You are on page 1of 10

1

CURRICULUM VITAE

Khalid Yousaf S/O Muhammad Yousaf

Dosundhi Street, Near Camp#4, New Civil Lines, Gujranwala.

E-mail: khalidyousaf1981@gmail.com

Cell # +923217182339
+923135680086

CAREER OBJECTIVE:

My objective is aimed towards applying my knowledge and to excel in the life to explore new dimensions
and to obtain a challenging position in an organization, where accomplishments are rewarded with
responsibility and advancement, which will maximize my natural strengths as a problem solver and where
my experience, formal education and technical expertise will have a direct influence on institutional growth.

PERSONAL PROFILE

 Date of Birth 01-10-1981


 Religion Islam
 Nationality Pakistani
 CNIC No. 34101-4482881-9
 Marital Status Married
 Domicile Gujranwala
 Degree Accreditation Pakistan Engineering Council
 PEC # Civil/ 41000

ACADEMIC QUALIFICATIONS

 MS Transportation Engineering (in progress)

Institution NUST: Military College of Engineering Risalpur


Session 2017 -2020
CGPA 3.36/4

 B.S (Civil Engineering)

Institution The University of Lahore.


Session 2011-2015
CGPA 3.24/4
2

 Diploma of Associate Engineer

Board Punjab Board of Technical Education Lahore


Institution Government College of Technology Rasul
Passing Year 2000
Grade A+ (2785/3350)

 Secondary School Certificate

Board BISE Gujranwala


Institution G/H School Dhuley, Gujranwala
Passing Year 1997
Grade A+ (695/850)

Additional Education

 Primavera The University of Lahore.


 Mx Road Pakistan Engineering Congress
 Etabs Pakistan Engineering Congress
 AUTO CAD Christian Technical Training College Gujranwala

 OFFICE MANAGEMENT
 MS WORD
 MS EXCEL
 MS POWER POINT

PROFESSIONAL PROFILE

LAB TECHNICIAN: 2000-05

 Project 01: Orascom Telecom Towers Erection 2000-2002


I worked in: Inter Builds Services
Client : Orascom Telecom
Consultant: ACE
Contractor: Inter Builds Services

 Project 02: Paktel Mobile Towers Erection 2002-2004


I worked in: Inter Builds Services
Client : Paktel Mobiles
Consultant: ACE
Contractor: Inter Builds Services

 Project 03: CMPak Mobile Towers Erection 2004-2005


I worked in: Inter Builds Services
Client : Orascom Telecom
Consultant: ACE
Contractor: Inter Builds Services
3

SITE INSPECTOR: 2005-08

 Project 01: Gujranwala-Nowshehra Wirkaan Road


I worked in: AZ Associates
Client : C&W Punjab
Consultant: AZ Associates
Contractor: Sheikh Nazar and Co

 Project 02: Gujranwala-Sialkot Road


I worked in: FWO
Client : C&W Punjab
Consultant: Nespak
Contractor: FWO: Frontier Works Organization

 Project 03:Sialkot-Pasrur Road


I worked in: AZ Associates
Client : C&W Punjab
Consultant: AZ Associates
Contractor: Asad and Co

CIVIL FOREMAN: 2008-11

 Project 01:Gujranwala-Hafizabad Road


I worked in: Asad and Co
Client : C&W Punjab
Consultant: AZ Associates
Contractor: Asad and Co

 Project 02:Gujranwala Public Library Gujranwala


I worked in: Asad and Co
Client : C&W Punjab
Consultant: AZ Associates
Contractor: Asad and Co

ASSISTANT RESIDENT ENGINEER: 2015-16

 Eight Weeks Internship


I worked in: Guaranty Engineering (Pvt) Limited.
Client : Nishat Emporium Mall
Contractor: Guaranty Engineering
 Project 01: Establishment of Model Cattle Market, Chichawatni District Sahiwal
I Worked in: ESC Associates
Consultants: ESC Associates
Contractors: Mian Ehsan ul Haq and Co.
Client: C&W Buildings
 Project 02: Establishment of Model Cattle Market, Gondal District Attock
I Worked in: ESC Associates
Consultants: ESC Associates
Contractors: Chaudhry Mehmood Builders
Client: C&W Buildings
4

