BILL OF QUANTITIES

JOB No. SHEET


PROJECT ETHIOPIA

HOUSE (15.7x3) 2.8m


DOUBLE DWELLING
SERVICE QUARTOR
Rev. No. DATE

Clear Height
Doc. No. Anx-A
A 15-Feb-16
PREPARED CHECKED
PARTICULARS DOUBLE DWELLING SERVICE QUARTOR HOUSE
VGD KVC

Sl. No. Item No. Description Unit

GROUND FLOOR (15.70x3) Sqm 47.10

TOTAL AREA Sqm 47.10

A Earth work

1 Volume of excavation. Cu.m 232.26

2 Volume of back filling. Cu.m 191.67

3 Removal of surplus earth. Cu.m 40.58

B Concrete work

1 Volume of PCC 1 : 4 : 8 Cu.m 7.10

2 RCC - C25 Cu.m 54.99

3 Weight of reinforcement. kg 24,010.00

4 Area of shuttering work. Sq.m 273.08

C Masonry work.
200mm Hollow Block class-A wall with cement sand mortar
1 Cu.m 21.18
1:3(EXTERNAL)
150mm Hollow Block class-B walls with cement sand mortar
2 Cu.m 4.37
1:3((INTERNAL)

D Plastering work

External wall plaster 18mm thk (12+6mm) with cement sand


1 Sq.m 143.43
plaster1:6 in two layer.
Internal walls - finished with 15 mm thick Three coats of plastering up
2 Sq.m 125.44
to fine finish in cement, sand mortar ratio (1:3) for all room

Page 1 of 20 Anx-A (buildings)


BILL OF QUANTITIES

JOB No. SHEET


PROJECT ETHIOPIA

HOUSE (15.7x3) 2.8m


DOUBLE DWELLING
SERVICE QUARTOR
Rev. No. DATE

Clear Height
Doc. No. Anx-A
A 15-Feb-16
PREPARED CHECKED
PARTICULARS DOUBLE DWELLING SERVICE QUARTOR HOUSE
VGD KVC

Sl. No. Item No. Description Unit

Internal walls - finished with 15 mm thick For toilet and shower rooms
3 of the surface of block wall, apply two coats of plastering in cement - Sq.m 43.12
sand mortar mix ratio (1:3)

4 Ceiling plastering 6mm thk with cement sand plaster 1:3 Sq.m 37.70

E Painting work

A Internal Wall Painting work

Internal walls: painted with quartz high quality plastic emulsion Sq.m 125.44

B External Wall Painting work

External wall will to be tyrolin rendered and painted HCB Sq.m 143.43

Page 2 of 20 Anx-A (buildings)


BILL OF QUANTITIES

JOB No. SHEET


PROJECT ETHIOPIA

HOUSE (15.7x3) 2.8m


DOUBLE DWELLING
SERVICE QUARTOR
Rev. No. DATE

Clear Height
Doc. No. Anx-A
A 15-Feb-16
PREPARED CHECKED
PARTICULARS DOUBLE DWELLING SERVICE QUARTOR HOUSE
VGD KVC

Sl. No. Item No. Description Unit

C Ceiling Painting

Ceiling paint : preferably by painting the smooth visible concrete Sq.m 37.70
surface or by providing fire-resistant false ceiling.

F A Floor Finishes

1 Terrazo Tiles Sq.m 37.70

2 200X300cm ceramic Glazed wall tiles For Bath room walls Sq.m 17.51

3 Rough trachite stone pavement around the Building 600mm Width Sq.m 23.80

False Ceiling

A 15mm thk 600 x 600mm mineral fiber Board panel False ceiling. Sq.m 37.70

B Skirting sq.m 12.04

G PLINTH PROTECTION :-

Plinth protection 0.75m wide Plinth protection 50 mm thick of


cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone)
aggregate 20 mm nominal size) shall be laid over 75 mm bed of dry m 37.40
brick ballast 40 mm nominal size well rammed and consolidated and
shall be grouted with fine sand
including finishing the top smooth.

H Schedule of Doors & Windows

Metal Door

Main Door & Rear Door Partly glazed frozen glass with grill and partly
1 Sq.m 10.29
covered with Aluminum panel.

