: 74.00 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
7 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dhrol - Water Supply Diagram (Class-D)
Narmada Canal

Ajee-III
Dam

GWSSB

WATER LOSS
Water Production at Source: 39.60 Lac Litres/Day
Padthari WDS
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 34.00 Lac Litres/Day
Estimated Total Loss: 5.60 Lac Litres/Day
Main Sourse WDS
Manokamana WDS 9.5 LL Sump+ESR

Bagicha WDS Darbargadh WDS


4 LL Sump+ESR 5 LL Sump+ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
8 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jasdan - Water Supply Diagram (Class-C)

Alan
Sagar
Dam

90
LL/Day

Gadhadiya road WDS Atkot road WDS


32.2LL Sump+ESR 33 LL Sump+ESR

WATER LOSS
Water Production at Source: 48.15 Lac Litres/Day
Average daily quantity of water supplied: 47.30 Lac Litres/Day
Water Estimated consumption quantity: 27.38 Lac Litres/Day
Estimated Total Loss: 20.77 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
9 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kalol - Water Supply Diagram (Class-A)
Narmada Canal
Railway pura WW WDS
15.8 LL Sump+ESR
Direct Pumping at 4 WDS:
Bore well No 2,3,5,6

GWSSB
3
Bore well 7

T.P. 46 WDS Vankurvas WDS 50 K. Pura WDS Divya WDS


Civil Hospital Sump

7.5
Town hall WDS
Sardar nagar WDS Garden WDS
Near Drainage pumping staion WDS
Civil Hospital WDS
Navjivan WDS

2 0.5 WATER LOSS


Water Production at Source: 107.00 Lac Litres/Day
Average daily quantity of water supplied: 90.13 Lac Litres/Day
Water Estimated consumption quantity: 72.18 Lac Litres/Day
Estimated Total Loss: 34.82 Lac Litres/Day
Mayur housing WDS Tersa Peru WDS
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
10 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kutiyana - Water Supply Flow Diagram (Class-D)

Main Source
2
Kalindri WDS

Sarnes WDS

5
1
Bore with small water Bhadar -WDS
tank (1000liter)- Direct
supply to 14 standpost
Ramvadi WDS

WATER LOSS
Water Production at Source: 5.56 Lac Litres/Day
Average daily quantity of water supplied: 5.56 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
11 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Morbi - Water Supply Flow Diagram (Class-A)
Machhu Paneli Lake
Dam
Gaushala WTP-New
2.25
120 430 13.5 20
LL/Day LL/Day 2.5 LL/Day
Gaushala WTP-0ld Paneli WTP
10
Someshwar WDS
Gaushala -0ld WDS

Gaushala-New WDS

7 5
7 6 1

5 5
5 5 4 1 5

Sardar Bag WDS Kesar Bag WDS


Panchasar WDS
Darbar Gadh WDS Suraj Bag WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
12 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Morbi - Water Supply Flow Diagram (Class-A)

WATER LOSS
Water Production at Source: 250.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 132.34 Lac Litres/Day
Estimated Total Loss: 117.66 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
13 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Upleta - Water Supply Flow Diagram (Class-B)

Venu
Moj Dam
Dam
Bore water quantity-Approx data No of
Bores:6 Stand post (Cum tank) capa: 1000
Ltr/tank (Bores are connected to stand post)
40 45
Venu WTP Moj WTP Freq: 3 filling/day
LL/Day LL/Day
Total Volume: 6*3*1000=18000 ltr/day
Total Volume: 18000/1000000=0.018 MLD +
other bore supply
6
22
3

Venu Main WDS


Darbargadh WDS

6 5

College Compound WDS Bhagwati WDS


WATER LOSS
Water Production at Source: 42.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 39.21 Lac Litres/Day
Estimated Total Loss: 2.79 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
14 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Anand - Water Supply Flow Diagram (Class-A)

9 9 5

Bhalej Road WDS


Town Hall WDS Shikhod WDS Padhariya WDS
(18 LL Sump+ESR)

27 5.3

Direct Pumping at 11 WDS :


Jaganath Mahdev, Lotiya
Bhagol, OzonoTekro,Pramukh Sojitra WDS Ganesh Quarters WDS
Swami,Kavita,Parikh
Bhuvan,Grid,Bhoi Wad, Vorai
Mata,Meena Park,Ankur
WATER LOSS
Water Production at Source: 180.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 156.00 Lac Litres/Day
Estimated Total Loss: 24.00 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
15 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Anklav - Water Supply Flow Diagram (Class-D)

9.5 0.25 0.3

Vir Kuva WDS Sakarba Tube WDS Champaba WDS

Direct Pumping at 2 WDS :


Balamsah Pir and Ranjipari Para

WATER LOSS
Water Production at Source: 40.00Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
16 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bagsara - Water Supply Flow Diagram (Class-C)

7.5 10

Direct Pumping at 7 WDS:


15 20 Natvar Nagar, Mangali Chowk,
Nadi Para, Meghani Nagar, Jim
para, Bhangi Vas, Ganga Maiya

Jetpur road WDS

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
17 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Balasinor - Water Supply Flow Diagram (Class-C)
Mahi Canal

12
LL/Day

0.4
5 5

Kalupur WDS
Indira Nagar WDS Old City WDS New Society Area WDS Town Hall Area WDS
(1.35 LL Sump+ESR)

WATER LOSS
Water Production at Source: 40.00Lac Litres/Day
Average daily quantity of water supplied: 38.15 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
18 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bareja - Water Supply Flow Diagram (Class-D)
Narmada Canal

GWSSB

5.5 2

Direct Pumping at 6 WDS:


Near Vrundavan Society,Near
3
Hariom Party Plot,Near ST bus
Timbala Vasahat WDS stand, Opposite to Shiv Shakti
bldg.Near lakshmi Rice Mill.,
Near Mota thakorwas

Raval Vas WDS WATER LOSS


Water Production at Source: 33 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 18.84 Lac Litres/Day
Estimated Total Loss: 14.16 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
19 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bavla - Water Supply Flow Diagram (Class-C)

Rupal WDS Srinagar WDS Trimurti WDS Yogeshwar WDS Cinema WDS
Havada WDS Madhuvan WDS
Not Woking

WATER LOSS
Water Production at Source: 46.40 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 31.01 Lac Litres/Day
Estimated Total Loss: 15.39 Lac Litres/Day
Ram Nagar WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
20 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Boryavi - Water Supply Flow Diagram (Class-D)
Bapunagar Bore
Handannagar Bore Chandannagar Bore Haripura Bore Nadaliya Chawk Bore

0.5 0.6 0.4 0.2 0.2

Ambajipura Bore
Pathak Bore Pathak Kuva Bore AzadChowk Bore Bhatiji Vistar Bore

0.2
0.2 0.2 2 0.6

In N.P. Compound Bore


Opp to N.P. Bore

2 WATER LOSS
Water Production at Source: 14.00 Lac Litres/Day
Average daily quantity of water supplied: 13.30 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
21 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Borsad - Water Supply Flow Diagram (Class-B)

JimKhana New WDS Direct Pumping at 3 WDS: Vrundavan WDS


Mahadev ,Bhobha ,Fatehpur

7 4

Bag Davakhana WDS Handannagar Bore

4 0.5

Jimkhana Old WDS

WATER LOSS
Water Production at Source: 70.20 Lac Litres/Day
Average daily quantity of water supplied: 49.20 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
22 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chaklasi - Water Supply Flow Diagram (Class-C)

0.4
0.2 0.3 0.5

4 no. of WDS with ESR


9 no. of WDS with ESR 6 No.of WDS with ESR 2 no.of WDS with Esr
capacity 0.4 LL : Bahilantri
capacity 0.2 LL : Umed Pura, Capacity 0.3LL :Devnagar, capacity 0.5 LL: Bhaga
Pura,Bhatji Mandir
Gamanpura, Motakua, Mota Suryanagar,Shivnagar,Raj Pura, Krush nagar
Raghupura,Bhagvan Pura
Rampura, Devkapura, nagar,Vijaynagar,Vanipura
Jadavpura road,Jadavpura
Village, Sadi pura,Dharmapura

3
0.1 2

2 no.of WDS with


Mahadev Pura WDS capacity of 3 LL :Kheti
Vora Colony WDS
Shala , Rajvad Talav
WATER LOSS
Water Production at Source: 36.60 Lac Litres/Day
Average daily quantity of water supplied: 34.20 Lac Litres/Day
Water Estimated consumption quantity: 21.27 Lac Litres/Day
Estimated Total Loss: 15.33 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
23 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dakor - Water Supply Flow Diagram (Class-D)

Shedhi Rakhiyal Vanoti Bore Patelwadi Bore


Bore Bore
Vinzol
Bore 5 6.5 4.1

4.5 7 7

Old Court WDS Kumarshala WDS Birla Bhuvan WDS

WATER LOSS
Water Production at Source: 21.00Lac Litres/Day
Average daily quantity of water supplied: 19.00Lac Litres/Day
Water Estimated consumption quantity: 16.34 Lac Litres/Day
Estimated Total Loss: 4.66 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
24 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dehgam - Water Supply Flow Diagram (Class-C)

2. Nr
1. Nr Water Hatkeshwar
Tank 5. Pankaj
Narmada Canal Society

8. Nehru Society
6. Ramajina
9. Bariyana 20 22.5
Chhapra
Chhapra New Old
3.Nr Bagharivas
Talav
10. Dogal 7.5
Talavadi 4. Nr Police
Station
11. Khajuri 7. Ganeshpur
Talavadi Chhapra