RESIDENT ENGINEER: 2017 To Onwards

Project 01: Construction of Metalled road from Vehova to Binda from Km No.0.00 to 8.00 Length =
8.00 KM, District Dera Ghazi Khan.
Project 02: Construction of Metalled road from Thul Janan to Mud Rindan U/C Thul Ali Muhammad,
Tibbi Lundan Length = 14 KM, District Rajanpur
Project 03: Widening/Improvement of road from Dajal to Harrand from Km No.0.00 to 5.55 Length =
5.55 KM, District Rajanpur
Project 04: Rehabilitation / W/I of Metalled road from Sheroo Adda to Nala Soon Road Length = 6.50 KM
(Phase-I to Phase-IV).
Project 05: Construction of Road from Chak No. 530/TP to Goormani Chowk, Chak No. 528, Length
11 Km (Phase-I Length = 7.00 KM)
Project 06: Metalled Road from Sohni Chowk to Rampur Hospital (24 Feet) 7.00 KM (Phase-I
Length = 3.70 KM)
Project 07: Construction of Metalled road from Chak No.157/TDA to Chak No. 425/ TDA via Chak
No.169/TDA Length = 19.70 KM (Phase-I Length =11.55 Km)
Project 08: Const. of Metalled road from Chak No.160-A/TDA to MM Road via Chak No.150, 151,
145, 140, 142 & 154-A, Layyah Length = 39.00 KM (Phase-I Length = 26 Km).
Project 09: W/I of Road from Heera Adda to Ghalloo MOR via Ladhana & Pir Jaggi Sharif, Length =
37.80 Km.

 Annual Development Programme Schemes 2016-17 : 137 No of Schemes in addition to above


mentioned schemes
I worked in: ESC Associates
Client: C&W
Consultant: ESC Associates
Contractor: Multiple Contractors

OFFICE OF THE
SUPERINTENDING ENGINEER
HIGHWAY CIRCLE DERA GHAZI KHAN
064-9260521  064-9260522
Email: sephcdgk@hotmail.com , sephcdgkhan@gmail.com

To,
Resident Engineer,
M/S ESC Consultants (ADP 2016-17),
D.G.Khan.

SUBJECT: RESIDENT SUPERVISION OF ROADS TO BE TAKEN UP UNDER ADP SCHEMES


FOR THE YEAR 2016-17 PERTAINING TO HIGHWAY CIRCLE, D.G.KHAN.

It is requested that the requisite staff for Resident Supervision / TPV of the following
schemes may be deputed so that the works are started / completed at the earliest.
Sr. Progr- Estimated Provision
Name of Project Consultancy
No. amme Cost Cost
DISTRICT D.G.KHAN
1. ADP Construction of Metalled Road from Aali Wala – Ghous Abad Road 3.971 0.077
5