2 Windows Sq.m 5.32

Page 3 of 20 Anx-A (buildings)


BILL OF QUANTITIES

JOB No. SHEET


PROJECT ETHIOPIA

HOUSE (15.7x3) 2.8m


DOUBLE DWELLING
SERVICE QUARTOR
Rev. No. DATE

Clear Height
Doc. No. Anx-A
A 15-Feb-16
PREPARED CHECKED
PARTICULARS DOUBLE DWELLING SERVICE QUARTOR HOUSE
VGD KVC

Sl. No. Item No. Description Unit

I Other item of works

Structural steel

Structural steel for Steel staircase and fire existing staircase kg 0.00

J Anti termite coating sq.m 47.10

K Roof Treatment

A) Roofing cover shall be G - 28 galvanized C.I.S., which is to be fixed


on 100 - 120 mm diameter eucalyptus wooden truss and 50 x 70 mm
Zigba wood purlins c/c 90cm according to structural drawing of the Sq.m 47.10
truss. For the protection of termites to be applied two coats of anti-
termite solution to all truss members and purlins before covering. The
ridge cover shall be galvanized flat iron sheet G-28

L Down Take pipe RM 11.20

M Timber Truss
Timber Quantity Cum 4.24
Corrugated Sheet Sqm 68.37
20mm Facia Board Cum 0.12
FIRE RESISTANCE CEILING MATERIAL Sqm 47.10
GIS Gutters Cum 0.795

Page 4 of 20 Anx-A (buildings)


Remarks

Page 5 of 20 Anx-A (buildings)


Remarks

Page 6 of 20 Anx-A (buildings)


Remarks

Page 7 of 20 Anx-A (buildings)


Remarks

Page 8 of 20 Anx-A (buildings)


FINISHING ITEMS

S.NO DESCRIPTION NO LENGTH BREADTH

FLOORING
GROUND FLOOR
1 KITCHEN 2 3.45 2.60
2 STORE 2 2.55 2.60
3 BATH ROOM 2 1.25 2.60

MASONRY WORKS
Outer wall(200mm) 2 20.45 0.2
2 7.95 0.2

Cross wall btwn inside of the building


For 200mm wall 2 1.25 0.2
For 150mm wall 2 5.2 0.15
TOTAL

Toilet Ceramic Wall tiles


Toilet and Shower Room 2 1.25
2 2.60

PLASTERING WORK
GROUND FLOOR
Outside 2 20.45
2 7.95
TOTAL
Internal Plastering
KITCHEN 2 12.1
STORE 2 10.3
BATH ROOM 2 7.7
TOTAL

PAINTING WORK
External Painting (Snow cem or Equavalent paint)

GROUND FLOOR
As per External Plastering

Internal Painting
GROUND FLOOR
KITCHEN 2 12.1
FINISHING ITEMS

S.NO DESCRIPTION NO LENGTH BREADTH

STORE 2 10.3
BATH ROOM 2 7.7
TOTAL

Anti termite Treatment


GROUND FLOOR 1 15.7 3.00

ROOF Treatment 1 15.7 3.00

Plinth Protection
GROUND FLOOR
1 37.4

Sand Filling (150mm thk)


GROUND FLOOR 1 15.7 3.00

SCHEDULE OF DOORS AND WINDOWS


GROUND FLOOR
External Doors & Windows

D1 4 0.80 2.10

D2 2 0.70 2.55

W1 2 1.20 1.10

W2 2 1.00 1.10

W3 2 0.60 0.40

Total

FALSE CEILING

KITCHEN 2 3.45 2.60

STORE 2 2.55 2.60

BATH ROOM 2 1.25 2.60

TOTAL
FINISHING ITEMS

S.NO DESCRIPTION NO LENGTH BREADTH

Damp Proof Course


GROUND FLOOR 1 15.7 3

Rain water pipe

WOODEN TRUSS

G-28 CIS Roofing 2 - -


Zigba Purlins 2 45.75 0.05
TIMBER RAFTERS 2 49.149
TIMBER STRUTS 2 9.604
GIS Gutter 2 7.95 0.2
20cm Facia Board 2 20.2 0.02
TIMBER TIE BEAMS 2 30
TIMBER CEILING MATERIAL 40x50mm ZIGBA WOOD 2 11.05 0.04
TIMBER CEILING JOISTS 2 30 0.05
FIRE RESISTANCE CEILING MATERIAL 2 - -