Main water works WDS

WATER LOSS
Water Production at Source: 70.00 Lac Litres/Day
Average daily quantity of water supplied: 70.00 Lac Litres/Day
Water Estimated consumption quantity: 32.76 Lac Litres/Day
Estimated Total Loss: 37.24 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
25 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dholka - Water Supply Flow Diagram (Class-B)

Direct Pumping at 5 WDS:


Mithikui, Meenabahen Tower,
Prahladwadi, Brahminpith,Saji
Talavadi

WATER LOSS
Water Production at Source: 54.00 Lac Litres/Day
Average daily quantity of water supplied: 50.00 Lac Litres/Day
Water Estimated consumption quantity: 49.38 Lac Litres/Day
Estimated Total Loss: 4.62 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
26 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kanjari - Water Supply Flow Diagram (Class-D)

Direct Pumping at 6 WDS:


Near Swaminarayan Mandir , Ambaji Temple,Indira Nagar,
Anandpura, Ranchavpura ,Nr. Kumnath Mahadev

WATER LOSS
Water Production at Source: 23.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
27 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kapadvanj - Water Supply Flow Diagram (Class-C)
Narmada Canal Mahisagar Canal

25
LL/Day

7.5 1 5

4.5
7.5
6

6 6 6
6

Fire station WDS Ratna Mata WDS

Soni pura WDS

M P Municipal school WDS

WATER LOSS
Water Production at Source: 40.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 36.69 Lac Litres/Day
Estimated Total Loss: 3.31 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
28 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Karamsad - Water Supply Flow Diagram (Class-C)

Main Waterworks WDS Smashan WDS Indira Colony WDS Devrai WDS Gokulpura WDS

2.4 9 0.1 0.25 0.1

Direct Pumping at 6 WDS:


Ramdevpi, Station water works

WATER LOSS
Water Production at Source: 30.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 14.87 Lac Litres/Day
Estimated Total Loss: 15.13 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
29 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kathlal - Water Supply Flow Diagram (Class-D)

Direct Pumping at 8 WDS:


Laxmi Kua, Bhatvada, Bhavsarbad, Ashapuri,Tekri Faliya,
Malekpura , Meldimata, Himmatpura

WATER LOSS
Water Production at Source: 36.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
30 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Khambhat - Water Supply Flow Diagram (Class-B)

Kanewal River

12
LL/Day 8 6

2
8 8 8 4

8 8 5
Ranmukteshwar WDS
8
Sahid Baug WDS

WATER LOSS
Direct Pumping at 3 WDS: Water Production at Source: 160.00 Lac Litres/Day
Nr College , Tilak Baug, Madva Baug Average daily quantity of water supplied: 156.00 Lac Litres/Day
Water Estimated consumption quantity: 82.47 Lac Litres/Day
Estimated Total Loss: 77.53 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
31 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kheda - Water Supply Flow Diagram (Class-D)

5 2.5 1 0.3 0.5


3

Hanuman Mandir Adalati Compound


Panivali Sheri WDS Mominwad WDS Kheda Camp WDS Vitthalpura WDS
WDS WDS

WATER LOSS
Water Production at Source: 12.50 Lac Litres/Day
Average daily quantity of water supplied: ND
Direct Pumping at 2 WDS: Water Estimated consumption quantity: 11.32 Lac Litres/Day
Indira Nagar, Bagicha Estimated Total Loss: 1.18 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
32 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mahudha - Water Supply Flow Diagram (Class-D)

Direct Pumping at 6 WDS:


Dakor road, Rabarivas, Finav bhagat,
chokhardi Bhagol, Mandir, Bhimkuva

WATER LOSS
Water Production at Source: 28.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 17.50 Lac Litres/Day
Estimated Total Loss: 10.50 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
33 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mehmedabad - Water Supply Flow Diagram (Class-C)

2
9.5 4.5 0.7 1

Ramdevpir Head Band Mahadev


Water Works Mahadev WDS Nr Post Office WDS Golibar Tekra WDS
WDS

5 5 2 WATER LOSS
Water Production at Source: 63.70 Lac Litres/Day
Average daily quantity of water supplied: 59.40 Lac Litres/Day
Water Estimated consumption quantity: 31.46 Lac Litres/Day
Estimated Total Loss: 32.24 Lac Litres/Day

Khat Raj Darwaja Nagarpalika


Fulbai Meta WDS WDS Garden WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
34 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Pethapur - Water Supply Flow Diagram (Class-D)

0.5 Old 0.5


2
New
5.7

0.5

3.5

Harijanwas Head Works


Palaiya Head Works

Sahid Baug WDS

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Fatehpura WDS Water Estimated consumption quantity: 17.98 Lac Litres/Day
Estimated Total Loss: 7.02 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
35 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Petlad - Water Supply Flow Diagram (Class-B)

0.5
13.5
6

6.75 7
3
College Chowkdi WDS

Ranchodji Temple WDS Santram Pura WDS


0.5

WATER LOSS
Water Production at Source: 80.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 73.03 Lac Litres/Day
Estimated Total Loss: 6.97 Lac Litres/Day

RadhaKuva Malav Bhagal WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
36 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Sanand - Water Supply Flow Diagram (Class-C)
Narmada Canal

Direct Pumping at 12 WDS : Lakshmana, Thakker


bapa chatralaya, Gowardhan park, Madhavnagar, Vadnagar,
GWSSB Laypura, Radhe Upvan, Nanu Shah no dehlo, Siddhnath,
Harekrushna Nagar , Gujarat Housing Board, Ambaji Mata

2.2
10
2.5
Shankar wadi WDS 5

Mamlatdar Kacheri WDS


5

50% Narmada +
50% Bore
Taluka Panchayat WDS

WATER LOSS
Water Production at Source: 55.00 Lac Litres/Day
5
3 CV Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 26.46 Lac Litres/Day
Navovas WDS
Gadhiya WDS Estimated Total Loss: 28.54 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
37 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Sojitra - Water Supply Flow Diagram (Class-D)

2.25

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: 17.00 Lac Litres /Day
Water Estimated consumption quantity: ND
9 Estimated Total Loss: ND

Char Kua (Bhagol) WDS

Shambhupura
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
38 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Thasra - Water Supply Flow Diagram (Class-D)

5
Direct Pumping at 7 WDS:
Chorwala Faliya, Madhav Faliya,
Premji Faliya, Krushna Township,
Dariya Dev, Andi, Shaidwada

2.75

RC Gandhiwala Gruh WDS

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 21.02 Lac Litres/Day
Estimated Total Loss: 3.98 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
39 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vallabh Vidyanagar - Water Supply Flow Diagram (Class-C)

Direct Pumping at 8 WDS: 0.5


Bachu mali bore booster near old
water tank,
Balvatika near Shantaba garden
Bakrol road,
Nutan club booster nana bazar ,
Mahadev area near patel park,
Iskon bore booster near karamsad
road VV nagar,
Amba mata bore booster Bakrol
road,
Municipal borough nana bazar, Bore + ESR at 6 WDS:
Hari om bore booster near Old Water Tank, Sardar Patel Statue (ESR – 2.24 )
Raghuvan society hari om nagar New Water tank hari om nagar road (ESR – 3.27)
Residence Campus (ESR – 0.55 ML)
Educational Campus (ESR – 0.5 ML)
CVM V P science Botony Ground (ESR – 4.5)
CVM, BVM Campus (ESR – 4.5)

WATER LOSS
Water Production at Source: 60.65 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
40 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Anjar - Water Supply Flow Diagram (Class-B)

Narmada Canal

20 21.2
GWSSB

20

10 10

10
Vijay Nagar WDS Nagalpar Water Works

Bhuj Road WDS

WATER LOSS
Water Production at Source: 66.00 Lac Litres/Day
Average daily quantity of water supplied: 60.00 Lac Litres /Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
41 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhachau - Water Supply Flow Diagram (Class-D)
Narmada Canal

3.5 GWSSB
2

Bapunagar WDS Rabarivas WDS

Narmada WDS

Direct Pumping at 4 WDS:


Navi Bhachau, Chhajed Talao,
Navagam,Vadinagar, WATER LOSS
Water Production at Source: 27.00 Lac Litres/Day
Average daily quantity of water supplied: 27.00 Lac Litres/Day
Water Estimated consumption quantity: 16.30 Lac Litres/Day
Estimated Total Loss: 10.70 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
42 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bharuch - Water Supply Flow Diagram (Class-A)
Tapi Canal

230
LL/Day

4.5 20 4.5 20 4.5


9
26

10 10 9 4.5
9

Tower WDS

Station WDS

Maktampura Vejalpur WDS


Housing Board Durgani WDS
Sonani mahal WDS
WDS
WDS
WATER LOSS
*Total 15 tubewells are also use for Water Production at Source: 200.00 Lac Litres/Day
supply of water through various WDS Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 118.75 Lac Litres/Day
Estimated Total Loss: 81.25 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
43 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Botad - Water Supply Flow Diagram (Class-A)
WATER LOSS
Water Production at Source: 122.50 Lac Litres/Day
Narmada Canal Turka road Average daily quantity of water supplied: ND
1
WDS Water Estimated consumption quantity: 67.00 Lac Litres /Day
Estimated Total Loss: 55.50 Lac Litres /Day

GWSSB

16
5 5 8
5 5

Krishnasagar Bajanan Tanki


1.25 4.25 WDS WDS
2.5 2

karinagar WDS harni kuva WDS


Taluka School Vihva talav WDS
Meghani Road Hepli vistar 4 LL Sump +ESR Salanpur
WDS 2 LL Sump +ESR
WDS WDS
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
44 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Gandhidham - Water Supply Flow Diagram (Class-A)
WATER LOSS
Tupper Water Production at Source: 270.00 Lac Litres/Day
dam Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 223.11 Lac Litres/Day
Estimated Total Loss: 46.89 Lac Litres/Day
400
LL/Day