Sr. Progr- Estimated Provision


Name of Project Consultancy
No. amme Cost Cost
Km No.2 to Basti Alyani Length= 0.70 Km
Approval Of Jeepable Tracks In Tuman Qaisrani. D.G Khan.
2. ADP 82.791 1.582
Lengyh 20.71 Km
Construction of Metalled Road from Azam Chowk to Nawan Shumali
3. ADP 5.500 0.107
Via Budan Wala Mouza jalbani. Length=1km
Const. of M/R from Barbar Miner to Basti Mustafa Jagiani Esa 0.174
4. ADP 9.000
Deveani Mouza Chak Bakhar L = 1.50 Km (Taken Length=1.0km TPV
Construction of Metalled Road from Frid Abad School to Railway
5. ADP 8.500 0.164
Line U/C Shadan Lund.Length= 1.50Km
Construction of Metalled Road from Indus Highway Qasba Kala to
0.126
6. ADP D.G. Canalvia Jamaly Wala, Hafiz Wala UC Basti Ranjha 5000 ft 6.500
TPV
Length= 5000Rft (Taken Length=4500 Rft)
Construction of Metalled Road from Indus Highway to Basti Bulkani,
7. ADP 8.500 0.164
Chah Mitho Walla UC Kala 4000 ft. Length=4000Rft
Construction of Metalled Road from Kowater Imam Bakhish Malghani
8. ADP 5.500 0.105
Length= 1.0 Km
Construction of Metalled Road from Shoria to basti Yaseen Lund
9. ADP 10.500 0.246
Mouza Khanpur Janobi .Length=1.50 km)
Construction of Metalled Road Sahiban Minor from Kandy Wala to 0.106
10. ADP 5.500
Thari Wala.Length=1.00km TPV
Rehabilation of Metalled Road from Kott Chuta Road to Basti Kappar 0.096
11. ADP 5.000
Shah. Length=2.20km (taken Length=1.50km) TPV
Rehabilation of Metalled Road from Mamori Kot Chuta Road to Basti 0.029
12. ADP 1.500
Lashari.Length=0.50 km(Taken Length=1075Rft). TPV
Rehabilation of Metalled Road from Manka to Mamori.
13. ADP 6.000 0.116
Length=2.00km
P.M Widening / Improvement of metalled road from Kalma Chowk to Tub
14. 18.453 0.351
SDG’s More (Old College Road) Length = 2.00 Km
P.M Rehabilitation / Repair of Metalled road from Mamoori to Basti Bada
15. 10.794 0.198
SDG’s Length = 2.00 Km
P.M Construction of metalled road from Adda Triman to Boys High School
16. 11.821 0.222
SDG’s Triman U/C Jallu Wali Length = 1.60 Km
P.M
17. Construction of Bridge on DGKhan Canal, Basti Ramin 29.278 0.547
SDG’s
P.M
18. Const. of Bridge Skip Channel Near Basti Abbas Hutwani 26.027 0.485
SDG’s
C.M Const. of M/R from Indus highway to Basti Bakir Wala via Faiz Abad,
19. 46.718 0.888
Spl. Basti Bhukhi U/C Babbi Length = 6.00 Km
DISTRICT LAYYAH
W/I / Const.of M/R Adda Talib wala to Model Village Chak No.
1. CMD 100.000 1.891
105/ML Via Chak No. 104/ML & Chak No. 102/ML , Length 9.20 Km
Construction of metalled road from Din Pur to Basti Warrn
2. -do- 12.882 0.241
Length=2.0 Km
Construction of M/Road From Warian Purana To Nawarian
3. 6037 50.000 0.912
(Remaining Portion) (Length 8.40 KM)
Sugar W/I of metalled road Basti Vige to khokhar wala via Sheran Wala
4. 42.930 0.786
Cess length=9.00 Km. (Phase-I from Km No.0.00 to 1.65)
Construction of Submersible Bridge 6 span 30’ each over Lala creek
5. -do- 18.508 0.327
with approaches Mouza Sahu wala.
6. -do- Rehabilitation of Metalled road from sheen wala to karor L = 3.97 Km 10.483 0.192
DISTRICT RAJANPUR
Widening / Improvement of metalled road from Pull Qadra to Head
1. ADP 26.520 0.510
Hamid (Phase-III) length = 1.60 Km
Construction of streets of Kot Mithan city Badly affected by flood of
2. ADP 25.000 0.243
2010.
P.M Construction / Rehabilitation of metalled raod from Kotla Mughlan
3. 2.700 0.051
SDG’s road to Kotla Dewan length = 0.40 Km
P.M
4. Construction of metalled road in basti Mew length = 0.25 Km 5.500 0.103
SDG’s
P.M Construction of metalled road from Aqilpur road to Gulo wali road via
5. 13.000 0.247
SDG’s Darbar Imam Shah Shaib length = 1.58 km.
P.M Rehabilitation / improvement of metalled road from Rajanpur to Asni
6. 10.000 0.190
SDG’s road (reach 5.06 km to 7.40 km) length = 2.34 km.
P.M Rehabilitation / widening / improvement of metalled road from Indus
7. 9.000 0.173
SDG’s Highway N-55 to Ramzan Abad length = 1.18 km.
P.M Construction of metalled road (Balance Portion) from basti Tanwari,
8. 5.000 0.095
SDG’s basti Gajani and basti Hafiz Barqat Balhora length = 0.59 km.
6

