‘Tamil Nadu Water Supply
31, Kamarajiar Sali, Chepak,Chenn:600005
Dr.C.N.Mahesvaran, LA.S.,
MANAGING DIRECTOR.
ge Board
Letter No.F.GST / SDO 2/ U/ PM/ 2017, dated 11.
To
All Chief Engineers of TWAD Board.
Sir,
Sub: TWAD BOARD - Preparation of Supplemental agreement
for the payment of bills, post GST period - Model
formats - Communication ~ Regarding.
Ref: 1) G.0.Ms No.264/Finance (Salaries) Department
dated 15.09.2017.
2) G.O.Ms No.296/Finance (Salaries) Department/
Dated 09.10.2017.
3) The Managing Director, TWAD Board Letter No.
F.Circular/SDOIV/COM/2017, dated 13.11.2017.
4) The Joint Managing Director, TWAD Board Letter
No.F.GST/SDO2/U/PM/2017,dated.17.11.2017.
wk
In continuation of the letter in the 4" cited, it is informed that, a meeting
was conducted on 20.11.2017 to finalise a model format for the preparation of
supplemental agreement for the payment of bills, post GST period at Head Office,
with the Field Engineers and Accounts Officers. In the. meeting representatives
from four Regions, Joint Chief Engineer (COM), Joint Chief Engineer (PM), Joint
Chief Engineer (Mega) & Chief Audit Officer were participated in the discussion to
finalise the model format.
Based on the discussion and considering the various aspects, model formats
were prepared and deciced to adopt these formats for preparation of Supplementa
agreement for the payment of bills, post GST period. While preparing the
supplemental agreement for payment of bills, the following points should be
considered.1) Balance works executed on or after 01.07.2017 should only be
taken into account
2) Miles stone to be achieved as per agreement should be taken
into account while arriving balance works.
3) Works delayed due to slow progress of work by the contractor
should not be taken into account.
4) Schedule of Rate for the year in which the work awarded should
be taken into consideration for arriving the basic cost of
materials.
5) Basic rate for Cement and Steel should also be arrived
The Chief Engineers are instructed to prepare Supplemental agreement for
the payment of bills, for post GST period in the enclosed formats and got approved
from the competent authority as per rules in force.
Encl.: Formats
yey
olniincnd Heron,
Qpwar BOARD, CHENNAI - 5.
yon?
Copy to
7 the Joint Chief Engineer (Mega)/ (CoM) and Chief Audit Officer, TWAD Board, Head
Office for information.
All Superintending Engineers and Executive Engineers of TWAD Board for necessary
action. \