Total Qunatity of Timber Truss=


CONTENT TOTAL
DEPTH SKIRTING
AREA QTY

37.700 12.04
8.970 17.940 4.84
6.630 13.260 4.12
3.250 6.500 3.08

2.8 11.452 19.782 cu.m


0.8 1.272 2.544 cu.m

2.8 0.700 1.400


2.8 2.184 4.368
3.427 cu.m

2.8 7.000
2.8 14.560
17.510 sq.m

2.80 57.260 114.520


2.80 22.260 44.520
143.430 sq.m

2.80 33.880 67.760


2.80 28.840 57.680
2.80 21.560 43.120
152.950 sq.m

143.430 sq.m

2.80 33.880 67.760


CONTENT TOTAL
DEPTH SKIRTING
AREA QTY
2.80 28.840 57.680
2.80 21.560 43.120
152.950 sq.m

47.100 sq.m

47.100 sq.m

37.400 m

0.15 7.065 7.065 cu.m

1.680 6.720

1.785 3.570

1.320 2.640

1.100 2.200

0.240 0.480

15.610 sq.m

8.970 17.940
6.630 13.260
3.250 6.500

37.700 sq.m
CONTENT TOTAL
DEPTH SKIRTING
AREA QTY

47.100 47.100 sq.m

11.200 RM

- 68.37 sq.m
0.07 0.320 cu.m
0.1 0.772 cu.m
0.1 0.151 cu.m
0.25 0.795 cu.m
0.15 0.121 cu.m
0.2 1.884 cu.m
0.05 0.044 cu.m
0.05 0.150 cu.m
- 47.10 47.10 sq.m

Total Qunatity of Timber Truss= 4.237 Cum


Depth of Foundation Below FGL = 1.75 m Excavation clearence for Foundation Each s 0.3 m
Total height of Pedestal = 1.75 m Depth of footing,D= 0.4 m
Thickness of PCC belowe foundations 0.075 m Total Height of column 4.80 m
Plinth beam Below FGL = 0.5 m
Clear Height of room = 2.8 m
CONCRETE QUANTITY
COMPONENT DIMENSIONS QUANTITY(CU.M) Per Raft
LENGTH BREADTH TOTAL Shuttering TOTAL FOR DESCRIP
NO.S (M) (M) DEPTH(M) FOR RCC Per Raft SHUTTERING TION
Trapezoid
STRIP FOOTINGS - D1 D2 Rec al Total
F-1 12 2.50 2.50 0.40 2.50 2.50 30.00 4.00 48.00

Total 12 30.00 4.00 48.00

COLUMNS -
GROUND FLOOR LEVEL
C1 12 0.40 0.40 4.80 0.77 0.77 9.22 7.68 92.16

Total 12 9.22 92.16

PLINTH BEAM -
Roof beam 1 75.58 0.30 0.50 11.34 11.34 11.34 98.26 98.26
PB 1 23.21 0.30 0.50 3.48 3.48 3.48 23.21 23.21
Cut Lintels 1 13.80 0.23 0.30 0.95 0.95 0.95 11.45 11.45
Total 15.77 132.92
GRADE SLAB+ROOF
SLAB
Grade slab 1 15.70 3.00 0.10 4.71 4.71 4.71 3.74 3.74

Grand Total 54.99 273.08


Surplus
Excavation PCC earth Back fill

221.81 6.32 36.32 185.49

221.81 6.32 36.32 185.49

10.44 0.78 4.26 6.18

232.26 7.10 40.58 191.67


Depth of Foundation
Below FGL 2 m Ld = 50 x dia of Bar No.of Floors (G or G+1) G m
Ht. of Column
2.80 + 2 = 4.8 m GF Roof Level from FGL 2.8 Bottom of GF Lintel 2.1

