-v- Note:-
A. Opening Details
1. Doors (D) 75 x 180cm = 2Nos.
2. Collapsible Gate 90 x 180 cm = 2Nos.
3. Ventilations (V) 75 x 45 cm = 4 Nos.
98.5 x 45 cm = 8 Nos.
B. Value of X
S.No. No. of Students Value of
X
1 Up to 200 326.75 cm
2 201 to 400 463.00 cm
SCHOOL TOILET/URINAL
Designed By:
SCHOOL SANITATION PROGRAMME (Capacity: students<400)
Yagya Shrestha
water Supply and Sanitation Division Consultant, UNICEF
Office/UN ICEF
SECTIONAL VIEW
Drg.No.:
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January, 2005 Date: October 14, 2003
5 of 7
40 x 40 x 4mm thk MS 25 x 25 x 4mm thk MS
anqle angle frame for shutter 25 x 25 x 4 mm MS angle frame
750
95
100
250 mm long tower-bolt/
400 l\=
100,00
Hi
105 |
1000
12 mm diaMS rcd@ I
Ventilation
1800
5 mm thk MS plate
holdfast
Designed By:
SCHOOL SANITATION PROGRAMME SCHOOL TOILET/URINAL
Yagya Shrestha
Water Supply and Sanitation Diciston
Consultant, UNICEF DETAILS OF DOORS & VENTILATIONS
Office/UN ICEF
Drg.No.:
Parsa/Chitwan/Nawalparast/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003 6 of 7
Note:-
Value of X
S.No. No. of Students Value of
X
1 Up to 200 326.75 cm
2 201 to 400 463.00 cm
X+287
132 X + 23 100 32
100
1—
188
288
253
l 188
i
r~ I I
I
(X+23V2 132
32. 100
A. Opening Details
1. Doors (D) 75x180cm = 4Nos.
2. Collapsible Gate 90x145cm = 2Nos.
3. Ventilations (V) 90 x 45cm = 6Nos.
100x 45cm = 2Nos.
Value of X
401 to 600 165 cm
601 to 800 240 cm
801 to 1000 315 cm
All mesurements are in centimeters 1001 and above 390 cm
o
o
r
FRONT
Ver J ation
Urinal (Girls) Urinal (Boys)
t-65,00-
Separator
SECTION 'B-B'
All mesurements are in centimeters
Sand Filing
SECTION 7WV
90 cm high Separators
o
nj
Natural Ground
-l-
1
o
d
SECTION 'C-C
Details of A
Details of B
a g
o
£g
r c
J bJ
250 mm long tower-bolt/ 1 i
100.00 T\
-1000.00-
Ventilation
25 x 4 mm MS strips
5 mm thk MS plate
holdfast
Designed By:
SCHOOL SANITATION PROGRAMME SCHOOL TOILET/URINAL
Yagya Shrestha
Water Supply and Sanitation Dicision DETAILS OF DOORS & VENTILATIONS
Office/UN ICEF Consultant, UNICEF
Drg.No.:
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003 7 of 8
Note:-
ValueofX
S.No. No. of Students Value of
X
1 401 to 600 165 cm
2 601 to 800 240 cm
3 801 to 1000 315 cm
4 1001 and above 390 cm
77 77 77 77 /
-571.50-
23.00
' 77 7~\77 77 77 77 77 77 77 // // 77 // //
1%slo
-148.50-
B (-70.0DH
Urinal (Girls)
15.00-
oXh dhh (Kh
1% slope
77 77 7/ 77 77
ilope
(-6o.(xH i
L__|^MO K I. _
iUrinal (Boys)
i slope X
V 77 77KV 77 7J\ 77 77 77 77 /7 77 '7 77 77 7.