Bharatnagar 9B Sundarpuri Sector 4 WDS Jagjivan nagar


HSR on highway Adipur 2B WDS
WDS WDS 26 LL Sump +ESR WDS
WDS 26 LL Sump +ESR
34 LL Sump +ESR 42 LL Sump +ESR 24 LL Sump +ESR
20 LL Sump +ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
45 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Godhra - Water Supply Flow Diagram (Class-A)

Narmada Canal Panam Canal

GWSSB

10 10 10 10 10
1.6 10 10

13 7 10 8.4 20
Bamroli Road RTO office
WDS WDS

Civil Line
WDS

Bavchawad Vorwad Satpul WDS Pathar Talavdi GIDC WDS


WDS WDS WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
46 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Godhra - Water Supply Flow Diagram (Class-A)

WATER LOSS
Water Production at Source: 130.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 88.10 Lac Litres/Day
Estimated Total Loss: 41.90 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
47 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jamnagar - Water Supply Flow Diagram (Municipal Corporation)
Sasoi
Mahi Pipe (Narmada Water)
Ranjit Und - I
Dam
Dam Dam

550 Khijadia WTP+ Sump


650 LL/Day
Lalpari
LL/Day

Pump House Gulabnagar WDS


17 LL Sump +ESR Shankar Tekri Ranjit Nagar Samarpan
WDS Solarium WDS WDS WDS
WDS
15 LL Sump +ESR 17 LL Sump +ESR 14 LL Sump +ESR 17 LL Sump +ESR
22 LL Sump+ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
48 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jamnagar - Water Supply Flow Diagram (Municipal Corporation)

WATER LOSS
Water Production at Source: 920.00 Lac Litres/Day
Average daily quantity of water supplied: 805.50 Lac litres/Day
Water Estimated consumption quantity: 511.09 Lac Litres/Day
Estimated Total Loss: 408.91 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
49 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jetpur - Water Supply Flow Diagram (Class-A)

Bhadar
Dam WATER LOSS
Water Production at Source: 150.00 Lac Litres/Day
Average daily quantity of water supplied: ND
200 Water Estimated consumption quantity: ND
LL/Day Estimated Total Loss: ND

45

12.5 20 7.5

Ujadepa ESR WDS


Jantanagar WDS
Filter plant Compound WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
50 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Junagadh - Water Supply Flow Diagram (Municipal Corporation)

Wallingtn Hasanpur
Ozat River Anandpur Weir
Dam Dam

90
LL/Day
Upperkot WW

Direct Pumping at 6 WDS:


Aaurvedichospital, Sardar bagh, Behra Munga
Dharam Aveda, Kalva Chowk,Randel Kuva

Sahyog chamber bore P.W.D

Ghyasvada
Diwan Office
Gendagar WDS WDS
WDS
WATER LOSS
Water Production at Source: 210.00 Lac Litres/Day
Average daily quantity of water supplied: 159.20 Lac Litres/Day
Water Estimated consumption quantity: 137.37 Lac Litres/Day
Estimated Total Loss: 72.63 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
51 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Karjan - Water Supply Flow Diagram (Class-C)

10
10
Direct Pumping at 1 WDS:
Jalaram nagar

12 10

Sitaram WDS Akshardhara WDS

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Average daily quantity of water supplied: 35.00 Lac Litres/Day
Water Estimated consumption quantity: 28.11 Lac Litres/Day
Estimated Total Loss: 6.89 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
52 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mandvi (Kutch) - Water Supply Flow Diagram (Class-C)
Narmada Canal
WATER LOSS
Water Production at Source: 59.10 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 38.63 Lac Litres/Day
Estimated Total Loss: 20.47 Lac Litres/Day

GWSSB

100 50
50

6.75 Laiza Road 3 WDS 67.5

Laiza Road 1 WDS Laiza Road 2 WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
53 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mehsana - Water Supply Flow Diagram (Class-A)

Narmada Canal

GWSSB

14 No. of WDS

Prashant Cinema 7.5 1 1


5 Rayanavadi Tanki
WDS Ranuja Nagar
WDS
WDS

0.5 5 5 0.5 0.5 0.5 0.5

Main water works Gautam Nagar WDS


Nagalpur Garampanchayat
Maha Shakti Ground
office WDS
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
54 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mehsana - Water Supply Flow Diagram (Class-A)

WATER LOSS
Water Production at Source: 263.20 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 139.84 Lac Litres/Day
Estimated Total Loss: 123.36 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
55 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Nadiad - Water Supply Flow Diagram (Class-A)
WATER LOSS Kheta Talav WDS
Water Production at Source: 230.00 Lac Litres/Day Kheta sump 300 LL Sump+ESR
Average daily quantity of water supplied: ND WDS
Water Estimated consumption quantity: ND
Estimated Total Loss: ND
120

Direct Pumping at 27 WDS:

210 210 210 210 210 210

Ranibaug WDS Radhe Krishna Pragati Nagar Civil Hospital


Bhandari WDS Magol Cot WDS
WDS WDS WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
56 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Navsari - Water Supply Flow Diagram (Class-A)
Kakrapar
Dam
Direct Pumping at 13 WDS:
Kaliyawadi, Khodiyar,Junathana,Mochiwadi,
Tulsivan,Tighara,Dashera Tekri,Sindhi camp
Dudhiya Talav Chikuvadi,Ajit Society,Gadhevan,Sagaravadi,
Jalalpur
Dudhiya Talav
WTP
100 360
Bhandari WTP
LL/Day LL/Day

13.6

6.8
13.6

13.6 13.6
Silot wad WDS Station WDS
Dudhiya Talav
WDS WATER LOSS
Water Production at Source: 280.00 Lac Litres/Day
Gelakhadi WDS Lunci Kue WDS Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 201.72 Lac Litres /Day
Estimated Total Loss: 78.28 Lac Litres /Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
57 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Ode - Water Supply Flow Diagram (Class-D)

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Direct Pumping at 3 WDS: Average daily quantity of water supplied: 23.70 Lac Litres/Day
Christiwaas, Marianu , Navapura Water Estimated consumption quantity: 15.84 Lac Litres/Day
Estimated Total Loss: 9.16 Lac Litres/Day

5
4
0.8 0.8

Ramnath Mahadev
Ranchodpur WDS WDS
Baadhipura WDS Surya Gate paase
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
58 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Padra - Water Supply Flow Diagram (Class-C)

Narmada Canal

9 9
Direct Pumping at 2 WDS:
Radharaman Society, Chipwaar
9 9

Ambaji Road WDS Sayaji Baag WDS

WATER LOSS
Water Production at Source: 63.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 40.17 Lac Litres/Day
Estimated Total Loss: 22.83 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
59 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Palanpaur - Water Supply Flow Diagram (Class-A)
Narmada Canal (Bhadar Dam)

Direct Pumping at 22 WDS:


GWSSB

40 9
Ami Baag
Ami Baag
SUMP-2
SUMP-1

10 10
10
5
2 Mira Baug 13.5
SUMP Gemerpura
SUMP

10 5 Fasai Tekra WDS


Gogari WDS 5 Rani Baug WDS

Dundhiyavadi
Survey number 540 Vrundavan
ESR
WDS ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
60 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Palanpaur - Water Supply Flow Diagram (Class-A)

WATER LOSS
Water Production at Source: 125.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
61 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Patdi - Water Supply Flow Diagram (Class-D)

4
1
0.5 0.5 1

1 7

Himatpara WDS
Dalitvas WDS High School WDS Velnar Nagar WDS

WATER LOSS
Water Production at Source: 10.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
62 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Patan - Water Supply Flow Diagram (Class-A)

5 WDS ( well+ESR) 6 WDS ( well+sump+ESR) 2 WDS ( well + sump)


Kalika, Kalivada, Damajirao, Gunvanta, Bagvada, Kalika, Kalivada, Unjha Tran, Motisha
Sidhehum, Bokarvada Damajirao, GEB

WATER LOSS
Water Production at Source: 180.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 155.16 Lac Litres/Day
Estimated Total Loss: 24.84 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
63 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Porbandar - Water Supply Flow Diagram (Class-A)

Podra Khambhara
WATER LOSS Dam Dam
Water Production at Source: 95.70 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 77.78 Lac Litres/Day
200 120
Estimated Total Loss: 17.92 Lac Litres/Day
LL/Day LL/Day

320 300

70 60
Jubeli Head
Quarter Kamla Baug

Library Navapada Kadia Plot Natwar Niwad Dilip School Ground Jhuri Baug

20 20 20 20 10 20
10

20 20 20 20 10 20

Shubhash Nagar

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
64 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Rajkot - Water Supply Flow Diagram (Municipal Corporation)
Lalpari Randarda Narmada Canal
Lake

BHADAR AJI NYARI-I NYARI-II


Dam Dam Dam Dam

500 1030 135


320
LL/Day LL/Day LL/Day
LL/Day
Ghanteshwar WTP
Ribda WTP Aji WTP Nyari WTP

20

356
20

Aji WDS
Gurukul WDS Jubilee WDS
200 LL Sump+ESR Ring Road + Raiyadha Nyari WDS
350 LL Sump+ESR 300 LL sump+ESR
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
65 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Rajkot - Water Supply Flow Diagram (Municipal Corporation)

