Professional Documents
Culture Documents
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
INTRODUCTION: Clients
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
SOLAR PV HYDRID PLANTS
Genset Meeting Madrid 2018
• “Hybrid Plant”
– It means that more than one primary source
Traditionally
of generation is been used (solar, wind,
diesel…)
• Hybridization
– Often referred to the process of integrating PV only
renewable energy sources into a genset based
power plant.
Source: Notholt, A.; Vallvé, X. Hibridación Fotovoltaica de plantas térmicas. La Paz, Bolivia, Julio 2017
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
CLASSIFICATION
Category Indicative PV PV capacity/ Attributes
energy fraction load ratio
• Genset(s) always on during duty cycle
• Little or no PV curtailment
Low < 20% < 50% • No supervisory controller needed
• Low capital costs and high internal rate of return (IRR)
• No impact: low environmental benefits and low savings
• Genset(s) always on during duty cycle
• Simple controller
Medium 20% - 50% > 50%
• Small storage for power stability and spinning reserve
• Substantial benefit
• Genset(s) not always on
• Requires sophisticated controller for grid regulation and control
> 50% • Requires batteries for PV energy time shifting
• High CAPEX, low OPEX
• High benefits
High >150%
• Genset as backup/emergency
Autonomous • Requires sophisticated controller for grid regulation and control
• Requires batteries for PV energy time shifting
> 80% • High CAPEX, low OPEX
• High benefits and impact
Source: Vallvé, X. et. al. Solar Photovoltaic (PV) Hybrid Power Plants. A guideline report. CEDRO-UNDP. July 2016
Genset Meeting Madrid 2018
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
(step-down)
(step-up)
OPPORTUNITIES
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
OPPORTUNITIES
POTENTIAL AREAS:
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
Operating temperatures (°C) -30 to +50 -40 to +75 -40 to +60 -30 to +60
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
MONITORING SCADA
DAS-DATA ACQUISITION SYSTEMS
EMS-ENERGY MANAGEMENT SYSTEMS
4. Battery: 5. Generators:
• Battery voltage • RPM
• Battery charge and • Voltage
discharge current • Current
• Battery temperature • Run hours
• Battery state of • Power
Charge
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
CASE STUDY:
HYBRID SOLAR
MICROGRID IN ERITREA
Genset Meeting Madrid 2018
PROJECT BACKGROUND
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
PROJECT BACKGROUND
1. Location identification
2. Feasibility study
7. Commissioning
8. Training/capacity building
9. Handover
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
STAKEHOLDERS
• Funding - UNDP/EU
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
Areza and Maidma are towns in Zoba Debub (Debub Administrative region)
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
Population
Areza & surrounding hamlets 26.270
Maidma & surrounding hamlets 16.535
TOTAL 42.805
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
AREZA
MAIDMA
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
FEASIBILITY STUDY
OTHER
TOWN HOUSEHOLDS TOTAL
CONSUMERS*
• A feasibility study identified the number of households, population and other potential
power consumers.
• *Other consumers: churches, mosques, health centers, schools, shops, workshops, flour
mills and water pumps
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
DEMAND ASSESSMENT
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
PV GRID INVERTER
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
PLANT COMPONENTS
AREZA MAIDMA
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
MONITORING
Microgrid controller: Encorp’s Microgrid System Controller™
Genset controllers: DEIF AGC 200
Communications:
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
Electrical production
467,822 276,038 53,598 219,254 13,944 1,030,656
kWh/yr.
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
Genset Meeting Madrid 2018
Gabriele Struthoff-Müller,
Conference Manager
Phone: +49 941 870 3861
Gabriele.Struthoff@energy-access-conferences.com
The information contained in these documents is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed
GRACIAS POR SU
ATENCIÓN