Note:-
A. Opening Details
1. Doors (D) 75x180cm =
2. Ventilations (V) 100x 45cm = 4Nos.
_L Lavaf of Straw fPaf^> S. VaijeofX
S.No. No. of Students Value of X
-111.50
1 401 to 600 165 cm
25.00 2 601 to 800 240 cm
3 801 to 1000 315 cm
All mesurements are in centimeters SECTIOM X-X 4 1001 and above 390 cm
o
q
in
FRONT
ELEVATION (right)
10
in
|t
Jl
90 cm high Separators
in
in
-22.50
7.50-
-(45.00)-
SECTION 'B-B1
Roof Truss
(Material: MS Circular Pipes, Span = 471 cm)
15,00
Details of B Details of A
I2 mm 4a MS rod @ 100 DC
5 mm thk MS plate
holdfast
Designed By:
SCHOOL SANITATION PROGRAMME SCHOOL URINAL
Yagya Shrestha
Water Supply and Sanitation Dicision DETAILS OF DOORS & VENTILATIONS
Office/UN ICEF Consultant, UNICEF
Drg.No.:
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang Revised Date: January 2005 Date: 14 October 2003 6 of 7
Note:-
Value of X
S.No. No. of Students Value of
X
1 401 to 600 165 cm
2 601 to 800 240 cm
3 801 to 1000 315 cm
4 1001 and above 390 cm
[-150 mm LEV
ELEVATION ELEVATION
OPENING SCHEDULE
ELEVATION GROUND FLOOR PLAN
40 Dm fjl
1 ^ -
!
S.1M. D E S C R I P T I O N
1.
2.
DOOR(D2)
DOOR (D3)
SIZE
900 XZ175
592X2175
NOs
1
3
MATERIAL
METAL FRAME
METAL FRAME
REMARKS
LEFT OPENING
RIGHT OPENING
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepa!
ELEVATION ELEVATION
..;
ELEVATION
GROUND FLOOR PLAN
OPENING SCHEDULE HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
SN. DESCRIPTION SIZE NOs. MATERIAL REMARKS NEPAL
1 DOOR(D2) 1200X2575 1 METAL FRAME LEFT OPENING
PRIMARY SCHOOL IMPROVEMENT
2. DOOR (03) 592 X 2175 3 METAL FRAME RIGHT OPENING PROJECT (PS1P)
3 DOOR (D3) 592X2175 3 METAL FRAME LEFT OPENiNG
Single Unit Toilet Block (Alternate)
4. ENlRANCEGATEfEG'j 875X195U \ METAL FRAME RIGHT OPENING
GROUND HOOR PLAN
5 ENTRANCE GATE (EG 1) 875 X1950 1 METAL FRAME LEFT OPEK1KG Drawing no: A - ] Scale:
6. WINDOW GRILL (WG1) 875 X 450 9 METAL FRAME Dale: 2Sir December. 2005
WINDOW GRILL (WG2) 1250X 450 METAL FRAME Drawn py P Thakur [checked by. |Approved by:
vzr-\ . - _ n - . :.T~TI:
ELEVATION 1
r ' "i ~ r~ 1 T~ T
; r;-r|-T-p-|r; r , r r T t T i T i : Y:i
(B) ELEVATION 4 g)
ELEVATION 2 HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
El. EVAT1ONS
Draw-r,g no: A - Scale:
Dare: 25th December, 2005
Drawn by: P.Thakur [CnecKed by: JApproved by:
- - Nr -
L500 200
450 GROUND LVL
;
^A\N ^>Cv>>>y'N-vr-.Av^
EPOXY LAYER
</^0&P"~ SAND AND GRAVEL
CEMENT PUNNING
40 MM CEMENT SCREEDING(1:6
75MM PCC (1:2:4) COMPACTED EARTH
150 MM SAND FILLING
HIS MAJESTY'S
RAMMED EARTH FILLING UNICEF-Nepal
GOVERNMENT OF
NEPAL
PRIMARY SCHOOL IMPROVEMENT
SECTION AT AA' PROJECT (PSIP)
Single Unit Toilet Block (Alternate)
SECTION ATA-A 1
Drawing no: A - | Scale:
Date: 25lh December. 2005
Drawn ay: P.Thakur |Checkecl by: |Approved by:
REF, DETAIL 4,
FOR CGI SHEET FIXING
TRT-1
22 GAUGE 900mm PLAIN Gl SHEET
900
.,- 25 NB (M) PURLIN PIPE
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
TOILET ROOM TRUSS j TYPE DESIGN
I Truss Details (Toilet Block)
WHEREVER PURLIN CONTINUE.