Sr. Progr- Estimated Provision


Name of Project Consultancy
No. amme Cost Cost
P.M Construction of metalled road from Reikh Bagh wala to basti Gulfaz
9. 5.000 0.094
SDG’s via Kamal Arrian length = 0.67 km.
P.M Construction of metalled road from Fateh pur road to basti Arshad
10. 5.000 0.094
SDG’s Shahid length = 0.60 km.
P.M Construction of metalled road from Harrand road to basti Lachi Khan
11. 10.000 0.182
SDG’s Lashari length = 0.86 km.
P.M Construction of metalled road at basti Dumra (2 span 12 ft each
12. 5.000 0.094
SDG’s Bridge with approaches) length = 0.17 km.
P.M Rehabilitation of metalled road from Meeranpur road to Graveyard
13. 3.000 0.057
SDG’s Sardar Bijar Khan length = 0.42 km.
P.M Construction of metalled road at basti Ali Haider Khan Khalilani
14. 5.000 0.095
SDG’s length = 0.62 km.
P.M Construction of metalled road at basti Yara Khan Khosa length =
15. 5.000 0.093
SDG’s 0.64 km.
P.M Construction of metalled road from Arbi road to basti Hazir Bakhsh
16. 12.600 0.235
SDG’s Jut Rojhan length = 1.06 km.
P.M Construction & Rehabilitation of metalled road from Harrand road to
17. 2.700 0.051
SDG’s Kotla Jamal & culverts U/c Harrand
P.M Construction of metalled road from Nai Abadi Kot Mithan to basti
18. 6.500 0.124
SDG’s Nazroo Main Qadra canal length = 0.72 km.
P.M Rehabilitation of metalled road Sardar Fayaz Khan Drishak length =
19. 5.000 0.095
SDG’s 0.66 km.
P.M Construction of metalled road from Railway Phatak to Chodhry
20. 5.000 0.095
SDG’s Muhammad Saleem length = 0.61 km.
P.M Construction of metalled road from Indus Highway to Ch. Abdul
21. 5.000 0.095
SDG’s Jabbar Arain Kotla Lundaan length = 0.62 km.
P.M Construction of metalled road from basti Ch. Munir Ahmad Sahan
22. 5.000 0.095
SDG’s Wala length = 0.62 km.
P.M Construction of metalled road from Main road to basti Nasir Ahmad
23. 5.000 0.095
SDG’s Poli length = 0.62 km.
P.M Construction of metalled road from Bait Sountra road to Basti Jam
24. 6.000 0.114
SDG’s Sadiq Beratha U/c Bait Sountra length = 0.70 km.
Sugar Construction of metalled road from Basti Khawaja to Basti Jatoi
25. 43.518 0.798
Cess length = 3.64 Km.
Re-construction / Widening of metalled road from Bumbka Pull to
Sugar
26. Chaki Allah Wadhaya Jatoi length = 3.60 Km. 21.981 0.403
Cess
Sugar Re-construction of metalled road from Railway Crossing to Qadra
27. 25.805 0.473
Cess Canal (Indus Sugar Mill to Wang road) length = 1.51 Km.
Sugar Rehabilitation / Widening / Improvement of metalled road from Qutab
28. 35.659 0.648
Cess Canal Grid Station road to Jageer Gabool length = 1.80 Km.
DISTRICT MUZAFFARGARH
Construction of metalled road from Jatoi road to basti Ghazi through
1. ADP
Basti Mazar wala length 2.34 KM
16.925 0.325
2. ADP Construction of road, head 46 to Patti Sakhai, 2-km. 14.786 0.282
3. ADP Construction of road Nooran Anbar band to Muzaffargarh kanal, 3-K. 21.522 0.450
4. ADP Construction of road Muzaffargarh road to Ammano wala, 3- km. 22.438 0.471
Construction of road MM road towards West Wallo male chak No.
5. ADP
616/TDA metalled road 3km.
21.069 0.440
MM road towards East Jhangi adda Chak No. 649/TDA metalled
6. ADP
road 3km.
22.868 0.471
Construction of FM metalled from Lower magasan to Chahtay wala
7. ADP
(Gurmani Shirqi) Tehsil kot Addo L=3.86 km
29.185 0.555
Construction of FM metalled road from Walloo wala to Mashori wala
8. ADP
Tehsil Kot Addo District Muzaffargarh L=4km.
32.491 0.575
Construction of FM metalled road from Koray wala to Siri Lohen
9. ADP
Tehsil Kot Addo District Muzaffargarh L=4km.
31.627 0.552
Construction of Metalled Road from Lund Minor Basti Morqand L=2
10. ADP
km.
13.384 0.251
Construction of Metalled Road from Sultanpur to Qasba Jangla L=2.5
11. ADP
km.
20.110 0.390
Construction / Improvement of Roads of City Shehr Sultan (5.5
12. ADP
KM+500 Meters Repair) Length 7.54 Km
27.477 0.515
Construction / Improvement of Roads of Union Council Dhamar Wala
13. ADP
Length 4 Km.
21.907 0.411
Construction / Improvement of Roads of Union Council of Binda
14. ADP
Ishaq (3.5 KM Repair) Length 9.75 Km
21.539 0.412
7