Plinth beam Below FGL 0.5 m FF Roof Level from GF 0 Bottom of FF Lintel

Beam Depth PB 0.5 GF LB 0.3 GF RB 0 FF LB 0 FF RB 0


Reinforcement
FOOTINGS Length Direction in footing
Top Bottom Top
LENG
LENGTH Spacin TH OF Unit LENGTH Unit
No. of OF RAFT WIDTH OF Dia of g of No. of BAR Weight of Weight Per Total Qty Spacing No. of OF BAR Weight of Weight Total Qty Spacing
FOOTING NO. Footings (m) RAFT (m) Bar Bars Bars (m) Bar (kg/m) Raft (kg) Dia of Bar of Bars Bars (m) Bar (kg/m) Per Raft (kg) Dia of Bar of Bars No. of Bars

F1 2 0.9 0.90 0 150 7 1.20 0 0 0 8 150 7 1.2 0.395 3.318 6.636 0 150 7

F2 3 1.8 1.80 0 12 175 11 2.1 0.888 20.513 61.539

F3 7 2.0 2.00 0 12 125 17 2.3 0.888 34.721 243.047

F4 7 2.2 2.20 0 16 175 14 2.5 1.578 55.23 386.61

0 697.832

Main Reinforcement
COLUMNS Main Bar 1 Main Bar 2
Normal Ties

Lengt Cuttin Unit Unit


Length of Width of h of g Weight Length Weight
No. of Column Column Dia of No. of Bar Lengt of Bar Weight Per of Bar of Bar Weight QUANTIT Spacing of No. of No. of Leg Lenth
COLUMN NO. Columns (m) (m) Bar Bar (m) h (kg/m) Column Total Qty Dia of Bar No. of Bar (m) (kg/m) Per Raft Y (kg) Dia of Bar Bars Bars Legs of Bar (m)

C1 2 0.45 0.45 20 4 5.55 6.925 2.466 68.308 136.616 8 163 35 2 1.504

C2 8 0.45 0.45 25 10 9.3 10.925 3.853 420.94 3367.52 8 163 58 2 1.504

C2 2 0.45 0.45 25 10 12.575 14.2 3.853 547.126 1094.252 8 163 78 2 1.504

C3 3 0.45 0.45 25 14 9.3 10.925 3.853 589.316 1767.948 8 163 58 2 1.504

C4 3 0.45 0.45 20 12 9.3 10.675 2.466 315.895 947.685 8 163 58 2 1.504

C4 1 0.45 0.45 20 12 9.3 10.675 2.466 315.895 315.895 8 163 58 2 1.504

C5 2 0.45 0.30 25 10 11.2 12.825 3.853 494.147 988.294 8 163 69 2 1.504

C6 2 0.45 0.30 20 12 11.2 12.575 2.466 372.119 744.238 8 163 69 2 1.504

C7 10 0.45 0.30 16 12 9.35 10.525 1.578 199.301 1993.01 8 163 58 2 1.504

C8 10 0.60 0.30 20 4 9.35 10.725 2.466 105.791 1057.91 8 163 58 2 1.504


C8 10 0.60 0.30 16 8 9.35 10.525 1.578 132.868 1328.68

C9 16 0.20 0.20 12 4 2.77 3.745 0.888 13.302 212.832 8 163 17 2 1.504

C10 22 0.20 0.20 16 4 1.62 2.795 1.578 17.642 388.124 8 163 10 2 1.504

SC1 12 0.25 0.25 25 4 4.15 5.775 3.853 89.004 1068.048 8 163 26 2 1.504

SC2 1 0.20 0.20 20 4 9.275 10.65 2.466 105.052 105.052 8 163 57 2 1.504

15516.104 0
Main Reinforcement
PLINTH BEAM & ROOF BEAM &
LINTEL BEAM Top Reinforcement Bottom Reinforcement

Length of Dia of No. of Unit Unit


Dia of No. of Unit Weight Dia of No. of Unit Weight Weight
Plinth beam Beam Width of Depth of Bar @ Bar @ Length of Weight of Weight Length of Weight of
Bar @ Bar @ of Bar Bar @ Bar @ Dia of Bar No. of Bar of Bar B1 Per Dia of Bar
& Roof Beam (Clear Beam Beam Layer Layer Bar- (m) Bar per Beam Bar (m) Bar B2
Layer 1 Layer 1 B1(kg/m) Layer 2 Layer 2 (kg/m) Beam
Span) 2 2 B2(kg/m) (kg/m)