f Drawing no: j Scale: 1:20
Date: 3rd Jan. S006
TRT-2 Drawn by S Upreti [checked by: iApprc.'Od tjy
4979
\- 250 4
TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS
WHEREVER PURLINS ARE CONNECTED
22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
NPIPE
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TYPE DESIGN ~
Truss Details (Toilet Block)
! Drawing no: Scale: 1:20
Date: 3nJj_ar>, 2006
Drawn by: S. Upreti [checked by: Approved by:
250 4 TOILET BLOCK GABLE TRUSS 250 4 SILT Consultants (P) Ltd IN ASSOCIATION
WHEREVER PURLIN CONTINUE.
WITH CERID, NLA and BTTC
IPS FLOOR FINISH
40 MM CEMENT SCRE£DING(1:6)
CEMENT PUNNING
40 MM CEMENT SCRE£DING(1:6>
75MM PCC (1:2:4)
75 MM THICK DPC
200
8mm b a r ® 175o'c
r
40 MM CEMENT SCREED1NG(1:6 - ~ - Levelling for PCC with Sand
4 nos 10mm bar @ 200 cfc
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
TRENCH PLAN & FOUNDATION DETAILS
DETAIL OF STEPS
Dale: 21 si Nov. 2005
Drawn py: P.Thakur |checked ay:
Secon. member
1^ I
Top View: Hold fasl & Hinoe arranqemenl
Scale:-1:4
250mmbnckWall
Internal member
20 x 3 mm Rat
One end ol hofd 'astweloed to lower
part arid door shutter frame welded to
upper part ol 1 6 m m 0 pivot hing
Kote:
1. Complete fabricated (loot 1o be hot dip galvanized
Hinge lixing delail
Scale:-1:4
HIS MAJESTY'S
Scale:-1:16 Dimensions are in mm GOVERNMENT OF UNICEF -Nepal
NEPAL
TOILET ENTRANCE MS GATE
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Entrance Gale Detai.s ( E G 1 )
Drawing no: A -
25x50x1.2 mm
recta hgulaf
galvanised
simile! 125 nun Bride wall
MSFIat!tel(IFasl
2 75
-4
Section a; "Fj-u!1
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
X 10x10x0.5 mm
Channel
75
-10
in»in»n
IIP
12 0
ril
4—40-4-20 •
FramB Profile Detail
Gunnel
I12HKH SO-
Section at A-A
OSS m m cclQr sheet
nvetedwiih 10XiDXO|5m
cnannel
AidrapFastener
6 9
Hinge fixing
detail of Door Shutter
ISO
Floor Level
25- Oi 25-I
Section at Y-Y
Scale:-1:16
Wall and dole fast omitted - Mela! Oal welded on
Dimensions are in mm
frame for fixing hinge Note:
1- Frame Profile to be made from l.Bmmthk
Galvanized US sheel
2.Shu!tertobe made from 1.2 mm Galvanised MS
p. Holes for screwing Sheet.
3 Nos. 7mm Torxari reinforcing bar Hinge
Hold last on both side^- HIS MAJESTY'S
2 Nos. @ ZOO mm from both ends- GOVERNMENT OF UNICEF-Nepal
1 No. @ center (length-140 mm) NEPAL
-660- PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOU FT BLOCK
Door DetaLis"(D2]T
-820- Hinge fixing Drawing no: A - Scale:
4ttiM5-|— -630- -JDS-t40l detail of Door Frame
rials ?1sl Dm:, ?M>
SeclionalY-V
Aldrop Kaslenei / Drawn by: P. Atyil
Scale:-V.10
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and 8TTC
3x20 MS flat wetded 3x20 MS flat welded 25x25mmX2.5mm
25x25mmX2.5mm on MS Angle Frame MS Angle Frame
on MS Angle Frame MS Angle Frame _
r HOLD FAST
ID 7mm ROD if)
7mm ROO in ———— CM
HOLD FAST
il 200 CM
200
IT) tn
CM CM
CM CM
125 125 125 • 125 125 I 125 125 125 I 125 125 | 125 125 125
125 125 125 125 i > -
875 1250
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
Window Grill Details
nu: A I Scale:
Date: 2Sin December. 2005
Drawn iiy: PThaktif |cneck&tl by ed by:
Manhole Manhole
450x450 450x450
+0.00 mm LEV.