Sr. Progr- Estimated Provision


Name of Project Consultancy
No. amme Cost Cost
Construction / Improvement of Roads of Union Council of Khalti
15. ADP
Length 3.70 Km
26.303 0.496
Construction / Improvement of Roads of Union Council of Kotla
16. ADP
Gamon (8.00 KM Repair + 0.75 New) Length 8.43 Km.
29.000 0.571
Construction / Improvement of Roads of Union Council of Kotla Lal
17. ADP
Shah (5.00 KM Repair) Length 8.05 Km.
29.464 0.557
Construction / Improvement of Roads of Union Council of Rampur
18. ADP
(7.00 KM Repair + 0.79 New) length 7.79 Km.
26.723 0.509
Construction / Improvement of Roads of Union Council of Shehr
19. ADP
Sultan length 4.85 Km.
30.329 0.588
Construction / Rehabilitation of road from Daira Deen Panah Road
20. ADP
Askar Petrol Pump to LMB Bund length 8.10 Km.
32.993 0.700
Construction of Metalled Road from Godar Road to Ghuman wala
21. ADP Mochi Wala Darali Basti Kahil, Basti Sanjhrain via Khajar Wala UC 49.930 0.960
Gul Qaim Mastoi Length 10.10 Kms
Rehabilitation / Construction of Metalled road from Manikpur Qureshi
22. ADP road more to shah jamal road via Parwala, Hassan Pur Kacha & 49.969 0.978
Basti Habib (L=8.04 Km)
Construction of Metalled Road from Nawan Road Bypass Basti
23. ADP Rozay Wala Mouza Din Pur Via Jalal Abad to Mubarak Pur Length 49.917 0.952
7.73 KM
Construction of Metalled Road from Qasba Sarki Road to Qasba
24. ADP
Kundai and Qasba Arain Length 6.87 Kms
49.944 0.959
Construction of Metalled Road Basti Jhanbh Mouza Taliri length
25. ADP
2.00 Km.
16.998 0.335
Rehabilitation / Construction of Metalled Road from Double More to
26. ADP
basti Ramzan Abad via Basti Mohana, Basti Lashari L=8.87 Km
49.964 0.969
Rehabilitation / Construction of Metalled Road from Shah Jamal Basti
27. ADP jhabail Ahmad Mohana via Basti Lunda, Graveyard Shah jamal, Basti 49.827 0.954
Gopang, Basti Ahmad Mohana agency, Basti Jhabeel L=9.05 km
28. ADP Construction of Road from Missan Kot to Khan Garh length 1.71 Km. 12.497 0.238
Rehabilation of Metalled Road from Zila Council to Khushab Road
29. ADP via Sherwani Chowk, Chungi No.9, Purana Rangpur Road, Railway 49.995 0.872
Phatak and Mouza Bhutta Pur length 5.74 Km.
Rehabilation of Road from Khushab Road to Rangpur Road via
30. ADP
Sheikh Laddhu Darbar length 6.67 Km.
34.975 0.666
Repairing of Road from Basira Road to Meerani Road length 2.15
31. ADP
Km.
12.267 0.234
Construction of metalled link road of Chak No: 598/TDA, 599/TDA,
32. ADP
600/TDA, 601/TDA and 604/TDA length 2.10 KM
14.297 0.210
P.M Construction / Rehabilitation of M/R Haji Shah from P/S Khurshid
33. SDG’s Chandia to Basti Haji Shah Length 1.79 KM
5.000 0.050
P.M Construction / Rehabilitation of M/R from Awan Bridge to Aman
34. SDG’s Chowk. (Length 3.50 KM)
9.994 0.100
P.M Construction / Rehabilitation of Metalled Road from Bridge Dingga to
35. SDG’s Sojal Wali (Length 3.75 KM)
10.192 0.100
P.M Construction / Rehabilitation of Metalled Road from Peer Talib
36. SDG’s Hussain Mor to Basti Chandia (Length 2.48 KM)
5.496 0.050
P.M Construction / Rehabilitation of Metalled Road from G.T Road Gujrat
37. SDG’s to Basti Jangla (Length 1.00 KM)
3.000 0.040
P.M Construction / Rehabilitation of Metalled Road from G.T Road Kot
38. SDG’s Addu to Bukhi Road via Basti Khera (Length 1.60 KM)
4.995 0.050
P.M Construction / Rehabilitation of M/R from Basti Beerin wala to Chiri
39. SDG’s wala at Canal Lower Magassan (Length 1.00 KM)
2.487 0.030
P.M Construction / Rehabilitation of Metalled Road from Nala Sardar to
40. SDG’s Abu Huraira Chowk Length 0.92 KM
4.999 0.050
P.M Construction / Rehabilitation of Metalled Road from Khar Gharbi
41. SDG’s Road to Basti Khoot (Length 0.80 KM)
2.500 0.020
Construction of M/R from Bridge Canal to Basti Chandia and
P.M
42. SDG’s
construction of metalled road from Gird Nalli to Basti Ranjha Wali 6.000 0.050
Length 0.93 KM
P.M Construction of Metalled Road from Thatha Gurmani Road to
43. SDG’s Rekhan Road Length 1.50 KM
9.997 0.100
P.M Construction / Rehabilitation of Metalled Road Daya Chokha Road to
44. SDG’s Peer Mumtaz Length 0.64 KM
1.999 0.020
P.M Construction of Metalled Road from Thatha Gurmani Road to Mian
45. SDG’s Suleman Afaq Length 0.23 KM
1.600 0.010
8

