Fundamental Contents
Objectives of a Lifting Plan Key Factors of a Lifting Plan
Physical &
ce Environmental
en
qu Considerations
se
n
yi
Acronym
s ar ‘GOLDEN’
Safe Outcomes ec
es Personnel
Involved in the
Facilitate common •Conduct Risk Assessment tn
understanding •Eliminate Risks
& No lifting operation
Lifting Supervisor
Crane Operator
amongst the lifting •Mitigate Risks Compliance to Means of
Rigger
Signalman
crews •PTW Regulations Communication Site Supervisor/ others

•LP Visual-Standard Hand Signal


Detail of the Audio-Radio
Lifting Within sight and view of load and all personnel
Equipment
Type of Lifting Equipment
Maxi SWL
Detail of Max boom/Jib length
the Load Intended Load Radius

Description of the load/s


Load Configurations
Overall dimensions
Weight
Centre of Gravity.

Fundamental Contents Formulating a Lifting Plan


Key Factors of a Lifting Plan Type of LGs

en
ce
Chain Sling
Fibre Sling General
qu Method of Wire Sling
se Rigging
n
yi
s ar Choker Hitch
es Critical Basket Hitch
ec Document and Direct Rigging
tn
No Information Sling Angle

Load Capacity Chart/ Range Diagram


Other Operations Manual/ Logbook
Considerations Appointment of Competent Personnel
based on the 5M Valid Test Certificate
Model Checklists

Machine
Sketch of the Material
Lifting Zone Medium
Man
Method
Sequence/
Special
Initial and Final location of the load
Precautions Path of the load
Load Radius
Obstructions

Public Safety/ Tandem Ops


Formulating a Lifting Plan- General Formulating a Lifting Plan

1
Detail of the Load/s

Formulating a Lifting Plan- Detail of the load/s Formulating a Lifting Plan - Detail of the load/s

Formulating a Lifting Plan Formulating a Lifting Plan - Detail of the Lifting Equipment
3
Detail of the Lifting
Equipment/ Lifting Gears
Formulating a Lifting Plan- Detail of the Lifting Equipment Formulating a Lifting Plan

4
Means of
Communications

Formulating a Lifting Plan Formulating a Lifting Plan- Lifting Personnel

5
Personnel Involved in the
Lifting Operation

Formulating a Lifting Plan Formulating a Lifting Plan – Physical & Env Considerations
6  Stability of Crane
Physical & Environmental (Tipping Stability)

Considerations  Structural Stability

 Integrity of Lifting
Gear/ Safety Devices

 ‘GOLDEN’’
Formulating a Lifting Plan Formulating a Lifting Plan-Sequence and Special Precautions

7
Sequence and Special
Precautions
• Public Safety
•Tandem Lift

Formulating a Lifting Plan Formulating a Lifting Plan -Sketch of Ops Zone


8
Sketch of the Zone of
Operation

Formulating a Lifting Plan-Sketch of Ops Zone Formulating a Lifting Plan- Sketch of Ops Zone
Lifting Plan Lifting Plan
PTW PTW
RA RA

Lifting Plan Checklists


PTW
RA

Review of the Lifting Plan


In conclusion
•Changes to Lifting Plans

Changes to the type and capacity of lifting equipment used.


Make Every Lifting Operations
Changes to the sequence of operations.

Changes requiring reconfiguration of the crane (boom/jib length, outrigger beam length
reduction, parts of hoist line, etc).

Changes in the rigging details which could result in a reduction in rigging strength or
significant increase in rigging weight.
SAFE
Changes in surrounding environment such as sudden presence of a temporary
structure obstructing the operation.

Changes in the weather and environmental conditions which have an adverse impact
to the lifting operation.

Changes to safety-critical personnel.