// // .i
s\f-S\f S\fW
'////Ar •W>/ s\/\rv
Flower Bed
HBUAJBBTVS
BWHBf
NEML
GROUND FLOOR PLAN PWMAflY SCHOOL MPROfflMBIT
PROJECT (PfflP)
Ltd M AMOCUTKM
WITH M A n d BTTC
2.5TVC
Perforated
Waster Pipe
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PLAN
PROJECT (PSIP)
Scale: 1:20
Double Unit Tdiet Block
Manhole & Leaching Pit Detail
[ Drawing no: SA-
I Dale: 11 Ih July. 2005
[Drawn by: P. Aryal [checksd by: ] Approved by:
90° Elbow -
(75, 1200 360 1250 . 62i i 8"i 5 250 B75 250 875 250 875 3'
150x25x5
MS Plate
40 DiaG! Pipe
- welded on
150x25x5fnm
MS Plate
V 25 Dia Gl Pipe
o
mi
Ftoor Level
Section at 1-1'
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Delail Plan {Toilet Block)
Drawing no: A - Scale:
Dale: 25ih December, 2005
Drawn by: P. Arya] ICrtecked by: | Approved by:
+ O.0 mm LVL;
i Details of fixing Grab Bar_ YA
in Handicapped Toilet
4D0ia Gt Pipe
welded on
150x25x5 mm
MS Plate
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSiP)
Double Unit Toilet Block
Detail Plan (Toilel Block) Alternate
5 25tp B75 E5
f
4625
Drawn by: P. Arya] ICfieckarJ by: [Approved by: '
<•>
UNITB
'—as BAR @
al lop of pavilion v
" V r 1 4 HOS 100 BAR
DETAIL 2
Lintel Detail for
openings above 1200mm
DETAIL 1 Scale 1:20
UNIT A
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepa!
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
_ DoubieJJnit Toilet Block
Section at A-A' (Toilet Block) Alternale
Orawinij tio: A 1" Scaia:
I Oats^_25tri December, 2005_
- Sirawn by: P. Aryal [Clieckbd by: JApproued by:
±0 PLINTH LVL.
COMPACTED EARTH
SECTION AT BB'
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepa!
NEPAL
REF. DETAIL 4,
FOR CGI SHEET FIXING
J-2SCl4 I-250 4
TRT-1
22 GAUGE 900mm PLAIN Gl SHEET
900
— 25 NB (M) PURLIN PIPE
<e
'°"cG/ 40 NB (M) PURLIN PIPE
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
L
32 N8 (L) BOTTOM TIE PIPE NEPAL
\- 250 4
TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS [-250 4
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND PRIMARY SCHOOL IMPROVEMENT
PROJECT <PSIP)
TYPE DESIGN
ONEBK. HEADERHIGH Truss Details (Toilet Btack)
LINTEL BAND Drawing no: i Scale: t:20
Date: 3rdjan, 2006
Drawn by: S. Upreti ICheckecl by: I Approved by:
J"- 250 4
TOILET BLOCK^GABLE TRUSS 250 4 SILT Consultants (P) Ltd IN ASSOCIATION
WHEREVER PURLIN CONTINUE.
WITH CERID, NLA and BTTC
BK. OM EDGE ON 250MM SQUARE (Ref Delail I)
I PS FLOOR FINISH
HIS MAJESTVS
GOVERNMENT OF UNICEF-Nepal
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
COMPOSITE OF BRICK AND COMCRETE
( Detail I ) Trench Plan & Foundation Details (Toilet Block)
Drawing no: S - Scale:
Dale: 21st Nov. 2005
Drawn by: P. Aryal Checked by: Approved by;
HOLD FAST
Of 7mm ROD If)
mi — — — CM
7mm ROD t-: m
CM CM
HOLD FAST : C\J 200
200 o
IT
in CM
CM CM
125 I 125 ;
125 125 125 125 125 125 125 125 ; 125 ; 125 j 125 125 : 125 , 125 j 125 .