ROOF BEAM 75.58 0.3 0.5 12 2 75.882 0.888 134.766 20 3 25 2 75.882 2.466 3.853 2397.492 8

PB 23.21 0.3 0.5 12 2 23.5085 0.888 41.751 20 3 25 2 23.5085 2.466 3.853 742.751 8

LB 13.80 0.23 0.3 12 2 14.1 0.888 25.042 20 3 25 2 14.1 2.466 3.853 445.49 8

201.559 3585.733
Length Direction in footing
SLABS
Top Bottom Top
LENG
LENGTH WIDTH OF Spacin TH OF Unit LENGTH Unit
DESCRIPTIO OF SLAB Dia of g of No. of BAR Weight of Weight Per Total Qty Spacing No. of OF BAR Weight of Weight Total Qty Spacing
N No. SLAB(m) (m) Bar Bars Bars (m) Bar (kg/m) Raft (kg) Dia of Bar of Bars Bars (m) Bar (kg/m) Per Raft (kg) Dia of Bar of Bars No. of Bars

Grade slab 1 15.70 3.00 12 200 16 16 0.888 227.328 227.328 12 200 16 16 0.888 227.328 227.328 12 200 80

227.328 227.328
orcement
Bredth direction in footing
Top Bottom
Unit
LENGTH Weight of LENGTH Unit Weight
OF BAR Bar Weight Per Total Qty Dia of Spacing of No. of OF BAR of Bar Weight Per Total Qty
(m) (kg/m) Raft (kg) Bar Bars Bars (m) (kg/m) Raft (kg) Total

1.2 0 0 0 8 150 7 1.2 0.395 3.318 6.636

12 175 11 2.1 0.888 20.513 61.539

12 125 17 2.3 0.888 34.721 243.047

16 175 14 2.5 1.578 55.23 386.61

0 697.832 1395.664

Normal Ties Confining Ties

Unit Weight Unit Weight


Weight of Per Total Qty Spacing No. of Leg Lenth of Bar Weight Per Total Qty
Bar (kg/m) Column (kg) Dia of Bar of Bars No. of Bars Legs of Bar (m) (kg/m) Column (kg)

0.39 20.53 41.06

0.39 34.02 272.16 8

0.39 45.752 91.504

0.39 34.02 102.06

0.39 34.02 102.06

0.39 34.02 34.02

0.39 40.473 80.946

0.39 40.473 80.946

0.39 34.02 340.2

0.39 34.02 340.2


0.39 9.972 159.552

0.39 5.866 129.052

0.39 15.251 183.012

0.39 33.434 33.434

1990.206 0 17506.31

Stirupps Additional Bars For Spacer Bars

Unit
Unit Weight Weight No. of Lenth of Unit Weight No. of Lenth of
Spacing of No. of Length of Weight Per Weight of Weight
of Bar Per Dia of Bar Bars @ Bar @ of Bar Dia of Bar Bars @ Bar @
Bars Bars Bar (m) Beam Bar Per Beam
(kg/m) Beam Mid mid (m) (kg/m) End End (m)
(kg/m)

0.15 504 1.24 0.395 246.8 16 76 0.22 1.578 26.239

0.15 155 1.24 0.395 75.783 16 23 0.22 1.578 8.057

0.15 92 1.02 0.395 37.067 16 14 0.15 1.578 3.266

359.65 37.562 0 4184.504


Bredth direction in footing

Top Bottom
Unit
LENGTH Weight of LENGTH Unit Weight
OF BAR Bar Weight Per Total Qty Dia of Spacing of No. of OF BAR of Bar Weight Per Total Qty
(m) (kg/m) Raft (kg) Bar Bars Bars (m) (kg/m) Raft (kg)

3.3 0.888 234.432 234.432 12 200 80 3.30 0.888 234.432 234.432

234.432 234.432 923.52

TOTAL REINFORCEMENT 24009.998 kgs