Sr. Progr- Estimated Provision


Name of Project Consultancy
No. amme Cost Cost
P.M Construction of M/R from Mochi Wala to Gohar wala U/C Budh
46. SDG’s length 0.54 Km
3.500 0.040
P.M Construction / Rehabilitation of Metalled Road from Mehmood Kot
47. SDG’s City to Lal Peer Railway Crossing length 1.04 Km
7.000 0.050
P.M Construction / Rehabilitation of Metalled Road from Dera Ghazi Khan
48. SDG’s Road to Wazir Khan Dasti House, U/C Baseera length 0.27 Km
2.000 0.020
Construction / Rehabilitation of Metalled Road Sheikh Wala, Bulle
P.M
49. SDG’s
Wala, Punjain Wala, Basti Kandh, Basti Ahmdani U/C Wan Pitafi 7.499 0.050
Length 1.16 KM
P.M Construction / Rehabilitation of Metalled Road Essan Wala, Shah Ali
50. SDG’s Wala, Bhatti Wala U/C Wan Pitafi length 0.77 Km
5.200 0.050
P.M Construction of metalled road from Balochwali to Jalalwala Mouza
51. SDG’s Umerpur Janubi Union Counicil Umerpur Janubi length 0.95 KM
6.000 0.050
P.M Construction of Metalled Road Basti Darkhasti Mauza Metla Length
52. SDG’s 0.66 KM
3.960 0.040
P.M Construction of Metalled Road Basti Haji Saeed Ahmad Length 0.41
53. SDG’s KM
2.943 0.030
P.M Construction of Metalled Road Mandu Road to Basti Sohrani Bait
54. SDG’s Qaim Shah length 0.41 Km
2.950 0.030
P.M
55. SDG’s
Construction of Metalled Road Basti Rana Zahid Length 0.37 Km 2.475 0.030
P.M
56. SDG’s
Const. of Metalled Road Basti Rana Shamshad Length 0.26 Km 1.967 0.020
P.M Construction of Metalled Road Basti Sial, Basti Jam Arshad Mahra,
57. SDG’s Basti Ghulam Hussain Khalung, Basti Altaf Kushak length 0.34 Km
2.469 0.020
P.M Construction / Rehabilitation Metalled Road Shah Jamal to Head 76
58. SDG’s Road Ahmad Mohana Length 2.55 KM
9.789 0.100
P.M Construction / Rehabilitation Ahmad Mohana Road to Muzaffargarh
59. SDG’s Canal Ahmad Mohana Length 2.70 KM
9.772 0.100
P.M Construction of metalled road from Basti Malookwala to Basti
60. SDG’s Balochan length 0.65 KM
5.000 0.050
P.M Construction / rehabilitation of M/R from Pull Dinga to PARCO length
61. SDG’s 1.23 KM
3.500 0.040
Construction / rehabilitation of M/R from Pull Dabbi Shah Minor to
P.M
62. SDG’s
Choki Janglaat Sojhalwali length 1.07 KM 3.500 0.040

P.M Construction / rehabilitation of M/R from P/S Khurshid Shah to Gujrat


63. SDG’s road length 1.007 KM
3.500 0.040
P.M Construction / rehabilitation of M/R from Mouza Kherra road to Bukhi
64. SDG’s road length 0.89 KM
3.500 0.040
P.M Construction of M/R from Nallah Sardar to Basti Ashiq Khan Gurmani
65. SDG’s (2000 Rft) length 0.61 KM
4.300 0.040
P.M Construction of M/R from Khakhi Pull road to Basti Attaullah Shah
66. SDG’s (1500 Rft) length 0.46 KM
3.677 0.040
P.M Construction of M/R from Khand Form to Basti Jatoi Easson wala
67. SDG’s (1800 Rft) length 0.55 KM
4.266 0.040
Sugar Widening of Road (Sanawan Langer Sarai Road) 06 Ft on Both
68. Cess Sides from Muzaffargarh Canal Pul to onward length 1.42 Km
49.762 0.913
Sugar Construction of metalled road from FSML along Eastern Bank of
69. Cess Saim Nallah to Khar Gharbi road length 3.80 KM
130.354 2.321
Sugar Widening / Improvement of metalled road from Sinawan Mehmood
70. Cess Kot road to Fatima Sugar Mill Railway x-ing length 0.96 KM
12.477 0.229
Rehabilitation of metalled road from Muzaffargarh to Shah Jamal via
Sugar
71. Cess
Mondka length 27.75 KM (Reach Bypass Chowk to Usman Koria) 132.992 2.414
length 23.18 KM
Sugar Rehabilitation of M/R from Bhukhi Adda to Adda Lal Mer (KAPCO
72. Cess Road) Length 8.60 Km
49.997 0.916
Sugar Rehabilitation of M/R (Arrain Wala Kashif Abad Road) from Saman to
73. Cess Kashif Abad upto Mehmood Kot Road Length 7 Km
39.101 0.716
Sugar Rehabilitation of M/R from Manahan to Sanawan Kot Addu Road
74. Cess length 4 Km
23.361 0.433
Sugar Rehabilitation of metalled road from Ali Di Basti to Usman Kuria and
75. Cess Mahra road to Basti Borr length 2.00 KM
10.146 0.186
Sugar Rehabilitation of metalled road from Kot Adu Bypass to Pull Chandia
76. Cess length 2.80 Km.
11.997 0.222
Sugar Rehabilitation of metalled road from Bunglow Hinjrai to Bund
77. Cess Sanawan length 0.65 Km.
4.460 0.076
9