WATER LOSS
Water Production at Source: 1690.00 Lac Litres/Day
Average daily quantity of water supplied: 1394.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
66 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Rapar - Water Supply Flow Diagram (Class-D)

Narmada Canal
WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: 25.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

GWSSB

12 12

10 10

Yojna 1 WDS
Yojna 2 WDS
20.9 LL Sump+ESR
17 LL Sump+ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
67 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Surat - Water Supply Flow Diagram (Municipal Corporation)

Tapi River
Varaccha WTP

2000
680 4700 3900
Sarthana WTP Katargam WTP LL/Day Rander WTP
LL/Day LL/Day LL/Day
Rander WW
Katargam WW
562.5
Sarthana WW 672 435
407.5 Khatodara WDS Joganinagar WDS 6 (West)
3 (South)

37.5 297 450 450 450 315


140

22.5 22.5 22.5 22.5 22.5


Varaccha WW

Udhna Sangh
337
WDS 10 (South)

22.5 Udhna WDS 4


Dumbhal WDS Katargam -1 (South) Umarwada
8 (South - East) WDS (North) 450 WDS 5 (East)
15 335
225

Pandesara WDS 7
Umarwada WDS 2 (East)
(South) Althan WDS 9
(South – West)
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
68 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Surat - Water Supply Flow Diagram (Municipal Corporation)

WATER LOSS
Water Production at Source: 6920.00 Lac Litres/Day
Average daily quantity of water supplied: 6590.00 Lac Litres/Day
Water Estimated consumption quantity: 4906.45 Lac Litres/Day
Estimated Total Loss: 2013.55 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
69 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Surendranagar - Water Supply Flow Diagram (Class-A)
Dhori
Dhariya
National Park Dam
Old WTP
210
80 130 Old – WTP LL/Day National Park – New
LL/Day LL/Day

Stage-II
Stage-I 84 LL Sump+ESR
30 LL Sump+ESR

Meghani Baug WDS Ratanpur WDS


28 LL Sump+ESR Dudhrej WDS
2 LL Sump+ESR
5 LL Sump+ESR
Joravarnagar WDS
13 LL Sump+ESR
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
70 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Surendranagar - Water Supply Flow Diagram (Class-A)

WATER LOSS
Water Production at Source: 220.00 Lac Litres/Day
Average daily quantity of water supplied: 154.00 Lac Litres/Day
Water Estimated consumption quantity: 123.31 Lac Litres/Day
Estimated Total Loss: 96.69 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
71 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Umreth - Water Supply Flow Diagram (Class-C)

9.5 15 2

Jagnath Valva Kuva


Mahi canal WDS Court Compound WDS
WDS

WATER LOSS
Water Production at Source: 65.00 Lac Litres/Day
Average daily quantity of water supplied: 65.00 Lac Litres/Day
Water Estimated consumption quantity: 50.48 Lac Litres/Day
Estimated Total Loss: 14.52 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
72 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vadodara - Water Supply Flow Diagram (Municipal Corporation)

Ajwa Sayaji Sarovar

500 450 500


LL/Day LL/Day LL/Day
Nimeta WTP

4 No. of WDS

19 No. of WDS WATER LOSS


Water Production at Source: 2950.00 Lac Litres/Day
Average daily quantity of water supplied: 2526.10 Lac Litres/Day
Water Estimated consumption quantity: 1931.84 Lac Litres/Day
Estimated Total Loss: 1018.16 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
73 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Valsad - Water Supply Flow Diagram (Class-A)
WATER LOSS
Auranga River Water Production at Source: 185.00 Lac Litres/Day
Average daily quantity of water supplied: 184.70 Lac Litres/Day
Water Estimated consumption quantity: 110.57 Lac Litres/Day
Estimated Total Loss: 74. 43 Lac Litres/Day

Kalyanbuag 12.5 LL Sump+ESR

9 13.6 9

Halor WDS Ramvadi WDS Madanvadi WDS Kalyanbaug WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
74 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vapi - Water Supply Flow Diagram (Class-A)
Daman Ganga River

WATER LOSS
Water Production at Source: 95.00 Lac Litres/Day
WTP Average daily quantity of water supplied: 90.40 Lac Litres/Day
GIDC Water Estimated consumption quantity: 55.60 Lac Litres/Day
Estimated Total Loss: 39.40 Lac Litres/Day
PART
GIDC

Vapi East Area

10

2
2
8
Municipality
Vapi

C Type WDS
Vapi West Area Suphard Area WDS
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
75 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Veraval - Water Supply Flow Diagram (Class-A)
Hiran
Mithapur River
Dam

WATER LOSS
Water Production at Source: 143.60 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND Filter plant
15 10

5 3.37
3.37 1

15 13.5 3.37 5

Shikshak colony Veraval WDS


WDS Patan WDS Harijanvas WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
76 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Viramgam - Water Supply Flow Diagram (Class-B)
Bharwadi WDS Gandhi Hospital WDS
Tower 1 WDS

Tower 2 WDS
10 10

1 15 10

6 6

Survey No 482
Koteshwari WDS

1 1.5 1.5 6
Direct Pumping:
Golwadi 6

Fulwadi WDS Milky Road WDS Raiyapur WDS Dispensary WDS


1.5
WATER LOSS
Water Production at Source: 80.00 Lac Litres/Day
Average daily quantity of water supplied: ND Moonsar WDS
Water Estimated consumption quantity: 40.88 Lac Litres/Day
Estimated Total Loss: 39.12 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
77 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bardoli - Water Supply Flow Diagram (Class-B)

5 3.5 3.5 2

9
Ram Baug WDS
Sardar Baug WDS Nityanand WDS Ramji Mandir WDS

9
Direct Pumping at 12 WDS
Nr. Railway Stn Municipality Bore, Luhar
Faliya Bore, Rang Upvan Bore, Bharvad
Vasahat Bore ,Hudko Society Bore, Navdurga
Old Power House
Society Bore ,Gayatri Society Bore
5 WDS (Main)
,Bhuneshwary Baug ,Bore Shradhdha Bore,
Akshanagar Bore, Kaan Faliya Bore

WATER LOSS
Abinandan Market Water Production at Source: 85.00 Lac Litres/Day
WDS Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 74.30 Lac Litres/Day
Estimated Total Loss: 10.70 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
78 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bilimora - Water Supply Flow Diagram (Class-B)
Hiran
Dam
WATER LOSS
Water Production at Source: 60.00 Lac Litres/Day
Average daily quantity of water supplied: 60.00 Lac Litres/Day
140 Water Estimated consumption quantity: 33.53 Lac Litres/Day
LL/Day Estimated Total Loss: 26.47 Lac Litres/Day

15

7.5

10 9 9

Antaliya WDS Vanka Mulla WDS

Desara WDS Navjeevan WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
79 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chhota Udaipur - Water Supply Flow Diagram (Class-D)

Mithapur River

Direct Pumping
Fatehpura Water Works

Railway R.C.C. WDS


0.35 LL Sump+ESR

WATER LOSS
Water Production at Source: 30.00 Lac Litres/Day
Average daily quantity of water supplied: 30.00 Lac Litres/Day
Water Estimated consumption quantity: 24.02 Lac Litres/Day
Estimated Total Loss: 5.98 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
80 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dabhoi - Water Supply Flow Diagram (Class-B)

14
10

8 10 6

Moti Baug WDS Rang Upvan WDS


9 LL Sump +ESR

WATER LOSS
Water Production at Source: 66.00 Lac Litres/Day
Average daily quantity of water supplied: 66.00 Lac Litres/Day
Water Estimated consumption quantity: 62.76 Lac Litres/Day
Estimated Total Loss: 3.24 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
81 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dahod - Water Supply Flow Diagram (Class-B)

Patadungi WATER LOSS


Dam Water Production at Source: 100.00 Lac Litres/Day
Average daily quantity of water supplied: 100.00 Lac Litres/Day
Water Estimated consumption quantity: ND
120 Estimated Total Loss: ND
LL/Day

1.2 7

9 4.5
4.5

Main Water Works Mandav Road


WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
82 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Devgadh Bariya - Water Supply Flow Diagram (Class-D)

WW Compound Sump
2
2
Shamshan ni baju ma Sump

2.6 6 1.2

Nagar Palika WDS Doongar Upar ni Civil Hospital WDS


Tanki WDS

WATER LOSS
Water Production at Source: 13.20 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
83 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dharampur - Water Supply Flow Diagram (Class-C)

Bamti River Par River

7.5 25

3.5 1.5

1.5 1.5
1.5

Nagari
Machiwad WDS WDS Navi Nagar WDS
Rajmahal Road Ozada Pada
WDS WDS

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 15.10 Lac Litres/Day
Estimated Total Loss: 9.90 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
84 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Gandevi - Water Supply Flow Diagram (Class-D)

Kaji owara river


(french well)

25

1.5 Direct Pumping at 6 Tubewells

Ozada Pada WDS


3.5 LL Sump +ESR

WATER LOSS
Water Production at Source: 17.00 Lac Litres/Day
Average daily quantity of water supplied: 7.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
85 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Halol - Water Supply Flow Diagram (Class-C)

5 6
2 2

9 4

Vadodara road
10 Karim WDS
WDS

Davda WDS Aaradhana WDS

2 2
Direct Pumping at 3 WDS:
Bharona WW, Ayodhya nagar, Amrapali

Marketing yard Sultanpura


WATER LOSS WDS WDS
Water Production at Source: 38.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 24.77 Lac Litres/Day
Estimated Total Loss: 13.23 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
86 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kalol (Panchmahal) - Water Supply Flow Diagram (Class-D)

10 12 1.25 1.25

10 10 1 1

Deewan ni vadi Dehrol Station Road Goli baar Daulatpura

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Direct Pumping at 1 WDS: Average daily quantity of water supplied: ND
Aashiyana Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
87 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kansad - Water Supply Flow Diagram (Class-D)

4.5

2.5

Tubewell +sump
Navi Tandi WDS Swaminarayan Nagar
9 WDS
WDS

WATER LOSS
Water Production at Source: 37.00 Lac Litres/Day
Direct Pumping at 35 WDS: Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
88 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Lunavada - Water Supply Flow Diagram (Class-C)

Panam river

Panam
Dam

10 Panam WTP
LL/Day

10 Panam Water works

WATER LOSS
Water Production at Source: 10.00 Lac Litres/Day
Average daily quantity of water supplied: 10.00 Lac litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
89 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mandvi (Surat) - Water Supply Flow Diagram (Class-D)

3 5 3

Juna Varigruh – 1 Juna Varigruh – 2


Smasham Bhumi
WDS WDS
WDS

Direct Pumping at 6 WDS:


Maruti Nagar, Gopal Nagar, Vajir Fadiya,
Kadiya Colony ,Andhatri, Kacha Fadia

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 19.50 Lac Litres/Day
Estimated Total Loss: 15.50 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
90 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Pardi - Water Supply Flow Diagram (Class-C)
Intake well

56
LL/Day

10

Direct Pumping at
10 Valsadi zapa bore, gayatri society bore

Killa uparni
WDS

WATER LOSS
Water Production at Source: 21.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 17.75 Lac Litres/Day
Estimated Total Loss: 3.25 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
91 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Rajpipla - Water Supply Flow Diagram (Class-C)

9 1
4.5

Water Works WDS Arab Tekra WDS


Near Garden WDS

WATER LOSS
Water Production at Source: 42.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 33.05 Lac Litres/Day
Estimated Total Loss: 8.95 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
92 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Shahera - Water Supply Flow Diagram (Class-D)
WATER LOSS
Water Production at Source: 10.00 Lac Litres/Day
Panam
Average daily quantity of water supplied: 10.00 Lac Litres/Day
Dam
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

GWSSB WTP

Chhugala
Sump

7
6

4
4

Town Head Works


Garden Head Works

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
93 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Santrampur Water Supply Flow Diagram (Class-C)

Mahi River

Sump 25
Sump WATER LOSS
GWSSB Water Production at Source: 12.00 Lac Litres/Day
Average daily quantity of water supplied: 12.00 Lac Litres/Day
4 Water Estimated consumption quantity: 8.69 Lac Litres/Day
ESR Estimated Total Loss: 3.31 Lac Litres/Day
GWSSB

4 3

2 2.3

Nagarpalika WDS Compound WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
94 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Savli - Water Supply Flow Diagram (Class-D)

2 2

Navi Tandi WDS

WATER LOSS
Water Production at Source: 9.00 Lac Litres/Day
Average daily quantity of water supplied : 9.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
95 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Songadh - Water Supply Flow Diagram (Class-D)

Narmada Canal
Juna Tadav

1.5 10 4

Juna water works


Devjipura WDS

Direct Pumping at 2 WDS WATER LOSS


Water Production at Source: 50.00 Lac Litres/Day
Mini water works Ukai road ,Mini water
Average daily quantity of water supplied: ND
works Station road
Water Estimated consumption quantity: 42.05 Lac Litres/Day
Estimated Total Loss: 7.95 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
96 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Tarsadi - Water Supply Flow Diagram (Class-D)

2.5
1.25

Direct Pumping at 9 WDS


1.2 Tarsadi Gam, Khodiyar Mandir, Tarsadi Swami
Narayan Mandir, Panchal Complex, Mota
Mandir, Sagar Nagar, Chikuvadi, Mangal Chistinagar WDS
Murti, Malakavad

Dadariya Water
Works

WATER LOSS
Water Production at Source: 5.47 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
97 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Umargam - Water Supply Flow Diagram (Class-D)

Akramaruti Temple,
near pond WDS

WATER LOSS
Water Production at Source: 5.00 Lac Litres/Day
Average daily quantity of water supplied: 5.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
98 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vijalpore - Water Supply Flow Diagram (Class-B)

10 Direct Pumping at 10 WDS


Mankodiya Bore, City Garden, Akar Park ,Dodi
Talav - 1 (OLD), Dodi Talav - 2 (NEW), Motana
Faliya, Jagruti Nagar, Shree Nagar, Samodiya
Faliya, Dada Nagar (S. N. 103)
Ramnagar WDS

WATER LOSS
Water Production at Source: 88.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
99 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vyara - Water Supply Flow Diagram (Class-C)

Intake well Narmada


Raw Water

0.5 0.4 0.4


60
LL/Day

20 Ratnamani Nagar
Navi Vasahat WDS
WDS Nala Falia WDS

3 7

0.5
0.25
Golvad WDS Panvadi Water works

WATER LOSS
Water Production at Source: 82.00 Lac Litres/Day Singi Falia WDS Pool Falia WDS
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 63.84 Lac Litres/Day
Estimated Total Loss: 18.16 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
100 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jhalod - Water Supply Flow Diagram (Class-C)

Dam

31
LL/Day

6 6.5

5.5
1.5 4.5 5

Kasba WDS
Ashram kuva WDS

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 19.50 Lac Litres/Day
Water Estimated consumption quantity: 8.59 Lac Litres/Day
Estimated Total Loss: 11.41 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
101 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Amod - Water Supply Flow Diagram (Class-D)

Narmada Pipe line

3 4

1.5

Mota Tadav WDS


Nava Tadav WDS

WATER LOSS
Water Production at Source: 31.50 Lac Litres/Day
Average daily quantity of water supplied: 24.00 Lac Litres/Day
Water Estimated consumption quantity: 15.72 Lac Litres/Day
Estimated Total Loss: 15.78 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
102 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Ankleshwar - Water Supply Flow Diagram (Class-B)

Ukai Dam
Gam Talav Raw
Water Reservoir

123.6
LL/Day

9 9
9

9 9

Bharuchi Naka WDS


Hasti Talav WDS

WATER LOSS
Water Production at Source: 100.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 82.76 Lac Litres/Day
Estimated Total Loss: 17.24 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
103 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bayad - Water Supply Flow Diagram (Class-D)

1 0.01
2 2 2

Arjan Vav WDS


Gapat Road WDS
1 1 1

Bagicha vistar Athamani Bukhel Road


WDS Barotwada WDS WDS
0.5 0.4

Bayad Gam WDS Sunder para WDS


Direct Pumping at 1 WDS
Bukhel Haier
WATER LOSS
Water Production at Source: 16.00 Lac Litres/Day
Average daily quantity of water supplied: 15.00 Lac Litres/Day
Water Estimated consumption quantity: 13.08 Lac Litres/Day
Estimated Total Loss: 2.92 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
104 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhabhar - Water Supply Flow Diagram (Class-D)

Kapuriya Kanpur Sarvoday Vidhya


Road Mandir High School

2.5 2.5

Khatri Bore WDS

Direct Pumping at 1 WDS


Nr. Brahminboarding, Hirpara, Mahalaxmi
Society

WATER LOSS
Water Production at Source: 30.00 Lac Litres/Day
Average daily quantity of water supplied: 30.00 Lac Litres/Day
Water Estimated consumption quantity: 20.35 Lac Litres/Day
Estimated Total Loss: 9.65 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
105 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dhanera - Water Supply Flow Diagram (Class-D)

5 3
3 5

2 1 2.5 2 5
2

Unchpadia WDS Sudama WDS Vivekanand WDS Tharad WDS


Patel Society WDS
Kotda Vaas WDS

WATER LOSS
Water Production at Source: 40.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
106 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Harij - Water Supply Flow Diagram (Class-D)

2.7 3 3 3

2.7 3 3 3

Nr Police Line Nr Ice Factory Nr Sahkari Jin Nr Vaniya Chali


WDS WDS WDS WDS

WATER LOSS
Water Production at Source: 18.00 Lac Litres/Day
Average daily quantity of water supplied: 18.00 Lac litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
107 /Open End
units are in Lac Litres ; As on 2008-09
Well
Himmatnagar - Water Supply Flow Diagram (Class-B)
Narmada Canal

GWSSB

10 3 9 9
12
20 20

12 8
Shradha Park Himat cinema wav
9 5
WDS WDS
2
Gokul nagar
WDS
Main Bagicha Khadachiya Talav
WDS WDS
8
Mehtapura WATER LOSS
WDS Water Production at Source: 90.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 74.62 Lac Litres/Day
Shubhash nagar Estimated Total Loss: 15.38 Lac Litres/Day
WDS
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
108 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Idar - Water Supply Flow Diagram (Class-C)
1.5 Shivam
WDS

15

Harijan
2 WDS

Mota kasaba
1.5 WDS
5 5 5 Townhall
Khokhanath
0.45 LL Sump +ESR
mahadev WDS
0.55 LL Sump +ESR

Dhuleti darwaja WDS Ghati WDS

1.5 1.5
WATER LOSS
Water Production at Source: 22.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 10.99 Lac Litres/Day
Morwadi WDS Kabarstan WDS
Estimated Total Loss: 11.01 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
109 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jambusar - Water Supply Flow Diagram (Class-C)
Narmada Canal

GWSSB
Ankhi Bhagol sump
Umna head Sump 3 10

2 8.4 2.25 2.5

1.25 2.25

Juna Darwaja WDS


Ankhi Bhagol
WDS
*Juna Darwaja sump inactive
Tankari Bhagol WDS Capacity 8.4 lac lit
Lelibaag WDS

WATER LOSS
Water Production at Source: 45.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
110 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kadi - Water Supply Flow Diagram (Class-B)

4.5 2

Sarv Vidhyalaya Karanpur


9.5 LL Sump+ESR
Khak chowk
Shri Amarnath –
19 LL Sump+ESR
GhruHousing
4.5 board Mahadev
Shakkarpur
13 LL Sump+ESR

3
Karannagar Road

Pashwwaenath

Thor Road Sujatpura Road


13 LL Sump+ESR 4 LL Sump+ESR
Mahadev- Manipur Station Road ShriShiddhesh nagar
Narayannagar 54.5 LL Sump+ESR 2.75 LL Sump+ESR
9.5 LL Sump+ESR
1 LL Sump+ESR
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
111 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kadi - Water Supply Flow Diagram (Class-B)

WATER LOSS
Water Production at Source: 116.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 68.56 Lac Litres/Day
Estimated Total Loss: 47.44 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
112 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Khedbrahma - Water Supply Flow Diagram (Class-C)

Harnav River

Mahalaxmi Temple
(Khsir Jama Mandir) 5

5
3

1.5
Mamlatdar Kacheri

Vasna Road

WATER LOSS
Water Production at Source: 23.00 Lac Litres/Day
Average daily quantity of water supplied: 23.00 Lac Litres/Day
Water Estimated consumption quantity: 19.79 Lac Litres/Day
Estimated Total Loss: 3.21 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
113 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kheralu - Water Supply Flow Diagram (Class-D)
Narmada Canal

GWSSB

20
60

Khari Kul WDS


GEB Area WDS
Shareshwar Talav Dr. Memal Hospital Harijan
WDS WDS WDS
75 LL Sump+ESR 60 LL Sump+ESR 24.5 LL Sump+ESR

WATER LOSS
Water Production at Source: 16.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
114 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mansa - Water Supply Flow Diagram (Class-C)
Narmada Canal

GWSSB

9 6.6 9 2.25 9 9.9

5 3.4 5 2.2

Main Water Works

Pipaiyawan Malav (Ambavadi) Satinavad (Rabarivas) Alkapuri


Water Works Water Works Water Works Water Works

WATER LOSS
Water Production at Source: 5.50 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
115 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Modasa - Water Supply Flow Diagram (Class-B)

9 Sarvoday
Mazum LL/Day Nagar 4.5
Dam WTP

9 9 4.5
Varigruh 9
WTP-9 Amardip WDS
4.5 4.5
9
Varigruh WDS 4.5

Sarvoday
Odhari WDS Nagar WDS

4.5 Sabaliya WDS


4.5 5 4,5

9 4.5

Chand
Crosss Road WDS
Tekri WDS
Rana
Direct Pumping at 2WDS Saiyad WDS
Navshe Shahid Paras , Jaldeep
Vinayak WDS
WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
116 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Modasa - Water Supply Flow Diagram (Class-B)

WATER LOSS
Water Production at Source: 70. 00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
117 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Prantij - Water Supply Flow Diagram (Class-D)

Supply from 14 Tube wells

0.5 0.5 4.5

Bakariapura
Navapara WDS Bakaria WDS WDS
Nr.Tako Nani Bhagol Chambhot vas
1 LL Sump+ESR 2 LL Sump +ESR 5.7 LL Sump+ESR

WATER LOSS
Water Production at Source: 15.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 13.94 Lac Litres/Day
Estimated Total Loss: 1.06 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
118 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Radhanpur - Water Supply Flow Diagram (Class-C)
Narmada Canal

3
3

GWSSB 2.5
2

Vithal Nagar WDS


Albusar Bugicha WDS

3 3 8 3

2.5 7 2.5
2.5 1

Rest House WDS New Post Office WDS Shantidham WDS


Desai Darwaja WDS

Bhiloti Dargwar WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
119 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Radhanpur - Water Supply Flow Diagram (Class-C)

WATER LOSS
Water Production at Source: 45.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 26.39 Lac Litres/Day
Estimated Total Loss: 18.61 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
120 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Siddhpur - Water Supply Flow Diagram (Class-B)
WATER LOSS
Water Production at Source: 50.00 Lac Litres/Day 14
Average daily quantity of water supplied: 50.00 Lac Litres/Day
Water Estimated consumption quantity: 32.69 Lac Litres/Day Dharoi
Estimated Total Loss: 17.31 Lac Litres/Day Dam 21
21 21
4 Bore wells +
1 Check dam at
Saraswati River SaitiPura

9
SaitiPura SaitiPura

5 5 5 5 5 5 15

2 4 4 6 4 4 4 1

Darbargadh Rajpura Acharya Nagar Kera Club Fulpara Ambika Nagar Gujarat
Navavas
Housing
Board

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
121 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Talod - Water Supply Flow Diagram (Class-D)

Desai nagar
Vikas Mill
5 Sump
Sump
5 0.67

2.72 1.5 2.7

Talod gaam
WDS
Market WDS
Sanmaan WDS Desai nagar WDS

WATER LOSS
Water Production at Source: 17.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
122 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Thara - Water Supply Flow Diagram (Class-D)

2.5 2.7 1

Referal Hospital Khadiya (Pr. School)


Bukalia WDS WDS WDS

Direct Pumping at 6 WDS:


Bagicha Bore Petrol pump bore, Parsavnagar
bore, Jesanji Deasiji Thakor ,Virmji Vastaji
Thakor, Pancholi Bharatkumar. B, Sakaraji
Shivaji Thakor

WATER LOSS
Water Production at Source: 7.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 5.20 Lac Litres/Day
Estimated Total Loss: 1.80 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
123 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Tharad - Water Supply Flow Diagram (Class-D)

Ambika Nagar
2.5
Sump
5
2

2.5 5

Narender Vistaar
Narsinh Tekri WDS WDS

Ambika Nagar WDS Juna Ganj Bazaar


WDS

WATER LOSS
Direct Pumping at 1 WDS: Water Production at Source: 34.00 Lac Litres/Day
PHC Bore Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
124 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Unjha - Water Supply Flow Diagram (Class-B)
WATER LOSS
Dharoi Water Production at Source: 85.00 Lac Litres/Day
Dam Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 68.11 Lac Litres/Day
Estimated Total Loss: 16.89 Lac Litres/Day

5 5 5 4.5 7 4.5 5

4 4.5 7 4.5 7 4.5 3.5

Laskari Chavni
Telephone Tulsi Bharat Rambagh Main Datardi Umiyamata Maruti Primary School
Exchange Nagar 9 LL Sump+ESR

4.5

Railway Station

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
125 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vadali - Water Supply Flow Diagram (Class-D)

Dharoi
Dam

Dharoi Intake

5 1 2
0.3 1.5 0.25 0.25

2.75

Gayatri nagar WDS SBI WDS


Dharoi ww Madari
Ramnagar
WDS Wasahat
WDS
WDS

Rambagh WDS

WATER LOSS
Water Production at Source: 10.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 5.80 Lac Litres/Day
Estimated Total Loss: 4.20 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
126 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vadnagar - Water Supply Flow Diagram (Class-C)
WATER LOSS
Dharoi Water Production at Source: 31.00 Lac Litres/Day
Dam Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 19.52 Lac Litres/Day
Estimated Total Loss: 11.48 Lac Litres/Day

2.15 7

Amarthor WDS Khaskot WDS

5 5

Bagicha WDS

Darbar WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
127 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vijapur - Water Supply Flow Diagram (Class-D)

5 5 5 5

5 5 5 5

Laldarwaja WDS Bagicha WDS


Bhudhi Sagar WDS Govindpura WDS

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 20.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
128 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Visnagar - Water Supply Flow Diagram (Class-B)
WATER LOSS
Water Production at Source: 113.00 Lac Litres/Day
Average daily quantity of water supplied: 84.00 Lac Litres/Day
Water Estimated consumption quantity: 80.82 Lac Litres/Day
Estimated Total Loss: 32.18 Lac Litres/Day
Dharoi
4.5 Dam 4

Darbar DK

4.5 4.5 1 1 3 3 3 0.5

2.7 4.5 4 4 3 1 3 2.5

Laldarwaja Tushabhai Fateh Darwaja Kamana Deepda Krishna Nagar Vivekanand Panchseel
Garden Chokdi Darwaja Residence

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
129 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Amreli - Water Supply Flow Diagram (Class-B)

Mahi River Dharoi


Dam

110 Tarvadi
Ambika nagar 100
LL/Day LL/Day

10 10
10 10 20 10

6
10 20 5

Jaysingh Para
Bhakti Nagar WDS Tarwadi WDS WDS
Brahman
Society WDS

WATER LOSS
Water Production at Source: 100.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
130 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Babra - Water Supply Flow Diagram (Class-D)
Mahi Canal

Babra Vadhavi 10
Jetpur
100
Pump House Sump
WTP
Kariyana
3.5 Road
Sump

1 2.5

Kariyana Road WDS


Amreli Road WDS

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 20.00 Lac Litres/Day
Water Estimated consumption quantity: 8.66 Lac Litres/Day
Estimated Total Loss: 11.34 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
131 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Barvala - Water Supply Flow Diagram (Class-D)

Mahi Pipe line

2.5

Nagarpalika
Kundal Gate pase
WDS

WATER LOSS
Water Production at Source: 12.50 Lac Litres/Day
Average daily quantity of water supplied: 12.50 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
132 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhanvad - Water Supply Flow Diagram (Class-D)

