KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 35. Trees Cutting
Klang, Selangor. Date: Date:

35. Trees Cutting


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

-Heat stress (low - Good / open ventilation at working area.


Psychological - To provide shelter/ rest area & drinking facilities
productivity) 2 3 6
Hot weather - Take a 2-3 minutes rest after every 2 ( two ) hours.
Project Manager
- Skin burn - To provide appropriate PPE.
1 Clearing of work area
Site Manager
- Moving parts of machinery / equipment shall be
Body parts contact with sharp Site Agent
-Serious injury 2 4 8 properly guarded.
object. - To provide appropriate PPE. Site Engineer

- Machinery shall be operated by license / competent Site Supervisor


-Serious injury / fatality person. SHO / SSS
Topple of machinery 2 5 10
Mobilization of -Damage to property - Adequate space and access.
- To provide appropriate PPE. EO
2 machinery /
Scaffolder
equipment - Compliance with approved TMP.
-Serious injury / fatality Work Leader
Road accident 2 5 10 - Ensure adequate space for machinery mobilize area.
-Damage to property - To provide appropriate PPE. Machinery opr/
Driver
- Storage area shall be properly barricade with signage.
Falling of object -Serious injury 2 4 8 - To provide appropriate PPE. Signalman
Banksman
- Materials shall be properly stacked and barricade. Rigger
Stacking and storage Struck by object -Serious injury 2 4 8 - Assistance from banskman and Traffic Controller.
3
of material at site - To provide appropriate PPE. Welder
Workers
- Not to pile up materials more than 2.5 meter.
Improper stack of materials -Serious injury / fatality 2 5 10 - To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Trees Cutting (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

- To provide safe access and egress.


- Machinery shall be operated by license / competent Project Manager
Struck by machinery -Serious injury / fatality 2 5 10 person.
- Banksman assistance. Site Manager
Clearing of - To provide appropriate PPE. Site Agent
vegetation / trees
4 Site Engineer
Site Supervisor
Bite by poisonous insect, snake -Serious injury / fatality 2 5 10 - To provide appropriate PPE. SHO / SSS
EO
Scaffolder
Work Leader
- To provide safe access and egress.
- Machinery shall be operated by license / competent Machinery opr/
Movement of Struck by machinery / topple of
5 -Serious injury / fatality 2 5 10 person. Driver
machinery machinery - Banksman assistance.
- To provide appropriate PPE. Signalman
Banksman
Rigger
- Moving parts of machinery shall be properly guarded. Welder
Cutting of trees /
6 Body contact with sharp object -Serious injury 2 4 8 - Only trained person to perform this activity.
branches - To provide appropriate PPE. Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)