Sr. Progr- Estimated Provision


Name of Project Consultancy
No. amme Cost Cost
Sugar Rehabilitation of metalled road from Bunglow Hinjrai Road to Basti
78. Cess Watto length 1.81 Km.
8.518 0.115
Sugar Rehabilitation /Construction of M/R from Badal Chowk to Adda Lal
79. Cess Meer (KDQ-DDP Road) length 2.90 Km.
17.831 0.329
Sugar Rehabilitation of M/R from Venhiwal Chowk to ByPass (Pirhar Road)
80. Cess length 1.90 Km.
9.545 0.120
Sugar Rehablitation of Sanawan Langer Sarai Road length 33.60 KM reach
81. Cess from 11.16 to 13.16 length 2 KM
38.135 0.700
Sugar Widening / Improvement of road from Sinawan to Khar Gharbi road
82. Cess from KM No: 0 to 1.75 KM length 1.75 KM
49.989 0.914
Sugar Rehabilitation of metalled road from Jhanb Chowk to Sh: Umer
83. Cess Chowk length 5 KM
25.774 0.471
Development of fisheries in Saline and Barakish Water of the
84. Deposit Southern Zone of Punjab one at Ghazanfargarh (Khangarh & 8.146 0.145
Muzaffargarh) District Muzaffargarh length 3000 Rft

You are directed to mobilize your resident supervisory staff immediately to attend respective

projects.

CC:-

1- Chief Engineer (South), Punjab Highway Department, Lahore.


2- All Executive Engineer, in Highway Circle, D.G.Khan..
3- M/S Engineering Services Consultants (ESC), House # 2, Block # 3, Sector A-II, Township,
Lahore.

 Study Tours
 Visit to Head Khanki on Chenab River.
 Visit to Mangla Dam.
 Visit to Waste Water Treatment Plant in Faisal Abad.
 Visit to Jinah underpass and Karim block Link Road.

 InterPersonal Skills and Abilities.


 Strong, dignified interpersonal skills that command authority.
 A team player with strong technical skills.
 Moral courage and high ethics.
 A reputation for honesty, integrity and fairness.
 Keen to learn new things.
 Work in a team with diverse backgrounds and a willingness to learn.
 Communicate people at levels.
 Work in a team with diverse backgrounds and willingness to learn.
10

 Activities and Hobbies.


 Reading any interesting books, Magazine and Newspaper.
 Solving Mathematical Puzzles.
 Designing Creative Engineering techniques.
 Playing Badminton with friends and family.
 Searching related course and works on the internet.
 I have a collection of over 300 books related to civil engineering.

 Reference
 Available on request.

 Declaration
 I hereby declare that the details mentioned above are true to the best of my knowledge.

. Khalid Yousaf

You might also like