Satsagar Lake Ranasar Lake

14

Timbdi Filter
WDS

Vartu-2 Filter Plant


4 LL Sump +ESR

WATER LOSS
Water Production at Source: 18.00 Lac Litres/Day
Average daily quantity of water supplied: 18. 00 Lac Litres/Day
Water Estimated consumption quantity: 11.54 Lac Litres/Day
Estimated Total Loss: 6.46 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
133 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bhayvadar - Water Supply Flow Diagram (Class-D)

Moj Dam

4.5 4

Ghentiya Dungar
Dhobital Sump
WDS
WDS

WATER LOSS
Water Production at Source: 22.00 Lac Litres/Day
Average daily quantity of water supplied: 22.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
134 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chalala - Water Supply Flow Diagram (Class-D)

Check Check
Dam Dam

Jhar/ Modsupda Khodiyar dam for 4 months


Water Works for 8 months

20

6
6

Khodiyar water works

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 20.00 Lac Litres/Day
Water Estimated consumption quantity: 14.99 Lac Litres/Day
Estimated Total Loss: 5.01 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
135 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Damnagar - Water Supply Flow Diagram (Class-D)

Mahi
Dam

33 GWSSB’s Sump in the City

4 2

4 1.5

Besides
Opp. Circuit
Nagarpalika
House

WATER LOSS
Water Production at Source: 12.50 Lac Litres/Day
Average daily quantity of water supplied: 12.50 Lac Litres/Day
Water Estimated consumption quantity: 9.08 Lac Litres/Day
Estimated Total Loss: 3.42 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
136 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dhoraji - Water Supply Flow Diagram (Class-B)

WATER LOSS
Water Production at Source: 91.00 Lac Litres/Day
Phophad Average daily quantity of water supplied: ND
Dam Water Estimated consumption quantity: 66.97 Lac Litres/Day
Estimated Total Loss: 24.03 Lac Litres/Day

100 Kumbhar wada WTP


LL/Day

20
12

16 20 12

Jetpur road ,
Kumbharwada Janta baug WDS mathliya wadi
pani ni tanki WDS WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
137 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Gadhda - Water Supply Flow Diagram (Class-C)

Mahi Pari Water supplied by GWSSB


yojana
Dam

1.2 1.2

Direct Pumping at 2 WDS: 1.2 1.2


Nariyeldhar, Ramghat Talav

Badligate WDS Samakanthein WDS

WATER LOSS
Water Production at Source: 19.00 Lac Litres/Day
Average daily quantity of water supplied: 19.00 Lac Litres/Day
Water Estimated consumption quantity: 17.34 Lac Litres/Day
Estimated Total Loss: 1.66 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
138 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Gariyadhar - Water Supply Flow Diagram (Class-C)

Mahi Pari
Shatranji Water supplied by GWSSB yojana
Dam Dam

5 5 5 5

Navagam Head Water Works Palitana Road- Water Works

Direct Supply
30 Deep wells

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Average daily quantity of water supplied: 35.00 Lac Litres/Day
Water Estimated consumption quantity: 29.04 Lac Litres/Day
Estimated Total Loss: 5.96 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
139 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Gondal - Water Supply Flow Diagram (Class-B)

Ashapura
Veri Talav Check Check Setubandh
Dam Dam

20 15 15
LL/Day LL/Day LL/Day

Malaviya Umbarda Ashapura Muktidham


Balashram
15 LL Sump+ESR 25 LL Sump+ESR 15 LL Sump+ESR 17 LL Sump+ESR
15 LL Sump+ESR

WATER LOSS
Water Production at Source: 50.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
140 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jaffrabad - Water Supply Flow Diagram (Class-C)

Dhatar
Vadi
Dam

Mitiyala Road 3.25 3.25 Mitiyala Road


WTP-1 LL/Day LL/Day WTP-2

1 2 0.8
3
2

Idgah WDS GEB WDS Hanuman Temple


Koliwad WDS
WDS
Mitiyala Road
WDS

WATER LOSS
Water Production at Source: 14.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
141 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Khambadia - Water Supply Flow Diagram (Class-D)

Ghee
Dam

30
LL/Day

10

Fulwadi WW

Ghee Dam
30 LL Sump+ESR

WATER LOSS
Water Production at Source: 40.00 Lac Litres/Day
Average daily quantity of water supplied: 40.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
142 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Lathi - Water Supply Flow Diagram (Class-D)

Mahi Pari
yojana
Dam

5.5 10 2 7.5

Mangalpara
Gagadiya Gate Gagadiya Gate Gagadiya Gate Vistar WDS
WDS WDS WDS

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 20.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
143 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mahua - Water Supply Flow Diagram (Class-B)

WATER LOSS
Water Production at Source: 59.60 Lac Litres/Day Dam
Average daily quantity of water supplied: 56.60 Lac Litres/Day
Water Estimated consumption quantity: 47.72 Lac Litres/Day
Estimated Total Loss: 11.88 Lac Litres/Day

50 Umaniyavadar village
LL/Day

5 2 5

15 15 15 20

Nr. Gandhi Baug Oppp. Hotel A-One WTP: Main water works

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
144 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Maliya Miyana - Water Supply Flow Diagram (Class-D)
Narmada Canal

GWSSB

2 4

4 2

Near Hospital Kodi Vaas


WDS WDS

WATER LOSS
Water Production at Source: 15.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
145 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Palitana - Water Supply Flow Diagram (Class-B)

Shetrunji river

50
LL/Day

15 10 2 10 2 10

Virpur tank-1
Jivapur-1 WDS Jivapur-2 WDS Jivapur-3 WDS Hathidhar-1 WDS Hathidhar-2 WDS
WDS

WATER LOSS
Water Production at Source: 80.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 47.55 Lac Litres/Day
Estimated Total Loss: 32.45 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
146 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Rajula - Water Supply Flow Diagram (Class-C)
Narmada Canal
Dhatarvdi
Dam

5
GWSSB

2
4
5 4

Infront of Bus Stand

Infront of Bus Stand Mountain

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: 25.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
147 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Salaya - Water Supply Flow Diagram (Class-D)

14

DV Nagar WDS

WATER LOSS
Water Production at Source: 4.50 Lac Litres/Day
Average daily quantity of water supplied: 4.50 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
148 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Savarkundla - Water Supply Flow Diagram (Class-B)

12.5 12.5 2.25 3 3

2.25 12.5

Aasopalav Society BD Kamdar Society Nesdi Sump WDS


WDS WDS

Savar Main Tanki


Kundla Main Tanki
WDS
WDS 2.25 2.25 2.25

Direct Supply at 31 WDS Maghavani Vadi Maghavani Vadi Madhuvan Society


WDS WDS WDS

WATER LOSS
Water Production at Source: 50.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
149 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Sihor - Water Supply Flow Diagram (Class-C)
Narmada Canal

Gautemshwar Lake

GWSSB

10 0.3 0.1 10 30
323

Opp. Ghatnath Opp. Pumping Opp. Pumping


Low Level WDS High Level WDS Opp. Pumping
WDS Station WDS Station WDS
Station WDS
WATER LOSS
Water Production at Source: 50.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 37.64 Lac Litres/Day
Estimated Total Loss: 12.36 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
150 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Talaja - Water Supply Flow Diagram ( Class-C)
Shetrunji
WATER LOSS
river
Water Production at Source: 30.00 Lac Litres/Day
check
Average daily quantity of water supplied: ND
dam
Water Estimated consumption quantity: 24.23 Lac Litres/Day
Estimated Total Loss: 5.77 Lac Litres/Day

30
LL/Day

12
4 0.6

10
4 0.7

Shastrinagar WDS
Jambuda WDS
Varahi WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
151 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Thangadh - Water Supply Flow Diagram (Class-C)

Bandiya
Beli
Dam

5
9.9

2 2.2

Bheed Bhanjan WW Jagdamba WDS

WATER LOSS
Water Production at Source: 25.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 15.54 Lac Litres/Day
Estimated Total Loss: 9.46 Lac Litres//Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
152 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vallabhipur - Water Supply Flow Diagram (Class-D)

WATER LOSS Mahi


Water Production at Source: 15.00 Lac Litres/Day Dam
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 13.21 Lac Litres/Day
Estimated Total Loss: 1.79 Lac Litres/Day Kalyanpur Sump
GWSSB

2.5

2.5

4.5

Phol vadi Nagarpalika Water Works

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
153 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Wankaner - Water Supply Flow Diagram (Class-C)

Machu
Dam

Gyatrinagar Tekri
WTP
75
LL/Day

20 40
10

At Filter Plant -1 At Filter Plant -2 Hanuman Mandir


WDS WDS WDS

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
154 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Bantawa - Water Supply Flow Diagram (Class-D)

Bus Stand WDS


5 LL Sump+ESR

WATER LOSS
Water Production at Source: 5.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
155 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chhaya - Water Supply Flow Diagram (Class-D)

Kodala
Dam

WDS -1
10 LL Sump + ESR

WATER LOSS
Water Production at Source: 45.00 Lac Litres/Day
Average daily quantity of water supplied: 45.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
156 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chorwad - Water Supply Flow Diagram (Class-D)

Narmada Canal

GWSSB

Vinay mandir WDS Hembagh WDS Bandar Road WDS


7.5 LL Sump + ESR 7.5 LL Sump + ESR 2 LL Sump + ESR

WATER LOSS
Water Production at Source: 15.00 Lac Litres/Day
Average daily quantity of water supplied: 15.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
157 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Chotila - Water Supply Flow Diagram (Class-D)

2
1.5 1.5

Direct Supply at 3 WDS:


2 Plot Area, Rameshwar , Sukhpura
0.64 1.5

Panchnath Mandir
Panchnath Mandir Shamshaan WDS WDS
ni Underground tanki
WDS

0.5 0.5 WATER LOSS


Water Production at Source: 7.50 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 6.24 Lac Litres/Day
Estimated Total Loss: 1.26 Lac Litres/Day

Popatpura WDS Mafatiapura WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
158 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dhrangadhra - Water Supply Flow Diagram (Class-B)
Narmada Canal

GWSSB

5 20 5

7.5 20 5

Jagosar WDS Lake View WDS Dhodidhar WDS

5 5
WATER LOSS
Water Production at Source: 115.00 Lac Litres/Day
Average daily quantity of water supplied: 103.00 Lac litres/Day 10 2.5
Water Estimated consumption quantity: 87.25 Lac Litres/Day
Estimated Total Loss: 27.75 Lac Litres/Day

S P Jain WDS Delhi Gate WDS


Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
159 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Dwarka - Water Supply Flow Diagram (Class-D)

Sanni Bhimganj
Dam Dam

Town Zone WDS Station Road WDS


8 LL Sump + ESR 8 LL Sump + ESR

WATER LOSS
Water Production at Source: 15.00 Lac Litres/Day
Average daily quantity of water supplied: 15.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
160 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Halvad - Water Supply Flow Diagram (Class-D)
Narmada Canal

10 5

Panchmukhi WDS 10

5 5

Direct Supply at 1 WDS: 5 4


Lambideri bore

WATER LOSS Morbi Darwaja Darbargadh


Water Production at Source: 40.00 Lac Litres/Day WDS WDS
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: 22.61 Lac Litres/Day
Estimated Total Loss: 17.39 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
161 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jam Rawal - Water Supply Flow Diagram (Class-D)

Sani Dam

5 5

5 5

Hanuman Dhar WDS Near Ghat WDS


7 LL Sump + ESR 7 LL Sump + ESR

WATER LOSS
Water Production at Source: 90.00 Lac Litres/Day
Average daily quantity of water supplied: 90.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
162 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Jamjodhpur - Water Supply Flow Diagram (Class-D)

Fulzar Venu
Dam Dam

45
LL/Day

15
15 15

Jantabag-2 WDS
Jantabag-1 WDS Jantabag-3 WDS

WATER LOSS
Water Production at Source: 30.00 Lac Litres/Day
Average daily quantity of water supplied: 30.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
163 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kalavad - Water Supply Flow Diagram (Class-D)

Mujibnaka Vav WDS


10 LL Sump + ESR

WATER LOSS
Water Production at Source: 19.00 Lac Litres/Day
Average daily quantity of water supplied: 19.00 Lac Litres/Day
Water Estimated consumption quantity: 11.65 Lac Litres/Day
Estimated Total Loss: 7.35 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
164 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Keshod - Water Supply Flow Diagram (Class-B)

1.5 1.5
1.1 4.5

1.5 1.5

Near dhar
akshyadgam area ward 7 WDS
WDS
Ward 9 WDS Ward 10 WDS
1.3 LL Sump + ESR 1.3 LL Sump + ESR

Direct Supply at 3 WDS:


Ward11 ,Ward 12, Argatraj road

4.5 5 5
WATER LOSS
Water Production at Source: 80.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Near Shasrinagar Water Estimated consumption quantity: 65.39 Lac Litres/Day
WDS Near Rajmahal Ward 6 WDS Estimated Total Loss: 14.61 Lac Litres/Day
school WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
165 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Kodinar - Water Supply Flow Diagram (Class-D)

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Sardarnagar WDS Samarpan Society WDS Surajkund WDS


5 LL Sump + ESR 2.5 LL Sump + ESR 4.5 LL Sump + ESR

Panjrapol (Jin Plot) Swaminagar WDS Swami Vivekanand Park


WDS 2 LL Sump + ESR WDS
3 LL Sump + ESR 5 LL Sump + ESR

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
166 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Limbdi - Water Supply Flow Diagram (Class-C)
Narmada Canal WATER LOSS
Water Production at Source: 50.00 Lac Litres/Day
WTP is not working . Average daily quantity of water supplied: ND
It was operated only for a year then 290 Water Estimated consumption quantity: ND
it was closed since 1989. LL/Day Estimated Total Loss: ND
The WTP was constructed under
Narmada Laxmisalam Sujhalam sufalam
Yojna
10

5
4 10 10

1 10 10
Gebansa WDS

Uthadi Gate WDS Nagarpalika offce Juna Water works


WDS WDS

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
167 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Mangrol - Water Supply Flow Diagram (Class-B)
Narmada Canal

GWSSB

2
5

6
WATER LOSS
Water Production at Source: 29.00 Lac Litres/Day
Average daily quantity of water supplied: 29.00 Lac Litres/Day
Nr. Old Bus stand Water Estimated consumption quantity: 22.19 Lac Litres/Day
WDS Estimated Total Loss: 6.81 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
168 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Manavadar - Water Supply Flow Diagram (Class-D)

Bus Stand WDS


5 LL Sump + ESR

WATER LOSS
Water Production at Source: 11.00 Lac Litres/Day
Average daily quantity of water supplied: 10.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
169 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Okha - Water Supply Flow Diagram (Class-B)

Nageshwar
Dam

5 7.5 2.8

3.5 4.15

2 1

Arambhda WDS Okha WDS


8 LL Sump + ESR

Ambedkar Society Gayatri Nagar WDS


WDS

WATER LOSS
Water Production at Source: 20.00 Lac Litres/Day
Average daily quantity of water supplied: 20.00 Lac Litres/Day
Water Estimated consumption quantity: 11.88 Lac Litres/Day
Estimated Total Loss: 8.12 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
170 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Ranavav - Water Supply Flow Diagram (Class-D)

Podana
Dam

7.5 0.5 1.5 1 2.5

Harijan Vas WDS Dispensary WDS Jagnath WDS Station WDS Adityana WDS

WATER LOSS
Water Production at Source: 52.00 Lac Litres/Day
Average daily quantity of water supplied: 49.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
171 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Sikka - Water Supply Flow Diagram (Class-D)
Narmada Canal
Sreeji
Dam

Sriji Water Works


GWSSB

Housing Board WDS


Main WW Sump WDS Sheeji Water Works
8 LL Sump + ESR
8 LL Sump + ESR 8 LL Sump + ESR

WATER LOSS
Water Production at Source: 18.00 Lac Litres/Day
Average daily quantity of water supplied: 17.04 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
172 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Sutrapada - Water Supply Flow Diagram (Class-D)
Narmada Canal

GWSSB

Paschimbardi /Uplapada Sump


4.5 LL Sump + ESR

WATER LOSS
Water Production at Source: 3.50 Lac Litres/Day
Average daily quantity of water supplied: 3.50 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
173 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Talala - Water Supply Flow Diagram (Class-D)

0.4

Gayatri WDS

Hiran-1 WDS
0.35 LL Sump + ESR

WATER LOSS
Water Production at Source: 24.00 Lac Litres/Day
Average daily quantity of water supplied: 24.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
174 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Una - Water Supply Flow Diagram (Class-B)
15 No. of open well

130
LL/Day

Unnatnagar Society WDS


Court Vistar WDS
Bheempara WDS Delvada Road WDS
Nr. Dhud Kotiya WDS 0.35 LL Sump + ESR
2.7 LL Sump + ESR 3 LL Sump + ESR
7 LL Sump + ESR

3.75 9
4

Modeshwar WDS
0.35 LL Sump + ESR
Bore/ PERFORMANCE ASSESSMENT SYSTEM,
TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
175 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Una - Water Supply Flow Diagram (Class-B)

WATER LOSS
Water Production at Source: 52.00 Lac Litres/Day
Average daily quantity of water supplied: ND
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
176 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vadhwan - Water Supply Flow Diagram (Class-B)
Dhori
Dhariya
Dam

100
LL/Day

10

15
10

8
7

12

Main Ambavadi WDS 7


Dholi Pole WDS

WATER LOSS
Water Production at Source: 35.00 Lac Litres/Day
Bhaktinadan WDS
Average daily quantity of water supplied: 34.70 Lac Litres/Day
Water Estimated consumption quantity: 24.70 Lac Litres/Day
Estimated Total Loss: 10.30 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
177 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Vanthali - Water Supply Flow Diagram (Class-D)

Direct Supply at 1 WDS:


Ojat

Ragatiya WDS

WATER LOSS
Water Production at Source: 10.00 Lac Litres/Day
Average daily quantity of water supplied: 10.00 Lac Litres/Day
Water Estimated consumption quantity: ND
Estimated Total Loss: ND

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
178 /Open End
All units are in Lac Litres ; As on 2008-09
Well
Visavadar - Water Supply Flow Diagram (Class-D)

20 4 4 2 2

Sattadhar Road-2 Sattadhar Road-3 Sattadhar Road-4 Sattadhar Road-5


Sattadhar Road-1
WDS WDS WDS WDS
WDS

WATER LOSS
Water Production at Source: 32.00 Lac Litres/Day
Average daily quantity of water supplied: 32.00 Lac Litres/Day
Water Estimated consumption quantity: 18.05 Lac Litres/Day
Estimated Total Loss: 13.95 Lac Litres/Day

Bore/ PERFORMANCE ASSESSMENT SYSTEM,


TubeWell Consumer
WTP Sump ESR HGLR Prepared by : Urban Management Centre
179 /Open End
All units are in Lac Litres ; As on 2008-09
Well

You might also like