875 1250 ;
HIS MAJESTrS
GOVERNMENT OF UNICEF-Nepal
NgPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Window Grill Details
Drawing no: A - Scale:
Date: 251h DecembeF, 2DO5
Drawn by: P. Aryal TcrTecfced by: j Approved by:
^250 4
22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
10W 1 064 -••-- 1034
HIS MAJESTY'S
HIGH INCLINED GABLE BAND
GOVERNMENT OF UNICEF-Nepal
NEPAL
I
I 0 1 6 x 100 mm Ptvot hinge
125 mm Nicksj
plated sleelhinoes frame Main member 40 x 5 mm Fial Hold fast
[IS 1341 heavydij|y}\
Int. member
Secon. member
I . I
Top View. Hold fast & Hinge arrangement
Scale:-1:4
Note:
1. Coraplele fabricated door lo tie hot dip galvanized
Hinge fixing detail
Scale:-1:4
HIS MAJESTTS
Scale:-1:16 Dimensions are in mm GOVERNMENT OF UNICEF-Nepal
NEPAL
TOILET ENTRANCE MS GATE
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS!P)
TOILET BLOCK
Entrance Gate Details (EG1)
Drawing no: A - Seals:
Dais: 26th Dec, 2005
Drawn by: P.Aryal IChKtsd Uy:
:
25 x 50 x1.2rnm
reclancufar \
-692-
galvanised
shultef 125 mm Brick wall
-75-
•
0.58 mm cotar sheet I
riveted with 10X1OX0-5mm
channel
10x5 0x0.5mm
channel \ 12- —25— HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
L— NEPAL
. _ _\_....
p40 IF -«20-
a-33-j ar>
1 10* 10x0.5 mm
Channel
57 5
40
4-1-10
1WM
chanm
csttv Gi siuM Var*
4—W-4-2O--
t-3M 80- ¥- - Holes for welding
Metal flat for fixing
Frame Profile Detail Seclion at A-A Section at B-8 SecBon at C-C hinge
Scale:-1:4 Scale:-1:4 Scale:-1:4 Scale:-1:4
Aldrap Fastener
89
Hinge ftxino
detail of Door Shutter
Floor Level
25- 1
Section at Y-Y
r<U
Scale:-1:16
Wall and hole fast omitted - Mstal flat welded on
Dimensions are in mm
frame lor fixing hinge Mole:
1. Frame Profile to be made from 1.6 mm thk
Galvanized MS sheet
2. Shutier lo be made from 1.2 mm Galvanised MS
^ Holes for screwing Sheet.
3 Nos. 7mm Torkari reinforcing bar
Hold (asi on both sides- HIS MAJESTTS
2 Mos. @ 200 nvn from both ends- GOVERNMENT OF UNICEF-Nepal
1 No. @ center (lenglh-140 mm) NEPAL
-660- PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Door Details (D2)
Hinge fa ing Drawing no: A - State:
-630- delail of Door Frame
Bate: 21S1O8C, 2005
SeclionatV-V Drawn by: P A r j S Crwctedby
Aktrop fastener /
Scale:-1:10
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and 8TTC
- "2.5"PVCPerferated
1000
•
Pipe
0001-
1000
KJitn TOIJO
1200mmdia.
Leaching Pit
HIS MAJESTY'S
GOVERNMENT OF UNICEF-Nepal
NEPAL
Manhole PRIMARY SCHOOL IMPROVEMENT
450x450 PROJECT (PS1P)
Double Unit Toilet Biock
lOOOmmdia. f \ lOOOmmdia Waste & Sewerage Pipe Line Diagram
Leaching Pit I /Leaching Pit Drawing no: SA- I Scaie:
:_Da1e: 11th J j y 2005
I D'ii'.vn by: P hr-jh- ^Chccised by lApproje
2.5"PVCPerferateH
SILT Consultants (P) Ltd IN ASSOCIATION
Pipe WITH CERID, NLA and BTTC
2.5"PVC
Perforated
Waster Pipe
HIS MAJESTY'S
GOVERNMENT O f
NEPAL
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
PLAN Scale: 1:20
Double Unit Toilet Block
Manhole & Leaching Pit Detail
Drawing no: SA- Scale: